Loading...
HomeMy WebLinkAboutMFP22001808.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP22001808 IVR Number: 22001808 Permit Information Permit Name: N.870249 - Forest Terrace revision Address/Location:04/08/2022Application Date:1288000010Parcel Number: 4101 NE 27TH PL Permit Type:04/13/2022Issue Date:Franchise Permit Work Class:04/13/2023Expiration Date:Minor Utility Job Number: N.870249Franchise Type:Telephone Description: Lumen to replace underground fiber between P6(new) and P7(new). Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling Dena Overaa QWEST / Century Link 23315 66th Ave S KENT, WA 98032 B: (206) 345-0173 C: (425) 247-6248 Applicant Austin Sweeney Century Link 23315 66th Ave S Kent, WA 98032 C: (253) 766-7549ApplicantX Kim Parker QWest Corporation 931 14th St, Suite 1000A Denver, CO 80202 B: (303) 992-0752Contact Austin Sweeney Century Link 23315 66th Ave S Kent, WA 98032 C: (253) 766-7549Contact Jesse Patjens CenturyLink / Lumen 23315 66th Ave S Kent, WA 98032 Contact Michael Smith Dycom Industries dba North Sky 11818 SE Mill Plain Blvd, SUITE 410 Vancouver, WA 98684 C: (206) 305-5881Contractor Business License Number: 36846Construction Contractor: NORTHSC857Q4 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner QWest/Century Link - Billing 7850 S TRAFTON St TACOMA, WA 98409 Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering Northsky Communications Tawnya Longfellow 22517 88th ave S Kent/WA 98031 N.870249 Forest Terrace 4101 NE 27th Pl 4/28 5/27 425 615 Lumen to replace underground fiber between P6(new) and P7(new) All other work to be performed by PSE and developer Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 4/13/2022 MFP22001808 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) Austin Sweeney Austin Sweeney 4/8/22 EXISTING CONSTRUCTIONEXISTING CONSTRUCTION EXISTING CONSTRUCTION EXISTING CONSTRUCTION EXISTING CONSTRUCTION EXISTING CONSTRUCTION NE 27TH PLNE 25TH PLUNION AVE NE UNION AVE NE TRAFFIC CONTROL PLAN JOB # N.870249.C.45 PERMIT # Legend EXISTING CONSTRUCTION X POLE WORK TRUCK CONES FLAGGER WORK AREA ONE LANE TWO WAY TAPER 50' MIN/100' MAX Date:2/28/2022 Author:Darlene Durr, Traffic Control Supervisor Project:N.870249.C.45 CERT:TCS # 011915 LUMEN:Certified Traffic Control Plan (DO NOT ALTER) Comments: General Requirements 1. All signs and spacing to conform to the MUTCD and CITY OF RENTON requirements.2. Channelizing devices are 28" traffic cones with retro reflective material.3. All signs are 48' X 48' B/O unless otherwise specified. 4. Alert affected local residents and businesses. 5. Crew is required to leave a minimum 11' for lane width.6. Work hours will be DETERMINED BY CITY, COUNTY AND/OR WSDOT. UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON TO ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM: DARLENE DURR, TCS #011915, darlene.durr@hotmail.com CHANNELIZING DEVICE SPACING (FEET) MPH TAPER TANGENT 50/70 35/45 25/30 40 40 30 20 80 60 Approved 2/28/2022Darlene Durr TCS # 011915 Phone 253-737-5198darlene.durr@hotmail.com _______________________Darlene Durr NOT TO SCALE NOTE ALL LANE WIDTHS ARE ESTIMATES; FOR ACCURANCY, MEASURE IN FIELD PRIOR TO WORK. REFER TO CHARTS FOR DEVICE SPACING, SIGNAGE SPACING, SIGN SIZE, BUFFER SPACING AND TAPER LENGTHS. XX AERIAL +/-287' P.6P.7 X P.8 NEW ANCHOR & DOWN GUY PLACEMENT UNDERGROUNDFIBER PLACEMENT +/-287'ROADWORKAHEADROADWORKAHEADCENTERLANECLOSEDAHEAD200' 200' 200' 200' 200'200'200'ROADWORKAHEADLANESHIFTAHEADROADWORKAHEAD 200'200'NUNION AVE NE @ NE 27TH PL AERIAL & UNDERGROUND FIBER / NEW DOWN GUY & ANCHOR PLACEMENT / RESTORE LANE SHIFT CENTER LANE CLOSURE FLAGGING Comments: THIS IS TO REPLACE AERIAL FIBER, PLACE UNGROUND FIBER IN EXISTING CONDUIT, PLACE NEW DOWN GUY & ANCHOR ANDRESTORE AS REQUIRED. THIS IS A LANE SHIFT, CENTER LANE CLOSURE AND FLAGGING. FLAGGERS WILL ASSIST DRIVEWAYS AND PEDESTRIANS AT WORK AREA. COORDINATE WITH EXISTING CONTRACTOR PRIOR TO WORK. WORK AREA 8' X 500' www.invarion.com MFP22001808 NOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTJOB:SH OF BEFORE YOU DIG811CALL TWO WORKING DAYSRNGE:SECT:TOWN:GEO CODE:WC CLLI:TOTAL EXISTING CONDUIT USED:TOTAL NEW BORE:TOTAL NEW DIRT TRENCHESTIMATED TOTALSTOTAL NEW AERIAL:SIDEWALK (PCC) R&R:ASPHALT (AC) R&R:S.F.S.F.L.F.L.F.L.F.L.F.TOTAL NEW ASPHALT TRENCH:L.F.TOTAL NEW S/W TRENCH:L.F.2150000000”NVICINITY MAPCUSTOMER NAME: FOREST TERRACELCON: WESLIE MACKIEPHONE NO: 253-606-0654EMAIL: wesliemackie@gmail.comPROJECT ID:  ARMOR OR DSR #:REVISION # SHEET # REASON FOR REVISION REVISED BY DATEREVISION 1 1, 5, 6 & 7 ADD COUNTY LINE FOR NEWCASTLE & RENTON SL 03/22/22REVISION 2 1-5 ONLY-RMV 6-8 ADD COUNTY LINE-KING COUNTY & RENTON, CHG TO UG FIBER ONLY-RMV WORK SHTS 6-8, UPDATE SOW, NOTES & RE# ALL SL 04/07/22SCOPE OF WORK:REPLACE 72CT & 12CT SS FIBER CABLES FROM MANHOLE 753 TO HANDHOLE. PSE IS ADDING & REMOVING POLES.WE WILL BE PLACING 2 - 4" RISERS @ 2 POLES AFTER THE DEVELOPER PLACES CONDUIT IN TRENCH.RDRAFTED BY: MOUNTAIN LTD/SL 11/15/2124N5E34N.870249W26226RNTNWA012611 UNION AVERENTON, WA 9805914MT LTD ENGINEER: RICK ROOFPHONE NO: (425) 873-1733EMAIL: rroof@mountainltd.comFIBER ENGINEER: TANAIYA ANDERSONPHONE NO: (253) 313-8961EMAIL: tanaiya.anderson@lumen.comMFP22001808 TTEE CATV CATV CATV GG TS TS WW S S SD SD IRRIG IRRIG C/L C/L R/W R/W R/W P/L P/L B/C B/C B/C EOP EOP TTTUSAMEEPWREETVTVVTSVWSSDVETTTXXX'XXX'XXX'XXX'XITEM #STATIONHT-CL-YRPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHERITEM#STAHT-CL-YRXX'-X"POLE#MAKE READYEXISTING ATTACHMENTSNOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTJOB:SH OF RNGE:SECT:TOWN:GEO CODE:WC CLLI: BEFORE YOU DIG811CALL TWO WORKING DAYSRDRAFTED BY: MOUNTAIN LTD/SL 11/15/2124N5E34N.870249W26226RNTNWA012611 UNION AVERENTON, WA 9805924MT LTD ENGINEER: RICK ROOFPHONE NO: (425) 873-1733EMAIL: rroof@mountainltd.comFIBER ENGINEER: TANAIYA ANDERSONPHONE NO: (253) 313-8961EMAIL: tanaiya.anderson@lumen.comMFP22001808 NOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTJOB:SH OF GEO CODE:WC CLLI:RNGE:SECT:TOWN:R BEFORE YOU DIG811CALL TWO WORKING DAYSDRAFTED BY: MOUNTAIN LTD/SL 11/15/2124N5E34N.870249W26226RNTNWA012611 UNION AVERENTON, WA 9805934MT LTD ENGINEER: RICK ROOFPHONE NO: (425) 873-1733EMAIL: rroof@mountainltd.comFIBER ENGINEER: TANAIYA ANDERSONPHONE NO: (253) 313-8961EMAIL: tanaiya.anderson@lumen.comNOTE:FOR UNDERGROUND ACTIVITY: TEST AND VENTILATEMANHOLE/UTILITY VAULT PRIOR TO ENTRY, PLACEWARNING DEVICES AND WORK AREA PROTECTION ASREQUIRED, AND USE EYE AND HEAD SAFETY PROTECTIONPER FEDERAL, STATE, AND LOCAL REGULATIONS.NOTE:THE RIGHT-OF-WAY SHOWN HAS NOT BEEN SURVEYEDOR TIED. RIGHT-OF-WAY LOCATION IS ASSUMED WITHREFERENCE TO ONLINE DATA SOURCE MATERIALS.CONTRACTOR TO VERIFY ALL RIGHTS OF WAY AND/OREASEMENTS PRIOR TO CONSTRUCTION.SEE SHEET 4 EOP EOP EOP EOP EOP EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W EOP EOP EOP EOP EOP EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W UNION AVE NE60' C/L C/L C/L C/L C/L C/L C/L C/L PARCEL#3345100512PARCEL#3345100511STATIONPSEPROPOSED HOAPOLE NUMBER(S) - LMN/PWR/OTHERPSE PLACING NEW POLE/PLACE 2-4" NEW PVC RISERDOWNNO #N/ANO 'A' TAG67+86SPEEDLIMIT30NOTE:REPLACE 72CT & 12CT SS FIBER CABLES FROM MANHOLE753 TO HANDHOLE. PSE IS ADDING & REMOVING POLES.WE WILL BE PLACING 2 - 4" RISERS @ 2 POLES AFTER THEDEVELOPER PLACES CONDUIT IN TRENCH.NEW P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L KING COUNTYRENTONPARCEL#0423059114NOTE:DEVELOPER TO PLACE 2-25TAHANDHOLES & 2-4" CONDUITS.MFP22001808RESTORATION PER CITY OF RENTON STANDARDS NOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTJOB:SH OF GEO CODE:WC CLLI:RNGE:SECT:TOWN:R BEFORE YOU DIG811CALL TWO WORKING DAYSDRAFTED BY: MOUNTAIN LTD/SL 11/15/2124N5E34N.870249W26226RNTNWA012611 UNION AVERENTON, WA 9805944MT LTD ENGINEER: RICK ROOFPHONE NO: (425) 873-1733EMAIL: rroof@mountainltd.comFIBER ENGINEER: TANAIYA ANDERSONPHONE NO: (253) 313-8961EMAIL: tanaiya.anderson@lumen.comNOTE:FOR UNDERGROUND ACTIVITY: TEST AND VENTILATEMANHOLE/UTILITY VAULT PRIOR TO ENTRY, PLACEWARNING DEVICES AND WORK AREA PROTECTION ASREQUIRED, AND USE EYE AND HEAD SAFETY PROTECTIONPER FEDERAL, STATE, AND LOCAL REGULATIONS.NOTE:THE RIGHT-OF-WAY SHOWN HAS NOT BEEN SURVEYEDOR TIED. RIGHT-OF-WAY LOCATION IS ASSUMED WITHREFERENCE TO ONLINE DATA SOURCE MATERIALS.CONTRACTOR TO VERIFY ALL RIGHTS OF WAY AND/OREASEMENTS PRIOR TO CONSTRUCTION.SEE SHEET 3 R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W UNION AVE NE60'106'STATIONPSEPROPOSED HOAPOLE NUMBER(S) - LMN/PWR/OTHERREMOVE POLE319112-167131TO BE REMOVEDA06037398+646STATIONPSEPROPOSED HOAPOLE NUMBER(S) - LMN/PWR/OTHERREMOVE POLE319092-167131TO BE REMOVEDA060373810+797 EOP EOP EOP C/L C /L C/L C/L C/L C/L C /L NE 27th PLACESPEEDLIMIT25PARCEL#0423059114PARCEL#0423059142PARCEL#0423059142 EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP SCHOOLSPEEDLIMIT20DURINGRESTRICTEDHOURSSTATIONPSEPROPOSED HOAPOLE NUMBER(S) - LMN/PWR/OTHERPSE PLACING NEW POLE/PLACE NEW 2-4" PVC RISERUPNO #PSE TO PLACENO 'A' TAG10+737NEW6'7'30'T SPEEDLIMIT30TNEW DEVELOPER PLACED 25TA HH48'34'NEW PROPOSEDNE 27th PLACE EOP EOP EOP NEW DEVELOPER PLACED 25TA HHNOTE:DEVELOPER TO PLACE 2-25TAHANDHOLES & 2-4" CONDUITS.RENTONNOTE:REPLACE 72CT & 12CT SS FIBER CABLES FROM MANHOLE 753 TOHANDHOLE. PSE IS ADDING & REMOVING POLES. WE WILL BEPLACING 2 - 4" RISERS @ 2 POLES AFTER THE DEVELOPER PLACESCONDUIT IN TRENCH. C/L C/L C/L C/L C/L MFP22001808