HomeMy WebLinkAboutExhibit _ Conditions of Approval_Dylan SPDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Plan LUA16-000754
Satisfied
Engineering Generic Condition
The applicant will be required to provide an updated geotechnical report approving the discharge of stormwater over the steep
slopes to the west of the property. OR The applicant will be required to provide alternative flow control BMPs which do not point
discharge over the steep slopes to the west of the property.
Comments: The approved Civil Constructions provided alternative flow control BMPs which do not point discharge over the
steep slopes to the west of the property.
PLN - Administrative Decision Condition
1. The applicant shall submit a building permit for review and approval by the City and received final occupancy for the portion of
the existing residence on Lot 1 to be removed and remodeled in order to comply with Residential-4 (R-4) minimum side yard
setbacks (combined 20 feet with not less than 7.5 feet on either side) of the zone from Tract A (shared driveway) prior to final
plat approval.
Comments: The existing residence was remodeled under B16006207. The building permit included removing 319 square
feet to comply with the required side yard setback of the Residential-4 (R-4) zone. The remodel also included a 288 square
foot addition.
2. The applicant shall submit a detailed landscape plan that complies with RMC 4-8-120D.12 at the time of utility construction
permit application to the current planning project manager for review and approval. Landscaping within the right-of-way and
landscaping within the 10-foot wide landscape strip on Lot 1 shall be installed prior to short plat recording. Onsite landscaping
for Lot 2 shall be installed prior to final occupancy for the single family building permit.
Comments: A final detailed landscape plan that complied with RMC 4-8-120D.12 was submitted and approved prior to utility
construction permit (U16006809) issuance.
3. The applicant shall submit a permanent drainage easement and a temporary construction easement prior to construction
permit issuance for all work proposed outside of the applicant’s property.
Comments: The permanent drainage easement is shown on the final short plat map. A wall has been constructed.
4. The applicant shall be limited to single loaded garage driveway cut, not to exceed nine feet (9’) in width, at the property line
along Jones Ave NE to serve the existing single family home on Lot 1. A plat note to this effect shall be added to the face of the
final short plat. A final detailed site plan shall be submitted to and approved by the City of Renton Project Manager prior to
construction permit approval.
Comments: A plat note (Note 2) was added to page 1 on the final short plat map. The plat note reads "The existing single
family home on Lot 1 shall be limited to a single loaded garage driveway cut, not to exceed nine feet (9) in width, at the
property line along Jones Ave NE."
5. The applicant shall comply with the recommendations included in the Geotechnical Engineering Study prepared by Ages
Engineering, LLC (dated July 6, 2016), or an updated report at a later date.
Comments: Construction of the short plat was completed in compliance with the recommendations included in the
Geotechnical Engineering Study prepared by Ages Engineering, LLC.
6. The applicant shall comply with the AASHTO 2011 Roadside Design Guide which includes a minimum 2-foot separation
between the retaining wall and the fully paved 16-foot wide shared driveway. A final shared access driveway road profile and
grading plan shall be submitted to and approved by the City of Renton Project Manager prior to utility construction permit
approval.
Page 1 of 2
Comments: The shared driveway was reviewed and approved under the utility construction permit. The shared driveway was
constructed per the approved plans.
Page 2 of 2