HomeMy WebLinkAbout15_1228 Construction Mitigation Description25 CENTRAL WAY SUITE 210 : KIRKLAND, WA 98033 : 425.454.7130 : WWW.MILBRANDTARCH.COM MILBRANDT ARCHITECTS   December 16, 2015  City of Renton Planning Division  1055 South Grady Way  Renton, WA 98057  Re: PPUD Construction Mitigation Description:  Proposed Construction dates  Construction will start once all the permits are obtained. The client intends to start construction in the summer  of 2016 and it is anticipated to take approximately one year to build out the site infrastructure.  Building  construction will start immediately and It is anticipated that building construction will be completed by summer  2017.  Hours and days of operation  Construction will occur Monday through Friday with some occasional work on Saturday. Work will not start  earlier than 7:00am and in most cases will be wrapped up for the day by 6:00pm  Proposed hauling/transportation routes  Vehicles arriving and leaving the site will be from the south along Grant Ave South. Grant Avenue South  intersects South Puget Drive just south of the site. South Puget Drive will provide the primary connection to and  from the site toward the west and onto Talbot Road South.  Measures to be implemented to minimize dust, traffic and transportation impacts, erosion, mud, noise and  other noxious characteristics  Hauling to and from the site will be limited to workday hours to minimize noise and traffic problems in the  evening and on weekends.  Stock piled soil will be covered with plastic as required.  During grading activities and  hauling of soil, a water truck will be used to wet the soil in order to minimize dust.  A street sweeper will be used  daily (as needed) to clean up any debris that is tracked onto the public roadway.  Temporary ditches will be  constructed as needed to collect and convey any stormwater runoff to the temporary sediment pond.  Silt  fences will also be installed as needed in specific locations to trap sediment onsite.  Future landscaped areas will  receive straw until they can be appropriately planted. Straw bales and other erosion control measures will be  stockpiled onsite so they are available when needed during construction.        Any Special hours proposed for construction or hauling  Hauling to and from the site will be performed as noted above in “Hours and days of operation”.   Preliminary traffic control plan  For the proposed road improvements and utility installations that are required in Grant Avenue South, traffic  control will be required.  It is anticipated that only one lane will need to be closed at a time. Flaggers will be  located to the north and south of the site to alternate traffic during construction.  A traffic control plan will be  prepared and submitted to the City for review and approval prior to permit issuance.  Sincerely,    Robert E. Weible  Principal