HomeMy WebLinkAboutMFP21001429.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP21001429
IVR Number: 21001429
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:04/04/2021Application Date:7941000310Parcel Number: 19919 TALBOT RD S
Permit Type:04/19/2021Issue Date:Franchise
Permit Work Class:04/19/2022Expiration Date:Minor Utility
Job Number: 141005626Franchise Type:Electric
Description: Puget Sound Energy Electric INSTALL RISER AT POLE (317539 166025). BORE IN SOFT SURFACE
APPROXIMATELY 430' SOUTHBOUND. BORE UNDER TALBOT RD S 125' TO PSE PROPERTY. 3" CONDUIT AND
48CT FIBER TO BE INSTALLED. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON
STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: BL.005109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
ZHOU HAIYING 19919 TALBOT ROAD SOUTH
RENTON , WA 98055
Owner
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031Specialized
Billing
X
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 1ϭ/Ϯϱ/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.܆ A copy of the Traffic Control Plan (TCP) Application form.
2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
܆ Include map(s) showing the location of the project and work area.
܆ Be legible lettering and clear, contrasting, symbols of viewing or printing.
܆ Must indicate street names, and north arrow and scale.
܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
܆ Types of plans required:
܆ Work hour plan – show all mobility impacts during construction hours.
܆ Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
܆ Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
܆ Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
4
4
4
4
4
4
4
4
4
4
4
141005626
991 TALBOT RD S
Monday Friday 8:00am 3:00pm
PLEASE SEE ATTACHED
POTELCO, INC 425 892 0416
Dylan Rutledge dylan.rutledge@pse.com
6905 S. 228TH ST KENT, WA 98032
MFP21001429
Scott Warlick CED 4/19/2021
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
x TCP must be approved prior to commencing the work, and all permit conditions shall be met.
x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
x Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
x Approved Temporary TCP must be at the work site during work hours.
x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
x Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
CORRIE RYDBERG
RIGHT LANECLOSEDAHEADW20-5RW20-7W4-2LROADWORKAHEADW20-1ROADWORKAHEAD991 TALBOT RD S
NATIONAL BARRICADE CO. LLCESTABLISHED IN 1951
Traffic Control SupervisorCard # 069749Traffic Plan Designer
Matt Wright
Evergreen Safety Council
EXP Date
01-22-21
Prepared By
Project Number
Phone Number (office) Project Location
Supervisor
DateEMAIL
Turnkey Telecom
Jeff Smith
TALBOT RD S
3-3-21
Matt Wright NATIONAL BARRICADE CO. LLC
ESTABLISHED IN 1951Phone Number
206.523.4045
turnkeytelecom@gmail.com
TYPICAL MOBILE RIGHT LANE CLOSURE NNOT TO
SCALE
TRAFFIC CONTROL PLAN
RENTON, WA
CHANNELIZING DEVICE SPACING (FEET)
TAPER TANGENT
1510
28“ CONES
FOR DELINEATION
SPACED @ 15’
SHALL MAINTAIN 11FT
TRAVEL WIDTH
ROADWORKAHEAD
ALL SIGNS AND SPACING TO CONFORM TO THE MUTCD AND THE CITY OF RENTON SPECSWORK AREA
TRAFFIC CONE
EXISTING TRAFFIC FLOW
LEGEND
SIGN LOCATION
Permit #__________
GENERAL NOTES
1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD
AND CITY OF RENTON SPECS.
2. PRIORITY PASSAGE THROUGH WORK AREA FOR EMERGENCY
VEHICLES SHALL BE PROVIDED AT ALL TIMES.
3. ALERT METRO TRANSIT 5 DAYS IN ADVANCE (IF APPLICABLE).
4. PROTECTIVE VEHICLE RECOMMENDED-MAY BE A WORK VEHICLE.
5 DEVICES SHALL NOT ENCROACH INTO ADJACENT LANES.
6. ALL SIGNS 48” X 48” B/O UNLESS OTHERWISE SPECIFIED.
7. CHANNELIZATION DEVICES ARE 28” REFL. CONES. (see
TABLE 1 for spacing distances).
8. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT GRADE
INTERSECTIONS AND/OR DRIVEWAYS.
MFP21001429
GRADYSUBSTATIONProject Location:Page-1:
T. Smith J. Smith J. Smith - 03/04/21 GRADY-SUB.DWG 03/04/211/4GRADY SUBSTATION FIBER BUILD
RENTONCITY OFDesigned by:Sheet:Scale:Date:Filename:Approved by-date:Checked by:
Confidential and ProprietaryRevised Date:Puget Sound
Energy
NTS PUGET SOUND ENERGY991 Talbot Rd SRenton, WashingtonWO# 141005626RENTONDennis LibadiaPuget Sound EnergyTelecom Fiber Transport Engineer9515 Willows Rd NERedmond,Wa.425 867-7338 ofc425 223-2108 cellPROJECTLOCATIONUNDERGROUNDIN ALL UNDERGROUND INSTALLATIONS, A TRACER WIREWILL BE RUN WITH THE FIBER OPTIC CABLE .PULLINGTENSION ON FIBER SHALL NOT EXCEED 600 LBSMAXIMUM.COMMUNICATION MARKERSCOMMUNICATIONS CABLE WRAP AROUND MARKERSSHALL BE INSTALLED AT EACH POLE LOCATION.FIBER HANDLINGALL FIBER CABLE ENDS WILL BE SEALED TO ENSURETHAT NO MOISTURE ENTERS.HANDLE FIBER WITH CARE. DO NOT ALLOW BEND RATIOSTO EXCEED 20 TIMES THEDIAMETER OF THE CABLE.PUGET SOUND ENERGY WILL TEST CABLE BEFORE ANDAFTER INSTALLATION TO CONFIRM THAT NO DAMAGEHAS OCCURRED WHILE IN THE CONTRACTOR'S CARE.SAFETYCONTRACTOR WILL PROVIDE ALL FLAGGING ANDWARNING SIGNS AS REQUIRED TO DO A SAFE JOB ANDMEET FEDERAL, STATE AND LOCAL REQUIREMENTS.PERMITTINGMOST CITY/STATE PERMITS REQUIRE THAT WE NOTIFYTHEM OF OUR INTENTION TO START A PROJECT 48HOURS IN ADVANCE OF CONSTRUCTION. CHECK YOURCOPIES FOR INFORMATION REGARDING NOTIFICATIONAND CALL 48 HOURS BEFORE YOUR INTENDED STARTDATE. PERMITS CAN BE VOIDED BY YOUR FAILURE TOMAKE NOTIFICATION. FOREMAN MUST HAVE COPIES OFPERMITS AT ALL TIMES WHERE REQUIRED.ADMINISTRATIONCONTRACTOR AUTHORIZED TO MAKE ON SITE CHANGESAS DEEMED NECESSARYFOREMAN IS TO SIGN AS-BUILT PRINTS AND RETURN TOPUGET SOUND ENERGY.ANY QUESTIONS ABOUT THE CONSTRUCTION OF THISJOB WILL BE ANSWERED BY:DENNIS LIBADIA - 425-867-7338FIELD NOTES:MFP21001429
GRADYSUBSTATION25ExistingPSE VaultsSAMS CLUBPARKING LOTSAMS CLUBOpen trench1-3" DuctTelcoBuildingDIRECTIONAL BORE 3" DUCT 430'RPlace 3" PVCriser at PSEFiber Splice onpoleDirectional bore1-3" duct acrossTalbot RdInterceptstubbed 3"duct125'118'143430'75'60706229286' SIDEWALK6' SIDEWALK6' SIDEWALK6' SIDEWALK6' S
IDEWALK 6' SIDEWALKTalbot RdTalbot Rd3 Lanes
2 LanesProject Location: Page: 2
T. Smith J. Smith J. Smith - 03/4/21 GRADY-SUB.DWG 03/04/212/4GRADY SUBSTATION FIBER BUILD
RENTONCITY OFDesigned by:Sheet:Scale:Date:Filename:Approved by-date:Checked by:
Confidential and ProprietaryRevised Date:Puget Sound
Energy
NTS0010NEW JOINT POLEJOINT POLEEXISTING RISERSTORAGE730FT730FT00DOUBLE DEADENDSTANGENT CLAMPSFIBER FTG. W/ STORAGEFIBER FTG. W/OUT STORAGER200'RENTONPLAN VIEW#SYMBOL CORRESPONDS TO PHOTOLOCATIONS AND ORIENTATION. SEESHEET FOR SITE PHOTOGRAPHS.MFP21001429POTHOLE ALL EXISTING UTILITIESRESTORATION PER CITY OF RENTON STANDARDS
Project Location:Page: 3
T. Smith J. Smith J. Smith - 03/04/21 GRADY-SUB.DWG 03/04/213/4GRADY SUBSTATION FIBER BUILD
RENTONCITY OFDesigned by:Sheet:Scale:Date:Filename:Approved by - date:Checked by:
Confidential and ProprietaryRevised Date:Puget Sound
Energy
NTS
RENTON MFP21001429
Project Location:Page: 4
T. Smith J. Smith J. Smith - 03/04/21 GRADY-SUB.DWG 03/04/214/4GRADY SUBSTATION FIBER BUILD
RENTONCITY OFDesigned by:Sheet:Scale:Date:Filename:Approved by - date:Checked by:
Confidential and ProprietaryRevised Date:Puget Sound
Energy
NTS
RENTONSITE PHOTOS#SYMBOL CORRESPONDS TO PHOTO LOCATIONSAND ORIENTATION. SEE PLAN VIEW SHEET.PHOTO #1 SEE PLAN VIEW PHOTO #4 SEE PLAN VIEW PHOTO #2 SEE PLAN VIEW PHOTO #3 SEE PLAN VIEW PHOTO #5 SEE PLAN VIEW Talbot RdTalbot RdTalbot RdTalbot RdTalbot RdGrady SubGrady SubGrady SubPSE VaultsPSE Splice cabinet3" PVC RiserDirectional Bore1-3" DuctDirectional Bore1-3" DuctPSE VaultsPSE VaultsMFP21001429
NNOT TO
SCALE
TRAFFIC CONTROL PLAN
RENTON, WA
CHANNELIZING DEVICE SPACING (FEET)
TAPER TANGENT
1510
28“ CONES
FOR DELINEATION
SPACED @ 15’
SHALL MAINTAIN 11FT
TRAVEL WIDTH
ALL SIGNS AND SPACING TO CONFORM TO THE MUTCD AND THE CITY OF RENTON SPECS GENERAL NOTES
1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD
AND CITY OF RENTON SPECS.
2. PRIORITY PASSAGE THROUGH WORK AREA FOR EMERGENCY
VEHICLES SHALL BE PROVIDED AT ALL TIMES.
3. ALERT METRO TRANSIT 5 DAYS IN ADVANCE (IF APPLICABLE).
4. PROTECTIVE VEHICLE RECOMMENDED-MAY BE A WORK VEHICLE.
5 DEVICES SHALL NOT ENCROACH INTO ADJACENT LANES.
6. ALL SIGNS 48” X 48” B/O UNLESS OTHERWISE SPECIFIED.
7. CHANNELIZATION DEVICES ARE 28” REFL. CONES. (see
TABLE 1 for spacing distances).
8. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT GRADE
INTERSECTIONS AND/OR DRIVEWAYS.
ROAD
WORKAHEAD
RIGHT LANE
CLOSED
AHEAD
W20-5R
W20-7
W20-1
W4-2L
W4-119L
PSE
STATION
POTHOLE ONE
LANE AT A TIME
CROSSING TALBOT RD S
TALBOT RD S TALBOT RD SPARKING LOT
PARKING LOT
Mobile Short Duration Right Lane Closure
to Pothole and Bore under roadway
This is a general place-
ment plan only and will
require field adjustments
to fit site conditions.
TEMPORARY RIGHT LANE CLOSURE
WORK AREA
TRAFFIC CONE
EXISTING TRAFFIC FLOW
LEGEND
SIGN LOCATION
Permit #__________
NATIONAL BARRICADE CO. LLCESTABLISHED IN 1951
Traffic Control SupervisorCard # 069749Traffic Plan Designer
Matt Wright
Evergreen Safety Council
EXP Date
04-22-25
Prepared By
Project Number
Phone Number (office) Project Location
Supervisor
DateEMAIL
Turnkey Telecom
Jeff Smith
TALBOT RD S
3-6-22
Matt Wright NATIONAL BARRICADE CO. LLC
ESTABLISHED IN 1951Phone Number
206.523.4045
turnkeytelecom@gmail.com
NNOT TO
SCALE
TRAFFIC CONTROL PLAN
RENTON, WA
CHANNELIZING DEVICE SPACING (FEET)
TAPER TANGENT
1510
28“ CONES
FOR DELINEATION
SPACED @ 15’
SHALL MAINTAIN 11FT
TRAVEL WIDTH
ALL SIGNS AND SPACING TO CONFORM TO THE MUTCD AND THE CITY OF RENTON SPECS GENERAL NOTES
1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD
AND CITY OF RENTON SPECS.
2. PRIORITY PASSAGE THROUGH WORK AREA FOR EMERGENCY
VEHICLES SHALL BE PROVIDED AT ALL TIMES.
3. ALERT METRO TRANSIT 5 DAYS IN ADVANCE (IF APPLICABLE).
4. PROTECTIVE VEHICLE RECOMMENDED-MAY BE A WORK VEHICLE.
5 DEVICES SHALL NOT ENCROACH INTO ADJACENT LANES.
6. ALL SIGNS 48” X 48” B/O UNLESS OTHERWISE SPECIFIED.
7. CHANNELIZATION DEVICES ARE 28” REFL. CONES. (see
TABLE 1 for spacing distances).
8. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT GRADE
INTERSECTIONS AND/OR DRIVEWAYS.
ROADWORK
AHEAD
RIGHT LANE
CLOSED
AHEAD
W20-5R
W20-7
W20-1
W4-2L
W4-119L
PSE
STATION
POTHOLE ONE
LANE AT A TIME
CROSSING TALBOT RD S
TALBOT RD S TALBOT RD SPARKING LOT
PARKING LOT
Mobile Short Duration Left Lane Closure
to Pothole and Bore under roadway
This is a general place-
ment plan only and will
require field adjustments
to fit site conditions.
TEMPORARY LEFT LANE CLOSURE
NATIONAL BARRICADE CO. LLCESTABLISHED IN 1951
Traffic Control SupervisorCard # 069749Traffic Plan Designer
Matt Wright
Evergreen Safety Council
EXP Date
04-22-25
Prepared By
Project Number
Phone Number (office) Project Location
Supervisor
DateEMAIL
Turnkey Telecom
Jeff Smith
TALBOT RD S
3-6-22
Matt Wright NATIONAL BARRICADE CO. LLC
ESTABLISHED IN 1951Phone Number
206.523.4045
turnkeytelecom@gmail.com
991 TALBOT RD S
ROADWORK
AHEAD
LEFT LANE
CLOSEDAHEAD
W20-5L
W20-7
W20-1
W4-2L
W4-119R
PSE
STATION
POTHOLE ONE
LANE AT A TIME
CROSSING TALBOT RD S
TALBOT RD S TALBOT RD SPARKING LOT
PARKING LOT
WORK AREA
TRAFFIC CONE
EXISTING TRAFFIC FLOW
LEGEND
SIGN LOCATION
Permit #__________
ROADWORK
AHEAD
RIGHT LANE
CLOSED
AHEAD
W20-5R
W20-7
W20-1
W4-2L
W4-119L
PSE
STATION
POTHOLE ONE
LANE AT A TIME
CROSSING TALBOT RD S
TALBOT RD S TALBOT RD SPARKING LOT
PARKING LOT
991 TALBOT RD S
W4-119R
PSE
STATION
POTHOLE ONE
LANE AT A TIME
CROSSING TALBOT RD S
TALBOT RD S TALBOT RD SPARKING LOT
PARKING LOT
991 TALBOT RD S
ROADWORK
AHEAD
LEFT LANE
CLOSEDAHEAD
W20-5L
W20-7
W20-1
W4-2L W4-119R PSE
STATION
POTHOLE ONE
LANE AT A TIME
CROSSING TALBOT RD S
TALBOT RD S TALBOT RD SPARKING LOT
PARKING LOTROADWORKAHEADLEFT LANECLOSEDAHEADW20-5LW20-7W20-1W4-2LNNOT TO
SCALE
TRAFFIC CONTROL PLAN
RENTON, WA
CHANNELIZING DEVICE SPACING (FEET)
TAPER TANGENT
1510
28“ CONES
FOR DELINEATION
SPACED @ 15’
SHALL MAINTAIN 11FT
TRAVEL WIDTH
ALL SIGNS AND SPACING TO CONFORM TO THE MUTCD AND THE CITY OF RENTON SPECS GENERAL NOTES
1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD
AND CITY OF RENTON SPECS.
2. PRIORITY PASSAGE THROUGH WORK AREA FOR EMERGENCY
VEHICLES SHALL BE PROVIDED AT ALL TIMES.
3. ALERT METRO TRANSIT 5 DAYS IN ADVANCE (IF APPLICABLE).
4. PROTECTIVE VEHICLE RECOMMENDED-MAY BE A WORK VEHICLE.
5 DEVICES SHALL NOT ENCROACH INTO ADJACENT LANES.
6. ALL SIGNS 48” X 48” B/O UNLESS OTHERWISE SPECIFIED.
7. CHANNELIZATION DEVICES ARE 28” REFL. CONES. (see
TABLE 1 for spacing distances).
8. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT GRADE
INTERSECTIONS AND/OR DRIVEWAYS.
Mobile Short Duration Left Lane Closure
to Pothole and Bore under roadway
This is a general place-
ment plan only and will
require field adjustments
to fit site conditions.
TEMPORARY LEFT LANE CLOSURE
NATIONAL BARRICADE CO. LLCESTABLISHED IN 1951
Traffic Control SupervisorCard # 069749Traffic Plan Designer
Matt Wright
Evergreen Safety Council
EXP Date
04-22-25
Prepared By
Project Number
Phone Number (office) Project Location
Supervisor
DateEMAIL
Turnkey Telecom
Jeff Smith
TALBOT RD S
3-6-22
Matt Wright NATIONAL BARRICADE CO. LLC
ESTABLISHED IN 1951Phone Number
206.523.4045
turnkeytelecom@gmail.com
WORK AREA
TRAFFIC CONE
EXISTING TRAFFIC FLOW
LEGEND
SIGN LOCATION
Permit #__________
ROADWORK
AHEAD
RIGHT LANE
CLOSED
AHEAD
W20-5R
W20-7
W20-1
W4-2L
W4-119L
PSE
STATION
POTHOLE ONE
LANE AT A TIME
CROSSING TALBOT RD S
TALBOT RD S TALBOT RD SPARKING LOT
PARKING LOT
991 TALBOT RD S
W4-119R
PSE
STATION
POTHOLE ONE
LANE AT A TIME
CROSSING TALBOT RD S
TALBOT RD S TALBOT RD SPARKING LOT
PARKING LOT
991 TALBOT RD S
PSE
STATION
POTHOLE ONE
LANE AT A TIME
CROSSING TALBOT RD S
TALBOT RD S TALBOT RD SPARKING LOT
PARKING LOTROADWORKAHEADLEFT LANECLOSEDAHEADW20-5LW20-7W20-1W4-2LW4-119RNNOT TO
SCALE
TRAFFIC CONTROL PLAN
RENTON, WA
CHANNELIZING DEVICE SPACING (FEET)
TAPER TANGENT
1510
28“ CONES
FOR DELINEATION
SPACED @ 15’
SHALL MAINTAIN 11FT
TRAVEL WIDTH
ALL SIGNS AND SPACING TO CONFORM TO THE MUTCD AND THE CITY OF RENTON SPECS GENERAL NOTES
1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD
AND CITY OF RENTON SPECS.
2. PRIORITY PASSAGE THROUGH WORK AREA FOR EMERGENCY
VEHICLES SHALL BE PROVIDED AT ALL TIMES.
3. ALERT METRO TRANSIT 5 DAYS IN ADVANCE (IF APPLICABLE).
4. PROTECTIVE VEHICLE RECOMMENDED-MAY BE A WORK VEHICLE.
5 DEVICES SHALL NOT ENCROACH INTO ADJACENT LANES.
6. ALL SIGNS 48” X 48” B/O UNLESS OTHERWISE SPECIFIED.
7. CHANNELIZATION DEVICES ARE 28” REFL. CONES. (see
TABLE 1 for spacing distances).
8. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT GRADE
INTERSECTIONS AND/OR DRIVEWAYS.
Mobile Short Duration Left Lane Closure
to Pothole and Bore under roadway
This is a general place-
ment plan only and will
require field adjustments
to fit site conditions.
TEMPORARY LEFT LANE CLOSURE
NATIONAL BARRICADE CO. LLCESTABLISHED IN 1951
Traffic Control SupervisorCard # 069749Traffic Plan Designer
Matt Wright
Evergreen Safety Council
EXP Date
04-22-25
Prepared By
Project Number
Phone Number (office) Project Location
Supervisor
DateEMAIL
Turnkey Telecom
Jeff Smith
TALBOT RD S
3-6-22
Matt Wright NATIONAL BARRICADE CO. LLC
ESTABLISHED IN 1951Phone Number
206.523.4045
turnkeytelecom@gmail.com
WORK AREA
TRAFFIC CONE
EXISTING TRAFFIC FLOW
LEGEND
SIGN LOCATION
Permit #__________
ROADWORKAHEADRIGHT LANECLOSEDAHEADW20-5RW20-7W20-1W4-2L PSE
STATION
POTHOLE ONE
LANE AT A TIME
CROSSING TALBOT RD S
TALBOT RD S TALBOT RD SPARKING LOT
PARKING LOT
W4-119LNNOT TO
SCALE
TRAFFIC CONTROL PLAN
RENTON, WA
CHANNELIZING DEVICE SPACING (FEET)
TAPER TANGENT
1510
28“ CONES
FOR DELINEATION
SPACED @ 15’
SHALL MAINTAIN 11FT
TRAVEL WIDTH
ALL SIGNS AND SPACING TO CONFORM TO THE MUTCD AND THE CITY OF RENTON SPECS GENERAL NOTES
1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD
AND CITY OF RENTON SPECS.
2. PRIORITY PASSAGE THROUGH WORK AREA FOR EMERGENCY
VEHICLES SHALL BE PROVIDED AT ALL TIMES.
3. ALERT METRO TRANSIT 5 DAYS IN ADVANCE (IF APPLICABLE).
4. PROTECTIVE VEHICLE RECOMMENDED-MAY BE A WORK VEHICLE.
5 DEVICES SHALL NOT ENCROACH INTO ADJACENT LANES.
6. ALL SIGNS 48” X 48” B/O UNLESS OTHERWISE SPECIFIED.
7. CHANNELIZATION DEVICES ARE 28” REFL. CONES. (see
TABLE 1 for spacing distances).
8. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT GRADE
INTERSECTIONS AND/OR DRIVEWAYS.
Mobile Short Duration Right Lane Closure
to Pothole and Bore under roadway
This is a general place-
ment plan only and will
require field adjustments
to fit site conditions.
TEMPORARY RIGHT LANE CLOSURE
NATIONAL BARRICADE CO. LLCESTABLISHED IN 1951
Traffic Control SupervisorCard # 069749Traffic Plan Designer
Matt Wright
Evergreen Safety Council
EXP Date
04-22-25
Prepared By
Project Number
Phone Number (office) Project Location
Supervisor
DateEMAIL
Turnkey Telecom
Jeff Smith
TALBOT RD S
3-6-22
Matt Wright NATIONAL BARRICADE CO. LLC
ESTABLISHED IN 1951Phone Number
206.523.4045
turnkeytelecom@gmail.com
WORK AREA
TRAFFIC CONE
EXISTING TRAFFIC FLOW
LEGEND
SIGN LOCATION
Permit #__________