Loading...
HomeMy WebLinkAboutMFP22001444.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP22001444 IVR Number: 22001444 Permit Information Permit Name: Puget Sound Energy Gas Permits Address/Location:03/22/2022Application Date:7227801785Parcel Number: 2805 SUNSET LN NE, LOT Permit Type:04/04/2022Issue Date:Franchise Permit Work Class:04/04/2023Expiration Date:Minor Utility Job Number: 108633848Franchise Type:Natural Gas Description: PSE Gas CUT AND CAP 4" MAIN (1958) AT HARRINGTON PL NE INTERSECTION AND SUNSET LN NE. CUT AND CAP 4" MAIN AT SUNSET LN NE INTERSECTION AND NE 10TH ST. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Stuart Bennett Infrasource Services LLC 1622 Eastport Plaza Dr Collinsville, IL 62234 B: (303) 419-8755 H: (425) 677-5197 C: (713) 985-6489 Contractor Business License Number: 36742Construction Contractor: INFRASL871C2 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering 4 4 4 4 4 4 4 4 4 4 4 108633848 2820 NE SUNSET BLVD Monday Friday 8:00am 3:00pm PLEASE SEE ATTACHED POTELCO, INC 425 892 0416 CHRIS.CARVO@PSE.COM 6905 S. 228TH ST KENT, WA 98032 MFP22001444 Scott Warlick CED 4/4/2022 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date CORRIE RYDBERG 121212121218 18 111110101212121212NE SUNSET BLVDNE 10TH ST1212BU S ST O P NE 10TH STSUNSET LN NESTOP FLAGGER STOP FLAGGER STOP FLAGGER W20-7AW20-4ONE LANEROADAHEAD10 0 ' 10 0 ' 10 0 'ROADWORKAHEADW20-1W20-7ARO A D W O R K AH E A D W20-1BEPR E P A R E D TOST O P W3-4100'100'100'W 2 0 - 7 AROADWORKAHEADW 2 0 - 1 BEPREPAREDTOSTOPW 3 - 4 100'100'100'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'1010ROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'R5 - 1 3 3 AC C E S S ON L Y SUNSET LN NE HARRINGTON AVE NESUNSET LN NE1313TEMPORARY TRAFFIC CONTROL PLANWORK PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be 30' NCL of NE 10th St & 20' WCLof Sunset Ln NE.0'60'30'PRINT ON11X17" SHEETS ONLYNProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV03/03/2022 1086338480 2820 NE SUNSET BLVD, RENTON, WA 98056.Jason Bisenius425-424-7316jason.bisenius@pse.com1 OF 2Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425MFP22001444 17 17 11 1 1 1 2 1 1 1 1 12 12 121616HARRINGTON PL NE17 17 SUNSET LN NESUNSET LN NE7777 STOP FLAGGER W20-7AW20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-177 SHOULDERWORKW21-5100'100'ROADWORKAHEADW20-1ST R E E T CL O S E D R1 1 - 2 R11-4R5-133ROAD CLOSEDTOTHRU TRAFFICLOCALACCESSONLYSHOULDERWORKW21-510 0 ' 10 0 'ROADWORKAHEADW20-1SUNSET LN NEWORK PIT LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 TEMPORARY TRAFFIC CONTROL PLAN 0'50'25' PRINT ON 11X17" SHEETS ONLYN Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 8. Work area will be 18' WCL of Sunset Ln NE & 18' SCL of Harrington PL NE. Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 03/03/2022 108633848 0 2820 NE SUNSET BLVD, RENTON, WA 98056. Jason Bisenius 425-424-7316 jason.bisenius@pse.com 2 OF 2 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 MFP22001444 Est. Start Date: & & & Tie-In Fitting Route #'s:Bollards:2.5" #4" #ADA Ramps #: Del Press:Traffic Signal:Bus Stop: No Parks #: Meter Loc:0 Trolley Lines:Mtr Hoods #: Meter:Speed Limit: Cut & Cap EFV:0 Police #:TCP:Yes Diameter:4" STW Flaggers #:Arterial:No of CL Service Information Street Information Job Type of CL HARRINGTON PL NE 3X5 ASPHALT of CL of CL SUNSET LN NE 3X5 ASPHALT 18'West of CL SUNSET LN NE 18'South 30'North of CL NE 10TH ST 20'West PLAT Map:206.084 N Work Location Size of Cut Surface Type Job Description / Scope of Work CUT AND CAP 4" MAIN (1958) AT HARRINGTON PL NE INTERSECTION AND SUNSET LN NE. CUT AND CAP 4" MAIN AT SUNSET LN NE INTERSECTION AND NE 10TH ST CP REVIEW: approved job as designed WJOHNS New Construction: No Construction Method PM / Inspector:Chris Carvo 253-234-6397 Est. Duration: Jurisdiction:RENTON City / Zip:RENTON, ROW Permit:Yes Customer:Justin Riener 208-559-6287 Job #:108633848 Date:2/7/21 Address:2820 NE SUNSET BLVD Puget Sound Energy Gas Pre-Inspect Form 5' 2' de 3' 5' 2' deep 3' 5' 2' deep 3' 5' 2' deep 3' MFP22001444 RESTORATION PER CITY OF RENTON STANDARDS