Loading...
HomeMy WebLinkAboutMFP22001703.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP22001703 IVR Number: 22001703 Permit Information Permit Name: Puget Sound Energy Gas Permits Address/Location:04/04/2022Application Date:0087000022Parcel Number: 10502 SE 166TH ST Permit Type:04/19/2022Issue Date:Franchise Permit Work Class:04/19/2023Expiration Date:Minor Utility Job Number: 106381436Franchise Type:Natural Gas Description: PSE Gas CREW TO INSTALL NEW GAS SERVICE AT EXISTING MAIN, APPROX 42' IN ROW. 1:3'X5' ASPHALT CUT ANTICIPATED. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Stuart Bennett Infrasource Services LLC 1622 Eastport Plaza Dr Collinsville, IL 62234 B: (303) 419-8755 H: (425) 677-5197 C: (713) 985-6489 Contractor Business License Number: 36742Construction Contractor: INFRASL871C2 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering 4 4 4 4 4 4 4 4 4 4 4 106381436 10502 SE 166TH ST Monday Friday 8:00am 3:00pm PLEASE SEE ATTACHED POTELCO, INC 425 892 0416 RUBY.OTIS@PSE.COM 6905 S. 228TH ST KENT, WA 98032 MFP22001703 Scott Warlick CED 4/19/2022 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date CORRIE RYDBERG SE 166TH ST106TH AVE SE BENSON RD S106TH AVE SE 105TH AVE SE 1010101010101050210 10 STOP FLAGGER STOP FLAGGERSTOP FLAGGER 104TH AVE SE 1010W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 100'100'100'W20-7AW20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1W20-7A100' 12 11 12 11RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREPLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 100'100'100'RO A D WO R K AH E A D W20-1BEPR E P A R E D TO ST O P W3-4100'100'ROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'receiving pitTEMPORARY TRAFFIC CONTROL PLANWORK PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be 12' SCL of E 166th ST & 150' ECLof 105th Ave SE.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV10/08/2021 1063814360 10502 SE 166TH ST, RENTON, WA 98055.Jason Bisenius425-424-7316jason.bisenius@pse.com1 OF 2Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425MFP22001703 SE 166TH ST106TH AVE SE BENSON RD S106TH AVE SE 105TH AVE SE 1010101010101050210 10 STOP FLAGGER STOP FLAGGERSTOPFLAGGER 104TH AVE SE 1010W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 100'100'100'W20-7AW20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1W20-7A100' 12 11 12 11RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREPLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKFROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 100'100'100'RO A D WO R K AH E A D W20-1BEPR E P A R E D TO ST O P W3-4100'100'ROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be 26' NCL of E 166th ST & 150'ECL of 105th Ave SE.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV10/08/2021 1063814360 10502 SE 166TH ST, RENTON, WA 98055.Jason Bisenius425-424-7316jason.bisenius@pse.com2 OF 2Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425TEMPORARY TRAFFIC CONTROL PLANWORK PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MFP22001703 Est. Start Date: & & & & & KNT FLT - Kent of CL of CL 0 Route #'s:Bollards:2.5" #4" #ADA Ramps #: Del Press:6" W.C.Traffic Signal:Bus Stop:No 25 No Parks #:0 Meter Loc:02 - OFL Trolley Lines:No Mtr Hoods #:0 Meter:A425 Speed Limit: New Residential Svc EFV:1-1/8" - 2600 - 9996743 Police #:0 TCP:Yes Diameter:1-1/8" PE Flaggers #:0 Arterial:No Tie-In Fitting of CL Service Information Street Information Job Type of CL of CL of CL of CL of CL 106TH AVE SE 3 X 5 X 2 A of CL 12'S of CL SE 166TH ST 264'E ROW Permit:Yes Customer:VLADIMIR BEJENARI 206-650-6372 Work Location Size of Cut Surface Type Job Description New Construction: No Construction Method All Scat / Trenchless PLAT Map:212.082 N Project Scope: TIE INTO 2" PE-A IP 12'S (920503): INSTALL APPROX 67' OF 1-1/8" ALL SCAT PE SERVICE (42' STUB, / 25' EXTENSION); SET A425 MSA - OFL *TYPE 17 BACKFILL, MIN. 95% COMPACTION PER ROW WORK STANDARDS* MDPE - 2" IPS - (DIA) 1"CTS 9999549 Job #:106381436 Date:9/29/21 Address:10502 SE 166TH ST Puget Sound Energy Gas Pre-Inspect Form 4/25/22 PM / Inspector:RUBY OTIS 425-919-3219 Est. Duration:1 Day (8 Hours) Jurisdiction:RENTON City / Zip:RENTON, 98055 20TH AVE SSW 100TH ST 5' 3' A425 172'E 25' EXTENSION 42' STUB 1 1/8" PE OH POWERLINE OH POWERLINE 2" PE-A IP 12'S (920503) APPROX 500 SQ FT OF WORK AREA POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS MFP22001703 107301072410720 10733 10725 282416551 16561 16543 10502 16533 10509 1052510517 16617 16625 1408 1420 1515 1426 1432 1500 1535 1506 1512 1518 2914 2910 10404 16618 10405 16624 10414 16425 10501 16632 16415 2810 2804 2907 2911 2903 2809 2805 2813 2817 2915 3003 3007 3014 2816 2822 2708 2714 2720 16427 10416 16521 1515 1503 16605 1509 16628 16607 16609 16611 16627 1508 1523 1525 1529 16634 1519 16550 16606 16602 16614 16612 1507 15031431 1429 16623 16501 16515 16525 1409 10419 16605 16617 1417 1413 1423 16616 16629 1305 1414 106TH AVE SES 2 8 TH P L S 28TH ST SE 166TH STCEDAR AVE SBENSON RD S BENSON RD S 24'S 164'W10'E8'E ,6'S236'N6'S 76'N 2" MPE IP 31'S 107048760-2014 JT 2" MPE IP 15'E 107048760-2014 JT2" MPEI 31'S 2" MPE IP 31'S 107048760-2014 JT 2" MPE 153'N2" MPE IP 16'W 107010516-20012" MPEI IP 31'S 107048760-20142" MPE IP 20'S 107010516-2001 2" MPE IP 25'S 107019788-2003 2" MPE IP 12'S 10 7055696-2018 2" STW IP 16'W 70E1242" PE IP 16'W 9029392" PE IP 12'S 920503 2" MPE IP 16'W 98162532" MPE 17'E2" MPE IP 20'S 107010516-2001 2" PE IP 6'E 802-1062" PE-A IP 10'W 802106A2" PE-A I P 10'E 802106A2" PE IP 12'S 892046 2" PE IP 12'W 8920462" MPE IP 20'S 107010516-2001 2" MPE IP 15'S 107014640-2003 2" MP E IP 6'W 1 0 70 1 4 64 0-20 0 3 2" PE IP 18'S 890100 2" PE IP 18'S 892219 1 1/8" MPEI2015-E 1 1/8" MPEI2015-E 1 1/8" MPEI2015-E 1 1/8" MPEI2015-E1 1/8" MPEI2015-E1 1/8" MPEI2015-E 1 1/8" MPEI2015-E 1 1/8"275'S 5/8" MPE2018 1 1/4" MPE2018-E 1 1/8" MPE2018-E 1 1/8" MPEI2015-E 1 1/8" MPEI2015-E 1 1/8" MPEI2015-E 1 1/8" MPEI2015-E 1 1/8" MPEI2015-E 1 1/8" MPEI2015-E 1 1/8" MPEI2015-E 1 1/8" MPEI2017-E 1 1/8" MPE2013-E1/2"217'S 1 1/8" MPEI2015-E 1 1/8" MPEI2014-E 1 1/8" MPEI2015-E 1 1/8" MPEI2015-E 1 1/8" MPEI2015-E 1 1/8" MPEI2015-E 1 1/8" MPEI2015-E 5/8" MPE2003 5/8" PE1986 5/8" PE1984 5/8" PE1987 5/8" PE1984 5/8" 5/8" PE1984 5/8"63'E5/8" PE1986 5/8" PE1984 5/8"636'S 5/8" 5/8" 5/8" PE1985 5/8" PE1984 5/8" PE1984 5/8" 5/8" PE1968 5/8" PE1988 5/8" PE1984 5/8" PE1988 5/8" PE1988 5/8" 5/8" MPE2004 5/8" MPE2002 5/8" PE1991 5/8" PE1994 5/8" PE1985 5/8" 5/8" PE1984 5/8" PE1985 5/8" PE1991 5/8" PE1985 5/8" PE1992 1/2" STW-U1970 5/8" PE1980 5/8" PE1990 1/2" STW-U1970 5/8" PE1990 1/2"217'S 1/2" STW-U1970 5/8" PE1994 5/8" PE1993 1/2" STW-U1970 5/8" 5/8" MPE2001 5/8" MPE2001 5/8" MPE1998 5/8" PE1989 1 1/8" MPE2011-E 5/8" MPEI2004 5/8" PE1989 5/8" MPE2003 5/8" MPE2004 5/8" MPEI2004 5/8" PE1989 5/8" PE1990 TF15'W39'E 30'S 355'S209'W 122'E483'W121'W110'W21'W198'S 151'S 63'E127'W618'S 556'S 391'S 690'S 708'S 348'N 350'N 254'N 140'W 83'W57'S 88'W53'W112'S 117'S 174'S 305'W247'W393'W55'W198'E190'W198'W38'N118'E80'S233'W216'S 113'N 76'N 145'N 220'N 53'E17'E94'W200'W455'S 275'S 217'S 279'S 319'S167'E136'S 7'N 172'S 447'W198'E60'W118'W350'S226'N173'N 103'W 224'N 579'S 164'S 594'S 768'S 29 3'N 297'E118'N 63'E755'S 167'S 233'S 415'S 123'S467'W,25'S166'W,25'S432'S 25'S,14'W 29'S,1 4'W 116'N 8'W306'W393'W,18'S 5'E227'E10'N RO PE 271'N TO 6'W 157'N 40'STL TL15'W14'E27'S 267'WH 31'SH 201'S172'E 300'E 120'W T S41'S #1/2 R OPES ROP ES 51'N,23'W 2" PE IP 12'S 920503 No electric grid information availableS212080, Q212082 The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“ 03-31-2022 Scale 1:1519 Lat\Long=47.4541, -122.2003 MFP22001703