Loading...
HomeMy WebLinkAboutAR Traffic Study - Traffex AVANA RIDGE APARTMENTS TRAFFIC IMPACT ANALYSIS CITY OF RENTON Prepared for Avana Ridge, LLC 9675 SE 36th St Suite 105 Mercer Island, WA 98040 PPrreeppaarreedd bbyy 11410 N.E. 124th St., #590 Kirkland, Washington 98034 Telephone: 425.522.4118 December 21, 2015 Mr. Justin Lagers December 21, 2015 Avana Ridge, LLC 9675 SE 36th St. Suite 105 Mercer Island, WA 98040 Re: Avana Ridge Apartments – City of Renton Traffic Impact Analysis Dear Mr. Lagers: We are pleased to submit this traffic impact analysis (TIA) for the proposed Avana Ridge Apartments consisting of 74 apartment residential units. The proposed project is located in the triangular area bordered by SR 515, Benson Rd S and SE 172nd St. in the City of Renton. Access to the site is via proposed driveways to SE 172nd St. and Benson Rd. South. This TIA has been prepared per City of Renton guidelines and notes from the pre-application meeting. PROJECT DESCRIPTION Figure 1 is a vicinity map showing the location of the site and the surrounding major street network. Figure 2 is the preliminary site plan of the proposed 74 unit apartment complex. Vehicle access is provided by driveways to SE 172nd St. and Benson Rd. South. The anticipated horizon year for development is 2017. TRIP GENERATION The 74 units in the proposed Avana Ridge Apartments are expected to generate the vehicular trips during an average weekday and during the street traffic peak hours as shown in the following table: Avana Ridge, LLC Page 3 TRIP GENERATION FOR 74 UNIT AVANA RIDGE APARTMENTS Time Period Trip Rate Trips Entering Trips Exiting Total Average Weekday 6.65 246 50% 246 50% 492 AM Peak Hour 0.51 8 20% 30 80% 38 PM Peak Hour 0.62 30 65% 16 35% 46 A vehicle trip is defined as a single or one direction vehicle movement with either the origin or destination (exiting or entering) inside the study site. The trip generation is calculated using the average trip rates in the Institute of Transportation Engineers (ITE) Trip Generation, Ninth Edition, for Apartment (ITE Land Use Code 220). These trip generation values account for all site trips made by all vehicles for all purposes, including resident, visitor, and service and delivery vehicle trips. TRIP DISTRIBUTION AND ASSIGNMENT Figures 3 and 4 show the AM and PM peak hour site generated traffic volumes and distribution for the Avana Ridge Apartments project. The trip distribution is based on existing traffic volume count patterns, the characteristics of the street network, the location of likely trip origins and destinations (employment, shopping, social and recreational opportunities), expected travel times and previous traffic studies. EXISTING PHYSICAL CONDITIONS Street Facilities The streets in the study area are classified per the City of Renton Comprehensive Plan as follows: Benson Dr. S. (SR 515) Principal Arterial Benson Rd. S (108th Ave SE) Minor Arterial SE 172nd St. Commercial Mixed Use Frontage on SE 172nd St. has shoulders with no curb, gutter, landscape strip or sidewalks. Frontage on SR 515 has curb, gutter and sidewalk. Frontage on Benson Rd. has curb and partial sidewalk sections. Figure 5 shows the number of lanes and traffic control at the study intersections and posted speed limit. Avana Ridge, LLC Page 4 Sight Distance Sight distance requirements are met at the site access driveway onto SE 172nd St. and also, with vegetation trimming within the street right of way, at the site access driveway to Benson Rd. South. SE 172nd St. has a posted speed limit of 25 mph. Per American Association of State Highway and Transportation Officials (AASHTO) requirements, a design speed of 25 mph requires a stopping sight distance (SSD) of 155 feet and an intersection sight distance (ISD) of 240 ft. (for a vehicle turning right from the side street), and 280 ft (for a vehicle turning left from the side street). The SSD and ISD is >400 ft. to the west and all the way to the 108th Ave. SE intersection to the east. Benson Rd. S has a posted speed limit of 35 mph. Per AASHTO requirements, a design speed of 35 mph requires a stopping sight distance (SSD) of 250 ft and an intersection sight distance (ISD) of 335 ft. (for a vehicle turning right from the side street), and 390 ft. (for a vehicle turning left from the side street). The SSD and ISD are estimated to be 360 ft. to the north with vegetation trimming within the ROW. The ESD and ISD to the south are all the way to the Benson Dr. S (SR 515) intersection. EXISTING TRAFFIC CONDITIONS Traffic Volumes Figures 6 and 7 show the existing AM and PM peak hour traffic volumes at the study intersections. Traffic volume turning movement counts were conducted on September 7th and 24th, 2015 at the study intersections and are included in the technical appendix. Per the City of Renton Policy Guidelines for Traffic Impact Analysis for New Development intersections and road segments that experience an increase of 5% in traffic volumes require analysis. Accident History The latest three year accident history for the study intersections and streets in the study area was obtained from WSDOT and are included in the technical appendix. There were a total of 4 accidents recorded at the 108th Ave SE/SE 172nd intersection, 2 accidents at the Benson Rd. S/108th Ave SE intersection, 5 accidents on 108th Ave SE , 2 accidents on Benson Rd. S and 1 accident on SE 172nd Street. Six of the accidents were due to inattention, 3 were due to following to close, and the rest were due to other miscellaneous driver errors and 1 operating a vehicle under the influence. Neither our field observations nor the accident history identified any obvious safety deficiencies. Avana Ridge, LLC Page 5 Level of Service Analysis LOS is a qualitative measure describing operational conditions within a traffic flow, and the perception of these conditions by drivers or passengers. These conditions include factors such as speed, delay, travel time, freedom to maneuver, traffic interruptions, comfort, convenience, and safety. Levels of service are given letter designations, from A to F, with LOS A representing the best operating conditions (free flow, little delay) and LOS F the worst (congestion, long delays). Generally, LOS A and B are high, LOS C and D are moderate and LOS E and F are low. Table 1 shows calculated levels of service (LOS) for existing and future conditions at the study intersection. The LOS’s were calculated using the procedures in the Transportation Research Board Highway Capacity Manual. The LOS shown indicates overall intersection operation. At intersections, LOS is determined by the calculated average control delay per vehicle. The LOS and corresponding average control delay in seconds are as follows: TYPE OF INTERSECTION A B C D E F Signalized < 10.0 >10.0 and <20.0 >20.0 and <35.0 >35.0 and <55.0 >55.0 and <80.0 >80. 0 Stop Sign Control <10. 0 >10 and <15 >15 and <25 >25 and <35 >35 and <50 >50 LOS calculation worksheets are included in the technical appendix. The study intersections are calculated to operate at an acceptable LOS for existing and future conditions per City of Renton standards. FUTURE TRAFFIC CONDITIONS WITHOUT THE PROJECT Figures 6 and 7 show projected future AM and PM peak hour traffic volumes without the project. These volumes include the existing traffic volumes, plus background traffic growth, plus pipeline project volumes from the Fieldbrook Apartments development. An annual growth factor of 2% per year was assumed per City of Renton request. The 2% per year growth factor over a two year period (totaling 4%) was added to 2015 existing traffic volumes. In addition to the growth factor, trips generated by the nearby pipeline project Fieldbrook Apartments were added to future volumes. Fieldbrook Apartments consists of 162 apartment units. Trip generation was obtained from the Fieldbrook Apartments TIA and is shown as pipeline volumes in Figures 6 and 7. Avana Ridge, LLC Page 6 FUTURE TRAFFIC CONDITIONS WITH PROJECT Figures 6 and 7 show the projected future AM and PM peak hour traffic volumes with the proposed project. The site generated traffic volumes were added to the 2017 future (without project) traffic volumes. Tables 1 and 2 show that the AM and PM peak hour calculated LOS for future conditions with and without the project meet the City of Renton intersection standards of LOS D or better. Signal Warrant Analysis Traffic signal warrants for new signals are contained in the Manual on Uniform Traffic Control Devices for Streets and Highways (MUTCD) FHWA. The warrants are as follows: Warrant Description 1 Eight Hour Vehicular Volume 2 Four Hour Vehicular Volumes 3 Peak Hour 4 Pedestrian Volume 5 School Crossings 6 Coordinated Signal System 7 Crash Experience 8 Roadway Network The primary warrant used by agencies in determining whether a signal is needed is warrant 1 (Conditions A and B). These warrants are satisfied when, for each of any 8 hours of an average day, certain minimum traffic volumes exist on the major and minor approaches to an intersection. Warrant 1 (Condition A) is met when the major roadway has at least 500 vehicles per hour (total of both approaches, 1 lane in each direction) and 150 vehicles per hour on the minor roadway for the same 8 hours. Warrant 1 (Condition B) is met when the major roadway has at least 750 vehicles per hour (total of approaches, 1 lane in each direction) and 75 vehicles per hour on the minor roadway for the same 8 hours. The City has requested that the traffic volumes at the 108th Ave SE/SE 172nd St. intersection be examined to determine if traffic signal warrants are met. The 2017 horizon year projected PM peak hour traffic volumes at the intersection is 717 vehicles per hour on 108th Ave. SE (total of both approaches) and 118 vehicles per hour on SE 172nd Street. Typically, traffic volumes for the 8th highest hour are 60% of the PM peak hour traffic volumes. Therefore, the 8th highest hour traffic volume on 108th Ave. SE is 430 vehicles per hour and on SE 172nd St. 71 vehicles per hour. Avana Ridge, LLC Page 7 The table below presents the traffic signal warrant analysis for warrant 1 (Condition A and Condition B) for future with project traffic volume conditions. 228th Ave. NE/NE 14th St. Traffic Signal Warrant 1 Movement Projected 8th Highest Hour Warrant 1A Required Min. Vol. Warrant 1A Met? Warrant 1B Required Min. Vol. Warrant 1B Met? Major 430 500 750 Minor 71 150 No 75 No The 2017 future projected traffic volumes are not anticipated to exceed the minimum traffic volumes for warrant 1A and warrant 1B on the major street (108th Ave. SE) nor on the minor street (SE 172nd St.) for eight hours on an average day. Therefore traffic signal warrant is not met and a signal is not warranted. TRAFFIC MITIGATION TRAFFIC MITIGATION REQUIREMENTS The City of Renton requires a Transportation Mitigation Fee payment of $1454.20 per apartment unit. The estimated Transportation Mitigation Fee for the 74 units of the Avana Ridge Apartments is estimated to be $107,611 (74 units x $1454.20 per unit). Frontage improvements to City of Renton standards are required on SE 172nd St. including curb, gutter, landscape strip, sidewalk and street lights. Landscape strip, sidewalk and street lights are required on Benson Rd. S. frontage. As shown on the site plan, the northern portion of the frontage on SR 515 will be improved to Renton standards with new landscape strip, sidewalk and street lights. Due to extreme slopes, a variance is requested for the southern portion of SR 515 frontage to be left as is with existing curb, gutter and sidewalk with no landscape strip. The combination of new and existing street lights on SR 515 will be designed to meet City of Renton lighting requirements. Avana Ridge, LLC Page 8 SUMMARY, CONCLUSIONS AND RECOMMENDATIONS We recommend that the Avana Ridge Apartments be constructed as shown on the site plan with the following traffic impact mitigation measures: · Construct frontage improvements. · Contribute the estimated Transportation Mitigation fee of approximately $107,611 to City of Renton. No other traffic mitigation should be necessary. If you have any questions, please call 425-522-4118. You may also contact us via e-mail at vince@nwtraffex.com or larry@nwtraffex.com. Very truly yours, Vincent J. Geglia Larry D. Hobbs, P.E. Principal Principal TraffEx TraffEx Avana Ridge, LLC Page 9 TABLE 1 AM PEAK HOUR LEVEL OF SERVICE SUMMARY INTERSECTION EXISTING 2011 FUTURE WITHOUT PROJECT 2013 FUTURE WITH PROJECT 2013 Site Access/ SE 172nd St. NA NA A 8.8 NB 108th Ave. SE/Benson Rd. S/ SE 172nd St. C 16.3 WB C 22.6 WB C 23.3 WB Site Access/Benson Rd S/ 108th Ave. SE B 14.7 WB C 15.5 WB C 17.1 WB XX Number shown is the average control delay in seconds per vehicle for the minor approach for unsignalized intersections, which determines the LOS for intersections per the Transportation Research Board Highway Capacity Manual A Indicates calculated level of service WB (westbound) Indicates direction of the minor approach for unsignalized intersections TABLE 2 PM PEAK HOUR LEVEL OF SERVICE SUMMARY INTERSECTION EXISTING 2011 FUTURE WITHOUT PROJECT 2013 FUTURE WITH PROJECT 2013 Site Access/ SE 172nd St. NA NA A 8.8 NB 108th Ave. SE/Benson Rd. S/ SE 172nd St. B 14.2 WB C 16.5 WB C 17.2 WB Site Access/Benson Rd S/ 108th Ave. SE B 14.3 WB C 15.4 WB C 18.0 WB XX Number shown is the average control delay in seconds per vehicle for the minor approach for unsignalized intersections, which determines the LOS for intersections per the Transportation Research Board Highway Capacity Manual A Indicates calculated level of service WB (westbound) Indicates direction of the minor approach for unsignalized intersections TECHNICAL APPENDIX * AvanaRidgeApartments-CityofRenton VicinityMap Figure 1 Project Site * AvanaRidgeApartments-CityofRenton SitePlan Figure 2 Project Site 1 3 2 2 31 25% 45% 6 442 2 Project Site Figure 3 AvanaRidgeApartments-CityofRenton AMPeakHourTripGenerationandDistribution Legend 15%PercentageofProject Traffic AMPeakHour TrafficVolume Enter8 Exit30 Total38 14% 65% 79% AMPeakHour TrafficVolume53%10% 7%11633 4 3 1 34116417 2 0 0 Site Access/ S 55th St.37%31130%1320% 1 2 270%14870%32774 2 43NAccess/ 156th ave 274 1 33S Access/ 156th Ave 214 0 02SE142 Pl156thAve/724 8 SiteAccess 5%0000 0 0 0 1 5 3013SE 172ndSite Access/0503 0 0 0 11 0 220Site Access/Benson Rd 21 3SiteAccess SiteAccess10%3110% 3 1 53% 4 16 3008 0 0 0 5 0 230SE 172nd108th Ave/ 1 3 2 2 31 25% 45% 6 442 2 Project Site Figure 4 AvanaRidgeApartments-CityofRenton PMPeakHourTripGenerationandDistribution Legend 15%PercentageofProject Traffic PMPeakHour TrafficVolume Enter30 Exit16 Total46 14% 65% 79% PMPeakHour TrafficVolume56%10% 7%11633 4 2 3 31719417 2 0 0 Site Access/ S 55th St.33%10530%1320% 1 2 270%14870%32774 2 43NAccess/ 156th ave 274 1 33S Access/ 156th Ave 214 0 02SE142 Pl156thAve/724 8 SiteAccess 5% 21 3SiteAccess SiteAccess10%3110% 3 1 53% 4 16 0000 0 0 0 3 16 206SE 172ndSite Access/8203 0 0 0 3 0 820108th Ave/ SE 172nd 2302 0 0 0 6 0 980Site Access/Benson Rd 1 3 2 2 31 25% 45% 6 442 2 1 2 3 4 5 32 Legend SpeedLimit LaneUseandDirection 25MPH StopSignControl35MPH XXMPH Project Site Figure 5 AvanaRidgeApartments-CityofRenton ExistingConditions Legend 15%PercentageofProject Traffic PMPeakHour TrafficVolume Enter8 Exit30 Total38 14% 65% 79% PMPeakHour TrafficVolume 7%11633 4 31417 2 0 0 Site Access/ S 55th St.30%1320% 1 2 270%14870%32774 2 43NAccess/ 156th ave 274 1 33S Access/ 156th Ave 214 0 02SE142 Pl156thAve/724 8 SiteAccess 5% 21 3SiteAccess SiteAccess10%3110% 3 1 53% 4 16 1 3 2 2 11 25% 45% 6 442 1 Pipeline Projects 11 2 2 2 Project Site Figure 6 AvanaRidgeApartments-CityofRenton AMPeakHourTrafficVolumes 14% 65% 79% 7%11633 4 1417 2 0 0 Site Access/ S 55th St.30%1320% 1 2 270%14870%32774 2 43NAccess/ 156th ave 274 1 33S Access/ 156th Ave 214 0 02SE142 Pl156thAve/724 8 SiteAccess 5% 21 3SiteAccess SiteAccess10%3110% 3 1 53% 4 16 Project TrafficExisting Future withProject Future withoutProject 33333 2 20000 0 50 48 0 0 0000000 0 2 6 0 0 0000000 0 54 56 0 0 0000000 0 0 0 1 5 30130000 0 54 56 1 5 301319215419 4 0 0 31 4 2941690070 30 2 6 0 30 007202241120 34 2 6 32 34 30433163008 0 0 0 5 0 230232241128 34 2 6 37 34 3243616028620 6 0 0 0 3 0511003000 0 0 0 0 0 070032820 6 0 0 0 3 053900503 0 0 0 11 0 220033323 6 0 0 11 3 25410 1 3 2 2 11 25% 45% 6 442 1 Pipeline Projects 11 2 2 2 Project Site Figure 7 AvanaRidgeApartments-CityofRenton PMPeakHourTrafficVolumes 14% 65% 79% 7%11633 4 1417 2 0 0 Site Access/ S 55th St.30%1320% 1 2 270%14870%32774 2 43NAccess/ 156th ave 274 1 33S Access/ 156th Ave 214 0 02SE142 Pl156thAve/724 8 SiteAccess 5% 21 3SiteAccess SiteAccess10%3110% 3 1 53% 4 16 Project TrafficExisting Future withProject Future withoutProject 33333 2 20000 0 41 48 0 0 0000000 0 7 3 0 0 0000000 0 50 53 0 0 0000000 0 0 0 3 16 2060000 0 50 53 3 16 20614283414 8 0 1 27 17 34272800290 16 7 3 0 16 0029152943315 24 7 4 28 34 35283378203 0 0 0 3 0 820232963318 24 7 4 31 34 4328537031950 3 0 0 0 11 0348401600 0 0 0 0 0 0290034850 3 0 0 0 11 039142302 0 0 0 6 0 980235152 3 0 0 6 11 93994 TECHNICAL APPENDIX Prepared for: Traffex Traffic Count Consultants, Inc. Phone: (253) 926-6009 FAX: (253) 922-7211 E-Mail: Team@TC2inc.com WBE/DBE Intersection:108th Way SE (Benson Rd S) & SE 172nd St Date of Count:Thurs 9/17/2015 Location:Renton, Washington Checked By:Jess Time From North on (SB) From South on (NB) From East on (WB) From West on (EB) Interval Interval 108th Way SE (Benson) 108th Way SE (Benson) SE 172nd St SE 172nd St Total Ending at T L S R T L S R T L S R T L S R 6:15 A1028206 32 1 0 1 0 1 0 2 06 79 6:30 A2035003 57 6 0 0 0 1 0 2 02 106 6:45 A2441413 73 5 0 0 0 0 0 0 08 138 7:00 A1037245 61 10 1 3 0 2 1 4 04 128 7:15 A4148246 87 3 3 2 0 1 0 3 08 161 7:30 A0246249 121 2 0 0 0 0 0 3 08 193 7:45 A 7 1 80 10 2 7 125 4 0 1 0 1 0 6 0 5 240 8:00 A4061537 83 0 1 1 0 2 2 7 010 176 8:15 A1238264 79 2 0 2 0 2 1 4 09 144 8:30 A1150453 95 2 0 2 0 1 0 2 05 165 8:45 A 3 1 68 6 4 12 60 2 0 2 0 1 1 5 0 7 164 9:00 A0046226 67 1 1 3 0 0 0 4 03 132 Total Survey 26 12 578 41 35 71 940 38 6 17 0 12 5 42 0 75 1826 Peak Hour: 7:00 AM to 8:00 AM Total 15 4 235 19 13 29 416 9 4 4 0 4 2 19 0 31 770 Approach 258 454 8 50 770 %HV 5.8% 2.9% 50.0% 4.0% 4.4% PHF 0.71 0.83 0.67 0.74 0.80 108th Way SE (Benson) 697 258 439 0 Bike SE 172nd St 19 235 4 2Ped SE 172nd St 4 48 Ped 0 08 Bike 0 4 21 98 19 0 Bike 50 0 7:00 AM to 8:00 AM 3Ped 13 31 PEDs Across:NS EW Ped 5 29 416 9 960 1.0 PHF Peak Hour Volume INT 01 11 2Bike3 PHF %HV INT 02 0 EB 0.74 4.0% INT 03 11270 454 Check WB 0.67 50.0% INT 04 13 4 In:770 NB 0.83 2.9% INT 05 11 1 3 724 Out:770 SB 0.71 5.8% INT 06 11 1 3 108th Way SE (Benson)T Int.0.80 4.4% INT 07 11Bicycles From: N S E W Conditions: INT 08 21 3 INT 01 0 INT 09 22 4 INT 02 0 INT 10 213INT 03 11 INT 11 0 INT 04 11 INT 12 0 INT 05 0 911 3 124 INT 06 11 Special Notes INT 07 0 INT 08 22 INT 09 0 INT 10 0 INT 11 0 INT 12 11 06 0 06 TRA15106M_03a Prepared for: Traffex Traffic Count Consultants, Inc. Phone: (253) 926-6009 FAX: (253) 922-7211 E-Mail: Team@TC2inc.com WBE/DBE Intersection:108th Way SE (Benson Rd S) & SE 172nd St Date of Count:Thurs 9/17/2015 Location:Renton, Washington Checked By:Jess Time From North on (SB) From South on (NB) From East on (WB) From West on (EB) Interval Interval 108th Way SE (Benson) 108th Way SE (Benson) SE 172nd St SE 172nd St Total Ending at T L S R T L S R T L S R T L S R 3:15 P1055335 59 3 1 1 0 2 2 3 16 138 3:30 P5075213 76 1 1 6 1 2 1 3 04 173 3:45 P 1 1 72 1 2 13 60 2 0 3 0 4 1 0 0 6 162 4:00 P 0 0 66 5 1 12 70 5 2 5 0 1 2 5 0 4 173 4:15 P0370616 66 0 0 3 0 1 0 6 013 174 4:30 P1066608 63 1 2 2 0 0 0 3 09 158 4:45 P 2 2 55 6 1 10 59 2 0 2 0 0 0 9 0 6 151 5:00 P1164616 66 2 0 4 0 5 01107 172 5:15 P 0 0 52 6 1 13 57 0 1 2 0 2 0 7 0 9 148 5:30 P2259716 62 0 0 2 0 1 0 9 08 156 5:45 P1369317 86 1 1 2 0 1 0 7 07 186 6:00 P1160307 71 2 0 2 0 1 0 4 07 158 Total Survey 15 13 763 54 13 96 795 19 8 34 1 20 6 67 1 86 1949 Peak Hour: 3:15 PM to 4:15 PM Total 6 4 283 14 5 34 272 8 3 17 1 8 4 14 0 27 682 Approach 301 314 26 41 682 %HV 2.0% 1.6% 11.5% 9.8% 2.6% PHF 0.95 0.90 0.72 0.54 0.98 108th Way SE (Benson) 595 301 294 0 Bike SE 172nd St 14 283 4 4Ped SE 172nd St 8 49 Ped 0 126 Bike 0 17 38 90 14 0 Bike 41 0 3:15 PM to 4:15 PM 0Ped 12 27 PEDs Across:NS EW Ped 6 34 272 8 744 1.0 PHF Peak Hour Volume INT 01 516Bike1 PHF %HV INT 02 0 EB 0.54 9.8% INT 03 22 4 327 314 Check WB 0.72 11.5% INT 04 21 3 In:682 NB 0.90 1.6% INT 05 33 641 Out:682 SB 0.95 2.0% INT 06 41 5 108th Way SE (Benson)T Int.0.98 2.6% INT 07 0 Bicycles From: N S E W Conditions: INT 08 22INT 01 0 INT 09 11 2 INT 02 0 INT 10 0 INT 03 0 INT 11 44INT 04 0 INT 12 0 INT 05 11 20 8 0 1 29 INT 06 0 Special Notes INT 07 0 INT 08 0 INT 09 11 INT 10 22 INT 11 22 INT 12 0 24 0 06 TRA15106M_03p Prepared for: Traffex Traffic Count Consultants, Inc. Phone: (253) 926-6009 FAX: (253) 922-7211 E-Mail: Team@TC2inc.com WBE/DBE Intersection:Benson Rd S & Benson Dr S (SR 515)Date of Count:Thurs 9/24/2015 Location:Renton, Washington Checked By:Jess Time From North on (SB) From South on (NB) From East on (WB) From West on (EB) Interval Interval Benson Rd S 0 Benson Dr S (SR 515) Benson Dr S (SR 515)Total Ending at TL S RTL S R T L S R T L SR 6:15 A 0 26 0 6 0 0 0 0 2 0 302 48 1 5 31 0 418 6:30 A 0 36 0 5 0 0 0 0 5 0 390 54 4 4 42 0 531 6:45 A 1 36 0 11 0 0 0 0 2 0 347 74 1 1 43 0 512 7:00 A 0 46 0 11 0 0 0 0 6 0 313 111 2 8 59 0 548 7:15 A 5 52 0 11 0 0 0 0 3 0 329 98 2 4 60 0 554 7:30 A 1 53 0 14 0 0 0 0 9 0 311 131 3 11 77 0 597 7:45 A 3 69 0 19 0 0 0 0 4 0 309 134 1 13 66 0 610 8:00 A 5 64 0 9 0 0 0 0 6 0 261 111 3 8 86 0 539 8:15 A 2 37 0 15 0 0 0 0 7 0 227 102 1 4 87 0 472 8:30 A 1 54 0 10 0 0 0 0 9 0 284 91 4 8 77 0 524 8:45 A 2 70 0 11 0 0 0 0 5 0 287 87 1 6 98 0 559 9:00 A 0 43 0 6 0 0 0 0 3 0 242 74 0 9 99 0 473 Total Survey 20 586 0 128 0 0 0 0 61 0 3602 1115 23 81 825 0 6337 Peak Hour: 6:45 AM to 7:45 AM Total 9 220 0 55 0 0 0 0 22 0 1262 474 8 36 262 0 2309 Approach 275 0 1736 298 2309 %HV 3.3% n/a 1.3% 2.7% 1.7% PHF 0.78 n/a 0.98 0.85 0.95 Benson Rd S 785 275 510 0 Bike Benson Dr S (SR 515)55 0 220 2Ped Benson Dr S (SR 515) 474 1317 Ped 0 1262 1736 Bike 0 0 2218 1615 36 0 Bike 298 262 6:45 AM to 7:45 AM 0Ped 482 0 PEDs Across:NS EW Ped 3 00 0 2440 1.0 PHF Peak Hour Volume INT 01 11Bike0 PHF %HV INT 02 0 EB 0.85 2.7% INT 03 11 00Check WB 0.98 1.3% INT 04 11 In:2309 NB n/a n/a INT 05 11 0 Out:2309 SB 0.78 3.3% INT 06 11 2 0 T Int.0.95 1.7% INT 07 11Bicycles From: N S E W N U's S U's E U's W U's INT 08 224 INT 01 00 INT 09 112 INT 02 00 INT 10 0 INT 03 00 INT 11 11 INT 04 00 INT 12 0 INT 05 00 36 0514 INT 06 NO BIKES 0 1 Special Notes INT 07 00 INT 08 01 INT 09 00 INT 10 00 INT 11 00 INT 12 00 00 0 00 0020 TRA15106M_reset_01a Prepared for: Traffex Traffic Count Consultants, Inc. Phone: (253) 926-6009 FAX: (253) 922-7211 E-Mail: Team@TC2inc.com WBE/DBE Intersection:Benson Rd S & Benson Dr S (SR 515)Date of Count:Thurs 9/24/2015 Location:Renton, Washington Checked By:Jess Time From North on (SB) From South on (NB) From East on (WB) From West on (EB) Interval Interval Benson Rd S 0 Benson Dr S (SR 515) Benson Dr S (SR 515)Total Ending at TL S RTL S R T L S R T L SR 3:15 P 2 91 0 7 0 0 0 0 4 0 133 63 2 5 247 0 546 3:30 P 4 78 0 14 0 0 0 0 1 0 160 72 5 8 283 0 615 3:45 P 0 63 0 6 0 0 0 0 8 0 131 66 0 11 294 0 571 4:00 P 0 64 0 3 0 0 0 0 3 0 136 83 1 13 300 0 599 4:15 P 1 80 0 7 0 0 0 0 3 0 160 68 1 8 255 0 578 4:30 P 1 70 0 8 0 0 0 0 3 0 146 67 0 13 305 0 609 4:45 P 1 60 0 9 0 0 0 0 0 0 136 69 2 9 291 0 574 5:00 P 0 84 0 7 0 0 0 0 0 0 155 70 0 15 233 0 564 5:15 P 1 73 0 9 0 0 0 0 1 0 158 62 2 11 318 0 631 5:30 P 0 70 0 7 0 0 0 0 1 0 144 64 0 18 207 0 510 5:45 P 0 72 0 11 0 0 0 0 1 0 151 88 2 22 288 0 632 6:00 P 0 59 0 10 0 0 0 0 2 0 171 60 4 13 314 0 627 Total Survey 10 864 0 98 0 0 0 0 27 0 1781 832 19 146 3335 0 7056 Peak Hour: 5:00 PM to 6:00 PM Total 1 274 0 37 0 0 0 0 5 0 624 274 8 64 1127 0 2400 Approach 311 0 898 1191 2400 %HV 0.3% n/a 0.6% 0.7% 0.6% PHF 0.94 n/a 0.94 0.91 0.95 Benson Rd S 649 311 338 0 Bike Benson Dr S (SR 515)37 0 274 0Ped Benson Dr S (SR 515) 274 661 Ped 2 624 898 Bike 0 0 2299 1852 64 1 Bike 1191 1127 5:00 PM to 6:00 PM 0Ped 1401 0 PEDs Across:NS EW Ped 1 00 0 2528 1.0 PHF Peak Hour Volume INT 01 0 Bike 0 PHF %HV INT 02 0 EB 0.91 0.7% INT 03 0 00Check WB 0.94 0.6% INT 04 11 In:2400 NB n/a n/a INT 05 123 0 Out:2400 SB 0.94 0.3% INT 06 235 0 T Int.0.95 0.6% INT 07 0 Bicycles From: N S E W N U's S U's E U's W U's INT 08 11 INT 01 00 0 INT 09 123 INT 02 00 0 INT 10 0 INT 03 00 0 INT 11 0 INT 04 00 1 INT 12 0 INT 05 00 0 14 1713 INT 06 00 0 Special Notes INT 07 00 0 INT 08 00 0 INT 09 00 0 INT 10 02 0 INT 11 00 0 INT 12 1100 00 1 01 2010 TRA15106M_reset_01p Prepared for: Traffex Traffic Count Consultants, Inc. Phone: (253) 926-6009 FAX: (253) 922-7211 E-Mail: Team@TC2inc.com WBE/DBE Intersection:Benson Rd S & 108th Ave SE Date of Count:Thurs 9/24/2015 Location:Renton, Washington Checked By:Jess Time From North on (SB) From South on (NB) From East on (WB) From West on (EB) Interval Interval Benson Rd S Benson Rd S 108th Ave SE 0 Total Ending at T L S R T L S R T L S R T L S R 6:15 A0032000 54 0 0 0 0 1 0 0 00 87 6:30 A0044010 56 2 0 2 0 0 0 0 00 104 6:45 A1041010 72 2 0 1 0 0 0 0 00 116 7:00 A0055030 120 0 0 2 0 3 0 0 00 180 7:15 A3262000 102 0 0 1 0 2 0 0 00 169 7:30 A2068070 142 0 0 0 0 0 0 0 00 210 7:45 A 3 0 101 0 1 0 147 0 0 0 0 1 0 0 0 0 249 8:00 A5258010 118 0 0 2 0 0 0 0 00 180 8:15 A1052070 99 0 0 0 0 0 0 0 00 151 8:30 A1164040 106 0 0 0 0 2 0 0 00 173 8:45 A2081020 93 0 0 0 0 0 0 0 00 174 9:00 A0050020 82 1 0 0 0 0 0 0 00 133 Total Survey 18 5 708 0 29 0 1191 5 0 8 0 9 0 0 0 0 1926 Peak Hour: 6:45 AM to 7:45 AM Total 8 2 286 0 11 0 511 0 0 3 0 6 0 0 0 0 808 Approach 288 511 9 0 808 %HV 2.8% 2.2% n/a n/a 2.4% PHF 0.71 0.87 0.45 n/a 0.81 Benson Rd S 805 288 517 0 Bike 0 0 286 2 2Ped 108th Ave SE 6 0 Ped 1 0 9 Bike 0 3 11 0 0 3 Bike 0 0 6:45 AM to 7:45 AM 5Ped 2 0 PEDs Across:NS EW Ped 0 0 511 0 996 1.0 PHF Peak Hour Volume INT 01 22Bike0 PHF %HV INT 02 0 EB n/a n/a INT 03 112 289 511 Check WB 0.45 n/a INT 04 0 In:808 NB 0.87 2.2% INT 05 213 800 Out:808 SB 0.71 2.8% INT 06 44 Benson Rd S T Int.0.81 2.4% INT 07 11Bicycles From: N S E W Conditions: INT 08 44 INT 01 11 INT 09 0 INT 02 0 INT 10 11 INT 03 0 INT 11 0 INT 04 11 INT 12 0 INT 05 11 20 8717 INT 06 11 Special Notes INT 07 0 INT 08 11 INT 09 0 INT 10 0 INT 11 0 INT 12 0 00 5 05 Prepared for: Traffex Traffic Count Consultants, Inc. Phone: (253) 926-6009 FAX: (253) 922-7211 E-Mail: Team@TC2inc.com WBE/DBE Intersection:Benson Rd S & 108th Ave SE Date of Count:Thurs 9/24/2015 Location:Renton, Washington Checked By:Jess Time From North on (SB) From South on (NB) From East on (WB) From West on (EB) Interval Interval Benson Rd S Benson Rd S 108th Ave SE 0 Total Ending at T L S R T L S R T L S R T L S R 3:15 P0196020 68 0 0 2 0 1 0 0 00 168 3:30 P4290010 74 1 0 1 0 0 0 0 00 168 3:45 P0068040 82 0 0 1 0 0 0 0 00 151 4:00 P0168020 90 6 0 1 0 1 0 0 00 167 4:15 P0183020 75 1 0 2 0 0 0 0 00 162 4:30 P2178000 75 2 0 0 0 1 0 0 00 157 4:45 P0171010 79 2 0 1 0 0 0 0 00 154 5:00 P0087000 85 1 0 1 0 1 0 0 00 175 5:15 P1278000 71 2 0 5 0 1 0 0 00 159 5:30 P0172000 82 0 0 4 0 0 0 0 00 159 5:45 P0282010 110 1 0 1 0 1 0 0 00 197 6:00 P0269010 73 0 0 1 0 1 0 0 00 146 Total Survey 7 14 942 0 14 0 964 16 0 20 0 7 0 0 0 0 1963 Peak Hour: 4:45 PM to 5:45 PM Total 1 5 319 0 1 0 348 4 0 11 0 3 0 0 0 0 690 Approach 324 352 14 0 690 %HV 0.3% 0.3% n/a n/a 0.3% PHF 0.93 0.79 0.58 n/a 0.88 Benson Rd S 675 324 351 0 Bike 0 0 319 5 0Ped 108th Ave SE 3 0 Ped 2 0 14 Bike 0 11 23 0 0 0 Bike 0 0 4:45 PM to 5:45 PM 1Ped 9 0 PEDs Across:NS EW Ped 0 0 348 4 788 1.0 PHF Peak Hour Volume INT 01 11Bike0 PHF %HV INT 02 0 EB n/a n/a INT 03 0 330 352 Check WB 0.58 n/a INT 04 22 In:690 NB 0.79 0.3% INT 05 22 682 Out:690 SB 0.93 0.3% INT 06 145 Benson Rd S T Int.0.88 0.3% INT 07 0 Bicycles From: N S E W Conditions: INT 08 11 INT 01 0 INT 09 22 INT 02 0 INT 10 0 INT 03 0 INT 11 0 INT 04 112 INT 12 0 INT 05 11 00 31013 INT 06 0 Special Notes INT 07 0 INT 08 0 INT 09 0 INT 10 0 INT 11 0 INT 12 21 3 31 2 06 OFFICER REPORTED CRASHES THAT OCCURRED on OR in the vicinity of THE FOLLOWING ROAD SEGMENTS IN THE CITY OF RENTONSR 515 (aka BENSON DR, MP 5.27 - 5.32)@ BENSON RD / 108th AVEBENSON RD / 108th AVE FROM SR 515 (aka BENSON DR) TO 172nd ST172nd ST FROM 106th AVE TO 108th AVE9/1/2012 - available 2015 (2015 data is partial and preliminary)UNDER 23 UNITED STATES CODE – SECTION 409, THIS DATA CANNOT BE USED IN DISCOVERY OR AS EVIDENCEAT TRIAL IN ANY ACTION FOR DAMAGES AGAINST THE WSDOT, OR ANY JURISDICTIONS INVOLVED IN THE DATAJURISDICTIONPRIMARY TRAFFICWAYBLOCK NUMBERINTERSECTING TRAFFICWAYDIST FROM REF POINTMI or FTCOMP DIR FROM REF POINTREFERENCE POINT NAMEA/BREPORT NUMBER DATE TIMEMOST SEVERE INJURY TYPE# INJ#FAT#VEH#PEDS#PEDAL JUNCTION RELATIONSHIPROADWAY SURFACE CONDITIONSLIGHTING CONDITIONS MV DRIVER CONT CIRC 1 (UNIT 1)City Street108TH AVE SE17200BENSON RD SE2190211/7/201314:05Possible Injury10200At Intersection and RelatedWetDaylightInattentionCity Street108TH AVE SE17100SE 172ND STE2502916/13/201317:35Serious Injury10101At Intersection and RelatedDryDaylightFail to Yield Row to PedestrianCity Street108TH AVE SE17100SE 172ND STE2657128/26/201318:40No Injury00200At Intersection and RelatedWetDuskFollow Too CloselyCity Street108TH AVE SE17100SE 172ND STE28874911/24/201311:59Possible Injury10300At Intersection and RelatedDryDaylightInattentionCity Street108TH AVE SESE 172ND ST E3585939/19/201417:12Possible Injury10200At Intersection and RelatedDryDaylightDriver Operating Handheld DeviceCity Street108TH AVE SE50FSSE 172ND STE2532346/27/201322:49Evident Injury10200Not at Intersection and Not RelatedDryDark-Street Lights OnUnder Influence of AlcoholCity Street108TH AVE SE1710041FNSE 172ND STE2678339/3/20137:24Possible Injury10300Not at Intersection and Not RelatedWetDaylightInattentionCity Street108TH AVE SE1720076FSSE 172ND STE28094310/28/20138:07No Injury00200Not at Intersection and Not RelatedDryDaylightFollow Too CloselyCity Street108TH AVE SE1070024FSSE 172ND STE28683211/12/20139:50Possible Injury30300Intersection Related but Not at IntersectionWetDaylightInattentionCity Street108TH AVE SE1710082FSSE 172ND STE4520237/31/201518:45No Injury00200Not at Intersection and Not RelatedDryDaylightInattentionCity StreetBENSON RD S0108TH AVE SEE4104773/24/20159:10No Injury00200At Intersection and RelatedWetDaylightInattentionCity StreetBENSON RD S8100100FSW108TH AVE SEE38138311/30/20140:06Unknown00100Not at Intersection and Not RelatedIceDark-Street Lights OnOtherCity StreetBENSON RD S1700033FNSE 172ND STE4117483/28/201510:45No Injury00200Not at Intersection and Not RelatedDryDaylightFollow Too CloselyCity StreetSE 172ND ST10600141FW108TH AVE SEE2302912/28/201317:01No Injury00200At DrivewayWetDaylightDid Not Grant RW to VehicleWSDOT - CRASH DATA and REPORTING09/28/20151 of 1 AM EXISTING 3: Benson Rd S/108th Ave SE & SE 172nd St 10/6/2015 Baseline Synchro 8 Light Report Page 1 Intersection Int Delay, s/veh 1.5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h 19 0 31 4 0 4 29 416 9 4 215 19 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 24 0 39 5 0 5 36 520 11 5 269 24 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 892 895 281 908 901 526 293 0 0 531 0 0 Stage 1 291 291 - 598 598 - - - - - - - Stage 2 601 604 - 310 303 - - - - - - - Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - - Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - - Pot Cap-1 Maneuver 263 280 758 256 278 552 1269 - - 1036 - - Stage 1 717 672 - 489 491 - - - - - - - Stage 2 487 488 - 700 664 - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 252 267 758 234 265 552 1269 - - 1036 - - Mov Cap-2 Maneuver 252 267 - 234 265 - - - - - - - Stage 1 688 668 - 469 471 - - - - - - - Stage 2 463 468 - 660 660 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 14.8 16.3 0.5 0.1 HCM LOS B C Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 1269 - - 430 329 1036 - - HCM Lane V/C Ratio 0.029 - - 0.145 0.03 0.005 - - HCM Control Delay (s) 7.9 0 - 14.8 16.3 8.5 0 - HCM Lane LOS A A - B C A A - HCM 95th %tile Q(veh) 0.1 - - 0.5 0.1 0 - - AM EXISTING 6: Benson Rd S & 108th Ave SE 10/6/2015 Baseline Synchro 8 Light Report Page 2 Intersection Int Delay, s/veh 0.2 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 3 6 511 0 2 286 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 81 81 81 81 81 81 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 4 7 631 0 2 353 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 989 631 0 0 631 0 Stage 1 631 - - - - - Stage 2 358 - - - - - Critical Hdwy 6.42 6.22 - - 4.12 - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 274 481 - - 951 - Stage 1 530 - - - - - Stage 2 707 - - - - - Platoon blocked, %- - - Mov Cap-1 Maneuver 273 481 - - 951 - Mov Cap-2 Maneuver 273 - - - - - Stage 1 530 - - - - - Stage 2 705 - - - - - Approach WB NB SB HCM Control Delay, s 14.7 0 0.1 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - - 384 951 - HCM Lane V/C Ratio - - 0.029 0.003 - HCM Control Delay (s) - - 14.7 8.8 0 HCM Lane LOS - - B A A HCM 95th %tile Q(veh) - - 0.1 0 - FUTURE WITHOUT PROJECT 3: Benson Rd S/108th Ave SE & SE 172nd St 10/6/2015 Baseline Synchro 8 Light Report Page 1 Intersection Int Delay, s/veh 3.4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h 20 2 32 34 6 34 30 433 16 11 224 20 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 25 2 40 42 8 42 38 541 20 14 280 25 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 971 956 293 967 959 551 305 0 0 561 0 0 Stage 1 320 320 - 626 626 - - - - - - - Stage 2 651 636 - 341 333 - - - - - - - Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - - Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - - Pot Cap-1 Maneuver 232 258 746 234 257 534 1256 - - 1010 - - Stage 1 692 652 - 472 477 - - - - - - - Stage 2 457 472 - 674 644 - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 199 242 746 210 242 534 1256 - - 1010 - - Mov Cap-2 Maneuver 199 242 - 210 242 - - - - - - - Stage 1 662 641 - 451 456 - - - - - - - Stage 2 396 451 - 625 633 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 17.5 22.6 0.5 0.4 HCM LOS C C Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 1256 - - 356 296 1010 - - HCM Lane V/C Ratio 0.03 - - 0.19 0.313 0.014 - - HCM Control Delay (s) 8 0 - 17.5 22.6 8.6 0 - HCM Lane LOS A A - C C A A - HCM 95th %tile Q(veh) 0.1 - - 0.7 1.3 0 - - FUTURE WITHOUT PROJECT 6: Benson Rd S & 108th Ave SE 10/6/2015 Baseline Synchro 8 Light Report Page 2 Intersection Int Delay, s/veh 0.2 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 3 6 539 0 2 328 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 81 81 81 81 81 81 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 4 7 665 0 2 405 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 1075 665 0 0 665 0 Stage 1 665 - - - - - Stage 2 410 - - - - - Critical Hdwy 6.42 6.22 - - 4.12 - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 243 460 - - 924 - Stage 1 511 - - - - - Stage 2 670 - - - - - Platoon blocked, %- - - Mov Cap-1 Maneuver 242 460 - - 924 - Mov Cap-2 Maneuver 242 - - - - - Stage 1 511 - - - - - Stage 2 668 - - - - - Approach WB NB SB HCM Control Delay, s 15.5 0 0.1 HCM LOS C Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - - 354 924 - HCM Lane V/C Ratio - - 0.031 0.003 - HCM Control Delay (s) - - 15.5 8.9 0 HCM Lane LOS - - C A A HCM 95th %tile Q(veh) - - 0.1 0 - AM FUTURE WITH PROJECT 3: Benson Rd S/108th Ave SE & SE 172nd St 10/9/2015 Baseline Synchro 8 Light Report Page 1 Intersection Int Delay, s/veh 3.8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h 28 2 37 34 6 34 32 436 16 11 224 23 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 35 2 46 42 8 42 40 545 20 14 280 29 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 982 967 294 981 971 555 309 0 0 565 0 0 Stage 1 322 322 - 635 635 - - - - - - - Stage 2 660 645 - 346 336 - - - - - - - Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - - Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - - Pot Cap-1 Maneuver 228 254 745 229 253 531 1252 - - 1007 - - Stage 1 690 651 - 467 472 - - - - - - - Stage 2 452 467 - 670 642 - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 195 238 745 203 237 531 1252 - - 1007 - - Mov Cap-2 Maneuver 195 238 - 203 237 - - - - - - - Stage 1 658 640 - 445 450 - - - - - - - Stage 2 390 445 - 615 631 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 19.5 23.3 0.5 0.4 HCM LOS C C Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 1252 - - 332 288 1007 - - HCM Lane V/C Ratio 0.032 - - 0.252 0.321 0.014 - - HCM Control Delay (s) 8 0 - 19.5 23.3 8.6 0 - HCM Lane LOS A A - C C A A - HCM 95th %tile Q(veh) 0.1 - - 1 1.3 0 - - AM FUTURE WITH PROJECT 6: Benson Rd S & Site Access/108th Ave SE 10/9/2015 Baseline Synchro 8 Light Report Page 2 Intersection Int Delay, s/veh 0.4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h 3 0 11 3 0 6 2 541 0 2 333 0 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 81 81 81 81 81 81 81 81 81 81 81 81 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 4 0 14 4 0 7 2 668 0 2 411 0 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 1093 1089 411 1096 1089 668 411 0 0 668 0 0 Stage 1 416 416 - 673 673 - - - - - - - Stage 2 677 673 - 423 416 - - - - - - - Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - - Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - - Pot Cap-1 Maneuver 192 215 641 191 215 458 1148 - - 922 - - Stage 1 614 592 - 445 454 - - - - - - - Stage 2 443 454 - 609 592 - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 188 214 641 186 214 458 1148 - - 922 - - Mov Cap-2 Maneuver 188 214 - 186 214 - - - - - - - Stage 1 612 590 - 444 453 - - - - - - - Stage 2 435 453 - 594 590 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 13.9 17.1 0 0.1 HCM LOS B C Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 1148 - - 423 308 922 - - HCM Lane V/C Ratio 0.002 - - 0.041 0.036 0.003 - - HCM Control Delay (s) 8.1 0 - 13.9 17.1 8.9 0 - HCM Lane LOS A A - B C A A - HCM 95th %tile Q(veh) 0 - - 0.1 0.1 0 - - AM FUTURE WITH PROJECT 9: Site Access & SE 172nd St 10/9/2015 Baseline Synchro 8 Light Report Page 3 Intersection Int Delay, s/veh 1.3 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h 54 1 5 56 3 13 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 80 80 80 80 80 80 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 68 1 6 70 4 16 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 69 0 151 68 Stage 1 - - - - 68 - Stage 2 - - - - 83 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1532 - 841 995 Stage 1 - - - - 955 - Stage 2 - - - - 940 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1532 - 838 995 Mov Cap-2 Maneuver - - - - 838 - Stage 1 - - - - 955 - Stage 2 - - - - 936 - Approach EB WB NB HCM Control Delay, s 0 0.6 8.8 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 961 - - 1532 - HCM Lane V/C Ratio 0.021 - - 0.004 - HCM Control Delay (s) 8.8 - - 7.4 0 HCM Lane LOS A - - A A HCM 95th %tile Q(veh) 0.1 - - 0 - PM EXISTING 3: Benson Rd S/108th Ave SE & SE 172nd St 10/9/2015 Baseline Synchro 8 Light Report Page 1 Intersection Int Delay, s/veh 1.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h 14 0 27 17 1 8 34 272 8 4 283 14 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 98 98 98 98 98 98 98 98 98 98 98 98 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 14 0 28 17 1 8 35 278 8 4 289 14 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 660 659 296 669 662 282 303 0 0 286 0 0 Stage 1 304 304 - 351 351 - - - - - - - Stage 2 356 355 - 318 311 - - - - - - - Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - - Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - - Pot Cap-1 Maneuver 376 384 743 371 382 757 1258 - - 1276 - - Stage 1 705 663 - 666 632 - - - - - - - Stage 2 661 630 - 693 658 - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 361 370 743 347 368 757 1258 - - 1276 - - Mov Cap-2 Maneuver 361 370 - 347 368 - - - - - - - Stage 1 682 660 - 644 611 - - - - - - - Stage 2 631 609 - 665 655 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 12.1 14.2 0.9 0.1 HCM LOS B B Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 1258 - - 546 417 1276 - - HCM Lane V/C Ratio 0.028 - - 0.077 0.064 0.003 - - HCM Control Delay (s) 7.9 0 - 12.1 14.2 7.8 0 - HCM Lane LOS A A - B B A A - HCM 95th %tile Q(veh) 0.1 - - 0.2 0.2 0 - - PM EXISTING 6: Benson Rd S & 108th Ave SE 10/9/2015 Baseline Synchro 8 Light Report Page 2 Intersection Int Delay, s/veh 0.3 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 11 3 348 4 5 319 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 88 88 88 88 88 88 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 12 3 395 5 6 362 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 772 398 0 0 400 0 Stage 1 398 - - - - - Stage 2 374 - - - - - Critical Hdwy 6.42 6.22 - - 4.12 - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 368 652 - - 1159 - Stage 1 678 - - - - - Stage 2 696 - - - - - Platoon blocked, %- - - Mov Cap-1 Maneuver 366 652 - - 1159 - Mov Cap-2 Maneuver 366 - - - - - Stage 1 678 - - - - - Stage 2 692 - - - - - Approach WB NB SB HCM Control Delay, s 14.3 0 0.1 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - - 404 1159 - HCM Lane V/C Ratio - - 0.039 0.005 - HCM Control Delay (s) - - 14.3 8.1 0 HCM Lane LOS - - B A A HCM 95th %tile Q(veh) - - 0.1 0 - PM FUTURE WITHOUT PROJECT 3: Benson Rd S/108th Ave SE & SE 172nd St 10/6/2015 Baseline Synchro 8 Light Report Page 1 Intersection Int Delay, s/veh 2.8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h 15 7 28 34 4 24 35 283 37 33 294 15 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 98 98 98 98 98 98 98 98 98 98 98 98 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 15 7 29 35 4 24 36 289 38 34 300 15 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 768 773 308 772 762 308 315 0 0 327 0 0 Stage 1 375 375 - 379 379 - - - - - - - Stage 2 393 398 - 393 383 - - - - - - - Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - - Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - - Pot Cap-1 Maneuver 319 330 732 317 335 732 1245 - - 1233 - - Stage 1 646 617 - 643 615 - - - - - - - Stage 2 632 603 - 632 612 - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 289 307 732 284 312 732 1245 - - 1233 - - Mov Cap-2 Maneuver 289 307 - 284 312 - - - - - - - Stage 1 623 596 - 620 593 - - - - - - - Stage 2 585 581 - 580 591 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 14.2 16.5 0.8 0.8 HCM LOS B C Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 1245 - - 443 375 1233 - - HCM Lane V/C Ratio 0.029 - - 0.115 0.169 0.027 - - HCM Control Delay (s) 8 0 - 14.2 16.5 8 0 - HCM Lane LOS A A - B C A A - HCM 95th %tile Q(veh) 0.1 - - 0.4 0.6 0.1 - - PM FUTURE WITHOUT PROJECT 6: Benson Rd S & 108th Ave SE 10/6/2015 Baseline Synchro 8 Light Report Page 2 Intersection Int Delay, s/veh 0.3 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 11 3 391 4 5 348 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 88 88 88 88 88 88 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 12 3 444 5 6 395 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 854 447 0 0 449 0 Stage 1 447 - - - - - Stage 2 407 - - - - - Critical Hdwy 6.42 6.22 - - 4.12 - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 329 612 - - 1111 - Stage 1 644 - - - - - Stage 2 672 - - - - - Platoon blocked, %- - - Mov Cap-1 Maneuver 327 612 - - 1111 - Mov Cap-2 Maneuver 327 - - - - - Stage 1 644 - - - - - Stage 2 667 - - - - - Approach WB NB SB HCM Control Delay, s 15.4 0 0.1 HCM LOS C Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - - 363 1111 - HCM Lane V/C Ratio - - 0.044 0.005 - HCM Control Delay (s) - - 15.4 8.3 0 HCM Lane LOS - - C A A HCM 95th %tile Q(veh) - - 0.1 0 - PM FUTURE WITH PROJECT 3: Benson Rd S/108th Ave SE & SE 172nd St 10/6/2015 Baseline Synchro 8 Light Report Page 1 Intersection Int Delay, s/veh 3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h 18 7 31 34 4 24 43 285 37 33 296 23 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 98 98 98 98 98 98 98 98 98 98 98 98 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 18 7 32 35 4 24 44 291 38 34 302 23 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 793 797 314 798 790 310 326 0 0 329 0 0 Stage 1 381 381 - 397 397 - - - - - - - Stage 2 412 416 - 401 393 - - - - - - - Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - - Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - - Pot Cap-1 Maneuver 306 319 726 304 322 730 1234 - - 1231 - - Stage 1 641 613 - 629 603 - - - - - - - Stage 2 617 592 - 626 606 - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 276 295 726 269 297 730 1234 - - 1231 - - Mov Cap-2 Maneuver 276 295 - 269 297 - - - - - - - Stage 1 613 592 - 601 576 - - - - - - - Stage 2 566 566 - 571 585 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 14.8 17.2 0.9 0.8 HCM LOS B C Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 1234 - - 425 359 1231 - - HCM Lane V/C Ratio 0.036 - - 0.134 0.176 0.027 - - HCM Control Delay (s) 8 0 - 14.8 17.2 8 0 - HCM Lane LOS A A - B C A A - HCM 95th %tile Q(veh) 0.1 - - 0.5 0.6 0.1 - - PM FUTURE WITH PROJECT 6: Benson Rd S & Site Access/108th Ave SE 10/6/2015 Baseline Synchro 8 Light Report Page 2 Intersection Int Delay, s/veh 0.6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Vol, veh/h 2 0 6 11 0 3 9 399 4 5 351 2 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 2 0 7 12 0 3 10 453 5 6 399 2 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 889 889 400 891 889 456 401 0 0 458 0 0 Stage 1 411 411 - 476 476 - - - - - - - Stage 2 478 478 - 415 413 - - - - - - - Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - - Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - - Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - - Pot Cap-1 Maneuver 264 282 650 263 282 604 1158 - - 1103 - - Stage 1 618 595 - 570 557 - - - - - - - Stage 2 568 556 - 615 594 - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 259 277 650 256 277 604 1158 - - 1103 - - Mov Cap-2 Maneuver 259 277 - 256 277 - - - - - - - Stage 1 611 591 - 563 550 - - - - - - - Stage 2 558 549 - 604 590 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 12.8 18 0.2 0.1 HCM LOS B C Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 1158 - - 472 292 1103 - - HCM Lane V/C Ratio 0.009 - - 0.019 0.054 0.005 - - HCM Control Delay (s) 8.1 0 - 12.8 18 8.3 0 - HCM Lane LOS A A - B C A A - HCM 95th %tile Q(veh) 0 - - 0.1 0.2 0 - - PM FUTURE WITH PROJECT 9: Site Access & SE 172nd St 10/6/2015 Baseline Synchro 8 Light Report Page 3 Intersection Int Delay, s/veh 1.4 Movement EBT EBR WBL WBT NBL NBR Vol, veh/h 50 3 16 53 2 6 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 54 3 17 58 2 7 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 58 0 148 56 Stage 1 - - - - 56 - Stage 2 - - - - 92 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1546 - 844 1011 Stage 1 - - - - 967 - Stage 2 - - - - 932 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1546 - 835 1011 Mov Cap-2 Maneuver - - - - 835 - Stage 1 - - - - 967 - Stage 2 - - - - 922 - Approach EB WB NB HCM Control Delay, s 0 1.7 8.8 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 960 - - 1546 - HCM Lane V/C Ratio 0.009 - - 0.011 - HCM Control Delay (s) 8.8 - - 7.4 0 HCM Lane LOS A - - A A HCM 95th %tile Q(veh) 0 - - 0 -