HomeMy WebLinkAboutAdden 3  AMENDMENTNO.3TOAGREEMENTCAGͲ20Ͳ002FOR BRONSONWAYBRIDGE–SEISMICRETROFITANDPAINTING   THISAMENDMENT,datedforreferencepurposesonlyas________________,isbyandbetween theCityofRenton(the“City”),aWashingtonmunicipalcorporation,andSargentEngineers,Inc. (“Consultant”),aWashingtoncorporation.TheCityandtheConsultantarereferredtocollectively inthisAmendmentasthe“Parties.”OncefullyexecutedbytheParties,thisAmendmentis effectiveasofthelastdatesignedbybothparties.  Whereas,theCityengagedtheservicesoftheConsultantunderAgreementCAGͲ20Ͳ002,dated April14,2020,toprovidenecessaryservicesforthecompletionofDesignPhase1fortheBronson WayBridge–SeismicRetrofitandPaintingProject(referredtohereinasthe“Agreement”);  Whereas,thePartieswishtoamendtheAgreementtochangethescopeofworkandchangethe compensationinordertocompleteDesignPhase4fortheBronsonWayBridge–SeismicRetrofit andPaintingProject.  NOWTHEREFORE,ItismutuallyagreeduponthatCAGͲ20Ͳ002isamendedasfollows:  1.ScopeofWork:Section1,ScopeofWork,isamendedtoaddworkasspecifiedinExhibit AͲ3,whichisattachedandincorporatedherein.  2.TimeofPerformance:Section3,TimeofPerformance,isamendedpursuanttothe schedule(s)setforthinExhibitAͲ3.AllWorkshallbeperformedbynolaterthan December31,2024.  3.Compensation:Section4,Compensation,isamendedsothatthemaximumamountof compensationpayabletoConsultantisincreasedby$99,000from$290,864to$389,864, plusanyapplicablestateandlocalsalestaxes.Theadditionalcompensationshallbepaid baseduponWorkactuallyperformedaccordingtotherate(s)oramountsspecifiedin ExhibitsDͲ3andE3Ͳ3,whichisattachedandincorporatedherein.  4.AlltermsoftheAgreementnotexplicitlymodifiedhereinshallremaininfullforceand effectandsuchtermsshallapplytoWorkperformedaccordingtothisAmendmentasif fullysetforthherein.  INWITNESSWHEREOF,thePartieshavevoluntarilyenteredintothisAmendmentasofthedate lastsignedbythePartiesbelow.            CAG-20-002, Adden #3-22 April 15, 2022            4-15-2022 Approved by Cheryl Beyer via 4/14/2022 email Page1of11 EXHIBITAͲ3 SCOPEOFWORK  CONTRACT:CAGͲ20Ͳ002 PROJECT:BRONSONWAYBRIDGE–SEISMICRETROFITANDPAINTING CONSULTANT:SARGENTENGINEERS,INC.   A. PROJECTDESCRIPTION:  Nochangefromoriginalcontract.  B. PURPOSE:  NochangefromcontractAmendmentNo.2.  C. DESIGNCRITERIA  NochangefromcontractAmendmentNo.2.  D. GENERALASSUMPTIONS:  Nochangefromoriginalcontract.  E. DELIVERABLES:  DeliverablestobepreparedandproducedbytheCONSULTANT,aspartofthiscontractamendment,are identifiedattheendofeachtasklistedbelow.  F. SCHEDULE:  TheCITYanticipatesprojectconstructionwilloccurinsummer2022,sometimebetweenJulyandOctober. Therefore,finalbiddocumentsshallbecompletedtoallowenoughtimetoadvertisetheprojectforbids andtoawardandexecuteaconstructioncontractforthesummer2022constructionseasonandCedar Riverfishwindow.AnticipatedbidadvertisementdateisMay10,2022.  Giventhecontinueduncertaintywiththepublichealthcrisis,locally,nationallyandworldwide,shoulda stayͲinͲplaceorderand/ortravelbanbeenactedbytheFederalGovernment,StateofWashington,King Countyand/orCityofRentonthatresultsinconditionswheretheCONSULTANTcannotobtainfielddata requiredtocontinueworkonanygiventask,theCONSULTANTshallstopworkonthetask.Additionally, thecompletiondatesforthedeliverablesofthattaskwillbeextendedforaperiodoftimethatequalsthe timeperiodofthestayͲinͲplaceorderand/ortravelban.Finally,theoverallprojectschedulewillbe adjustedtoreflectthedelay.  G. SCOPEOFWORK:  TASK12–PROJECTMANAGEMENTFORDESIGNPHASENO.4             Page2of11 TheCONSULTANTwillprovideoverallprojectmanagement,coordinationwiththeCITY,monthlyprogress reportsandinvoicing.Thiseffortwillincludethefollowingelements.  12.1–Administration,CoordinationandSupervision x InitiateprojectsetͲupincludingestablishmentoftimesheets(chargecodes),creationofproject files(electronicandphysical)andschedulingofCONSULTANTpersonnelworkactivitiesforTasks 12,13and14describedinthiscontractamendment. x CoordinationwithCITYforanyrequiredpublicmeetingsorotherformsofpublicoutreachthat mayberequiredfortheworktobeperformedinthiscontract. x SupervisionofCONSULTANTpersonnelandactivitiestoensurecompliancewithcontractscope andscheduleandproperchargingoftimeagainstthecontract. x OversiteofsubͲconsultantactivitiestoensurecompliancewithcontractscope,scheduleand budget.  12.2–Invoicing x Preparationofmonthlyinvoiceswithprogressreportsthatincludethefollowing: o Summaryofbudget,expensestodateandexpensesforinvoiceperiod,assignedtoeachtask. o Summaryofworkaccomplishedfortheinvoiceperiod. o SummaryofoutstandingissuestoberesolvedbytheCITY. o Backupdetailthatincludesthename,directsalaryrateandhourscharged,foreachindividual chargingtimetothiscontract,fortheinvoiceperiod. o BackupdetailofalldirectnonͲsalarycostsincludedintheinvoicefortheworkperiod.  12.3–ProjectMeetingsandSiteVisits x DesignPhase4KickoffMeeting–AfterreceivingaNoticetoProceed(NTP)fromtheCITY,setup aDesignPhase4kickoffmeetingwithkeyCITYanddesignteampersonnel.Thepurposeofthe meetingistodiscusskeyelementsofthescopeofwork,projectscheduletimelinesandcritical pathelements.ThismeetingwillbeheldatRentonCityHall.However,thismeetingmaybeheld onͲlineorviaconferencecalliftheneedarises(e.g.RentonCityHallisclosedtothepublic). x MeetingsandcoordinationwithCITY–ForDesignPhase4,theCONSULTANTprojectmanagerwill participateinphoneconferencecallswiththeCITYprojectmanagertoprovidestatusupdates. Thefrequencyisestimatedtobeonceperweek.TheCONSULTANTprojectmanagerandkey teammemberswillattendprojectmeetingswiththeCITYprojectmanager.Estimatetwo meetings.TheCITYanticipatesthatthemeetingswillbeheldonͲlineorviaconferencecall. x ForanyfacetofaceprojectmeetingswiththeCITY,theCONSULTANTshallprepareanagenda, signͲinsheet,recordofmeetingincludingalistofactionitems,ifany. x Internaldesigncoordinationmeetings–TheCONSULTANTprojectmanagerwillconductregular internaldesigncoordinationmeetingsand/orconferencecallswithkeydesignteammembers includingsubͲconsultants. x SiteVisitforFinalEnvironmentalCoordination–CONSULTANTandCITYstaffmayperformone(1) sitevisitwiththeCITY’senvironmentalconsultanttodiscussenvironmentalconsiderations. x SiteVisitforDesignCoordination–Uptotwo(2)additionalsitevisitsareestimatedforthe CONSULTANTtoevaluateandverifyprojectdesignelementsduringDesignPhase4.Thesesite visitsmayalsoincludemeetingswiththeCITYandfranchiseutilitiestocoordinateanddiscuss temporaryrelocationofexistingfranchiseutilities,asnecessary.  12.4–EnvironmentalCoordination            Page3of11 x Asthefinaldesigniscompleted,coordinationwiththeCITY’senvironmentalconsultantmaybe necessarytoensurethatthedesignremainsincompliancewithenvironmentalpermitting.  DELIVERABLES  ThefollowingdeliverablesanddeliverytimesareincludedinTask9.  x Meetingagenda(s)inMicrosoftWordformat–DeliveredtotheCITYone(1)businessdaybefore scheduledmeeting. x SignͲinsheet(s)inMicrosoftWordorExcelformat–DeliveredtotheCITYatthescheduled meeting. x DraftrecordofmeetinginMicrosoftWordformat–DeliveredtotheCITYthree(3)businessdays afterscheduledmeeting. x FinalrecordofmeetinginMicrosoftWordformat–DeliveredtotheCITYthree(3)businessdays aftercommentsreceivedfromCITY. x Monthlyinvoiceswithprogressreports–DeliveredtotheCITYmonthly.  TASK13–FINALDESIGN–100%SUBMITTAL(ADREADY) ThefollowingitemsaretobeperformedbytheCONSULTANTunderthistask.  Assumption(s) x ThebudgetshowninExhibitDͲ3assumesthistaskisfour(4)weeksinduration. x Forthefinalconstructioncontract(100%),two(2)volumesareanticipated.Volume1consistsof instructionstobidders,scheduleofprices,bidandcontractforms(e.g.bidbond,agreement, contractbond,etc.),specialprovisionsandappendices.Volume2consistsofthecontractplans withbridgerecorddrawingsincludedattheendoftheplanset. x CITYtoassemblefinalconstructioncontract(100%)Volumes1and2inAdobepdfformatupon receiptofPlans,SpecialProvisionsandScheduleofPricesfromCONSULTANT.Oncefinal constructioncontractassemblyiscomplete,theCITYwillsendacompletepdfelectroniccopyof Volumes1and2totheCONSULTANT. x CITYtoadvertiseprojectforbids. x CITYtosubmitbiddocumentstoBuildersExchangeofWashington(BXWA).  13.1–100%Plans x Incorporatechanges/revisionsresultingfromthe90%reviewcomments. x The100%plansaretobethefinalplans,readytoadvertiseforbids.  13.2–FinalScheduleofPrices x Incorporateanychanges/revisionstotheScheduleofPricesresultingfrom90%review. x VerifyallprojectelementsareincludedasbiditemsintheScheduleofPrices. x VerifyquantitiesforallbiditemsintheScheduleofPrices. x VerifyallbiditemshaveameasurementandpaymentprovisionintheWSDOTStandard Specificationsand/orSpecialProvisions.  13.3–FinalSpecialProvisions x Incorporatechanges/revisionstoSpecialProvisionsDivisions1thru9resultingfrom90%review.            Page4of11 x UpdateTableofContentsforSpecialProvisionsasnecessary. x Updatepagenumberingasnecessary.StartpagenumbersonfirstpageofTableofContentsfor SpecialProvisions.PagenumberformattobeSPͲ#. x CoverofSpecialProvisionssectiontobestampedandsignedbyEngineerofRecord.  13.4–FinalEngineer’sOpinionofProbableConstructionCosts x Prepareafinalengineer’sopinionofprobableconstructioncostusingthebiditemlistand quantitiesdevelopedinSubtask13.2.Includeacontingencyonthetotalsumthatisappropriate fora100%submittalandcurrenteconomicconditions.  13.5–100%QA/QC x ReviewallCONSULTANTgeneratedworkperformedinSubtasks13.1through13.4forqualityand accuracy,priortosubmissiontoCITY.Noteerrorsand/oromissionsandreviewcorrections.  DELIVERABLES  ThefollowingdeliverablesanddeliverytimesareincludedinTask13.  x Final100%PlansinAdobepdfformat–DeliveredtotheCITYwithinfour(4)weeksafterNotice toProceeddate.AsperWAC196Ͳ23Ͳ020,finalplanssubmittedtotheCityforconstructionmust bestamped,signedanddatedbythelicensee. x FinalScheduleofPrices–DeliveredtotheCITYwithinfour(4)weeksafterNoticetoProceeddate. x FinalSpecialProvisions–DeliveredtotheCITYwithinfour(4)weeksafterNoticetoproceeddate. SpecialProvisionsSectioncovertobestamped,signedanddatedbytheCONSULTANTforthis submittal. x FinalEngineer’sOpinionofProbableCostsinAdobepdfformat–DeliveredtotheCitywithinfour (4)weeksafterNoticetoProceeddate.  TASK14–DESIGNSUPPORTDURINGBIDPHASE  ThefollowingitemsaretobeperformedbytheCONSULTANTunderthistask.  Assumption(s) x ThebudgetshowninExhibitDͲ3assumesthistaskisnine(9)weeksinduration. x ThebudgetshowninExhibitDͲ3assumesthree(3)inquiriesperweekduringthebidphase. Additionally,aSummaryofBiddersInquirieswillbeissuedaminimumofonceperweekduring thebidphase. x ThebudgetshowninExhibitDͲ3assumestwo(2)Addendawillbeissuedduringthebidphase. Additionally,eachAddendawillinvolverevisionstothree(3)SpecialProvisionSectionsandthree (3)Plansheets.  14.1–ResponsestoBidderInquiries x TheCITYwillbetheprimarycontactforinquiriesfrombiddersaspertheinstructionstobidders. x TheCITYwillprovidecopiesofallbidderinquiriestotheCONSULTANT. x TheCITYwilleitherprovidesuggesteddraftresponsestotheCONSULTANTforrevieworrequest responsesfromtheCONSULTANT.TheCONSULTANTshallprovidewrittenresponsestobidder inquiriestotheCITY,whenrequestedtodoso.            Page5of11 x Onceresponsesaresettledon,CITYtoprepareSummaryofBidderInquiriesandsubmitto CONSULTANTforreview.IfnocommentsaregeneratedbyCONSULTANT,CITYtosubmitto Builder’sExchangeofWashington(BXWA).  14.2–Addenda x TheCONSULTANTshallassistinthepreparationofuptotwo(2)addendatothecontract. AddendamayrequiremodificationstotheScheduleofPrices,SpecialProvisionsand/or EngineeringPlans. x CONSULTANTtopreparemodificationstoScheduleofPrices,asnecessary,withinputfromCITY. Addingbiditems,deletingbiditemsormodifyingbiditemnames,quantitiesand/orunitsof measurementwillrequireacompletereissueoftheScheduleofPriceswiththeapplicable Addendum.Therefore,theAddendumNumbershallbeaddedtotheheaderofeachpageofthe ScheduleofPricesissuedwiththeapplicableAddendum. x CONSULTANTtopreparemodificationstoSpecialProvisionsand/orEngineeringPlans,as necessary,withinputfromCITY.RevisionsonindividualsheetsoftheEngineeringPlansshallbe highlightedwithcloud(s).Smalltriangle(s)withtheapplicableaddendumnumberinsideshallbe addedtothesheet,adjacenttothecloud(s).Thetriangle(s)withapplicableaddendumnumber insideshallalsobeaddedtotheTitleBlockintheRevisionNumbersection.Therevision descriptionshallbe“AddendumNo.__”.Placecloud(s)onaseparatelayerthatistobeturned offwhengeneratingtheConformedEngineeringPlans. x CITYtoassembleAddendaandsubmittoCONSULTANTforreview.Ifnocommentsaregenerated byCONSULTANT,CITYtosubmittoBuilder’sExchangeofWashington(BXWA).  14.3–PreparationofConformedPlansandSpecialProvisions x Afterbidopening,theCONSULTANTshallconformSpecialProvisionsand/orEngineeringPlans anddelivertoCITYforincorporationintothefinalconstructioncontractdocuments.Addenda modificationstoSpecialProvisionsshallbeincorporatedintofinalconformedSpecialProvisions. AddendamodificationstoindividualsheetsoftheEngineeringPlansshallbeshownwithout cloudsinthefinalconformedEngineeringPlans. x CONSULTANTtodeliverfinalconformedSpecialProvisionsand/orEngineeringPlanstoCITYfor incorporationintofinalconstructioncontractdocuments.  14.4–PreparepreliminaryRecordofMaterials(ROM)andMasterListofSubmittals x TheCONSULTANTwillprepareapreliminaryRecordofMaterials(ROM)basedontheconstruction contractspecifications.TheprimarypurposeoftheROMisfortrackingtheapprovaland acceptancerequirementsformaterialspermanentlyincorporatedintotheproject.Ataminimum, theROMwillincludethebiditemnumber,quantity,unitofmeasurement,description, specificationreference(noteifstandardspec.(SS)orspecialprovision(SP))andconditionsof engineerapproval.AtemplatewillbeprovidedbytheCITYtotheCONSULTANTforanexample. ThepreliminaryROMwillbeprovidedtotheConstructionManagementTeamforreviewanduse indevelopingafinalROMfortheproject. x TheCONSULTANTwillprepareapreliminaryMasterListofSubmittalsbasedontheconstruction contractspecifications.TheprimarypurposeoftheMasterListofSubmittalsisfortrackingthe approvalofsubmittals(e.g.shopdrawings,SWPPP,criticalpathschedule,etc.)theContractoris requiredtoprovide.Ataminimum,thelistwillincludethespecificationreference(noteif standardspec.(SS)orspecialprovision(SP)),documentsrequiredforsubmission,andwhenthe submittalisrequired.ThepreliminaryMasterListofSubmittalswillbeprovidedtothe            Page6of11 ConstructionManagementTeamforreviewanduseindevelopingafinalMasterListofSubmittals fortheproject.  14.5–QA/QC x ReviewallCONSULTANTgeneratedworkperformedinSubtasks14.1through14.4forqualityand accuracy,priortosubmissiontoCITY.Noteerrorsand/oromissionsandreviewcorrections.  DELIVERABLES  ThefollowingdeliverablesanddeliverytimesareincludedinTask14.  x WrittenResponsetoBidderInquiry–DeliveredtotheCITYwithintwo(2)businessdaysafter receiptfromCITY. x ReviewofdraftCITYResponsetoBidderInquiry–DeliveredtotheCITYwithintwo(2)business daysafterreceiptfromCITY. x ReviewofdraftSummaryofBidderInquiries–DeliveredtotheCITYwithinone(1)businessday afterreceiptfromCITY. x SpecialProvisionmodificationsforAddenda–DeliveredtotheCITYwithinthree(3)businessdays afterrequestfromCITY. x PlanSheetrevisionsforAddenda–DeliveredtotheCITYwithinthree(3)businessdaysafter requestfromCITY. x ReviewofdraftAddenda(complete)–DeliveredtotheCITYwithinone(1)businessdayafter receiptfromCITY. x ConformedSpecialProvisionsand/orEngineeringPlans–DeliveredtotheCITYwithinthree(3) weeksafterbidopening. x PreliminaryROM–DeliveredtotheCITYwithinsix(6)weeksafterbidopening. x PreliminaryMasterListofSubmittals–DeliveredtotheCITYwithinsix(6)weeksafterbid opening.  TASK15–PROJECTMANAGEMENTFORDESIGNPHASENO.5  ThefollowingitemsaretobeperformedbytheCONSULTANTunderthistask,uponawardofthe constructioncontracttothelowestresponsiveandresponsiblebidder.  Assumption(s) x Asofthedateofawardoftheconstructioncontract,CONSULTANTTasks9and12willbe complete.TheCONSULTANTwillchargenomoreexpensestoTasks9and12afterthedateof awardandallunspentbudgetassignedtotheCONSULTANTforTasks9and12shallbereallocated toTask15,effectivethedatefollowingthedateofaward. x TheCITYrecognizesthatafutureamendmenttothisagreementmaybenecessarytoprovidefor sufficientbudgettocompletethistask.Therefore,afutureamendmentwillbepreparedand executedasnecessary,toaddbudgetforcompletionofthistaskand/oraddadditionalsubtasks andbudgettothistask.  15.1–Administration,CoordinationandSupervision            Page7of11 x InitiateprojectsetͲupincludingestablishmentoftimesheets(chargecodes),creationofproject files(electronicandphysical)andschedulingofCONSULTANTpersonnelworkactivitiesforTasks 15and16describedinthiscontractamendment. x SupervisionofCONSULTANTpersonnelandactivitiestoensurecompliancewithcontractscope andscheduleandproperchargingoftimeagainstthecontract. x OversiteofsubͲconsultantactivitiestoensurecompliancewithcontractscope,scheduleand budget.  15.2–Invoicing x Preparationofmonthlyinvoiceswithprogressreportsthatincludethefollowing: o Summaryofbudget,expensestodateandexpensesforinvoiceperiod,assignedtoeachtask. o Summaryofworkaccomplishedfortheinvoiceperiod. o SummaryofoutstandingissuestoberesolvedbytheCITY. o Backupdetailthatincludesthename,directsalaryrateandhourscharged,foreachindividual chargingtimetothiscontract,fortheinvoiceperiod. o BackupdetailofalldirectnonͲsalarycostsincludedintheinvoicefortheworkperiod.  15.3–ProjectMeetingsandSiteVisits x FirstmeetingwithContractor–Typically,theCITYschedulesameetingwiththeContractor, ConstructionManagementTeam,DesignEngineeringSupportTeamandEnvironmentalSupport Teamthedayafterawardoftheconstructioncontract.Thepurposeofthismeetingisthreefold. First,toprovidetheContractorwiththeconformedconstructioncontractforexecution.Second, tomakeintroductionsbetweenallthepartiesinvolvedwiththeproject.Third,todiscuss preliminariessuchaspotentialdaysoftheweekandtimesforweeklymeetingsandadateand timetoholdtheofficialPreͲConMeeting.PriortotheCOVIDͲ19pandemic,thismeetingwas typicallyheldinpersonatRentonCityHall.SinceCOVIDͲ19,thesemeetingshavebeenconduction onͲline.Forthisproject,itmaybeeitherorsomecombinationthereof. x PreͲConMeeting–ThisistheofficialPreconstructionMeetingfortheproject.Typically,the Contractor,ConstructionManagementTeam,DesignEngineeringSupportTeamand EnvironmentalSupportTeamattendthismeeting.Theprimarypurposeistodiscussandsettle preliminarymatters,projectschedule,weeklymeetingschedule,invoicecutoffdate,submittals plusanyothertopicdeemedimportantforconstruction.PriortotheCOVIDͲ19pandemic,this meetingwastypicallyheldinpersonatRentonCityHall.SinceCOVIDͲ19,thesemeetingshave beenconductiononͲline.Forthisproject,itmaybeeitherorsomecombinationthereof. x WeeklyMeetings–TheCITYandContractorwillholdweeklymeetingsforthedurationof construction.TheConstructionManagementTeam,DesignEngineeringSupportTeamand EnvironmentalSupportTeamareanticipatedtoroutinelyattendthesemeetings.Estimate12 weeklymeetings. x Sitevisitsduringconstruction–Shouldweeklymeetingsoccurinperson,theCONSULTANTmay decidetovisitthesiteandobservetheconstructionprogress.Itisassumedthatthismayoccur immediatelyfollowingtheweeklymeeting.Estimate6sitevisits. x SpecificsitevisitsrequestedbytheCITYͲTheCONSULTANTmaybeaskedbytheCITYtoperform specificsitevisitstoobserveanddiscussspecificissue(s)raisedbytheContractorduring construction.Thisrequestwillmostlikelyoccurataweeklymeeting,ifatall.Uponcompletionof thesitevisit,theCONSULTANTwillprepareandprovidearecordofthesitevisittotheCITY.This recordshouldaddresswho(whoconductedthesitevisit),what(issuetobeobservedand/or discussed),where(specificlocationoftheissue),when(dateandtime),why(thepurposeofthe            Page8of11 sitevisit),observationsmadeandanydirectionsgiventowardsresolvingtheissue.The requirementforasummaryofthesitevisitdoesnotapplytoroutinesitevisitsconductedto observeconstructionprogress.Estimate3specificsitevisits.  DELIVERABLES  ThefollowingdeliverablesanddeliverytimesareincludedinTask15.  x DraftrecordofsitevisitinMicrosoftWordformat–DeliveredtotheCITYthree(3)businessdays aftersitevisit. x FinalrecordofsitevisitinAdobepdfformat–DeliveredtotheCITYthree(3)businessdaysafter reviewcommentsreceivedfromCITY. x Monthlyinvoiceswithprogressreports–DeliveredtotheCITYmonthly.  TASK16–ENGINEERINGSUPPORTDURINGCONSTRUCTION  ThefollowingitemsaretobeperformedbytheCONSULTANTunderthistask,uponawardofthe constructioncontracttothelowestresponsiveandresponsiblebidder.  Assumption(s) x Asofthedateofawardoftheconstructioncontract,CONSULTANTTasks10,11,13and14willbe complete.TheCONSULTANTwillchargenomoreexpensestoTasks10,11,13and14afterthe dateofawardandallunspentbudgetassignedtotheCONSULTANTforTasks10,11,13and14 shallbereallocatedtoTask16,effectivethedatefollowingthedateofaward. x TheCITYrecognizesthatafutureamendmenttothisagreementmaybenecessarytoprovidefor sufficientbudgettocompletethistask.Therefore,afutureamendmentwillbepreparedand executedasnecessary,toaddbudgetforcompletionofthistaskand/oraddadditionalsubtasks andbudgettothistask.  16.1–SubmittalReviewandApproval x TheconstructioncontracthasrequirementsfortheContractortosubmitvariousdocumentsfor review.Thesedocumentsincludebutarenotlimitedtothefollowing: 9 RequestsforApprovalofMaterials(RAM’s) 9 ShopDrawings x TheConstructionManagementTeamwillbetaskedwithprovidinganinitialreviewofsubmittals withrecommendationsforapprovalorrejection.TheCITYmayprovideadditionalreview comments.ThesubmittalsandassociatedrecommendationswillbeprovidedtoCONSULTANTfor finalapprovalorrejection.  16.2–RequestsforInformation(RFI’s) x TheContractorwillbeinstructedtosubmitallRequestsforInformation(RFI’s)totheConstruction ManagementTeamandCITY. x TheConstructionManagementTeamand/orCITYwillprovidecopiesofallRFI’stothe CONSULTANT. x TheCITYwilleitherprovidesuggesteddraftresponsestotheCONSULTANTforrevieworrequest responsesfromtheCONSULTANT.TheCONSULTANTshallprovidewrittenresponsestoRFI’sto theCITYandConstructionManagementTeam,whenrequestedbytheCITYtodoso.            Page9of11 x TheConstructionManagementTeamand/orCITYwillprovidetheRFIresponsetotheContractor.  16.3–ChangeOrders x TheConstructionManagementTeamwillinitiateandpreparedraftchangeordersforreviewand commentbytheCITY.TheCITYwillsenddraftchangeorderstoCONSULTANTforreviewwithCITY reviewcomments.Oncefinalized,theConstructionManagementTeam,CONSULTANTandCITY willsignthechangeorder,priortoissuancetotheContractor. x Forchangeordersrequiringrevisionstoplansheetsand/orspecifications,theCONSUTLANTshall prepareanddeliverrevisedplansheetsand/orspecificationstotheCITYforincorporationinto thechangeorder,whenrequestedbytheCITYtodoso.  16.4–RecordDrawings x Uponphysicalcompletionoftheconstructioncontract,theCITYwillprovideredlinemarkupsof thebiddrawingsettotheCONSULTANT.TheCONSULTANTshallprepareasetofrecorddrawings fortheprojectbasedontheseredlinemarkups.Therecorddrawingsareintendedtocapture significantfieldchangesmadeduringconstruction(additions,modifications,ordeletions).The recorddrawingsetshallincludeandsheetsrevisedorreissuedduringconstructionastheresult ofchangeordersandshallincludechangesresultingfromRFIresponses.Thesedrawingsshallbe notedas“RecordDrawings”inthedrawingrevisionsblockandshallbestampedandsealedby theEngineerofRecord.  16.5–QA/QC x ReviewallCONSULTANTgeneratedworkperformedinSubtasks16.1through16.4forqualityand accuracy,priortosubmissiontoCITY.Noteerrorsand/oromissionsandreviewcorrections.  DELIVERABLES  ThefollowingdeliverablesanddeliverytimesareincludedinTask16.  x SubmittalReviewandApproval–DeliveredtotheCITYwithinthree(3)businessdaysafterreceipt ofthesubmittalfromCITYand/orConstructionManagementTeam. x RFIResponses–DeliveredtotheCITYwithinthree(3)businessdaysafterreceiptoftheRFIfrom CITYand/orConstructionManagementTeam. x ChangeOrderApprovals–DeliveredtotheCITYwithinthree(3)businessdaysafterreceiptofthe changeorderfromCITYand/orConstructionManagementTeam. x Revisionstodrawingsand/orspecificationsresultingfromchangeorders–DeliverytoCITYto bedeterminedonacasebycasebasisandmutualagreementbetweenCITYandCONSULTANT. Timefordeliveryisdependentupontheextentofchanges. x RecordDrawings–DeliverytotheCITYtobedeterminedbymutualagreementbetweenCITYand CONSULTANT.DeliverytooccursometimeaftertheacceptanceoftheprojectbytheCITY.Time fordeliveryisdependentupontheextentofchanges.   TASKS3–TRAFFICANALYSISANDTRAFFICCONTROLPLANS(SUPPLEMENTTOAMENDMENTNO.2)  ThefollowingitemssupplementTaskS3inAmendmentNo.2andaretobeperformedbythe subconsultant,KPG,P.S.(KPG),underthistask.            Page10of11  Assumption(s) x ThebudgetshowninExhibitE3Ͳ3assumesthesupplementalworkinthistaskissix(6)weeksin duration.  S3.1–Administration,CoordinationandSupervision x NochangefromcontractAmendmentNo.2.  S3.2–Invoicing x NochangefromcontractAmendmentNo.2.  S3.3–ProjectMeetings x DesigncoordinationmeetingswithCITYandCONSULTANTstaff.Thesemeetingsaretobeheldat RentonCityHall.However,thesemeetingsmaybeheldonͲlineorviaconferencecalliftheneed arises(e.g.RentonCityHallisclosedtothepublic).ItisestimatedthatKPGwillattendupto3 meetingsforDesignPhase4. x Internaldesigncoordinationmeetings–KPGwillconductregularinternaldesigncoordination meetingswithkeydesignteammembersand,asapplicable,withKPGsubͲconsultants.  S3.4–ReviewConstructionPhasing x NochangefromcontractAmendmentNo.2.  S3.5–TrafficModelRefinement x NochangefromcontractAmendmentNo.2.  S3.6–TrafficAnalysis x NochangefromcontractAmendmentNo.2.  S3.7–TechnicalMemorandum x KPGwillincorporateanyreviewcommentsfromCITYand/orCONSULTANTonthedraftfinal technicalmemorandumintoafinaltechnicalmemorandum.Thefinaltechnicalmemorandumis anticipatedtobeincludedwiththe100%submittal(Task13)submittedbytheCONSULTANTto theCITY.  S3.8–TrafficControlPlans x KPGwillreviewthedraftfinaltrafficcontrolplansandprovidecommentstoTrafficControl Services.TrafficControlServiceswillincorporaterevisions,resultingfromreviewcommentsfrom CITY,CONSULTANTand/orKPG,intothefinaltrafficcontrolplans.Thefinaltrafficcontrolplans areanticipatedtobeincludedinthe100%submittal(Task13)submittedbytheCONSULTANTto theCITY.  S3.9–ReviewTempTrafficControlBidItemsinScheduleofPricesandSpecialProvisions x NochangefromcontractAmendmentNo.2.  S3.10–BidPhaseSupport x AssistCONSULTANTinprovidingresponsetobidderinquiriesregardingTemporaryTrafficControl.            Page11of11 x KPGshallprepareplansheetrevisionstoTemporaryTrafficControlPlansforAddenda,upon requestfromCONSULTANT,andsubmittoCONSULTANTforincorporationintoAddendapackage. RevisionsonindividualsheetsoftheEngineeringPlansshallbehighlightedwithcloud(s).Small triangle(s)withtheapplicableaddendumnumberinsideshallbeaddedtothesheet,adjacentto thecloud(s).Thetriangle(s)withapplicableaddendumnumberinsideshallalsobeaddedtothe TitleBlockintheRevisionNumbersection.Therevisiondescriptionshallbe“AddendumNo.__”. Placecloud(s)onaseparatelayerthatistobeturnedoffwhengeneratingtheConformed EngineeringPlans. x Afterbidopening,theKPGshallconformTrafficControlPlanSheets,uponrequestfrom CONSULTANT,anddelivertoCONSULTANTforsubmissiontotheCITY.Addendamodificationsto individualsheetsoftheEngineeringPlansshallbeshownwithoutcloudsinthefinalconformed EngineeringPlans.  DELIVERABLES  ThefollowingdeliverablesanddeliverytimesareincludedinTaskS3.  x FinalTechnicalMemoranduminAdobepdfformat–DeliveredtotheCONSULTANTwithintwo (2)weeksafterreceivingreviewcommentsfromCITYand/orCONSULTANT.AsperWAC196Ͳ23Ͳ 020,officialfinalreportssubmittedtotheCITYmustbestamped,signedanddatedbythelicensee. x FinalTrafficControlPlansinAdobepdfformat–DeliveredtotheCONSULTANTwithintwo(2) weeksafterreceivingreviewcommentsfromCITYand/orCONSULTANT.AsperWAC196Ͳ23Ͳ020, officialfinalplanssubmittedtotheCITYformustbestamped,signedanddatedbythelicensee. x PlanSheetrevisionsforAddenda–DeliveredtotheCONSULTANTwithinthree(3)businessdays afterrequestfromCONSULTANT. x ConformedSpecialProvisionsand/orEngineeringPlans–DeliveredtotheCONSULTANTwithin three(3)weeksafterbidopening.   ADDITIONALSERVICES  TheCITYwillrequireadditionalservicesoftheCONSULTANTforfuturedesignphasesofthisproject. SectionBsummarizesthefuturedesignphasesanddescribestheworkanticipatedforeach.  Thescopeofworkforadditionalserviceswillbedeterminedbasedonanticipatedorunanticipatedproject needsorotherconsiderationsatthesolediscretionoftheCITY.Thisworkmayincludeitemsidentifiedin thecurrenttaskauthorizationsaswellotheritems,whichmayinclude,butarenotnecessarilylimitedto thefollowing:  x EngineeringSupportDuringConstructionServices x Otherservicesnotspecificallyreferencedthisscopeofwork.  Theseserviceswillbeauthorizedunderfuturesupplementalagreementstothiscontract.Atthetime theseservicesarerequired,theCONSULTANTshallprovideadetailedscopeofworkandanestimateof costs.TheCONSULTANTshallnotproceedwiththeworkuntiltheCITYhasauthorizedtheworkandissued anoticetoproceed.            CONTRACT:CAGͲ20Ͳ002 PROJECT:BRONSONWAYBRIDGEͲSEISMICRETROFITANDPAINTING PRIMECONSULTANT:SARGENTENGINEERS,INC. DIRECT(RAW)LABOR(DL): Classification DL HOURS TOTAL Principal $54.00 x 172 = $9,288 SeniorProjectEngineer $44.00 x 328 = $14,432 ProjectEngineer $40.00 x 0 = $0 DesignEngineer $35.00 x 0 = $0 $0.00 x 0 = $0 DLSubtotal=500 $23,720 INDIRECTCOSTRATE(ICR) DLxICRof 177.33% x $23,720 =$42,063 FEE(PROFIT) DLxFEE 30.00% x $23,720 =$7,116 DL+ICR+FEE=$72,899 DIRECTNONͲSALARYCOSTS(DNSC) Mileage 300 x $0.560 = $168 SUBTOTAL =$168 TOTALFORPRIME = $73,067 TOTALFORPRIME(ROUNDED)=$73,100 SUBCONSULANTS Traffic= $25,896 TOTALFORSUBCONSULTANTS = $25,896 TOTALFORSUBCONSULTANTS(ROUNDED)=$25,900 TOTAL=$99,000 EXHIBITDͲ3 PRIMECONSULTANTCOSTCOMPUTATIONSSUMMARY NEGOTIATEDHOURLYRATE Page1of2            CONTRACT:CAGͲ20Ͳ002 PROJECT:BRONSONWAYBRIDGEͲSEISMICRETROFITANDPAINTING PRIMECONSULTANT:SARGENTENGINEERS,INC. Principal Sr.Proj. Project Design Engineer Engineer Engineer $54.00 $44.00 $40.00 $35.00 TASK12ͲPROJECTMANAGEMENTFORDESIGNPHASENO.4 12.1 Administration,CoordinationandSupervision 160000$864 12.2 Invoicing80000$432 12.3 ProjectMeetingsandSiteVisits 88000$784 12.4 EnvironmentalCoordination 80000$432 Total 408000$2,512 IndirectCostRate(ICR) ICR=DLxICR% ICR%=177.33%ICR=$4,455 Fee(Profit) FEE=DLxFEE% FEE%=30.00%FEE=$754 DirectNonͲSalaryCost(DNSC) Mileage=300 Rate=$0.560 DNSC=$168 Task9Total=$7,888 Task9Total(Rounded)=$7,890 TASK13ͲFINALDESIGNͲ100%SUBMITTAL 13.1 100%Plans 100%PlanSheetsbySEI(Est.18) 8 72 0 0 0 $3,600 Review100%PlanSheetsbyKPG(Est.6) 8 16 0 0 0 $1,136 13.2 FinalScheduleofPrices 8 16 0 0 0 $1,136 13.3 FinalSpecialProvisions 8 40 0 0 0 $2,192 13.4 FinalEngineer'sOpinionofProbableCosts 8 24 0 0 0 $1,488 13.5 100%QA/QC 88000$784 Total 48 176 0 0 0 $10,336 IndirectCostRate(ICR) ICR=DLxICR% ICR%=177.33%ICR=$18,329 Fee(Profit) FEE=DLxFEE% FEE%=30.00%FEE=$3,101 DirectNonͲSalaryCost(DNSC) Mileage=0 Rate=$0.560 DNSC=$0 Task10Total=$31,766 Task10Total(Rounded)=$31,770 TASK14ͲDESIGNSUPPORTDURINGBIDPHASE 14.1 ResponsestoBidderInquiries 12 24 0 0 0 $1,704 14.2 Addenda 16 32 0 0 0 $2,272 14.3 PreparationofConformedPlansandSpecialProvisions 24 40 0 0 0 $3,056 14.4 PreparePrelimROMandMasterListofSubmittals 24 40 0 0 0 $3,056 14.5QA/QC 88000$784 Total 84 144 0 0 0 $10,872 IndirectCostRate(ICR) ICR=DLxICR% ICR%=177.33%ICR=$19,279 Fee(Profit) FEE=DLxFEE% FEE%=30.00%FEE=$3,262 DirectNonͲSalaryCost(DNSC) Mileage=0 Rate=$0.560 DNSC=$0 Task11Total=$33,413 Task11Total(Rounded)=$33,420 TotalHours=172 328 0 0 0 TotalMileage=300 TotalDL=$23,720 TotalICR=$42,063 TotalFEE=$7,116 TotalDNSC=$168 TOTAL=$73,067 TOTAL(ROUNDED)=$73,100 DirectLabor(DL) EXHIBITDͲ3 PRIMECONSULTANTͲHOURANDFEESUMMARY Task Description Total Page2of2            CONTRACT:CAGͲ20Ͳ002 PROJECT:BRONSONWAYBRIDGEͲSEISMICRETROFITANDPAINTING SUBCONSULTANT:KPG,P.S. Project SeniorProj Design SeniorTran Tran Office Manager Engineer Engineer Planner Planner Admin $56.00 $60.00 $42.50 $56.00 $36.54 $32.24 TASKS3ͲTRAFFICANALYSISANDTRAFFICCONTROLPLANS S3.1 Administration,CoordinationandSupervision 800000$448 S3.2 Invoicing200002$176 S3.3 ProjectMeetings(upto3meetings) 400000$224 S3.4 ReviewConstructionPhasing 000000 $0 S3.5 TrafficModelRefinement 000000 $0 S3.6 TrafficAnalysis 000000 $0 S3.7 TechnicalMemorandum 8 0 0 16 11 2 $1,810 S3.8 TrafficControlPlans 8 8 4 18 12 0 $2,544 S3.9 ReviewTempTrafficControlBidItems 048000$580 S3.10 BidPhaseSupport 4 0 24 0 8 0 $1,536 Total 34 12 36 34 31 4 $7,320 IndirectCostRate(ICR) ICR=DLxICR% ICR%=167.61%ICR=$12,269 Fee(Profit) FEE=DLxFEE% FEE%=30.00%FEE=$2,196 DirectNonͲSalaryCost(DNSC) Mileage=200 Rate=$0.56 DNSC=$112 TrafficCounts(7day,24hrtubecount,1location)=$0 ($800perlocation)DNSC=$0 TurningMovementCounts(peak2hr,13locations,AM&PMweekdaypeak)=$0 ($150perlocation)DNSC=$0 TrafficControlPlans(Est.8sheets90%to100%)=$4,000 DNSC=$4,000 TaskS3Total=$25,896 TaskS3Total(Rounded)=$25,900 TotalHours=34 12 36 34 31 4 TotalMileage=200 TotalDL=$7,320 TotalICR=$12,269 TotalFEE=$2,196 TotalDNSC=$4,112 TOTAL=$25,896 TOTAL(ROUNDED)=$25,900 EXHIBITE3Ͳ3 SUBCONSULTANTͲHOURANDFEESUMMARY Task Description DirectLabor(DL) Total Page1of1