Loading...
HomeMy WebLinkAbout33 - C - Landscape Analysis Structure Coverage CalcsHighlands 435 Zone Reservoir and Generator ReplacementBuilding Structure Coverage CalculationsStructure Existing Area ‐ SF Proposed Area ‐ SFBldg Area ‐ Before Mt Olivet Res Replacement ‐ SFPercentage of Lot Covered by Bldgs or Structures ‐ Before Mt Olivet ReplacementBldg Area ‐ After Mt Olivet Res Replacement ‐ SFPercentage of Lot Covered by Bldgs or Structures ‐ After Mt Olivet ReplacementNew reservoir 45,218 45,218 45,218New tank slab98 98 98New load bank slab plus retaining wall 245 245 245Existing AMI Cabinet 19 19 19Existing TCCs ‐ 6 each 722 722 722Existing Generator shed slab 252 252 252Existing Highlands BPS 323 323 323Exisitng Highlands Chlorination Bldg 213 213 213Existing Highlands 565 Zone 750KG reservoir 4,133 4,133 4,133Exisitng Highlands 435 2.0 MG reservoir 27,609 27,609Existing Highlands 435 1.5 MG reservoir 21,921 21,92155,191 45,561 100,753 49.25% 51,223 25.04%