HomeMy WebLinkAboutR-417819NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M.
00
T
O
W
I—
MQ
LL
LU
J
O
U)
R
k
DOCY5190 Envelope Is 3B1B34D3-7E0A47sC ADB3i329FFE0C108
OPEN RICER TT VP VOTED ENDURSI B pRYEIT_
a
SEE OLD MANSURA
I PADS Dt ADEQUATE STRAPPING
ED
FAMETNYIENEt
PUBINGT MOTSU SC MIN
Wu*wNIIP_ TACK WELD IL
DEWATERING ORIFICE TLEGING SHALL METAL RISER
CORRUGATED
COMPLY WITH ASEAN FEET AND PASHTO FACE
WATERTIGHT COUPLING
DAWATERING ORIFICE SCH An STEEL AREA MIN
THE CITY OF RENTON SURFDIAMETER AS PER CALCULATIONS
CONCRETE BASE
(ALTERNATIVELY.
MAY BE USED TO PREVENT FOODS TONN
� S.RIVER DNA MIN ---------, I
NYiEB:
1. SEE CONSTRUCTION Pu"s FOR SPECIFIC PROJECT REOUu>itiba>.Ss
I OTHERIVEM
STD EPIANDRAWING
E216.30�
PUBLIC WORKS SEDIMENT POND RISER DETAIL eL..+MMeAS 8/13/202
DEPARTMENT artin Pastuch s
FOR REFERENCE ONLY
REFER TO EARLY CLEAR AND GRADE PERMIT
C21-003938
SITS
OPPOSING Envelope In 6EECF586602A4E4A-B436A317AA638679
THE FOLLOWING IS A LISTING OF GENE RALL NOTED THAT SHALL BE INCORPORATED IN FILE EROSION AND SEDIMENT CONTROL IESCR PLAN SET. OL FINE NOTES ON THEAPPLICABLE TO THE PROJECT HOWEVER, THE APPLICANT SHALL NOT RENUMBER NOR EDIT THE REMBUNINNE NOTES IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC
LIST MAY FAST PERTAIN TO EVERY PROJECT THE APPLICANT OR OWNER HEREBY REFERRED TO AS APKICANT MAY ANN OUT
REELECAND
I BEFORE MY CONSTRUCHRON OR DEVELOPMENT ACTIVITY SECURE A PREFCONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON HEREBY
REFERRED TO AS THE DRY FILE VOLUNTARY ADD THE APPLICANTS CONFEDERATION
2 THE APPLICANT IS RESPONSIBLE FOR OBETUNING THE WASHINGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGY) CONSTRUCTION STORMWATERGENERAL
PERM 17 IF IT IS e"IEEDFOR HE ROJEST THE SP UICANTSNUN SHALL EPAPROCE THE CITY COPIES OF ALL MONITORING REPORTS PROVIDED 70SCPLOGY
ASSOC ARE WITH3 THE ESC PENN SET SHALL INCLUDE AM ME CONSTRUCTI ON SEQUENCE DATA LING THE ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION
COMMENCEMENT TO POSTPROJECT CLEAN IN ORDER TO FULFILL PROJECT SEND REGUIREMENTS
4 THE BOUNDARIES OF
PRESCRIBED OR THE wCI516 "u ANC EEwu go[NrvGrEnA[INiC NGAND PROTEC [ENSHE FIEELD INACCO DANCE WITH PPP[ DIX u OFFING LIry OF
ALIRENTC SWPMIaRIORTOTHESTA OFPP DURPINGTHSCONSTRUCTION PERIOD, NO DISTUREAMN
CONSTRUCTION
5 STANSITZED CONSURSUCHRON ENTRANCES SPELL BE INSTALLED AT THE BEGINNING OF ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS MAY BEREQUIRED m ENSURE T THE OF THE ARE KEPTCLEAN AND THREATEN TO READ RIGHT OF WAY DOES NOT OCCUR FOR THE DALEATION OF THE PROJECT IF SEDIMENT IS TRACKED DEFEND, PUBLIC FUNDS SHALL
WAFERS OF THE STATE
6 WASHOUT TRW CONCRETE TIN USCOU SHALL BE PERFORMED UPDATE OR AN DESIGNATED CONCRETE AMBIENT AREAS ONLY US) NOT WASH OUT CONSCRIETE
TRUCKS ONTO THE GROUND OR TO STORM DOWNS OR OPEN D SENSE ON DUMPING OF EXCESS CONCRETE ANNUAL ONLY OCCUR IN DESIGNATED CONTENTS
ALL REOUIRw DEC USES SHALL BE CONSTRUCTED D ADD IN OPERATION PRIOR TO w.O CLEARING SUDAN CONSTRUCTION TO PREVENT TRANSroRTATION OF
SEDIMENT TO SURFACE WATER PURCHASE SYSTEM$ ADD ADJACENT PROPERTIES ALF EST 5MPSV $HALL BE MASON IN A SATISFACTORY CONDITION UNTIL
SLASH TIME THAT CLEAN UND ARTHUR CONSTRUCTION IS CENNINCIFTE AN A POTENTIAL FOR ON SITE E ROBLON HAS PASSED ALL ESC PIPE SHALL BE REMOVED AFTER
CONSTRUCTIONS IS COMPLETED AND THE SITE NEW BEEN STABILIZED TO ENSURE POTEENTANNA. FOR ONGITE EROSION DOES NOT EXIST THE MPLEMENTARKIN
8 ANY HAZARDOUS MATERIALS MY UI ADD REMOVAL
LLUTEU�flryB�o.N PRODUCTS THAT PoTOPOLRNS�aE OIPoEoERLY9 THE ESO USES DEPICTED ON THIS DRAWING ME INTENDED TO BE MINIMUM REQQRSEMENTS TO MEET ANTICIPATED GTE CONDITIONS ASSOUBTRUCTION
.
DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN SEE FOR LOCATION OF PIPES. RESTRATORSCHANNELSORSTORMLIVATERGANCLITIES
11 ANY DEVATERING SYSTEM NECESSARY FOR THE CONSTRUKETION OF SUPORARMATER FACILITIES SHALL BE SUBMITTED TO THE CITY FOR
12 ANY AREAS ON THROUGH APRIL INCLUDING STABILIZED OC.�s.:�ENEYSEaTxGSEEBEE°sa°a'Eo�aTEEN((Ooe,
BOTH) OR GT DSEASON IS OUHPTMaTHMM.WITH THE APPROVED
RISC COVER PS ISG, DEPENDS, MULCHING PLASTECOVEHISING ETC) IN CONFORMANCE WITH APPENDIX O OF THE RENTON SYRIA
13 WET SEASON FRO FREGUIREMRNTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER LET AND APRIL 30TH UNLESS OTHERWISE APPROVED PROVED DYTHE CITY
14 ANY AREA NEEDING ADDITIONAL EI MEASURES NET REGUIRENG IMMEDIATE ATTENTION SHALL BE ADDRESSED MATIN" EN1IS.
15 THE AEG SUED ON PACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MANINJUM OF ONCE A MONCH OR WITHIN 24 HOURS FOLLOGNING A STORM EVENT
INSPECTION AGO 14FINTERANCE SHALL OCCUR MORE FIRSEAUENTLY AS ASSURED By THE CITY
16 BEFORE DRAIN s`Fso°`DHFEEAoUBDRC;MMA EE'TI`BECE onoEWITIMAM TOs RECONSTRUCTION AREA ONVTOASEDIMENTIMENDoTRAP ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY EEL BEENGCONDITION
17 AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 213 OF THE CAPACITY OF THE CATCH BASIN SUMP ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE
CLEARED PRIOR TOPEAVING THE CLEARING OPERATION SHALL NOT FLUSH SEDIMENT IN WATER INTO THE D�STR�m SYSTEM
18 ANY PERMAMENT STERMYNHATER FACILITY LICKLATION USED AN A TEMPORARY SELFTLINS BASIN SHALL BE MODIFIED WITH THE NECESSARY EST BLUE$ AND SHALL
NEIRDEVIDEADEQUATEATTERESCAPACITY IF THE TEMPORARY FACILITY IS TO ULTIMATELY FUNCTION AS AN WILTRATION SYSTEM IN To PERMANENT STATE. THE
TEMPORARY FAGURP SHALL BE FAULT GFULDED SO THAT THE BYN ADD SIGN MAE AT LEAST THREE FEET ABOVE THE HAVE GRADE OF TI PERMANENT
FACILITY
19 ETC)SHALLB ^CLE°ARLYFENE DANDPROEEC"EoUSING DECEMPSTTOFAVOIDSEDIME°NTTATio'ANDCOMPAACTIONDURINGCONSTRU ex FN FAPLFPAVEMENT
.
20 PRIOR TO THE DURING UP OF THE MET UN(OCTOBERIST) ALL DISTURBED AREAS SHALLBEINSPE«DTOIC�DIFY WHICH ONES SHALL BESODDED SEEDED IN PREPARATION! FOR THE AINTER ANSI DISTURBED AREAS SHALL BE SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WAY ON
ciSITE
ALL ERIC BINGICSFIALL BE TISHRI AND STORMOVAJER CONVEYANCE SYSTEMS, OCCUPIED, AND ON SITE USES SHALL BE RESTORER TO THEIR FULLY
AN WHISIT OF THOSE ARMS TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN DISCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW
21 PRIOR TO FINAL OUN SDRUI ACCEPTANCE, THE PROJECT 81 TE SHALL BE STABILIZED TO PREVENT SUESTARDENT LADEN WATER FROM LEAVI No THE
FUNCTIONING CONDITION ALL DISTURBED ARUBA OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE PERMN DUTY STAR BODY AT A MI M1 MUM
DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED 70 ENSURE FIRST SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL MULCH
22 ROCKERIES SEE IB:STTEwoVT:HE�ACCORDANCEw, NOT BE TMTElIs: aaalsalo OF
ROADRG�-WAYSHA OR:ACCoC INTERNATIONAL
� 0,D""NG15NOTUSSTABIN,
STD. PLAN-268.00
PUBLIC WORKS EROSION AND SEDIMENT CONTROL
1 8:I v DEPARTMENT GAZ 9/28/2018
STANDARD PLAN NOTES DATE
Call 811
• business days
before you dig
CNIL CONSTRUCTION PERMIT
CIVIL CONSTRUCTION PERMIT RESUBM17AL
CIVIL CONSTRUCTION PERMIT RESUBMITTAL
NO. I REVISION
NTS
BY I DATE I APPR
An
AS NOTED RIZONL'W" ""o ISSAN
DATUM
AT PBLL
IF HAT ONE INCH
BASE �c�LY
ASPHALT SAW CUT LINE AT ENTIRE
PERIMETER OF 1:1.5 SLOPE TO
WITHIN THREE FEET OF FOUNDATION
OF STRUCTURE. OCCURS AROUND
ENTIRE A & B BUILDINGS
ALL EXISTING ASPHALT TO
REMAIN OUTSIDE OF BUILDING
FOOTPRINT FOR EROSION AND
SEDIMENT CONTROL
MEASURES. DEMOLITION AND
REMOVAL OF ASPHALT TO
OCCUR AT A LATER DATE.
t.1
lq:yff
16015th Avenue, Suite 1600
Seattle, WA 98101
2016.622.5822
www.kieff.com
CITY OF
' FENTON
Planning/Building/Public Works Dept.
NTS
THREE-FOOT ORANGE SNOW FENCE
TO BE INSTALLED AT THE ENTIRE
PERIMETER OF ASPHALT SAWCUT
LINE AND ATTACHED TO FIVE-FOOT
METAL STAKES AT SIX-FOOT
ON -CENTER MAXIMUM. ZIP TIES TO
BE USED TO SECURE SNOW FENCE
TO METAL STAKES.
ASPHALT VARIES IN THICKNESS. SLOPE TO
BEGIN FOUR TO SIX INCHES BELOW TOP OF
ASPHALT AND TO BE COVERED WITH
NSOUEEN & SANDBAGS UNTIL BACKFILLING
OF STRUCTURE CAN BE ACHIEVED. SAND
BAGS TO BE SECURED BY NYLON ROPE
AND STAKING AS NECESSARY TO PREVENT
NSOUEEN FROM BEING MOVED DURING
WEATHER EVENTS. SLOPE TO BE
MAINTAINED THROUGHOUT CONSTRUCTION
UNTIL SUCH TIME SLOPE IS REMOVED AND
REPLACED WITH BACKFILL TO STRUCTURE.
R-41781
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING
rr ippD 04/07/2022
SOLERA
2842 NE SUNSET BLVD
RENTON, WA 98056
TESC DETAILS
HAVE
17.121
O
N
O
T
O
O
N
Z
O
M
O
O
O
O
N
Q
J
M
M
M
O
O
O
Do
LL
19 141