Loading...
HomeMy WebLinkAboutMFP22001773.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP22001773 IVR Number: 22001773 Permit Information Permit Name: N.986364 Address/Location:04/06/2022Application Date:7841800165Parcel Number: 422 S 3RD ST Permit Type:04/07/2022Issue Date:Franchise Permit Work Class:04/07/2023Expiration Date:Minor Utility Job Number: N.986364Franchise Type:Telephone Description: Lumen to access HH28 1, MH4 352, and dig & fix buried conduit. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling Dena Overaa QWEST / Century Link 23315 66th Ave S KENT, WA 98032 B: (206) 345-0173 C: (425) 247-6248 Applicant Austin Sweeney Century Link 23315 66th Ave S Kent, WA 98032 C: (253) 766-7549ApplicantX Jesse Patjens Century Link / Lumen Contact Kim Parker QWest Corporation 931 14th St, Suite 1000A Denver, CO 80202 B: (303) 992-0752Contact Austin Sweeney Century Link 23315 66th Ave S Kent, WA 98032 C: (253) 766-7549Contact Michael Smith Dycom Industries dba North Sky 11818 SE Mill Plain Blvd, SUITE 410 Vancouver, WA 98684 C: (206) 305-5881Contractor Business License Number: 36846Construction Contractor: NORTHSC857Q4 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner QWest/Century Link - Billing 7850 S TRAFTON St TACOMA, WA 98409 Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering Northsky Communications Tawnya Longfellow 22517 88th ave S Kent/WA 98031 N.986364 S 3rd St & Morris Ave S 4/12 4/29 425 615 7121 Lumen to access HH28-1, MH4-352, and dig & fix buried conduit MFP22001773 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 4/7/2022 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) Austin Sweeney Austin Sweeney 4/6/2022 N TRAFFIC CONTROL PLAN JOB # N. 986364. C. 45 PERMIT # MORRIS AVE S @ ALLEY BTWN S 3RD ST & S 4TH ST MH4-352 ACCESS ALLEY WORK LEGEND CONES FLAGGER SPOTTERS SPOTTER WORK AREA WORK TRUCK Jeffrey Hubbard Comments: CHANNELIZATION SPACING MPH TAPER TANGENT25 / 30 20' 40'35 / 45 30' 60'ONE-LANE TWO-WAY TAPER 50' TO 100' NOT TO SCALE Comments: MERGING TAPER LENGTHTAPER ("L") LANE WIDTH L MPH 10' 11' 12' SHIFTING 20 70 75 80 TAPER 25 105 115 1651/2 L 30 150 165 18035 205 225 245SHOULDER 40 270 295 320 TAPER 45 450 495 540 1/3 L 50 500 550 600 Designed For: LUMEN Project # N. 986364. C. 45 Jeffrey D. Hubbard Traffic Control Supervisor WA TCS # 011989 Draw Date: 3/31/2022 Phone 253-737-5198 jhubbard.tcp@gmail.com _______________________ Date:3/31/2022 Author:Jeffrey D. Hubbard, Traffic Control Supervisor Project:N. 986364. C. 45 CERT:WA TCS # 011989 LUMEN:Certified Traffic Control Plan LOCATION:RENTON, WA Comments: General Requirements 1. All signs and spacing to conform to the MUTCD and City of RENTON Requirements. 2. Channelizing devices are 28" traffic cones with retro reflective material.3. All signs are 36" x 36" B/O unless otherwise specified.4. Alert affected local residents and businesses. 5. Crew is required to leave a minimum 11' for lane width. 6. Work hours will be determined by City of RENTON. UNLAWFUL FOR ANYONE (OTHER THAN CITY OF RENTON) TO ALTER THIS CERTIFIED PLAN WITHOUT EXPRESS WRITTEN CONSENT FROM:JEFFREY D. HUBBARD, TCS# 011989, JHUBBARD.TCP@GMAIL.COM Comments: ACCESS MH4-352 LOCATED IN ALLEY. ALLEY WORK. ALLEY WILL BE CLOSED. FLAGGER WILL ASSIST ALLEY TRAFFIC. SPOTTER WILL ASSIST AT WORK AREA. Comments: SIGN SPACING MPH "X" 20-25 100' 30 200' 35-40 350'45+ 500' SPEED LIMIT 25 S 3RD ST 28 28 28 28MORRIS AVE SALLEY CLOSEDTO THRU TRAFFICW20-7aALLEYCLOSED100' +-ALLEYWORKAHEAD100' +-ALLEYWORKAHEAD100' +-ALLEYWORKAHEAD100' +-ALLEYWORKAHEAD ALLEY ALLEY 14SIDEWALKSIDEWALKSIDEWALKSIDEWALKMH4-352 ACCESS WORK ZONE 14' X ~60' SPOTTERS MORRIS AVE SSMITHERS AVE SSMITHERS AVE SALLEYCLOSEDwww.invarion.com MFP22001773 Alley required to be opened back up at the end of the work day N TRAFFIC CONTROL PLAN JOB # N. 986364. C. 45 PERMIT # S 3RD ST @ MORRIS AVE S DIG & FIX IN ROADWAY RIGHT-LANE CLOSURE Jeffrey Hubbard Comments: CHANNELIZATION SPACING MPH TAPER TANGENT25 / 30 20' 40'35 / 45 30' 60'ONE-LANE TWO-WAY TAPER 50' TO 100' NOT TO SCALE Comments: MERGING TAPER LENGTHTAPER ("L") LANE WIDTH L MPH 10' 11' 12' SHIFTING 20 70 75 80 TAPER 25 105 115 1651/2 L 30 150 165 18035 205 225 245SHOULDER 40 270 295 320 TAPER 45 450 495 540 1/3 L 50 500 550 600 Designed For: LUMEN Project # N. 986364. C. 45 Jeffrey D. Hubbard Traffic Control Supervisor WA TCS # 011989 Draw Date: 3/31/2022 Phone 253-737-5198 jhubbard.tcp@gmail.com _______________________ Date:3/31/2022 Author:Jeffrey D. Hubbard, Traffic Control Supervisor Project:N. 986364. C. 45 CERT:WA TCS # 011989 LUMEN:Certified Traffic Control Plan LOCATION:RENTON, WA Comments: General Requirements 1. All signs and spacing to conform to the MUTCD and City of RENTON Requirements. 2. Channelizing devices are 28" traffic cones with retro reflective material.3. All signs are 36" x 36" B/O unless otherwise specified.4. Alert affected local residents and businesses. 5. Crew is required to leave a minimum 11' for lane width. 6. Work hours will be determined by City of RENTON. UNLAWFUL FOR ANYONE (OTHER THAN CITY OF RENTON) TO ALTER THIS CERTIFIED PLAN WITHOUT EXPRESS WRITTEN CONSENT FROM:JEFFREY D. HUBBARD, TCS# 011989, JHUBBARD.TCP@GMAIL.COM Comments: SIGN SPACING MPH "X" 20-25 100' 30 200' 35-40 350'45+ 500' SPEEDLIMIT 25 100' +-100' +-ROADWORKAHEADW20-1RIGHT LANECLOSEDAHEADW20-5W4-2100' +- 100' +-100' +-100' +-ROADWORKAHEADW20-1RIGHT LANECLOSEDAHEADW20-5W4-2PARKING AREA PARKING AREA SIDEWALK SIDEWALK PR8-3aPR8-3aPR8-3aPR8-3aARROWBOARD DETOUR DETOURSPOTTERS SPOTTERS LEGEND ARROW BOARD CONES CROSSWALK SPOTTERS SPOTTER TRAFFIC LIGHT WORK AREA WORK TRUCK DRIVEWAYS 3RD ST S 3RD ST ONE-WAY ONE-WAY 1111111128MORRIS AVE SMORRIS AVE SDIG & FIX IN ROADWAY 100' +-ROADWORKAHEAD W20-1100' +-ROADWORKAHEADW20-1SIDEWALKSIDEWALK19 19 PARKING AREAPARKING AREAComments: DIG & FIX IN ROADWAY ON S 3RD ST. RIGHT-LANE CLOSURE ON S 3RD ST. ARROW BOARD WILL BE USED. RESTRICTED PARKING IN WORK ZONE. DRIVEWAYS REMAIN OPEN/ACCESSIBLE. SIDEWALKS REMAIN OPEN/ACCESSIBLE. CROSSWALK CLOSED AT WORK AREA. PEDESTRIANS ROUTED TO OTHER SIDE. SPOTTERS WILL ASSIST AT WORK AREA. WORK ZONE 18' X ~350' (TOTAL) MERGINGTAPER 11' X ~115' PARKING AREA PARKING AREA SIDEWALK SIDEWALK ONE-WAY www.invarion.com MFP22001773 NTRAFFIC CONTROL PLAN JOB # N. 986364. C. 45 PERMIT # MORRIS AVE S @ S 3RD ST HH28-1 ACCESS SHOULDER WORK Jeffrey Hubbard Comments: CHANNELIZATION SPACING MPH TAPER TANGENT25 / 30 20' 40'35 / 45 30' 60'ONE-LANE TWO-WAY TAPER 50' TO 100' NOT TO SCALE Comments: MERGING TAPER LENGTHTAPER ("L") LANE WIDTH L MPH 10' 11' 12' SHIFTING 20 70 75 80 TAPER 25 105 115 1651/2 L 30 150 165 18035 205 225 245SHOULDER 40 270 295 320 TAPER 45 450 495 540 1/3 L 50 500 550 600 Designed For: LUMEN Project # N. 986364. C. 45 Jeffrey D. Hubbard Traffic Control Supervisor WA TCS # 011989 Draw Date: 3/31/2022 Phone 253-737-5198 jhubbard.tcp@gmail.com _______________________ Date:3/31/2022 Author:Jeffrey D. Hubbard, Traffic Control Supervisor Project:N. 986364. C. 45 CERT:WA TCS # 011989 LUMEN:Certified Traffic Control Plan LOCATION:RENTON, WA Comments: General Requirements 1. All signs and spacing to conform to the MUTCD and City of RENTON Requirements. 2. Channelizing devices are 28" traffic cones with retro reflective material.3. All signs are 36" x 36" B/O unless otherwise specified.4. Alert affected local residents and businesses. 5. Crew is required to leave a minimum 11' for lane width. 6. Work hours will be determined by City of RENTON. UNLAWFUL FOR ANYONE (OTHER THAN CITY OF RENTON) TO ALTER THIS CERTIFIED PLAN WITHOUT EXPRESS WRITTEN CONSENT FROM:JEFFREY D. HUBBARD, TCS# 011989, JHUBBARD.TCP@GMAIL.COM Comments: SIGN SPACING MPH "X" 20-25 100' 30 200' 35-40 350'45+ 500' SPEEDLIMIT 25 LEGEND CONES CROSSWALK SPOTTERS SPOTTER TRAFFIC LIGHT WORK AREA WORK TRUCK Comments: ACCESS HH28-1 OFF ROADWAY. THIS WILL BE SHOULDER WORK. TRAFFIC FLOW IS NOT IMPACTED. MAINTAIN 11' MINIMUM LANE WIDTH. RESTRICTED PARKING IN WORK ZONE. DRIVEWAYS REMAIN OPEN/ACCESSIBLE. SIDEWALKS REMAIN OPEN/ACCESSIBLE. MAINTAIN 4' MIN WALKWAY WIDTH. SPOTTER WILL ASSIST AT WORK AREA.PARKING AREAPARKING AREASPOTTERS S 3RD STS 3RD STONE-WAY111128MORRIS AVE S MORRIS AVE S100' +-ROADWORKAHEADW20-1SIDEWALK SIDEWALK PARKING AREA PARKING AREA PARKING AREAPARKING AREASIDEWALKSIDEWALKONE-WAY1111 100' +-ROADWORKAHEADW20-1191911' MIN 24 HH28-1 ACCESS 100' +-SHOULDERWORKW21-5100' +-ROADWORKAHEADW20-1100' +-ROADWORKAHEADW20-1WORK ZONE 8' X ~60' 4' MINIMUMWALKWAYWIDTH DRIVEWAYwww.invarion.com MFP22001773 •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••3434 33 343435CRPL#1 66" STLCRPL#2 51.5" STLH3+00 H4+00 H5+00 H6+00 H6+60H3+00 H4+00 H5+00 H6+00 H6+60 8" SDR 35 SS 24" C900 SS24" C900 SSH3+00 H4+00 H5+00 H6+00 H6+60 STA H3+59, 19.9' LT 1-CB #62 STA H3+59, 13.2' LT 1-48'' SDMH #45 STA H3+69, 20.0' RT 1-CB #63 STA H4+85, 19.9' LT 1-CB #30 STA H4+85, 13.5' LT 1-48'' SDMH #24 STA C18+88, 69.7' LT 1-CB #29 STA H4+10, 19.3' RT 1-CB #64 STA H4+10, 14.2' LT 1-48'' SDMH #46 12" C900 SD 18" PP SD12" PP SD12" PP SD12" PP SD 12" D I S D12"DI SD12"DI SD12"DI SDTBD TBD 10 15 20 25 30 35 40 45 10 15 20 25 30 35 40 45 H3+20 H3+40 H3+60 H3+80 H4+00 H4+20 H4+40 H4+60 H4+80 H5+00 H5+20 H5+40 H5+60 H5+80 H6+00EXIST UGPEXIST WSEXIST TEXIST UGPEXIST UGPEXIST GEXIST FHEXIST GPROP 24"SSIE=15.0EXIST W75 LF 12" PP SD @ SLP=0.50%56 LF 12" PP SD @ SLP=0.50% 48'' SDMH #24 IE(IN)12"(N)=26.56 IE(IN)12"(W)=31.03 IE(IN)12"(E)=27.49 IE(OUT)12"(S)=26.56 STA H4+85, 13' LT RIM=33.29 48'' SDMH #45 IE(IN)12"(E)=27.67 IE(IN)12"(W)=30.43 IE(OUT)12"(S)=27.19 STA H3+59, 13' LT RIM=33.20 40 LF 12" C900 SD @ SLP=0.50% 48'' SDMH #25 STA H5+41, 14' LT RIM=33.75 SEE SHT SD-10 48'' SDMH #26 IE(IN)12"(SE)=28.02 IE(IN)6"(W)=31.50 IE(OUT)12"(N)=26.48 STA H5+81, 10' LT RIM=33.50 48'' SDMH #46 IE(IN)12"(N)=26.94 IE(IN)12"(W)=30.73 IE(OUT)12"(S)=26.94 STA H4+10, 14' LT RIM=33.35 50 LF 12" PP SD @ SLP=0.50% (RECONNECT)EXIST UGPEXIST SS18-2251 SD-21 of 121 RENTON DOWNTOWN UTILITY IMPROVEMENTS PROJECT January 2021 CONFORMED DRAWINGSAS SHOWN MORRIS AVE S STORM PLAN & PROFILE STA H3+20 TO STA H6+00 SEO BAW TTT 35NO. DATE BY REVISION NOT TO SCALE THEN DRAWING IS NOT MEASURE 1" IF THIS BAR DOES NOTICE CHECKED DRAWN DESIGNED PROJECT NO.:SCALE:DATE:H:\EVT_Projects\18\2251 - Renton DUIP Phase 2\CAD\Sheets\18-2251-WA-SD.dwg SD-21 11/14/2020 12:17 PM BRETT.WILLIAMS 23.0s (LMS Tech)SHEET 120 1 20100 40 60 PLAN SCALE: 1"=20' MORRIS AVE S S 3RD STEXIST GR @ ROW CL SCALE: 1"=20' HORIZ, 1"=5' VERT PROFILE 11 12 11 11 48IN SDMH #25, SEE SHT SD-10 1 TYP FOR CONTINUATION SEE SHEET SD-10 FOR CONTINUATION SEE SHEET SD-9 11 12 48IN SDMH #26, SEE SHT SD-10 15 15 48IN SDMH #23, SEE SHT SD-9 CB #31, SEE SHT SD-10 CB #28, SEE SHT SD-9 CB #27, SEE SHT SD-9 15 CONSTRUCTION CL EQUALS R/W CL, SEE SURVEY CONTROL PLAN, SHT G-5 INSTALL CB PER COR STD PLAN 200.00 INSTALL CB PER COR STD PLAN 201.00 CONNECT EXIST STORM DRAIN PIPE TO NEW STRUCTURE SEE PROFILE 3 ON SHT SD-44 SEE PROFILE 4 ON SHT SD-44 SEE PROFILE 5 ON SHT SD-44 CONSTRUCTION NOTES: 1 11 12 15 280 422 425 19 20 21 20 19 21 21 01/29/21 WOR KI N G S E T DAMAGE LOCATION Exist. Lumen Buried Facilities HH 28-1 (25-TA) Damaged Lumen 900pr Copper Cable Anticipated repair work needed : - Excavate and expose damaged facilities in approx. 4' x 6' work pit - Pull excess slack back to HH 28-1 & MH 4-352 - Place encapulated wrap over damaged sheath - Place 4" split duct - Backfill w/ select fill - Complete HSR (t-cut & patch back) - Final grind and overlay to be completed by others. Continues to MH 4-352 @ AlleyMFP22001773 Customer Street Address City, ST Zip Customer City, ST Zip Renton, WA LUMEN Reference Only: CMS : FW :N.986364 ARMOR: WFMT: HH 28-1 Approx. Damage Location MH 4-352 MFP22001773 Customer Street Address City, ST Zip Customer City, ST Zip Renton, WA LUMEN Reference Only: CMS : FW :N.986364 ARMOR: WFMT: HH 28-1 Approx. Work/Staging Area MH 4-352 Approx. Work/Staging Area Need temp closure of alley access MFP22001773 Customer Street Address City, ST Zip Customer City, ST Zip Renton, WA LUMEN Reference Only: CMS : FW :N.986364 ARMOR: WFMT: Approx. Damage/Repair Location Approx. Work/Staging Area MFP22001773 Customer Street Address City, ST Zip Customer City, ST Zip Renton, WA LUMEN Reference Only: CMS : FW :N.986364 ARMOR: WFMT: Approx. Work/Staging Area Approx. Damage/Repair Location MFP22001773