Loading...
HomeMy WebLinkAboutC_Comment_Response_Letter_to_On_Hold_Notice_Meadow_Ave_220307_v1 Western Washington Division Eastern Washington Division 165 NE Juniper St., Ste 201, Issaquah, WA 98027 407 Swiftwater Blvd, Cle Elum, WA 98922 Phone: (425) 392-0250 Phone: (509) 674-7433 www.EncompassES.net March 4, 2022 City of Renton Planning Division Attn: Brittany Gillia, Assistant Planner 1055 S Grady Way Renton, WA 98055 Subject: Meadow Ave Short Plat – Response to “On Hold” Notice LUA21-000084, SHPL-A Dear Brittany, In response to your On Hold Letter dated September 8, 2021, we have revised the plans as requested. The City comments are provided in italics with a detailed response provided in bold below. COMMENTS 1. Proposed storm water management conflicts with adjacent critical areas. Please update and address the following items on the Civil Plans, Technical Information Report, and Geotechnical Report: o Infiltration trenches must be a minimum of 50’ away from the existing Erosion Hazard Area. Please revise location of infiltration trenches on Civil Plans. o Infiltration trenches must be 5’away from any property lines and 15’ away from buildings with crawl space or basement elevations that are below the overflow point of the infiltration trench. o Infiltration devices proposed within 200 feet of a steep slope hazard area, erosion hazard area, or landslide hazard must be approved by a geotechnical engineer or engineering geologist unless otherwise approved by CED. The geotechnical analysis must consider cumulative impacts from the project and surrounding areas under full built-out conditions. o If infiltration trenches are not feasible, please address propose a different BMP that meets the requirements of the 2017 Renton Surface Water Design Manual. The infiltration trenches have been relocated to the front of the lots to create separation from the critical area. The new trench locations are a minimum of 5-feet from property lines and 15-feet from the proposed houses. Additionally, an overflow system has been added to show any overflows connecting back to the public system within Meadow Avenue N. Please see the attached Response Letter from Earth Solutions NW for additional information. City of Renton Planning Division Meadow Ave Short Plat – Response to “On Hold” Notice 03/2/2022 Page | 2 2. Provide a section view of the proposed street improvements to confirm the plan view. The section view was previously included on sheet 4. Per new comments the section has been updated to show 14-feet of pavement on the east side of Meadow Avenue N and the right-of-way dedication has been increased to 7.5-feet. If you have any questions, please email me at CostaP@encompasses.net or call me at 425-392-0250. Sincerely, Encompass Engineering and Surveying, Inc. Costa Philippides Senior Engineer