HomeMy WebLinkAboutMFP22001576.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP22001576 IVR Number: 22001576 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:03/29/2022Application Date:7841300460Parcel Number: 517 WHITWORTH AVE S Permit Type:04/07/2022Issue Date:Franchise Permit Work Class:04/07/2023Expiration Date:Minor Utility Job Number: 593243636Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO INSTALL SPAN GUY WIRE FROM EXISTING P01 (317680 165922) TO EXISTING P02 (317668 165927). NO HS CUTS ANTICIPATED. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL DELLAY JOSHUA W 517 WHITWORTH AVE S RENTON , WA 98057 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date P02 P01 ALLEY CLOSED ALLEYCLOSED ALLEY CLOSED ALLEYCLOSED ALLEYCLOSED AHEAD ALLEY CLOSED AHEAD ALLEYCLOSEDAHEAD ALLEYCLOSEDAHEAD ROAD WORKAHEAD W20-1 ROADWORKAHEAD W20-1 ROADWORKAHEAD W20-1 ROAD WORK AHEAD W20-1 ROADWORK AHEAD W20-1 ROADWORKAHEAD W20-1 ROADWORKAHEAD W20-1 ROAD WORK AHEAD W20-1 Shattuck Ave SShattuck Ave SHouser W ay S Whitworth Ave SWhitworth Ave S100' 100' 100' 100' 100' 100' S 6th St Notify Residence 72 Hours in Advance of Alley Closure PLEASE SCHEDULE WITH DISPATCH @ 800-343-4049 OPT.1 AND PROVIDE A COPY OF THE APPROVED TRAFFIC CONTROL PLAN Notes: 1. Maintain ped. access to and through crosswalks 2. Maintain Min. 11' lanes 3. Maintain local access4. Notify Transit Authority at least 72 hrs. in advance of bus stop closure 5. Traffic control plan and all devices shall comply with MUTCD, PROWAG & WSDOT 6. DEVICE SPACING Flag Taper 20' Signs per WSDOT Tapers per WSDOT 7. 28" Cones36" Barrels 48" Signs 24" Paddle 8. Adjust to field conditions K&D Services, as the preparer of this traffic control plan makes no representation as to its' general adequacy or being approved for implementation. Approval must result from the Traffic Engineer or other Public Official having statutory enforcement authority in the jurisdiction. Utilization and implementation of this plan shall be a result of that approval. Ref. MUTCD 2009 6A-01 (10) Legend ALLEYCLOSED Alley Closed Barricade Bucket Truck Pole ROADWORKAHEAD W20-1 road work ahead ALLEYCLOSEDAHEAD W21-7 utility work ahead Manifest 8 x W20-1 road work ahead 4 x R11-2 R11-2 4 x W21-7 utility work ahead NOT TO SCALE NOTIFY EMS, FIRE, POLICE AND LOCAL TRANSIT AUTHORITY 72 HOURS IN ADVANCE N Adjust Controls as Needed PRINT ON 11"X17"CUSTOMER: CONTACT: LOCATION: DATE:W/O # Inland Group Tyler Puterbaugh 253.281.3017 517 Whitworth Ave S Renton WA 03.22.2022 OFFICE: 800-343-4049 CELL: 425-765-1153 WATCP@KNDSERVICES.NET WSTCS#013076 593243636 DESIGNED BY: CHRIS SCHALEGER www.invarion.com 500 504 510 512 535 516 520 524 530 532 303 516 505 515 517 521 529 525 533 520 526 530 537 538WHITWORTH AVE SHOUSE R W A Y S SHATTUCK AVE S#6CUGRA 15 317680-165922 37.5 kVA (B) 317668-165921 37.5 kVA (B) 317656-165921 37.5 kVA (B) 317684-165938 37.5 kVA (C) 317667-165938 25 kVA (C) SLAG6968 317655-165937 25 kVA (C) SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT N Vicinity Map -122.212, 47.476 Owner / Developer Contact Info officeATTN: JOSH DELLAY 517 WHITWORTH AVE S RENTON, WA 98057 JOSH DELLAY 206-734-0565 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE GRA-15 09/2021 61 50 37 -1.77 - 61 51.77 37 FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. CIRCUIT FEET ADDED: 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 1050 SQ.FT. 200 AMPS ELECTRIC 12.1KW 65A 2.9% 2.2% 8. 9. SCALE: 1" = 50'593243636THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) Superior ORDER#NOTIF# PWR PROJECT PHASE CABLE TV PHONE PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Tyler Puterbaugh 253-281-3017 3/10/22 Ann Bettencourt 206-584-4182 3/10/22 --- Ann Bettencourt 206-584-4182 3/10/22 N/A RENTON DELLAY BRIDLE RELOCATE 517 WHITWORTH AVE S, RENTON, WA 98057 N/A N/A N/A 593243636 As Noted 1/1 King County N/A N/A N/A N/A N/A N/A 2305E065 2305E076 2305E065 GRA-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 511175910 E-Mail: Cell Phone: Project Manager Contact Information: Manager:Tyler Puterbaugh 253-281-3017 tyler.puterbaugh@pse.com 593243636 SITE SPECIFIC NOTES P01 (317680-165922): -EXISTING 1984 40' UN CL POLE TO REMAIN -EXISITNG 37.5kVA 120/240V XFMR TO REMAIN P02 (317668-165921): -EXISTING 1959 40' UN CL POLE TO REMAIN -EXISITNG 37.5kVA 120/240V XFMR TO REMAIN -INSTALL (1) RIGID CLEVIS (MID# 9257200) M01: -INSTALL 200 AMP METER SPAN SPECIFIC NOTES: P01 TO P02: -INSTALL 3/8 SPAN GUY WIRE ±85' ___' ACTUAL PER STD. 6024.1000. -INSTALL MID-SPAN TAP CLAMP (MID# 2152500) P01 TO M01: -RELOCATE EXISTING BRIDLE SERVICE TO NEW CONNECTION POINT -CONNECT TO NEW METER OVERHEAD BRIDLE N.T.S. SERVICE LINE (UTILITY OWNED) SERVICE MAST CONNECTION POINT 26' 18' 12'13' STATE HIGHWAYS STREETS, ALLEYS, COUNTY ROADS, DRIVEWAYS, AND PARKING AREAS RESIDENTIAL PROPERTY OVERHEAD SERVICE CLEARANCE DETAIL SCALE: NONE 00 1"2" 00 50'100'