PRELIMINARY PLAT - 19
5. All utilities designed to serve the subdivision shall be placed underground. Any utilities installed
in the parking strip shall be placed in such a manner and depth to permit the planting of trees.
Those utilities to be located beneath paved surfaces shall be installed, including all service
connections, as approved by the Department of Public Works. Such installation shall be
completed and approved prior to the application of any surface material. Easements may be
required for the maintenance and operation of utilities as specified by the Department of Public
Works.
6. Any cable TV conduits shall be undergrounded at the same time as other basic utilities are
installed to serve each lot. Conduit for service connections shall be laid to each lot line by
Applicant as to obviate the necessity for disturbing the street area, including sidewalks, or alley
improvements when such service connections are extended to serve any building. The cost of
trenching, conduit, pedestals and/or vaults and laterals as well as easements therefore required to
bring service to the development shall be borne by the developer and/or land owner. The
applicant shall be responsible only for conduit to serve his development. Conduit ends shall be
elbowed to final ground elevation and capped. The cable TV company shall provide maps and
specifications to the applicant and shall inspect the conduit and certify to the City that it is
properly installed.
7. The applicant shall install all street name signs necessary in the subdivision prior to final plat
approval.
8. The applicant shall be required to demonstrate compliance with the lot width requirement of 70
for proposed Lots 4 and 6 utilizing the lot width definition pursuant to RMC 4-11-120. The
average distance between the side lines connecting front and rear lot lines shall be submitted to
the Current Planning Project Manager prior to construction permit approval.
9. The applicant shall be required to submit a revised landscape plan, depicting a 10-foot wide on-
site landscape strip for all lots. The final detailed landscape shall be submitted to and approved
by the Current Planning Project Manager prior to Final Plat recording. Such landscaping shall
include a mixture of trees, shrubs, and groundcover as approved by the Department of
Community and Economic Development.
10. The applicant shall submit a Final Mitigation Plan for impacts (tight-lining of drainage system
and pedestrian connections) to the critical areas on site or their buffers. The Final Mitigation
Plan shall be submitted to and approved by the Current Planning Project Manager prior to utility
construction permit approval. The applicant shall also establish a Native Growth Protection
Easement over that part of the site encompassing the stream/wetland and buffer area and place
fencing and signage along the buffer.