Loading...
HomeMy WebLinkAboutR-4178121n f 2 PLANT I NIS SPEC I P I CATIONS NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. PART I: GENERAL 1.1 SEQUENCING A. LANDSCAPE WORK THI5 SECTION INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING: I. PREPARATION OF 51,16-BA5E AS REQUIRED FOR GRA55 AND PLANTING BEDS. 2.FIN15H GRADING OF TOPSOIL MATERIALS. 3. PREPARATION OF 501L MIXTURES. +EXCAVATION AND BAGKFILLING FOR TREES AND SHRUBS. 5. PLANTING OF TREES, SHRUBS AND GROUNDGOVER5. 6. MISCELLANEOUS LANDSCAPE WORK. T. QUALITY ASSURANCE: SUBCONTRACT LANDSGAPE WORK TO A SINGLE FIRM SPECIALIZING IN LANDSCAPE WORK. 1.2 SOURCE QUALITY CONTROL A. GENERAL SHIP LANDSCAPE MATERIALS WITH GERTIBGATE5 OF INSPECTION REQUIRED BY GOVERNING AUTHORITIES. COMPLY WITH REGULATIONS APPLICABLE TO LANDSCAPE MATERIALS. 1. DO NOT MAKE SUBSTITUTIONS: IF SPECIFIED LANDSCAPE MATERIAL IS NOT OBTAINABLE, SUBMIT NON -AVAILABILITY TO LANDSCAPE ARCHITECT, TOGETHER WITH PROPOSAL FOR USE OF EQUIVALENT MATERIAL. WHEN AUTHORIZED, ADJUSTMENT OF CONTRACT AMOUNT WILL BE MADE, IF NECESSARY, 2.ANALY515 AND STANDARDS: PACKAGE STANDARD PRODUCTS WITH MANUFACTURERS CERTIFIED ANALYSIS, FOR OTHER MATERIALS, PROVIDE ANALYSIS BY REGOGNIZED LABORATORY MADE IN AGGORDANGE WITH METHODS ESTABLISHED BY THE ASSOCIATION OF OFBGIAL AGRIGULTURE CHEMISTS, WHEREVER APPLICABLE, B. TOR501L: BEFORE DELIVERY OF ADDITIONAL TOPSOIL, FURNISH LANDSCAPE ARCHITECT WITH WRITTEN STATEMENT GIVING LOCATION OF PROPERTIES FROM WHICH TOPSOIL 15 TO BE OBTAINED. G. PLANT MATERIAL: PROVIDE PLANT MATERIAL OF QUANTITY, SIZE, GENUS, SPECIES AND VARIETY SHOWN AND SCHEDULED FOR LANDSCAPE WORK AND GOMPLYING WITH RECOMMENDATIONS AND REQUIREMENTS OF AN51 ZbO.I, CURRENT EDITION, "AMERIGAN STANDARD FOR NURSERY STOCK". PROVIDE HEALTHY, VI60ROU5 STOCK, GROWN IN REGOONIZED NURSERY IN ACCORDANCE WITH GOOD HORTICULTURAL PRACTICE AND FREE OF DISEASE, INSECTS, EG65, LARVAE AND DEFECTS SUCH A5 KNOTS, SUN -SCALD, INJURIES, ABRASIONS, OR DISFI6UREMENT. I. EXCEPT A5 FOLLOWS, LABEL AT LEAST ONE TREE AND ONE SHRUB OF EACH VARIETY WITH A SECURELY ATTACHED WATERPROOF TAG BEARIN6 LEGIBLE DESIGNATION OF BOTANICAL AND COMMON NAME. 2. NOTIFY LANDSCAPE ARCHITECT PRIOR TO INSTALLATION FOR QUALITY INSPECTION, LOCATION OF PLANT MATERIAL AND REVIEW OF PLANTIN6 TIME AND SCHEDULE. LANDSCAPE ARCHITECT RETAINS THE RIGHT TO FURTHER INSPECT PLANT MATERIAL FOR 51ZE AND CONDITION OF BALLS AND ROOT SYSTEMS, INSECTS, INJURIES AND LATENT DEFECTS, AND TO REJECT UNSATISFACTORY OR DEFECTIVE MATERIAL AT ANY TIME DURING FR06RE55 OF WORK. REMOVE REJECTED TREES OR SHRUBS IMMEDIATELY FROM PROJECT SITE. D. TE5TIN6: OBTAIN SOIL TEST TO DETERMINE PH AND LIME REQUIREMENTS PRIOR TO PLANTING. E. MAINTENANCE INSTRUCTIONS: SUBMIT TYPEWRITTEN INSTRUGTION5 REGOMMENDIN6 PROCEDURES TO BE ESTABLISHED BY OWNER FOR MAINTENANCE OF LANDSCAPE WORK FOR ONE FULL YEAR. SUBMIT TO LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO EXPIRATION OF REQUIRED MAINTENANCE PERIOD(B. 1.5 DELIVERY STORAGE AND HANDLING A. TREES AND SHRUBS: PROVIDE FRESHLY DU6 TREES AND CONTAINERIZED SHRUBS. DO NOT PRUNE PRIOR TO DELIVERY UNLESS OTHERWISE APPROVED BY LANDSCAPE ARCHITECT. DO NOT BEND OR BIND -TIE TREES OR SHRUBS IN SUCH MANNER AS TO DAMAGE BARK, BREAK BRANGHES OR DESTROY NATURAL SHAPE, PROVIDE PROTECTIVE GOVERING DURING DELIVERY. DO NOT DROP BALLED AND BURLAPPED STOCK DURING DELIVERY, 1. DELIVER TREES AND SHRUBS AFTER PREPARATIONS FOR PLANTIN6 HAVE BEEN COMPLETED AND PLANT IMMEDIATELY. IF PLANTIN6 15 DELAYED MORE THAN 6 HOURS AFTER DELIVERY, SET PLANT MATERIAL IN SHADE, PROTECT FROM WEATHER AND MECHANICAL DAMAGE, AND KEEP ROOTS M015T BY GOVERIN6 WITH MULCH, BURLAP OR OTHER AGGEPTABLE MEANS OF RETAINING MOISTURE, 2D0 NOT REMOVE GONTAINER GROWN STOCK FROM GONTAINERS UNTIL PLANTING TIME, 1.4 JOB CONDITIONS A. PROCEED WITH AND COMPLETE LANDSCAPE WORK AS RAPIDLY AS PORTIONS OF THE SITE BEGGHE AVAILABLE, WORKING WITHIN SEASONAL LIMITATIONS FOR EACH KIND OF LANDSCAPE WORK REQUIRED. 1. UTILITIES: DETERMINE LOCATION OF UNDERGROUND UTILITIES AS REQUIRED BY LAW AND PERFORM WORK IN A MANNER WHICH WILL AVOID POSSIBLE DAMAGE. HAND FXGAVATF, AS REOUIRED. MAINTAIN GRADE STAKES SET BY OTHERS UNTIL REMOVAL 15 MUTUALLY AGREED UPON BY PARTIES CONCERNED, 2.EXGAVATION: WHEN CONDITIONS DETRIMENTAL TO PLANT GROWTH ARE ENCOUNTERED, SUGH AS RUBBLE FILL, ADVERSE DRAINAGE CONDITIONS, OR OBSTRUCTIONS, NOTIFY LANDSCAPE ARCHITECT BEFORE PLANTIN6. 5.PLANTIN6 TIME: PLANT OR INSTALL MATERIALS DURING NORMAL PLANTIN6 SEASONS FOR EACH TYPE OF LANDSCAPE WORK REQUIRED. GORRELATE PLANTING WITH SPECIFIED MAINTENANGE PERIODS TO PROVIDE MAINTENANCE FROM DATE OF SUBSTANTIAL COMPLETION. 1.5 GENERAL SITE CONDITIONS A. LANDSCAPE CONTRACTOR SHALL GIVE LANDSCAPE ARCHITECT A MINIMUM OF TEN (10) DAYS NOTICE PRIOR TO INTENTION TO PROCEED WITH CONSTRUCTION. B. CONSTRUCTION MUST BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE CODES, PERMIT CONDITIONS, ORDINANCES AND POLICIES OF THE GOVERNING JURISDICTION. C. THE APPLICANT IS RESPONSIBLE FOR OBTAINING ANY OTHER RELATED OR REQUIRED PERMITS PRIOR TO THE START OF CONSTRUCTION. D. A COPY OF THE APPROVED PLANS, SPECIFICATIONS, AND PERMIT APPROVALS MUST BE ON SITE WHENEVER CONSTRUCTION 15 IN PR06PES5 AND SHALL REMAIN ON SITE UNTIL PROJECT COMPLETION. E. LANDSCAPE ARCHITECT SHALL BE ON SITE, AS NECESSARY, TO MONITOR CONSTRUCTION AND APPROVE MINOR REVISIONS TO THE PLAN. 1.6 TOPSOIL A. ALL 6RADIN6 SHALL BE DONE PER THE APPROVED CIVIL SET AND SPECIFICATIONS. ALL PLANTING AREAS SHALL BE OVER -EXCAVATED 9" FOR PLAGEMENT OF IMPORTED 3-WAY TOPSOIL (GEDAR GROVE OR EQUAL). GENERAL CONTRACTOR SHALL PROTECT TOPSOIL AS NECESSARY TO ENSURE STABILITY AND ADEQUATE EROSION CONTROL. SEE TESL PLAN BY CIVIL FOR EROSION 5MP5 FOR THE SITE. STOCKPILED TOPSOIL SHALL BE SCREENED THROUGH A I" MESH PRIOR TO PLACEMENT IN PLANTING BEDS. o AV CIF NOTES tt�BNNorcN AFGI MT I. SURVEY FROVIDED BY AX15 5URVEY5 4 MAPPING, 15241 HE 90TH 5T, REDMOND, WA 46052, (425) 623-5100. WA pM 2. 51TE PLAN PROVIDED BY KPFF, 1601 FIFTH o FIGAV Wo. lI AVE, SUITE 1600, SEATTLE, WA 96101 p�wl�ansmK (206) 622-5&22. 3. SOURCE DRAWING WAS MODIFIED BY TALA5AEA CONSULTANTS FOR VISUAL ENHANCEMENT. NOT FOR CONSTRUCTION THESE PLAN5 HAVE BEEN %5MIT7ED TO THE APFAOPftIATE AGENCIES FOR REVIEW Alm APPROVAL UNTIL APPRCNE , Know whars below. THESE PLAN5 ARE: Call before you dig. 5U5JECT TO REV15ION B. IN ALL IN -GROUND LAN05CAPE BEDS OVER -EXCAVATE 9" BELOW FINISHED ELEVATION 5HOWN ON PLANS FOR PLACEMENT OF 4" OF STOCKPILED ORGANIC TOPSOIL OR IMPORTED 3-WAY TOPSOIL. TILL INTO THE TOP 6" OF 50136RADE PRIOR TO PLANTING. INSTALL AREA DRAINS WHERE LANDSCAPE CONTRACTOR DEEMS NEGE55ARY FOR PROPER DRAINAGE THIS PLAN DOES NOT INCLUDE DRAINA6E FOR LANDSCAPED AREAS. THIS SHALL BE ASSESSED AND INCLUDED WITH THE LANDSCAPE CONTRACTOR'S SCOPE FOR IMPLEMENTATION OF THIS LANDSCAPE PLAN. 1.7 PROJECT WARRANTY A. WARRANTY ALL PLANTING FOR A PERIOD OF ONE YEAR AFTER DATE OF FINAL ACCEPTANCE BY OWNER, AGAINST DEFECTS INCLUDING DEATH AND UNSATISFACTORY GROWTH, EXCEPT FOR DEFEGT5 RESULTING FROM NEGLECT BY OWNER, ABUSE OR DAMAGE BY OTHERS, OR UNUSUAL PHENOMENA OR INCIDENTS WHICH ARE BEYOND LANDSCAPE GONTRAGTOR'S CONTROL. B. IMMEDIATELY REMOVE AND REPLACE TREES, SHRUBS OR OTHER PLANTS FOUND TO BE DEAD OR IN UNHEALTHY CONDITION DURING WARRANTY PERIOD. REPLACE PLANT MATERIAL IN DOUBTFUL CONDITION AT END OF WARRANTY PERIOD; UNLESS, IN OPINION OF LANDSCAPE ARCHITECT, IT 15 ADVISABLE TO EXTEND WARRANTY PERIOD FOR A FULL GROWING SEASON. G. ANOTHER INSPECTION WILL BE CONDUCTED AT END OF EXTENDED WARRANTY PERIOD TO DETERMINE ACCEPTANCE OR REJECTION OF PLANT MATERIAL. ONLY ONE REPLACEMENT (PER TREE, SHRUB OR PLANT) WILL BE REQUIRED AT END OF WARRANTY PERIOD, EXCEPT FOR LOSSES OR REPLACEMENTS DUE TO FAILURE TO COMPLY WITH SPECIFIED REQUIREMENTS. PART 2: PRODUCTS AND MATERIALS 2.1 TOPSOIL A. IMPORTED TOPSOIL SHALL BE FERTILE, FRIABLE, SANDY LOAM, FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND FREE OF ROOTS, STAMPS, STONES LARGER THAN I" IN ANY DIMENSION, AND OTHER EXTRANEOUS OR TOXIC, MATTER HARMFUL TO PLANT GROWTH. 501L SHALL BE OF EQUAL PARTS BY VOLUME: SANDY LOAM, SAND AND GOMP05T. AGGEPTABLE PRODUCT: 3 WAY TOPSOIL FROM CEDAR GROVE OR APPROVED EQUAL. B. PROVIDE ADDITIONAL TOPSOIL FROM LOGAL SOURCES OR FROM AREAS HAVING SIMILAR 501L CHARACTERISTICS TO THAT FOUND AT PROJECT SITE. OBTAIN TOP501L ONLY FROM NATURALLY, WELL -DRAINED SITES WHERE TOPSOIL OCCURS IN A DEPTH OF NOT LE55 THAN b"; DO NOT OBTAIN FROM BOSS, MARSHES OR OTHER WETLAND AREAS. 2.2 501L AMENDMENTS A. LIME: NATURAL DOLOMITIC LIMESTONE CONTAINING NOT LE55 THAN 55% OF TOTAL CARBONATES WITH A MINIMUM OF 30% MAONE51UM CARBONATES, GROUND 50 THAT NOT LESS THAN 90% PASSES A 10-MESH SIEVE AND NOT LESS THAN 50% PASSES A 100-ME5H SIEVE. RATE OF APPLICATION SUITED TO SOIL ACIDITY AND TYPE OF PLANTING, AS DETERMINED BY 501L TESTING. B. ORGANIC MATTER: ORGANIC, WEED- AND DEBRIS -FREE COMPOST, GEDAROROVE OR EQUIVALENT. 2.3 MULCH A. BARK OR WOOD CHIP MULCH SHALL BE DERIVED FROM DOU6LA5 FIR, PINE, OR HEMLOCK SPECIES. THE MULCH SHALL NOT CONTAIN RESIN, TANNIN, OR OTHER COMPOUNDS IN QUANTITIES THAT WOULD BE DETRIMENTAL TO ANIMAL, PLANT LIFE, OR WATER QUALITY. SAWDUST SHALL NOT BE USED AS MULCH. B. MULCH SHALL BE MEDIUM -COARSE GROUND WITH AN APPROXIMATELY 3-INCH MINUS PARTICLE SIZE. FINE PARTICLES SHALL BE MINIMIZED 50 THAT NOT MORE THAN 30%, BY L005E VOLUME, WILL FA55 THROUGH A US NO. 4 SIEVE. 2.4 COMMERCIAL FERTILIZER D. FOR ALL PLANTING BEDS: PLANTINGS SHALL BE FERTILIZED WITH A SLOW-RELEA5E GENERAL GRANULAR FERTILIZER (I6-16-16), OR SLOW -RELEASE FERTILIZER TABLETS, WITH APPLICATION RATES AS SPECIFIED BY MANUFACTURER. FERTILIZER SHALL BE APPLIED AFTER PLANTING PIT 15 BAGKFILLED (OR DURING BAGKFILL IN THE CASE OF TABLETS), AND PRIOR TO APPLICATION OF MULCH. FERTILIZER SHALL NOT BE APPLIED BETWEEN NOVEMBER AND MARCH. E. 2.5 PLANT MATERIALS A. VERIFY QUANTITIES: VERIFY PLANT LOCATIONS AND QUANTITIES OF PLANTS ON THE PLANT SCHEDULE WITH TH05E REPRESENTED ON THE PLAN. ACTUAL PLANT QUANTITIES SHOWN ON PLANTING PLANS TO PREVAIL OVER QUANTITIES SHOWN ON PLANT SCHEDULE IN THE EVENT OF A DISGREPANCY. B. QUALITY: PROVIDE PLANT MATERIAL OF SIZE, GENUS, SPECIES AND VARIETY SHOWN AND SCHEDULED FOR LANDSCAPE WORK AND COMPLYING WITH RECOMMENDATIONS AND REQUIREMENTS OF AN51 Z60.1, CURRENT EDITION "AMERIGAN STANDARD FOR NURSERY STOCK". ALL PLANT MATERIALS TO BE LOCALLY GROWN (WESTERN WA, WESTERN OR, OR WESTERN BC,), HEALTHY, BUSHY, AND IN VIGOROUS GROWING CONDITION. IF REPLACEMENT OF PLANT MATERIAL 15 NECESSARY DUE TO CONSTRUCTION DAMAGE OR PLANT FAILURE WITHIN ONE YEAR OF INSTALLATION, SIZE AND QUALITY SHALL BE AS INDICATED ON THE PLANS. G. DECIDUOUS AND EVERGREEN TREES: PROVIDE BALLED AND BURLAPPED (545)TREES OF HEIGHT AND/OR CALIPER SCHEDULED AND WITH BRANCHING CONF16URATION RECOMMENDED BY ANSI Z60.1, CURRENT EDITION, FOR TYPE AND SPECIES REQUIRED. TREES TO HAVE UNIFORM BRANCHING, SINGLE STRAIGHT TRUNKS, (UNLESS SPECIFIED AS MULTI -STEM) AND CENTRAL LEADER INTACT AND UNDAMAGED. BALLED AND BURLAPPED STOCK SHALL HAVE BEEN ROOT PRUNED AT LEAST ONCE IN THE LAST THREE YEARS. CONTAINER STOCK SHALL BE FULLY ROOTED BUT NOT ROOT -BOUND. PLANT MATERIAL WITH DAMAGED ROOT ZONES OR BROKEN ROOTBALLS WILL NOT BE ACCEPTED. 2.6 TEMPORARY IRRIGATION A. A TEMPORARY (3 YEAR WARRANTEE) DRIP IRRIGATION SYSTEM SHALL BE DESIGNED AND INSTALLED BY LANDSCAPE CONTRACTOR UPON COMPLETION OF TOP501L PLACEMENT AND PRIOR TO INSTALLATION OF PLANTINGS WITHIN THE LANDSCAPE AREA. ALL PLANTED AREAS SHALL RECEIVE ADEQUATE DRIP COVERAGE TO ALL NEW PLANTINGS IN THE LANDSCAPED BEDS. B. PROVIDE WRITTEN VERIFICATION TO LANDSCAPE ARCHITECT THAT BAGKFLOW PREVENTION PER CODE EXISTS ON THE LINE TO BE USED AS A POINT OF CONNECTION FOR THE IRRIGATION SYSTEM. IF VERIFICATION CANNOT BE MADE, PROVIDE BAGKFLOW PREVENTION PER CODE AS A PART OF THE INSTALLATION. G. GENERAL CONTRACTOR SHALL PROVIDE SLEEVIN6, WATER AND ELECTRICITY FOR THE SYSTEM. LANDSCAPE CONTRACTOR SHALL PROVIDE ISOLATION VALVE AND CONNECTION TO WATER AND CONTROLLER. D. LANDSCAPE CONTRACTOR SHALL INSTALL 501L MOISTURE PROBE CONNECTED TO IRRIGATION SYSTEM TO DETERMINE WHEN IRRIGATION 15 NECESSARY DURING THE DRY SEASON. INSTALL PER MANUFAGTURER5 SPECIFICATIONS. E. LANDSCAPE CONTRACTOR 15 RESPONSIBLE FOR ENSURING PROPER FUNCTION AND CONNECTION OF THE IRP16ATION SYSTEMS, AND TO "WINTERIZE" INSTALLED IRRIGATION SYSTEM PRIOR TO OCT05ER 315T. 2.1 MISCELLANEOUS LANDSCAPE MATERIALS A. STAKES DEADMEN AND GUYS: PROVIDE STAKES AND DEADMEN OF SOUND NEW, PRESSURE TREATED HEM -FIR, FREE OF KNOT HOLES AND OTHER DEFECTS. SIZE AS FOLLOWS: STAKES: 2"X2"X8'-O", POINTED, STAINED DARK BROWN. B. DEADMEN: 2"X2"X3'-O% POINTED, STAINED DARK BROWN. PROVIDE WIRE TIES AND )UY5 OF 2-5TRAND, TWISTED, PLIABLE GALVANIZED IRON HIRE NOT LIGHTER THAN 12 6A. WITH ZING-GOATED TURNBUCKLES. PROVIDE NOT LESS THAN 5/4 INCH DIAMETER BLACK RUBBER OR PLASTIC HOSE, GUT TO REQUIRED LENGTHS TO PROTECT TREE TRUNKS FROM DAMAGE BY WIRES. C. LIGHTING: SEE DRAWINGS BY OTHERS FOR ALL OUTDOOR LIGHTING DETAILS. PART 3: EXECUTION 5.1 501L PREPARATION A. COORDINATE THE WORK OF THI5 SECTION WITH "IRRIGATION SYSTEM INSTALLATION". I. STAKE PROPOSED TREE LOCATIONS AND SECURE LANDSCAPE ARGHITE6T'5 AGGEPTANGE BEFORE START OF PLANTING WORK. MAKE MINOR ADJUSTMENTS AS MAY BE REQUESTED. 2. PREPARATION OF PLANTING AREAS: PRIOR TO PLANTINI TOPSOIL SHALL BE PLACED AND TILLED INTO THE 5UB6RADE PER THE TOPSOIL SECTION. 3. EXCAVATION FOR TREES AND SHRUBS: EXCAVATE PITS AND BEDS WITH VERTICAL SIDES AND WITH BOTTOM OF EXCAVATION SLIGHTLY RAISED AT CENTER TO PROVIDE PROPER DRAINAGE. SCARIFY SOIL IN BOTTOM AND SIDES OF PLANTING PIT. 4. FOR BALLED AND BURLAPPED (54 B) TREES AND SHRUBS, MAKE EXCAVATIONS AT LEAST TWICE AS WIDE AS THE BALL DIAMETER AND EQUAL TO THE BALL DEPTH, PLUS AN ALLOWANCE FOR SETTING OF BALL ON A T' LAYER OF COMPACTED PLANTING 501L MIXTURE. 5. FOR CONTAINER GROWN STOCK, EXCAVATE AS SPECIFIED FOR BALLED AND BURLAPPED STOCK, ADJUSTED TO SIZE OF CONTAINER WIDTH AND DEPTH. 5.2 PLANTING A. TIMING: TO OCCUR BETWEEN NOVEMBER I5T AND MARCH BST. NO PLANTING 15 TO BE PERFORMED WHEN GROUND 15 FROZEN. B. INSPECTION: NOTIFY LANDSCAPE ARCHITECT PRIOR TO PLANTING TO REVIEW QUALITY, PLACEMENT AND TIMING. STAKE THE PROPOSED LOCATION OF ALL TREES AND SHRUBS WITH AN APPROVED GODING SYSTEM. FOR LARGE GROUPINGS OF SINGLE SHRUB SPECIES, BOUNDARY MAY BE STAKED. LANDSCAPE ARCHITECT TO REVIEW AND APPROVE LOCATIONS PRIOR TO PLANTING OR RELOGATING PLANT MATERIAL. G. PLANTING TREES AND SHRUBS: SET BALLED AND 13UPLAPFED (34B) STOCK ON LAYER OF COMPACTED PLANTING SOIL MIXTURE, PLUMB AND IN CENTER OF PIT WITH TOP OF BALL 5LI&HTLY HIGHER THAN ADJACENT FIN15HED LANDSCAPE GRADES TO ACCOUNT FOR MULCH DEPTH. UNTIE AND REMOVE BURLAP FROM SIDES OF BALLS; RETAIN ON BOTTOMS. WIRE BASKETS, IF USED, SHALL BE GUT AWAY FROM ROOTBALL TO THE MAXIMUM EXTENT PRACTICABLE. WHEN SET, PLACE ADDITIONAL BAGKFILL AROUND BASE AND SIDES OF BALL, AND WORK EACH LAYER TO SETTLE BAGKFILL AND ELIMINATE VOIDS AND AIR POCKETS. PLACE FERTILIZER WHILE BACKFILLIN6. WATER AFTER PLACING FINAL LAYER OF BAGKFILL AND CORRECT ANY SETTLEMENT THAT MAY OCCUR. I. SET CONTAINER GROWN STOCK AS SPECIFIED FOR BALLED AND BURLAPPED STOCK, EXCEPT FULLY REMOVE CONTAINER. 2.CREATE SAUCER IN BAGKFILL AROUND TREES TO HELP RETAIN WATER. SAUCER AREA SHALL HAVE A DIAMETER OF AT LEAST 3 FEET. 3. TREES PLANTED TOO HIGH (EXPOSED SIDES OF ROOT BALL) OF TOO LOW (BURIED BASE OF TRUNK) WILL BE REQUIRED TO BE REPLANTED. D. PRUNE TREES AND SHRUBS ONLY TO REMOVE BROKEN OR DAMAGED BRANGHE5, OR AS DIRECTED BY LANDSCAPE ARCHITECT. ALL PRUNING SHALL FOLLOW STANDARD HORTICULTURAL PRACTICES. DO NOT GUT TREE LEADERS. ANY PRUNING OF SHRUBS SHALL RETAIN A NATURAL CHARACTER. DO NOT SHEAR SHRUBS I. REMOVE AND REPLACE EXGE551VELY PRUNED OR MALFORMED 5TOGK RESULTING FROM IMPROPER PRUNING. E. APPLY ANTI -DESICCANT 051NO POWER SPRAY TO PROVIDE AN ADEQUATE FILM OVER TRUNKS, BRANGHE5, STEMS, TWI55 AND FOLIAGE. I. IF DEGIDUOU5 TREES OR SHRUBS ARE MOVED IN FULL -LEAF, SPRAY WITH ANTI-DESIGGANT AT NURSERY BEFORE MOVING AND AGAIN 2 WEEKS AFTER PLANTING. F. GUY AND STAKE TREES IMMEDIATELY AFTER PLANTIN6, WITH 2 STAKES PER DECIDUOUS TREE OR 3 STAKES PER EVERGREEN TREE. ORIENT STAKES TO RESIST THE FORGE OF THE WIND. 6. PLANTIN6 6ROUNDGOVER: SPACE PLANTS AS SHOWN IN DETAIL. I. DIG HOLES LARGE ENOUGH TO ALLOW FOR 5PREADIN6 OF ROOTS AND BAGKFILL WITH PLANTIN6 SOIL. WORK 501L AROUND ROOTS TO ELIMINATE AIR POCKETS AND LEAVE A SLIGHT SAUCER INDENTATION AROUND PLANTS TO HOLD WATER. WATER THOROUGHLY AFTER PLANTING, TAKING CARE NOT TO GOVER GROWNS OF PLANTS WITH WET SOILS. 2. MULCH AREAS BETWEEN 6ROUNDCOVER PLANTS TO A DEPTH OF 31,. TAPER MULCH TO BASE OF 6ROUNDGOVERS AND TAKE EXTRA CARE TO ENSURE 6ROUNDCOVERS ARE NOT BURIED WITH MULCH. H. MULCH ALL PLANTING BEDS: PROVIDE NOT LESS THAN A 3-INCH THICKNESS OF MULCH AND FINISH LEVEL WITH ADJACENT FINISHED GRADES AND PAVED SURFACES. MULCH SHALL BE FEATHERED TO THE BASE OF PLANTS AND KEPT AT LEAST b-INCHES AWAY FROM THE CROWNS OF SHRUBS OR TRUNKS OF TREE5. 3.4 MAINTENANCE A. BEGIN MAINTENANCE IMMEDIATELY AFTER PLANTING. B. MAINTAIN TREES, SHRUBS AND OTHER PLANTS UNTIL FINAL PROJECT ACCEPTANCE BY OWNER BUT IN NO CASE LESS THAN 90 DAYS AFTER SUBSTANTIAL COMPLETION OF THE PROJECT. G. MAINTAIN TREES, SHRUBS AND OTHER PLANTS BY WATERING, PRUNING, CULTIVATING AND WEEDING AS REQUIRED FOR HEALTHY GROWTH. APPLY ANTI -DESICCANT AS SPECIFIED. RESTORE PLANTING SAUGERS. TIGHTEN AND REPAIR STAKE AND GUY SUPPORTS AND RESET TREES AND SHRUBS TO PROPER GRADES OR VERTICAL POSITION AS REQUIRED. SPRAY AS REQUIRED TO KEEP TREES AND SHRUBS FREE OF INSECTS AND DISEASE. 3.5 CLEANUP AND PROTECTION A. DURING LANDSCAPE WORK, KEEP PAVEMENTS GLEAN AND WORK AREA IN AN ORDERLY CONDITION. B. PROTECT LANDSCAPE WORK AND MATERIALS FROM DAMAGE DUE TO LANDSCAPE OPERATIONS, OPERATIONS BY OTHER CONTRACTORS AND TRADES AND TRESPASSERS. MAINTAIN PROTECTION DURING INSTALLATION AND MAINTENANCE PERIODS. TREAT, REPAIR OR REPLACE DAMAGED LANDSCAPE WORK AS DIRECTED. 3b INSPECTION AND ACCEPTANCE A. WHEN LANDSCAPE WORK 15 GOMPLETED, INGLUDIN6 MAINTENANCE, LANDSCAPE ARCHITECT WILL, UPON REQUEST, MAKE AN INSPECTION TO DETERMINE ACCEPTABILITY. B. LANDSCAPE WORK MAY BE INSPECTED FOR ACCEPTANCE IN PARTS ONLY IF AGREEABLE TO LANDSCAPE ARCHITECT, PROVIDED WORK OFFERED FOR INSPECTION 15 COMPLETE, INGLUDIN6 MAINTENANCE. C. WHERE INSPECTED LANDSCAPE WORK DOES NOT COMPLY WITH REQUIREMENTS, REPLACE REJECTED WORK AND CONTINUE SPECIFIED MAINTENANCE UNTIL RE -INSPECTED BY LANDSCAPE ARCHITECT AND FOUND TO BE ACCEPTABLE. REMOVE REJECTED PLANTS AND MATERIALS PROMPTLY FROM PROJECT SITE. 1 CIVIL CONSTRUCTION PERMIT /12/21 ° 11"ZLN AS NOTED araaar.' 1°0198°21991 DATUM CITY OF DL'T.TTOT.T g/Pu1bli RENTON Planning/Building/Public Works Dept. 2 CIVIL CONSTRUCTION PERMIT RESUBMNTAL WO8/31/21 o EP 3 CINL CONSTRUCTION PERMIT RESUBMIDAL 01/07/22 4 CIAL CONSTRUCTION PERMIT RESUBM17AL 0/11/22 PHN4 LK EP °- � 3f1 "f0°p1"' NO. REVISION BY DATE APPR as" R-417 8121 IN COMPLIANCE WITH CITY OF RENTON STANDARDS erra 4/060 22G I I D EVELOPMEWrENGINEERih MHerinsippo 04/07/2022 SOLERA 2842 NE SUNSET BLVD RENTON, WA 98056 PLANTING 5PECIFICATION5 .O O N O O O T N Lei Ln O M O O O O N Q Z) J M C'M CM O O O 00 r7