Loading...
HomeMy WebLinkAboutERC_Mitigation Measures_20171608 (2) DETERMINATION OF NON-SIGNIFICANCE-MITIGATED (DNSM) MITIGATION MEASURES AND ADVISORY NOTES PROJECT NUMBER: PR17000215 APPLICANT: Parkway Capital, Inc, Craig Koeppler, 520 Pike St, Suite 1500, Seattle, WA 98101 PROJECT NAME: VIA 405 Apartments, LUA17-000237,ECF,PUD PROJECT DESCRIPTION: The applicant is requesting a Preliminary Planned Urban Development (PUD) land use decision and threshold determination under the State Environmental Policy Act (SEPA) for the construction of a mixed use building containing 270 multi-family dwelling units PROJECT LOCATION: 25 S Grady Way (APN 723200-0010) LEAD AGENCY: The City of Renton Department of Community & Economic Development Planning Division MITIGATION MEASURES: 1. The project shall comply with the recommendations of the geotechnical report, prepared by Golder Associates dated March 20, 2017, or a future addendum to the subject report. 2. The applicant’s geotechnical engineer shall review the project’s construction and building permit plans to verify compliance with the geotechnical report(s). The geotechnical engineer shall submit a sealed letter stating that he/she has reviewed the construction and building permit plans and in their opinion the plans and specifications meet the intent of the report(s). 3. The applicant shall submit a final stream buffer enhancement plan, prepared by a qualified professional, with the construction permit application for review and approval by the Current Planning Project Manager. To provide a functional lift to the existing buffer, the applicant shall remove the existing asphalt south of the emergency vehicle access lane and provide new riparian buffer planting where the existing surface parking is located. The final enhancement plan shall also provide refuse and invasive vegetation removal followed by ERC Mitigation Measures and Advisory Notes Page 2 of 2 riparian vegetation plantings along the existing buffer area adjacent to both the north and south banks of Rolling Hills Creek on the subject property. Fencing and critical areas signage shall be provided to restrict access (with the exception of maintenance activities) to the stream buffer area. The stream buffer enhancement shall be monitored to ensure performance for 5-years and backed by a surety device sufficient to guarantee that structures, improvements, and mitigation required perform satisfactorily for a minimum of five (5) years after installation has been completed. 4. The applicant shall prepare an acoustical study to determine whether additional sound attenuation or acoustical architectural measures are necessary to mitigate the impacts of the freeway noise generated by the abutting I-405. The study shall be submitted with the Final Planned Urban Development application for review and approval by the Current Planning Project Manager prior to Final PUD approval. ADIVISORY NOTES: The following notes are supplemental information provided in conjunction with the administrative land use action. Because these notes are provided as information only, they are not subject to the appeal process for the land use actions.