Loading...
HomeMy WebLinkAboutR-417876NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. 00 Hit I O W H Q LU J O C7 k MATERIAL LOCATION DESCRIPTION AASHTO MATERIAL CLASSIFICATIONS COMPACTION / DENSITY REQUIREMENT ITNALFIL4 FILL MATERIAL FOR LAYER 'D' STARTS FROM THE TOP OF THE 'C' LAYER ANY SOIL/ROCK MATERIALS, NATIVE SOILS, PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED a TO THE BOTTOM OF FLEXIBLE PAVEMENT OR PER ENGINEER'S PLANS. CHECK PLANS N/A INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND OR UNPAVED FINISHED GRADE ABOVE. FOR PAVEMENT SUBGRADE REQUIREMENTS. PREPARATION REQUIREMENTS. NOTE THAT PAVEMENT SUBBASE MAY BE PART OF THE V LAYER INITIAL FILL FILL MATERIAL FOR LAYER AASHTO M145' BEGIN COMPACTIONS AFTER 12" (300 mm) OF C' STARTS FROM THE TOP OF THE GRANULAR WELL -GRADED SOIL/AGGREGATE A-1, A-2-4, A-3 MATERIAL OVER THE CHAMBERS IS REACHED. EMBEDMENT STONE ('B' LAYER) TO 18" MIXTURES, <35% FINES OR PROCESSED COMPACT ADDITIONAL LAYERS IN 6" (150 mm) MAX c AGGREGATE. OR UFTS TO A MIN. 95% PROCTOR DENSITY FOR WELL (450 mm) ABOVE THE TOP OF THE GRADED MATERIAL AND 95% RELATIVE DENSITY FOR CHAMBER. NOTE THAT PAVEMENT MOST PAVEMENT SUBBASE MATERIALS CAN AASHTO M43 PROCESSED AGGREGATE MATERIALS. ROLLER GROSS SUBBASE MAY BE A PART OF THE 'C' BE USED IN UEU OF THIS LAYER. 3, 357, 4, 467, 56, 57,, VEHICLE WEIGHT NOT TO EXCEED 12,000 Ibs (53 W). LAYER. 8, 10 DYNAMIC FORCE NOT TO EXCEED 20,000 Ibs (89 M). EMBEDMENT STONE: FILL SURROUNDING B THE CHAMBERS FROM THE FOUNDATION 'C' CLEAN, CRUSHED, ANGULAR STONE AASHTO M43' NO COMPACTION REQUIRED. STONE ('A' LAYER) TO THE LAYER 3, 3579 4, 467, 5, 56, 57 ABOVE. FOUNDATION STONE: FILL BELOW A CHAMBERS FROM THE SUBGRADE UP TO CLEAN, CRUSHED, ANGULAR STONE AASHTO M43' PLATE COMPACT OR ROLL TO ACHIEVE A FLAT THE FOOT (BOTTOM) OF THE CHAMBER. 3, 357, 4, 467, 5, 56, 57 SURFACE. ' ' PLEASE NOTE: 1. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE'. 2. WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR COMPACTION REQUIREMENTS. Call 811 • twoC business days before you dig BEGIN/END LINER AT TOP OF STONE -�, PERIMETER STONE (SEE NOTE 6) EXCAVATION WALL (CAN BE SLOPED OR VERTICAL) ADS GEOSYNTHETICS 601T NON -WOVEN GEOTEXTILE ALL AROUND CLEAN, CRUSHED, 1 LAYER OF ADS GEOSYNTHETICS NON -WOVEN ANGULAR STONE IN A & B LAYERS7I, / GEOTEXTILE BEWWEEN COVER STONE AND C LAYER. n 6" MINEND3500 CAP S� ADE SOILS— J/ MIN (SEE NOTE 4) PVC UNER (SEE NOTE 8) 3 1. MC3500 CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418-16a, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS" CHAMBER CLASSIFICATION 451 DESIGNATION SS. 2. SC-310 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 3. "ACCEPTABLE FILL MATERIALS" TABLE ABOVE PROVIDES MATERIAL LOCATIONS, DESCRIPTIONS, GRADATIONS, AND COMPACTION REQUIREMENTS FOR FOUNDATION, EMBEDMENT, AND FILL MATERIALS. 4. THE GEOTECHNICAL ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. 5. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS. 6. ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION. 7. MINIMUM COVER OF 18 INCHES REQUIRED TO BOTTOM OF PAVEMENT. FOR UNPAVED AND TEMPORARY INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR, COVER SHALL BE INCREASED TO A MINIMUM OF 30 INCHES. B. CHAMBER SYSTEM BOTTOM AND SIDES SHALL BE UNED WITH A NON —REINFORCED 30 MIL PVC LINER. LINER SHALL BE BETWEEN PERIMETER STONE/BOTTOM OF STONE AND SUBGRADE SOILS. STORMTECH MC-3500 FILL MATERIALS NTS (PER STORMTFDH - MOI)IFIFD BY KPFFI CIVIL CONSTRUCTION PERMIT CIVIL CONSTRUCTION PERMIT RESUBM17AL CIVIL CONSTRUCTION PERMIT RESUBMITTAL REVISION BY I DATE I APPR AS NOTED a':mow Nm9°°n°°, DATUM AT Eu IF NOT ONE INCH lcpff 36015th Avenue, Suite 1600 Seattle, WA 98101 2015.622.5822 www.kpff.com = CITY OF ' FENTON viav Planning/Building/Public Works Dept. R-417876 IN COMPLIANCE WITH CITY OF RENTON STANDARDS SURFACE WATER UTILITY DEVELOPMENT ENGINEERING JFarah04/01/2022 msippo04/07/2022 01 SOLERA 2842 NE SUNSET BLVD ° ® "' RENTON, WA 98056 C5.62 STORMWATER CHAMBER SYSTEM DETAILS CHI 76 14, Aw t1Q O M O O O O N Q J CM M M O O O 00 MT LL