Loading...
HomeMy WebLinkAboutNOA 14000480 NOTICE OF APPLICATION AND PROPOSED DETERMINATION OF NON-SIGNIFICANCE-MITIGATED (DNS-M) A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: April 25, 2014 LAND USE NUMBER: LUA14-000480 PROJECT NAME: Riverview Park Bridge Replacement PROJECT DESCRIPTION: The applicant is requesting SEPA Environmental Review and a Shoreline Exemption for the replacement of the Riverview pedestrian Bridge, located in Riverview Park, 2901 Maple Valley Highway, parcel #1623059033. The existing bridge provides pedestrian connections from the parking lot to Riverview park located on the south side of the Cedar River. The bridge crosses the Cedar River, in Reach C, where the north bank is designated Shoreline High Intensity and the south bank is designated Urban Conservancy. The park is zoned Resource Conservation (RC) and is 11.53 acres in size. The project would impact 6,000 SF for the bridge replacement and 19,873 SF for shoreline vegetation plantings and enhancement. The replacement bridge would be constructed of aluminum providing a clear span of the Cedar River. This would result in the removal of 18 piles currently below the Ordinary High Water Mark (OHWM). The project is located in the 100 year flood plain and floodway of the Cedar River, Aquifer Protection Zone 1, Landslide hazard area, protected slopes, and a seismic hazard area. The applicant submitted a geotechnical report, Biological Assessment and a Stream Study with the land use application. No trees are proposed to be removed as a result of the subject project. PROJECT LOCATION: 2901 Maple Valley Highway OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS- M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance- Mitigated (DNS-M). A 14-day appeal period will follow the issuance of the DNS-M. PERMIT APPLICATION DATE: April 11, 2014 NOTICE OF COMPLETE APPLICATION: April 25, 2014 APPLICANT/PROJECT CONTACT PERSON: Laura Gurley, PND Engineers, Inc., 1736 Fourth Ave S,Ste A, Seattle, WA 98134 Permits/Review Requested: Environmental (SEPA) Review, Shoreline Exemption Other Permits which may be required: Hydraulic Project Approval (HPA), DNR Access Permit Requested Studies: Biological Assessment, Geotechnical Report, Stream/ Study Location where application may be reviewed: Department of Community & Economic Development (CED) – Planning Division, Sixth Floor Renton City Hall, 1055 South Grady Way, Renton, WA 98057 CONSISTENCY OVERVIEW: Zoning/Land Use: The subject site is designated Residential Low Density on the City of Renton Comprehensive Land Use Map and Resource Conservation on the City’s Zoning Map. Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist . Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-9-070; RMC 4-3- 090; RMC 4-9-190 and other applicable codes and regulations as appropriate. Proposed Mitigation Measures: The following Mitigation Measures will likely be imposed on the proposed project. These recommended Mitigation Measures address project impacts not covered by existing codes and regulations as cited above.  The applicant shall comply with the recommendations included in the Geotechnical Investigation Report, prepared by PND Engineers, Inc., dated April 2014.  The applicant shall comply with the recommendations included in the Biological Evaluation, prepared by HartCrowser, dated March 26, 2014.  The applicant shall comply with the recommendations in the Stream Report, prepared by HartCrowser, dated March 28, 2014. Comments on the above application must be submitted in writing to Vanessa Dolbee, Current Planning Manager, CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on May 9, 2014. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Vanessa Dolbee, Current Planning Manager; Tel: (425) 430-7314; Eml: vdolbee@rentonwa.gov PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION