Loading...
HomeMy WebLinkAboutContractEmergency Construction Contract  Agreement  CAG‐22‐102  THIS AGREEMENT (“Agreement”) is made as of the 11th  day of April, 2022, (the “Effective Date”)  by and between the City of Renton, a non‐charter code city under RCW 35A, and a Washington  municipal corporation (“Renton”), Public Works Department and Totem Electric INC,  (“Contractor”), who are collectively referred to as the “Parties”, to Replace a damaged signal  pole foundation, signal cabinet foundation, install a city supplied signal pole, install a city  supplies signal cabinet, and replace damaged wiring and conduit. City and Contractor agree as  set forth below.  Emergency Declaration.  On April 11, 2022, an emergency was declared by the City, on April 13, 2022 pursuant to RCW  39.04.280 and Renton Policy and Procedure 250‐02 paragraph 6.10 the Mayor issued a written  Declaration of Emergency, and the Renton City Council has scheduled the approval of a  Resolution finding and ratifying the Emergency Declaration waiving competitive  bidding  requirements and authorizing the City to award all necessary contacts for the emergency  1.Scope of Work :  Contractor will provide all material and labor necessary to perform all work described in the Scope of Work which is attached and fully incorporated into this Agreement by reference as Attachment “A.” 2.Changes in Scope of Work:  City, without invalidating this Agreement, may order changes to the Scope of Work consisting of additions, deletions or modifications, the Agreement Sum being adjusted accordingly by Parties mutual agreement.  Such changes in the work shall be authorized by written Change Order or Amendment signed by the Parties. 3.Time  of  Performance:    Contractor  commenced  performance  of  the  Agreement as authorized on April 11Th, 2022 in accordance with the Emergency Declaration.. 4.Term of Agreement: The Term of this Agreement shall end at completion of the Scope of Work, no later than 20 days from the Effective Date. Agreement may be extended to accomplish  change  orders,  if  required,  upon  mutual  written  agreement  of  City and Contractor. 5.Agreement Sum:  The total amount of this Agreement is time and material base d and shall not exceed $150,000.00 which includes Washington State Sales Tax.  This amount may be adjusted to a mutually agreed amount based on changes to the Scope of Work. CAG-22-102 PAGE 2 OF 12 6.Consideration:  In exchange for Contractor’s performance of the items and res ponsibilities identified in the Scope of Work, City agrees to make payment of the amount identified as the Agreement Sum. 7.Prevailing Wage/ Method of Payment/ Retainage/ Bonding:  Payment by the City for the Work will only be made after the Work has been performed and a voucher or invoice is submitted in a form acceptable to the City. A.Prevailing Wage Rates: Contractor must comply with the State of Washington prevailing wage requirements.  Contractor must file an Intent To Pay Prevailing Wage at the beginning of the project and an Affidavit of Wages Paid at the end of the project with the Washington State Department of Labor and Industries. The State of Washington prevailing wage rates applicable for this project, which is located in King County, may be found at the following website address of the Department of Labor and Industries: http://www.lni.wa.gov/TradesLicensing/PrevWage/default.asp http://www.lni.wa.gov/TradesLicensing/PrevWage/WageRates/default.asp Pursuant to WAC 296‐127‐011, the applicable effective date for prevailing wage rates paid for the duration of this contract shall be the date the contract is executed as reflected in the “Effective Date” identified at the top of the first page of this Agreement. Upon request, the City will provide a copy of the applicable prevailing wages for this project. Alternatively, the rates may be viewed at the City of Renton City Hall by making an appointment with the contact person identified herein or prior to contract award with the contact person identified as the City of Renton contact in Paragraph 15 Notices of this agreement. B.Retainage held by the City or in Escrow Account: Pursuant to RCW Chapter 60.28, a sum equal to five percent (5%) of the monies earned by the Contractor will be retained from payments made by the City to the Contractor under this Contract. This retainage shall be used as a trust fund for the protection and payment (1) to the State with respect to taxes imposed pursuant to RCW Title 82 and (2) the claims of any person arising under the Contract. Monies retained under the provisions of RCW Chapter 60.28 shall be: Contractor must pick one – if contractor does not pick one then the first option (retainage held in a fund by the City) applies. PAGE 3 OF 12 ___x____ Retained in a fund by the City.   or  ________ Deposited by the City in an escrow (interest‐bearing) account in a bank,  mutual saving bank, or savings and loan association (interest on monies so  retained shall be paid to the Contractor). Deposits are to be in the name of the  City and are not to be allowed to be withdrawn without the City’s written  authorization. The City will issue a check representing the sum of the monies  reserved, payable to the bank or trust company. Such check shall be converted  into bonds and securities chosen by the Contractor as the interest accrues.  At or before the time the Contract is executed, the Contractor shall designate the  option desired. The Contractor in choosing option (2) agrees to assume full  responsibility to pay all costs that may accrue from escrow services, brokerage  charges or both, and further agrees to assume all risks in connection with the  investment of the retained percentages in securities.   The City may also, at its option, accept a bond in lieu of retainage.  C.For Agreements over $150,000: Pursuant to RCW 60.26 and 39.08 The City requires a 5 % Retainage be withheld and that the Contractor will provide a Performance and Payment (Contract) Bond on the City approved form upon execution of the Agreement. Payment of the initial 95% will be made in the next pay cycle of the Renton Finance Department after receipt of such voucher or invoice (pay cycles are bi‐weekly).  The remaining 5% will be retained for the purpose of completion of the project and fulfillment of claims and liens. D.For Agreements under $150,000 Pursuant to RCW 60.26 and 39.08 the City requires a 5 % Retainage be withheld and that the Contractor will provide either a Performance and Payment (Contract) Bond on the City approved form upon execution of the Agreement or waive the payment and performance bond and instead the City will retain 10%. Payment of the initial 95% will be made in the next pay cycle of the Renton Finance Department after receipt of such voucher or invoice (pay cycles are bi‐weekly).  The remaining 5% will be retained for the purpose of completion of the project and fulfillment of claims and liens. (Unless the Contractor waives the payment and performance bond below and opts for a 10% retainage below.) Contractor must pick one – if contractor does not pick one then the first option (5% retainage with contract bond) applies: PAGE 4 OF 12 _______ To provide a payment and performance bond (contract bond) in the  amount of 100% of the estimate including taxes with a 5% retainage.  or   ___x____ To waive a payment and performance bond (contract bond) and  instead the city will retain the remaining 10% will be retained for the purpose of  completion of the project and fulfillment of claims and liens.  E.For limited Public Works Contracts under $35,000 For limited public works projects, the City may choose to waive the payment and performance bond requirements of chapter 39.08 RCW and the retainage requirements of chapter 60.28 RCW, for laborers, mechanics, subcontractors, material persons, suppliers, and taxes imposed under Title 82 RCW that may be due from the contractor for the limited public works project, however The City shall have the right of recovery against the contractor for any payments made on the contractor's behalf. F. City shall have the right to withhold payment to Contractor for any work not completed in a satisfactory manner until such time as Contractor modifies such work so that the same is satisfactory. G. Final Acceptance.  Final Acceptance of the Project occurs when the Public Works Director has determined that the Project is one hundred percent (100%) complete and has been constructed in accordance with the Plans and Specifications. H.Payment in the Event of Termination.  In the event this Contract is terminated by the either party, the Contractor shall not be entitled to receive any further amounts due under  this  Contract  until  the  work  specified  in  the  Scope  of  Work  is satisfactorily completed, as scheduled, up to the date of termination.  At such time, if the unpaid balance of the amount to be paid under the Contract exceeds the expense incurred by the City in finishing the work, and all damages sustained by the City or which may be sustained by the City or which may be sustained by the reason of such refusal, neglect, failure or discontinuance of Contractor performing the work, such excess shall be paid by the City to the Contractor.  If the City’s expense and damages exceed the unpaid balance, Contractor and his surety shall be jointly and severally liable therefore to the City and shall pay such difference to the City.  Such expense and damages shall include all reasonable legal expenses and costs incurred by the City to protect the rights and interests of the City under the Contract. 8.Hold Harmless:  Contractor shall indemnify, defend and hold harmless City, its elected officials, officers, agents, employees and volunteers, from and against any and all claims, losses or liability, or any portion of the same, including but not limited to reasonable attorneys’ fees, legal expenses and litigation costs, arising from injury or death to persons, PAGE 5 OF 12 including injuries, sickness, disease or death of Contractor’s own employees, agents and  volunteers, or damage to property caused by Contractor’s negligent act or omission,  except for those acts caused by or resulting from a negligent act or omission by City and  its officers, agents, employees and volunteers.   Should a court of competent jurisdiction determine that this agreement is subject to RCW  4.24.115, (Validity of agreement to indemnify against liability for negligence relative to  construction, alteration, improvement, etc., of structure or improvement attached to real  estate…) then, in the event of liability for damages arising out of bodily injury to persons  or damages to property caused by or resulting from the concurrent negligence of the  contractor and City, its officers, officials, employees and volunteers, Contractor’s liability  shall be only to the extent of Contractor’s negligence.   It is further specifically and expressly understood that the indemnification provided in this  Agreement constitute Contractor’s waiver of immunity under the Industrial Insurance Act,  RCW Title 51, solely for the purposes of this indemnification. The Parties have mutually  negotiated and agreed to this waiver. The provisions of this section shall survive the  expiration or termination of this Agreement.   9.Insurance:  Contractor shall secure and maintain: A.Commercial general liability insurance in the minimum amounts of $1,000,000 for each occurrence/$2,000,000 aggregate for the Term of this Agreement. B.Professional liability insurance, in the minimum amount of $1,000,000 for each occurrence, shall also be secured for any professional services being provided to City that are excluded in the commercial general liability insurance. C.Workers’ compensation coverage, as required by the Industrial Insurance laws of the State of Washington, shall also be secured. D.It is agreed that on Contractor’s commercial general liability policy, the City of Renton will be named as an Additional Insured on a non‐contributory primary basis.  City’s insurance policies shall not be a source for payment of any Contractor liability. E.Subject to City’s review and acceptance, a certificate of insurance showing the proper endorsements, shall be delivered to City before executing the work of this Agreement. F.Contractor shall provide City with written notice of any policy cancellation, within two (2) business days of their receipt of such notice. G.Additional Insurance if marked as “Required” by City: PAGE 6 OF 12 1.☐ Required.  Builders Risk insurance covering interests of the City, the Contractor, Subcontractors, and Sub‐contractors in the work.  Builders Risk insurance shall be on a  special perils policy form and shall insure against the  perils  of  fire  and  extended coverage  and  physical  loss  or  damage including flood,  earthquake,  theft,  vandalism,  malicious  mischief,  and collapse. The Builders Risk insurance shall include coverage for temporary buildings, debris removal and damage to materials in transit or stored off‐ site.  This Builders Risk insurance covering the work will have a deductible of $5,000  for  each  occurrence,  which  will  be  the  responsibility of the Contractor.  Higher deductibles for flood and earthquake perils may be accepted by the City upon written request by the Contractor and written acceptance by the City.  Any increased deductibles accepted by the City will remain the responsibility of the Contractor.  The Builders Risk insurance shall be maintained until final acceptance of the work by the City. 2.☐ Required.    Contractors  Pollution  Liability  insurance  covering losses caused by pollution conditions that arise from the operations of  the Contractor.  Contractors Pollution Liability insurance shall be written in an amount of at least $1,000,000 per loss, with an annual aggregate of at least $1,000,000. Contractors  Pollution  Liability  shall  cover  bodily injury, property damage, cleanup costs and defense including costs and expenses incurred in the investigation, defense, or settlement of claims. If the Contractors Pollution Liability insurance is written on a claims‐made basis, the Contractor warrants that any retroactive date applicable  to coverage under the policy precedes the effective date of this contract; and that continuous coverage will be maintained or an extended discovery period will be exercised for a period of three (3) years beginning from the time that work under the contract is completed. The City shall be named by endorsement as an additional insured on the Contractors Pollution Liability insurance policy. If the scope of services as defined in this contract includes the disposal of any hazardous materials from the job site, the Contractor must furnish to the City evidence of Pollution Liability insurance maintained by the disposal site operator for losses arising from the insured facility accepting waste under  this  contract.  Coverage  certified  to  the  Public  Entity  under this paragraph must be maintained in minimum amounts of $1,000,000 per loss, with an annual aggregate of at least $1,000,000. PAGE 7 OF 12 Pollution Liability coverage at least as broad as that provided under ISO  Pollution Liability‐Broadened Coverage for Covered Autos Endorsement CA  99 48 shall be provided and the Motor Carrier Act Endorsement (MCS 90)  shall be attached.  10.Discrimination Prohibited: Except to the extent permitted by a bona fide occupational qualification, the Contractor agrees as follows: A.Contractor, and Contractor’s agents, employees, representatives, and volunteers with regard to the Work  performed or to be performed under this Agreement, shall not discriminate on the basis of race, color, sex, religion, nationality, creed, marital status, sexual orientation or preference, age (except minimum age and retirement provisions), honorably discharged veteran or military status, or the presence of any sensory, mental or physical handicap, unless based upon a bona fide occupational  qualification  in  relationship  to  hiring  and  employment,  in employment or application for employment, the administration of the delivery of Work  or any other benefits under this Agreement, or procurement of materials or supplies. B.The Contractor will take affirmative action to insure that applicants are employed and that employees are treated during employment without regard to their race, creed, color,  national  origin,  sex,  age,  sexual  orientation,  physical,  sensory or mental handicaps, or marital status.  Such action shall include, but not be limited to the following employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms of compensation and selection for training. C.If Contractor fails to comply with any of this Agreement’s non‐discrimination provisions, City shall have the right, at its option, to cancel the Agreement in whole or in part. D.Contractor is responsible to be aware of and in compliance with all federal, state and local laws and regulations that may affect the satisfactory completion of the project, which  includes  but  is  not  limited  to  fair  labor  laws  and worker's compensation. 11.Independent Contractor: Contractor’s employees, while engaged in the performance of any of Contractor’s Work  under this Agreement, shall be considered employees of the Contractor and not employees, agents, representatives of City and as a result, shall not be entitled to any coverage or benefits from the City of Renton. Contractor’s relation to City shall be at all times as an independent contractor. Any and all Workman’s Compensation Act claims on behalf of Contractor employees, and any and all claims made by a third‐party   PAGE 8 OF 12   as a consequence of any negligent act or omission on the part of Contractor’s employees,  while engaged in Work  provided to be rendered under this Agreement, shall be the solely  Contractor’s obligation and responsibility.  12. City of Renton Business License: The Consultant shall obtain a City of Renton Business  License prior to performing any Work and maintain the business license in good standing  throughout the term of this agreement with the City.  Information regarding acquiring a city business license can be found at:  http://www.rentonwa.gov/cms/One.aspx?portalId=7922741&pageId=9824882  Information regarding State business licensing requirements can be found at:  http://dor.wa.gov/doing‐business/register‐my‐business  13. Record Keeping and Reporting:  Contractor shall maintain accounts and records, which  properly  reflect  all  direct  and  indirect  costs  expended  and  Work  provided  in  the  performance of this Agreement.  The Contractor agrees to provide access to and copies of  any records related to this Agreement as required by the City to audit expenditures and  charges and/or to comply with the Washington State Public Records Act (Chapter 42.56  RCW).   14. Public Records Compliance.  To the full extent the City determines necessary to comply  with the Washington State Public Records Act, Contractor shall make a due diligent search  of all records  in its possession, including, but not limited to, e‐mail, correspondence,  notes, saved telephone messages, recordings, photos, or drawings and provide them to  the City for production. In the event Contractor believes said records need to be protected  from disclosure, it shall, at Contractor’s own expense, seek judicial protection. Contractor  shall indemnify, defend, and hold harmless the City for all costs, including attorneys’ fees,  attendant to any claim or litigation related to a Public Records Act request for which  Contractor has responsive records and for which Contractor has withheld records or  information contained therein, or not provided them to the City in a timely manner.  Contractor shall produce for distribution any and all records responsive to the Public  Records Act request in a timely manner, unless those records are protected by court order.  15. Other Provisions:    A. Administration and Notices.  Each individual executing this Agreement on behalf  of City and Contractor represents and warrants that such individuals are duly  authorized to execute and deliver this Agreement on behalf of City or Contractor.   Any notices required to be given by the Parties shall be delivered at the addresses  set forth below.  Any notices may be delivered personally to the addressee of the  notice or may be deposited in the United States mail, postage prepaid, to the  address set forth below.  Any notice so posted in the United States mail shall be  PAGE 9 OF 12 deemed received three (3) calendar days after the date of mailing.  This Agreement  shall  be  administered  by  and  any  notices  should  be  sent  to  the undersigned  individuals or their designees.  CITY OF RENTON  Eric Cutshall  3555 NE 2nd ST BLDG B  Renton, WA 98057  Phone: (425) 430‐7423  ecutshall@rentonwa.gov  CONTRACTOR  Chris Bond/Roger Palfenier  2332 Jefferson AVE  Tacoma, WA 98402  Phone: 206‐730‐0217  rpalfenier@totemelectric.com  B.Amendment and Modification.  This Agreement may be amended only by an instrument in writing, duly executed by both Parties. C.Assignment and  Subcontract.    Contractor  shall  not  assign  or  subcontract any portion of  this  Agreement  without  the  City  of  Renton’s  prior  express written consent. D.Compliance with Laws.  Contractor and all of the Contractor’s employees shall perform the Work in accordance with all applicable federal, state, county and city laws, codes and ordinances. A copy of this language must be made a part of any contractor or subcontractor agreement. E.Conflicts.  In the event of any inconsistencies between contractor proposals and this contract, the terms of this contract shall prevail. F.Governing Law.  This Agreement shall be made in and shall be governed by and interpreted in accordance with the laws of the State of Washington. G.Joint Drafting Effort.  This Agreement shall be considered for all purposes as prepared by the joint efforts of the Parties and shall not be construed against one party or the other as a result of the preparation, substitution, submission or other event of negotiation, drafting or execution. H.Jurisdiction and Venue.  Any lawsuit or legal action brought by any party to enforce or interpret this Agreement or any of its terms or covenants shall be brought in the King County Superior Court for the State of Washington at the Maleng Regional Justice Center in Kent, King County, Washington, or its replacement or successor. Contractor hereby expressly consents to the personal and exclusive jurisdiction PAGE 10 OF 12 and venue of such court even if Contractor is a foreign corporation not registered  with the State of Washington.  I.Severability.  A court of competent jurisdiction’s determination that any provision or part of this Agreement is illegal or unenforceable shall not cancel or invalidate the remainder of this Agreement, which shall remain in full force and effect. J.Sole and Entire Agreement.  This Agreement contains the entire agreement of the Parties and any representations or understandings, whether oral or written, not incorporated are excluded. K.Third‐Party Beneficiaries.  Nothing in this Agreement is intended to, nor shall be construed to give any rights or benefits in the Agreement to anyone other than the Parties, and all duties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of the Parties and no one else. L.Waivers.  All waivers shall be in writing and signed by the waiving party.  Either party’s failure to enforce any provision of this Agreement shall not be a waiver and shall not prevent either City or Contractor from enforcing that provision or any other provision of this Agreement in the future.  Waiver of breach of any provision of this Agreement shall not be deemed to be a waiver of any prior or subsequent breach unless it is expressly waived in writing. IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of  Effective Date.  CITY OF RENTON  _____________________________  CONTRACTOR  ____________________________  Armondo Pavone, Mayor  1055 South Grady Way  Renton, WA 98057  _____________________________  Date  Attest  _____________________________              ____4/14/22__________________              Date 4-15-2022 PAGE 11 OF 12 Jason A. Seth  City Clerk  Approved as to Legal Form  _______________________________  Shane Moloney  Renton City Attorney  Non‐standard 4/12/22 clb 1982   Approved by Cheryl Beyer via 4/14/2022 email   PAGE 12 OF 12     Attachment A      SCOPE OF WORK    CITY OF RENTON    Signal pole foundation and signal cabinet foundation at Renton AVE EXT. and Taylor  AVE NW.      The work involved under the terms of this contract document shall be full and complete of  providing labor, materials, and equipment necessary to replace a compromised signal pole  foundation, signal cabinet foundation and all field wiring on the NE corner of Renton AVE EXT.  and Taylor AVE NW. The work will include, but not be limited to:    Intercept existing conduit and bring into new signal cabinet foundation   Install new signal cabinet foundation   Install new city supplied signal cabinet   Install new signal pole foundation on NE corner of intersection in island   Install 1 2” and 1 3” conduit from new signal pole foundation to nearest junction box   Install city supplied temporary signal pole and mast arm.    Install city supplied signal equipment   Rewire intersection field wiring as needed   Connect to the power source and put the signal pole in operation.    Remove old, damaged foundations. Foundation shall be removed 1’ below roadway grade.   Restore traffic island   All traffic control shall follow Washington State Work Zone Traffic Control Plans.  Any contractor connected with this project shall comply with all Federal, State, County, and City  codes and regulations applicable to such work and perform the work in accordance with the  current WSDOT Standard Specifications.