Loading...
HomeMy WebLinkAboutAddendum - 5AMENDMENT NO. 5 TO AGREEMENT FOR COULON MEMORIAL PARK TRESTLE BRIDGE REPLACEMENT THIS AMENDMENT,dated for reference purposes only as _________ __, is by and between the City of Renton (the "City"), a Washington municipal corporation, and WSP USA, Inc. ("Consultant"), a New York corporation. The City and the Consultant are referred to collectively in this Amendment as the "Parties." Once fully executed by the Parties, this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-20-009, dated January 13, 2020, to provide necessary services for the Coulon Memorial Beach Park Trestle Bridge Replacement (referred to herein as the "Agreement"). Whereas, the Parties wish to amend the Agreement to change the consultant hourly rates, as provided in Exhibit A-5, to complete the engineering and construction administration services. NOW THEREFORE, it is mutually agreed upon that CAG-20-009 is mended as follows: 1.Compensation: Section 4, Compensation, is amended so that the maximum amount of compensation payable to Consultant is unchanged by this Amendment and the Consultant shall continue to be paid based upon Work actually performed according to the rate(s) or amounts specified to the Amended Rates in Exhibit A-5 ,which is attached and incorporated herein. 2.All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. IN WITNESS WHEREOF,the Parties have voluntarily entered into this Amendment as of the date last signed by the Parties below. CITY OF RENTON By: K� "&�- Parks and Recreation Administrator CONSULTANT By:_�--�-�-�--- Kara Crawford, PE Senior Director, Local Business Leader­ Federal Way CAG-20-009, Adden #5-22 April 15, 2022 Date Approved as to Legal Form By: _________ _ Shane Maloney Renton City Attorney Contract Template Updated 06/17/2021 Clb Non Standard 4/11/22 1025 April 12, 2022 Date PAGE 2 OF 2 (approved via email from Cheryl Beyer on 4/15/2022) WSP USA Suite 300 33301 Ninth Avenue South Federal Way, WA 98003-2600 +1 206-431-2300 wsp.com March 31, 2022 Mr. Alan Wyatt Capital Projects Manager City of Renton 1055 South Grady Way Renton, WA 98057 Subject: Gene Coulon Memorial Beach Park Trestle Bridge Replacement Engineering Request for Rate Increase Dear Mr. Wyatt: WSP USA is respectfully requesting a modification to the rates provided to the City of Renton in 2019, for the Gene Coulon Memorial Beach Park Trestle Bridge Replacement. In our original fee estimate we provided rates for staff for the work to be completed through 2021. As this project has moved into construction which to be completed in 2023, we would like to propose the following rates to account for promotions and raises for our staff in 2022, and 2023: Title Current 2021 Rate Proposed 2022 Rate Proposed 2023 Rate Manager/Project Engineer $151 $185 $192 Design Engineer $130 $133 $138 Senior Landscape Architect $161 $165 $171 Landscape Designer $161 $165 $171 Environmental Scientist $120 $129 $134 Senior CAD Operator $140 $145 $150 We propose this contract modification as a no cost change, with a maximum fee of $361,700 (Three Hundred Sixty-One Thousand and Seven Hundred Dollars), per contract amendment 3. We look forward to continuing to assist the City of Renton in its engineering needs. Sincerely, Kara C. Crawford, PE Garth Nelson, PE Project Manager | Assistant Vice President Project Manager | Engineer-Diver KCC:GDN