Loading...
HomeMy WebLinkAboutCouncil 10/05/2009ti AGENDA RENTON CITY COUNCIL REGULAR MEETING October 5, 2009 Monday, 7 p.m. 1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE 2. ROLL CALL 3. PROCLAMATION: National Domestic Violence Awareness Month - October 2009 4. SPECIAL PRESENTATONS: a. Renton River Days Wrap -Up b. Public Works Department Employee Recognition 5. ADMINISTRATIVE REPORT 6. AUDIENCE COMMENT (Speakers must sign up prior to the Council meeting. Each speaker is allowed five minutes. The comment period will be limited to one-half hour. The second audience comment period later on in the agenda is unlimited in duration.) When you are recognized by the Presiding Officer, please walk to the podium and state your name and city of residence for the. record, SPELLING YOUR LAST NAME. NOTICE to all participants: pursuant to state law, RCW 42.17.130, campaigning for any ballot measure or candidate from the lectern during any portion of the council meeting, and particularly, during the audience comment portion of the meeting, is PROHIBITED. 7. CONSENTAGENDA The following items are distributed to Councilmembers in advance for study and review, and the recommended actions will be accepted in a single motion. Any item may be removed for further discussion if requested by a Councilmember. a. Approval of Council meeting minutes of 9/28/2009. Council concur. b. Mayor Law appoints Tom Lambro to the Airport Advisory Committee, The Boeing Company position, for an unexpired term expiring on 5/7/2011 (position previously held by Jan Fedor). Refer to Community Services Committee. c. Community and Economic Development Department recommends approval of a contract in the amount of $25,000 with Lund Consulting, Inc. for development of the Arts and Culture Master Plan. Refer to Community Services Committee. d. Development Services Division recommends approval, with conditions, of the Talbot Ridge Estates Final Plat, 22 single-family lots on 4.3 acres located in the vicinity of SE 192nd St. and 102nd Ave. SE. Council concur. (See 9. for resolution.) e. Finance and Information Services Department recommends approval of Addendum #51 to CAG- 06-097, Eastside Fiber Consortium agreement, to add the City of Puyallup as a consortium partner. Council concur. f. Finance and Information Services Department recommends approval of a five-year lease agreement in the amount of $109,613 per year, with IKON Office Solutions, Inc., for copier machine rental and maintenance services. Council concur. g. Finance and Information Services Department recommends a public hearing be set on 10/26/2009 to consider the 2009 Revenue Sources and Preliminary Budget, and a public hearing be set on 11/16/2009 to consider the 2010 Budget. Refer to Committee of the Whole; set public hearings on 10/26/2009 and 11/16/2009. CONTINUED ON REVERSE SIDE) 3 CITY OF RENTON COUNCIL AGENDA BILL Submitting Data: Dept/Div/Board, Staff Contact...... Subject: Executive Department/ Mayor's Office Denis Law, Mayor Airport Advisory Committee Appointment: Mr. Tom Lambro Exhibits: Community Service Application Al #: For Agenda of: October 5, 2009 Agenda Status Consent .............. Public Hearing.. Correspondence.. Ordinance ............. Resolution............ Old Business........ New Business....... Study Sessions...... Information......... Recommended Action: Approvals: Legal Dept......... Refer to Community Services Committee Finance Dept..... Other ............... Fiscal Impact: Expenditure Required... Transfer/Amendment....... Amount Budgeted....... Revenue Generated......... Total Project Budget City Share Total Project.. SUMMARY OF ACTION: Mayor Law appoints the following to the Airport Advisory Committee: X Mr. Tom Lambro, 13917 East Lake Kathleen Drive SE, Renton, WA 98059 (The Boeing Company position), for an unexpired term expiring on May 7, 2011 (position previously held by Jan Fedor). STAFF RECOMMENDATION: Confirm Mayor Law's appointment of Mr. Lambro to the Airport Advisory Committee. CITY OF RENTON APPLICATIONFOR COMMUNITYSER VICE MAYjt s8 cl7 RC,a If you are interested in participating in local government by membership on any of the following City bo rds, commissions, or committees, please complete this application and return it to: Office of the Mayor E ►�' tj-. City of Renton R� 0 Z, 1055 South Grady Way ! r a Yz -5 r�� Renton, WA 98057 _( Check the boards/commissions/committees in which you are interested: AIRPORT ADVISORY COMMITTEE* ❑ PLANNING COMMISSION* ❑ CIVIL SERVICE COMMISSION* ❑ ADVISORY COMMISSION ON DIVERSITY ❑ HOUSING AUTHORITY* ❑ SENIOR CITIZENS ADVISORY COMMITTEE* ❑ HUMAN SERVICES ADVISORY COMMITTEE* ❑ SISTER CITY COMMITTEE - CUAUTLA ❑ LIBRARY BOARD ❑ SISTER CITY COMMITTEE - NISHIWAKI ❑ MUNICIPAL ARTS COMMISSION* ❑ TRANSIT ADVISORY BOARD ❑ PARKS COMMISSION* ❑ NON -MOTORIZED TRANSPORTATION ADV CMTE 1,Npeczal membership requirements apply. Visit www.rentonwa.gov or call 425-430-6500 for details. Your application will be given every consideration as vacancies occur. MR. MS. ❑ NAME DATE '2 O ADDRESS `ljT LA �=F_ l7 ZIP CODE v PHONE: DAY 2-6 " q- Iq_5W NIGHT"[J7 'M2-9--1Z'i EMAILC44-e sLAO 6Et144.1 RENTON RESIDENT? YE-5 IF SO, SINCE WHEN? i l 93 CITY OF FORMER RESIDENCE A EDUCATIONAL BACKGROUND_ 'TT�IU Q7TTt,-C U� V��LS( OCCUPATIONI"S� '( EMPLOYER� 6_ 1 061 CQ M 1', 1E :Cl 4 t­ OCCUPATIONAL BACKGROUND 3 Yam-$?_S tit 1:-AC k (_( COMMUNITY ACTIVITIES (organizations/clubs/service groups, Su PPo4T REASON FOR APPLYING FOR THIS BOARDXOMMISSIONXOMMITTEE rj PU Al E 5 ( -J U-V O FLA-io(Nlt '3-SPooSIF>tt..�T1�S CAN ATTEND DAY MEETINGS? CAN ATTEND NIGHT MEETINGS? Applications will be kept on file for one year. if you have questions about serving on a board, commission, or committee, please feel free to contact the Mayor's Office at 425-430-6500. CITY OF RENTON COUNCIL AGENDA BILL Submitting Data: Dept/Div/Board.. Department of Community & Economic Development Staff Contact...... Jennifer Davis Hayes x6589 Subject: Issue Paper Arts and Culture Master Plan Contract Exhibits: Scope of Work and Contract with Lund Consulting Inc. AI#: -7, G, For Agenda of: October 5, 2009 Agenda Status Consent .............. Public Hearing.. Correspondence.. Ordinance ............. Resolution............ Old Business........ New Business....... Study Sessions...... Information ......... ►9 Recommended Action: Approvals: Refer to Community Services Committee Legal Dept......... X Finance Dept...... Other ............... Fiscal Impact: Expenditure Required... $25,000 Transfer/Amendment....... Amount Budgeted....... $25,000 Revenue Generated......... Total Project Budget $25,000 City Share Total Project.. SUMMARY OF ACTION: A contract with Lund Consulting Inc. is required to assist City staff and a Steering Committee in the development of an Arts and Culture Master Plan. The Council and Mayor recognized the benefit to create a strategic vision for the future of arts and culture in Renton when it passed Ordinance 5365 in March 2008 to direct the Renton Municipal Arts Commission to develop such a plan. The plan will create a strategic vision and actionable goals that will be implemented by the City and community -based organizations over the next 5 years. STAFF RECOMMENDATION: Approve a contract with Lund Consulting Inc. in an amount not to exceed $25,000 to assist in the development of the Arts and Culture Master Plan and authorize the Mayor and the City Clerk to sign the contract. ��y O DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT ♦ '�" M E M O R A N D U M DATE: September 28, 2009 TO: Randy Corman, Council President Members of the Renton City Council VIA: y, Denis Law, Mayor FROM: Alex Pietsch, Administrator STAFF CONTACT: Jennifer Davis Hayes, Community Development Project Manager (ext. 6589) SUBJECT: Arts and Culture Master Plan ISSUE: Should the City enter into a contract with Lund Consulting Inc. for $25,000 to assist in the development of the Arts and Culture Master Plan? RECOMMENDATION: The Department of Community & Economic Development staff recommends that the Council approve a contract with Lund Consulting Inc. for $25,000 to assist in the development of the Arts and Culture Master Plan. BACKGROUND SUMMARY: As the City of Renton continues to grow in area and population, a strategic vision and investment in the arts and culture sector will help to meet the needs of our residents. A community that has a strong arts and culture environment enhances its quality of life, generates jobs, contributes to the economic vitality, and can attract businesses and residents to the City. Arts and culture events and infrastructure can enhance tourism to the City, which in turn benefits hotels, restaurants and retail businesses. The Council and Mayor recognized the benefit to create a strategic vision for the future of arts and culture in Renton when it passed Ordinance 5365 in March 2008. This ordinance amended ordinance 5155 and stated: Arts and Culture Master Plan Consultant Contract Issue Paper September 28, 2009 Page 2 of 2 "The Commission shall develop a Five -Year Master Plan for Arts and Culture, which shall include the City's vision and goals for future works of public art, and a strategic plan for implementing these goals. The Five -Year Master Plan shall be subject to review and approval by the Mayor and City Council on an annual basis." The plan will develop a strategic vision for the future of arts and culture in the City of Renton by building upon Renton's strengths and ensure that investments made by the City through the 1% for Art contribution and operating funds are efficiently and effectively invested. The goal of the process will be to develop a plan implemented by not only the City, but also organizations and individuals throughout the City via public -private partnerships or outside funding sources. The investment in the development of a strategic master plan will help to identify and leverage funding sources in the wider community. Lund Consulting Inc. will assess the arts and culture landscape in Renton, solicit input on opportunities and develop a five-year implementation plan. The plan could contain the following strategies for the Renton community to implement: *Identification of public art investment opportunities in the next five years, including within the neighborhoods and business districts *Identification of funding and sustainability grant and resource opportunities -Role definition of the Arts Commission and other art groups moving forward, as well as organizational development and technical assistance tools *Support arts education •Increased cultural and ethnic diversity with the arts and cultural offerings •Enhanced cultural tourism opportunities *Support individual artists •Recommendation for effective use of existing cultural facilities CONCLUSION: The $25,000 contract to hire Lund Consulting Inc. to assist in the development of the Arts and Culture Master Plan will create a community -driven implementable strategy to ensure that Renton remains "Ahead of the Curve" and continues to attract families and businesses to the City to thrive. Attachments: • Scope of Work and Contract with Lund Consulting Inc. cc: Jay Covington, CAO Bonnie Walton, City Clerk Suzanne Dale Estey, Economic Development Director CONSULTANT AGREEMENT THIS AGREEMENT is made as of the day of , 20 , between the CITY OF RENTON, a municipal corporation of the State of Washington, hereinafter referred to as "CITY" and Lund Consulting, Inc., hereinafter referred to as "CONSULTANT", for their services related to developing an Arts and Culture Master Plan. Information shall be made available for use by the City of Renton Staff and City Council. The CITY and CONSULTANT agree as set forth below: 1. Scope of Services. The Consultant will provide all labor necessary to perform all work, which is described in the attached Scope of Services (Exhibit A). This Agreement and Exhibit hereto contain the entire agreement of the parties and supersedes all prior oral or written representation or understandings. This Agreement may only be amended by written agreement of the parties. The scope of work may be amended as provided herein. 2. Changes in Scope of Services. The City, without invalidating the Consultant Agreement, may order changes in the services consisting of additions, deletions or modifications, and adjust the fee accordingly. Such changes in the work shall be authorized by written agreement signed by the City and Consultant. If the project scope requires less time, a lower fee will be charged. If additional work is required, the consultant will not proceed without a written change order from the City. If any provision of this Agreement is held to be invalid, the remainder of the Agreement shall remain in full force and effect to serve the purposes and objectives of this Agreement. 3. Time of Performance. The Consultant shall complete performance of the Consultant Agreement for the items under Consultant's control in accordance with Exhibit A. If items not under the Consultant's control impact the time of performance, the Consultant will notify the City. 4. Term of Consultant Agreement. The term of this Agreement shall end at completion of the scope of work identified in Exhibit A, but no later than June 30, 2010. This Agreement may be extended to accomplish change orders, if required, upon mutual written agreement of the City and the Consultant. 5. Consultant Agreement Sum. The total amount of this Agreement is not to exceed the sum of $25,000. Washington State Sales Tax is not required. The Cost Estimate provided by the Consultant to the City specifies total cost. 6. Method of Payment. Payment by the City for services rendered will be made after a voucher or invoice is submitted in the form specified by the City. Payment will be made within thirty (30) days after receipt of such voucher or invoice. The City shall have the right to withhold payment to the Consultant for any work not completed in a satisfactory manner until such time as the Consultant modifies such work so that the same is satisfactory. 7. Record Maintenance and Work Product. The Consultant shall maintain accounts and records, which properly reflect all direct and indirect costs expended and services provided in the performance of this Agreement. The Consultant agrees to provide access to any records required by the City. All originals and copies of work product, exclusive of Consultant's proprietary items protected by copyright such as computer programs, methodology, methods, materials, and forms, shall belong to the City, including records, files, computer disks, magnetic media or material which may be produced by Consultant while performing the services. Consultant will grant the City the right to use and copy Consultant copyright materials as an inseparable part of the work product provided. 8. Assignment Agreement. The Consultant shall not assign any portion of this consultant Agreement without express written consent of the City of Renton. 9. Hold Harmless. The Consultant shall indemnify, defend and hold harmless the City, its officers, agents, employees and volunteers, from and against any and all claims, losses or liability, or any portion thereof, including attorneys fees and costs, arising from injury or death to persons, including injuries, sickness, disease or death of Consultant's own employees, or damage to property caused by a negligent act or omission of the Consultant, except for those acts caused'by or resulting from a negligent act or omission by the City and its officers, agents, employees and volunteers. Should a court of competent jurisdiction determine that this agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the contractor and the city, its officers, officials, employees and volunteers, the contractor's liability hereunder shall be only to the extent of the contractor's negligence. It is further specifically and expressly understood that the indemnification provided herein constitute the contractor's waiver of immunity under the Industrial Insurance Act, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this agreement. 10. Insurance. The Consultant shall secure and maintain commercial liability insurance in the amount of $1,000,000 in full force throughout the duration of this Consultant Agreement. It is agreed that on the CONTRACTOR's policy, the City of Renton will be named as Additional Insured(s) on a non-contributory primary basis. A certificate of insurance and the Primary & Non -Contributory Additional Insurance Endorsement page, properly endorsed, shall be delivered to the City before executing the work of this agreement. Please note: The cancellation language should read "Should any of the above described policies be cancelled before the expiration date thereof, the issuing company will mail 45 days written notice to the certificate holder named to the left." 11. Independent Contractor. Any and all employees of the Consultant, while engaged in the performance of any work or services required by the Consultant under this agreement, shall be considered employees of the Consultant only and not of the City. The Consultant's relation to the City shall be at all times as an independent contractor. Any and all claims that may or might arise under the Workman's Compensation Act on behalf of said employees, while so engaged, and any and .all claims made by a third party as a consequence of any negligent act or omission on the part of the Consultant's employees, while so engaged on any of the work or services provided to be rendered herein, shall be the sole obligation and responsibility of the Consultant. 12. Compliance with Laws. The Consultant and all of the Consultant's employees shall perform the services in accordance with all applicable federal, state, county and city laws, codes and ordinances. Discrimination Prohibited: Consultant, with regard to work performed under this agreement, will not discriminate on the grounds of race, color, national origin, religion, creed, age, sex, the presence of any physical or sensory handicap, or sexual orientation, in the selection and/or retention of employees, or procurement of materials or supplies. ' This agreement is entered into as of the day and year written above. CONSULTANT Lund Consulting, Inc. 411 University Street, Suite 1200 Seattle, WA 98101 APPROVED AS TO FORM: City Attorney CITY OF RENTON Denis Law, Mayor ATTEST: Bonnie I. Walton, City Clerk Exhibit A Scope of Work Arts and Culture Master Plan Phase I: Project Start Up, Data Collection (November 1— November 13) Lund Consulting will, meet with City staff to discuss specific project details, responsibilities, expectations, protocols, deadlines and other contract requirements. The discussion will also include recommendations for steering committee membership. Lund Consulting will review background materials provided by the City and through their research. Deliverables: • Memorandum summarizing goals and a detailed work plan • Key messages and annotated bibliography from research and material review conducted Contract Payment Schedule: • A $2,000 payment will be processed upon completion and receipt of materials listed in Phase I deliverables if completed by November 13. • Payment will be reduced by 5% per week past November 16, unless written agreement between Lund Consulting and City staff. E-mail communication will suffice as written agreement. Phase II: Needs Assessment, Findings and Options (November 16 — January 29) 1) Stakeholder Interviews Lund Consulting will work with City staff to identify the number and names of stakeholders to be interviewed. 2) Cultural Mapping Lund Consulting will map arts and cultural organizations, creative industry cluster data, public art identification, and potential philanthropic partnership businesses or institutions. This may include non -profits, music venues, community centers, theatres, schools, ethnic centers and film business and venues. Lund Consulting will coordinate with City staff for technical assistance as needed. 3) Public Art Assessment Lund Consulting will meet with City staff to understand the City's objectives for its public art holdings and program. The assessment of Renton's current public art collection will include review of the collection, its condition and placement and existing records and policies to assess what exists presently. A retention and deaccesion plan, if desired by the City and steering committee, could be included in this work. Lund Consulting will facilitate further discussion of potential actions pursuant to collection stewardship, public art, exhibition development, policy development, funding strategies or other strategies with the Steering Committee. This discussion will include strategies to partner with community and business organizations to enhance the public art objectives identified. Lund Consulting, hie. Page 1 of 3 Arts & Cultural Master Plan 4) Community Meetings and Focus Groups Lund Consulting will develop an agenda for community meetings, open houses and focus groups. City staff will be responsible for identifying and arranging locations as well as inviting stakeholders. 5) Comparable City and Program Research , Lund Consulting will expand the research conducted to learn from comparable situations nationally, including the tie between economic development and community -driven arts and cultural resources. 6) Assess organizational capacity, roles and development Lund Consulting will host two workshops with the Municipal Arts Commission and other non-profit cultural community organizations to gather information and gain an understanding of the mission, budgets, service delivery and management. Deliverables: Written results of stakeholder interviews (by December 18) Physical map with icons and directory in format that can be posted on the web and printed by the City (by December 18) Written assessment of public art collection (by January 4) Written summary of public feedback on plan priorities (by January 15) Needs assessment and critical issues report (by January 29) Contract Payment Schedule: $14,000 payment will be processed upon completion and receipt of materials listed in Phase II deliverables. • Payment will be reduced by 5% per week past January 29, unless written agreement between Lund Consulting and City staff. E-mail communication will suffice as written agreement. PHASE III: Arts and Cultural Master Plan Development (February 1— April 30) The first two phases of this process provide the foundation for the Arts and Cultural Master Plan. Lund Consulting will continue to communicate and/or meet weekly with City staff and the Steering Committee to guide this work. The meetings will be used to review approaches, identify gaps, debate approaches and reach consensus on next steps. From these conversations, a strategy and action plan for the future on defined topic areas will be developed, to be implemented by the City and community and business organizations. 1) Draft Recommendations Work Session Lund Consulting will develop options for strategic actions, recommendations, and priorities by presenting suggestions, facilitating discussion and reaching consensus with the City and Steering Committee. This process will be augmented with research and supporting information in the development of the final plan. Lund Consulting, Inc. Page 2 of 3 Arts & Cultural Master Plan 2) Develop Draft Plan Lund Consulting will develop a draft plan for review and comment by compiling the work of all the previous steps. 3) Public Event Lund Consulting will assist the City and Steering Committee to present to a broad and diverse audience identified throughout the process. This event will be not only an opportunity to present the plan, but to gather final input and galvanize support around the action plan. 4) Outreach Activity Lund Consulting will work with the City and Steering Committee to identify opportunities to broaden awareness of the Arts and Culture Master Plan process and to animate what might otherwise be "just a report." This could include a roundtable discussion or to produce a critical issues presentation and call for action to be shown on Renton's public television station. 5) Final Report and Presentation Lund Consulting will develop the final Arts and Culture Master Plan report. A PowerPoint presentation will also be developed by Lund Consulting to present the plan to City Council, Renton's art groups, business and community organizations and other future presentation opportunities. The PowerPoint presentation should include speaking points and notes that would allow City staff and Steering Committee members to make these presentations independently. City staff will work with Lund Consulting to identify presentations that require consultant participation. Deliverables: • Draft Arts and Culture Master Plan (by March 1) • Public Event to present master plan points to the larger community (by March 19) • Completion of outreach activity identified through collaboration with Lund Consulting, City staff, and the Steering Committee (by April 9) • Final Arts and Culture Master Plan. The plan will be a camera-ready, graphically rich report that includes an executive summary brochure, strategies and an action plan for next steps. A PowerPoint presentation will summarize key points of the process and plan recommendations. (by April 23) • Final Presentation (date TBD) Contract Payment Schedule: • $6,500 payment will be processed upon completion and receipt of materials listed in Phase III deliverables. Payment will be reduced by 5% per week past April 30, unless written agreement between Lund Consulting and City staff. E-mail communication will suffice as written agreement. Project Expenses: • $2,500 has been reserved for project expenses that will be mutually agreed upon by Lund Consulting and City,staff. Payment of these expenses will be processed after invoice submittal. Lund Consulting, Inc. Page 3 of 3 Arts & Cultural Master Plan CITY OF RENTON COUNCIL AGENDA BILL Submitting Data: CED Dept/Div/Board Development Services Division Staff Contact Rick Moreno, X7278 Subject: Talbot Ridge Estates Final Plat File No.: L05P007 FP (King County) LUA 07-150, FP Exhibits: Staff Report, Legal Description, Project Site Map, and Vicinity Map Resolution Recommended Action: Council Concur Al #: • 6r. For Agenda of: October 5, 2009 Agenda Status Consent..............X Public Hearing.. Correspondence.. Ordinance ............. Resolution............ X Old Business........ New Business....... Study Sessions...... Information......... Approvals: Legal Dept ......... X Finance Dept...... Other ............... Fiscal Impact: Expenditure Required... Transfer/Amendment....... Amount Budgeted....... Revenue Generated......... Total Project Budget City Share Total Project.. SUMMARY OF ACTION: The recommendation for approval of the referenced final plat is submitted for Council action. This final plat subdivides 4.3 acres into 22 single-family residential lots vested to King County standards to include storm facilities, street improvements and street lighting. All water and sewer utilities are provided through Soos Creek Water and Sewer Utility District. This project was initiated through King County. STAFF RECOMMENDATION: Approve the Talbot Ridge Estates Final Plat, LUA07-150, FP, with the following conditions and adopt the resolution. 1. All plat improvements has been either constructed or deferred to the satisfaction of the City staff prior to recording of the plat. 2. All plat fees shall be paid prior to recording the plat. DEVELOPMENT SERVICES DIVISION BUILDING/PLANNING/PUBLIC WORKS CITY OF RENTON STAFF REPORT AND RECOMMENDATIONS APPLICANT: John O'Neil Talbot Ridge Estates, LLC Talbot Ridge Estates Final Plat. File: LUA 07-150, FP LOCATION: SUMMARY OF REQUEST: RECOMMENDATION: SW Corner at 192nd St & 102nd Ave SE NW Section 5, Twp. 22 N., 5 Rge. E, W.M. Final Plat for 22 single-family residential lots with water, sanitary sewer, storm, street and lighting. Approve With Conditions FINDINGS, CONCLUSIONS & RECOMMENDATION The applicant, Talbot Ridge Estates, LLC., filed a request for approval of Talbot Ridge Estates, a 22-lot Final Plat. Staff now makes and enters after having reviewed the record documents in this matter the following: FINDINGS: 1. All appropriate City of Renton personnel reviewed the subject proposal. 2. The new plat is located in NW Section 5, Township. 22 N., Range. 5 E, W.M. The subject site is located at the 100th block of SE 192" P1. 3. The subject site is comprised of a parcel of 4.3 acres. 4. The Preliminary Plat, L05P0007 was approved by the King County Hearing Examiner on January 30, 2007. 5. The site is zoned R-6 (Single Family — 6 dwelling units/acre). 6. The Final Plat complies with King County the Zoning and Comprehensive Codes. As a condition of Final Plat submittal, the following items address the conditions of plat approval from the Hearing Examiner's decision approved by the City Council. The conditions of the Plat Approval and actions taken are summarized below. The application has complied with the requirements of the Determination of Non - Significance (DNS) that was issued by the Hearing Examiner on January 12, 2007. The applicant shall comply with the recommendations contained within the Decision by the Hearing Examiner on January 30, 2007 (conditions to follow): As a requirement for Final Plat submittal, the following comments will address the Conditions of Approval from the Hearing Examiner for the above referenced project. 1. Compliance with all platting provisions of Title 19A of the King County Code. This condition has been met through the review and approval of the Final Plat. 2. All persons having an ownership interest in the subject property shall sign on the face of the final plat a dedication which includes the language set forth in King County Council Motion No. 5952. The required signatures will be provided on the Final Plat. The City of Renton's standard dedication/certification has been included on the plat. 3. The plat shall comply with the density requirements of the R-6-SO zone classification. All lots shall meet the minimum dimensional requirements of the R-6-SO zone classification or shall be as shown on the face of the approved preliminary plat, whichever is larger, except that minor revisions to the plat which do not result in substantial changes may be approved at the discretion of the Department of Development and Environmental Services. This condition has been met through the platting. process. 4. The applicant shall provide the TDR certificate with the submittal of the engineering plans and the final plat. If the TDR certificate cannot be obtained, the applicant shall redesign the number of lots based upon the allowable density. This will result in the reconfiguration and loss of lots. The Preliminary Plat approval included developing 27 lots. The number of lots has been reduced to 22 which meet the standard zoning requirements. Therefore, this development does not utilize the Transfer of Development Rights option. There is no TDR certificate to provide. 5. All construction and upgrading of public and private roads shall be done in accordance with the King County Road Standards established and adopted by Ordinance No. 11187, as amended (1993 KCRS). This condition has been met by the completion of construction as shown on the approved engineering plans and design revisions approved by the City of Renton. 6. The applicant shall obtain documentation by the King County Fire Protection Engineer certifying compliance with the fire flow standards of Chapter 17.08 of the King County Code. This condition has been met by the completion of construction of the proposed water facilities as shown on the approved water plans and acceptance of the City Fire Marshal. 7. Final Plat approval shall require full compliance with the drainage provisions set forth in King County Code 9.04. Compliance may result in reducing the number and/or location of lots as shown on the approved preliminary plat. Preliminary review has identified the following conditions of approval which represent portions of the drainage requirements. All other applicable requirements in KCC 9.04 and the Surface Water Design Manual (SWDM) must also be satisfied during engineering and final review. a. Drainage plans and analysis shall comply with the 1998 King County Surface Water Design Manual and applicable updates adopted by King County. DDES approval of the drainage and roadway plans is required prior to any construction. b. Current standard plan notes and ESC notes, as established by DDES Engineering Review, shall be shown on the engineering plans. These conditions have been met through the review and approval process of the engineering plans. c. The following note shall be shown on the final recorded plat: "All building downspouts, footing drains, and drains from all impervious surfaces such as patios and driveways shall be connected to the permanent storm drain outlet as shown on the approved construction drawings on file with DDES and/or the King County Department of Transportation. This plan shall be submitted with the application of any building permit. All connections of the drains must be constructed and approved prior to the final building inspection approval. For those lots that are designated for individual lot infiltration systems, the systems shall be constructed at the time of the building permit and shall comply with plans on file." As amended and agreed upon by Development Services Division, a revised City of Renton version of this note has been included on the Final Plat. d. The storm water facilities for this site shall be designed to meet at a minimum the Conservation Flow Control and. Basic Water Quality requirements in the 2005 King County Surface Water Design Manual (KCSWDM). A Surface Water Drainage Adjustment (L05V0061) is approved for this site. All conditions of approval for this adjustment shall be met prior to approval of the engineering plans. These conditions have been met through the review and approval process of the engineering plans. e. To implement the required Best Management Practices (BMP's) for treatment of storm water, the final engineering plans and technical information report (TIR) shall clearly demonstrate compliance with all applicable design standards. The requirements for best management practices are outlined in Chapter 5 of the 2005 KCSWDM. The design engineer shall address the applicable requirements on the final engineering plans and provide all necessary documents for implementation. The final recorded plat shall include all required covenants, easements, notes, and other details to implement the required BMP's for site development. This development has been approved with the understanding that the allowable impervious area of each lot will be specifically restricted to satisfy the Best Management Practices requirements. A covenant and table listing the maximum allowable impervious area for each lot has been shown on the Final Plat. f. The applicant's geotechnical engineer shall provide recommendations for the design and construction of the road, onsite grading and compaction, drainage detention vault, and any required retaining walls. The geotechnical recommendations shall be included in the TIR and incorporated into the design with submittal of the engineering plans. These conditions have been met through the review and approval process of the engineeringL plans. 8. Special geotechnical construction inspection of the road improvements, onsite grading and compaction, drainage detention vault, and any required retaining walls is required to ensure compliance with the geotechnical recommendations. Daily inspection reports shall be submitted to the assigned Land Use Inspector during the construction phases of those facilities. A final construction report shall be submitted verifying compliance with the geotechnical recommendations. Notes requiring the above shall be shown on the engineering plans. This condition has been met by action taken by the developer and his geotechnical engineer. Following the completion of construction of the site's improvements the Final Construction Report will be provided. The required notes have been included on the engineering_plans. 9. Geotechnical engineer review of the future home foundation construction is required. Notes to this effect shall be shown on the engineering plans and the final plat. The required note has been included on the approved engineering plans and Final Plat. 10. The proposed subdivision shall comply with the 1993 King County Road Standards (KCRS) including the following requirements: a. Road A shall be improved at a minimum to the urban sub -access street standard, with a cul-de-sac at the west end. This condition shall be met by the completion of construction as shown on the 4pproved engineering_plans.� b. FRONTAGE: The frontage along 102nd Ave SE shall be improved at a minimum to the urban neighborhood collector street standard (west side). The design shall require compliance with Section 4.01(f) of the KCRS; asphalt overlay when widening. This condition has. been met by the completion of construction as shown on the approved engineering plans. c. FRONTAGE: The frontage along SE 192nd Street shall be widened and lowered, as approved by DDES and in compliance with the conditions of approval for Road Variance L05V0066. The frontage shall be widened to the urban neighborhood collector standard on the south side. The road lowering is required to improve the entering and stopping sight distance at the SE 192nd Street/102nd Ave SE intersection. Details of this improvement shall be shown on the engineering plans and routed to KCDOT for approval. This condition has been met by the completion of construction as shown on the approved engineering_plans. d. The proposed private access tract and joint use driveways shall comply with Sections 2.09 and 3.01 of the KCRS, unless otherwise approved by DDES. These tracts shall be owned and maintained by the lot owners served. Notes to this effect shall be showed on the engineering plans and the final plat. The improvements for these tracts have been designed to comply with the required standards. Appropriate notes assigning ownership and maintenance have been included on the Final Plat. e. Modifications to the above road conditions may be considered according to the variance provisions in Section 1.08 of the KCRS. This condition has been met by the completion of construction as shown on the approved engineering plans and a subsequent design revision approved by the City of Renton. The approved revised design matches grade of the existing road and provide a 2% cross slope with curb gutter and sidewalk on the south side of the road and extruded curb on the north side of the road. 11. All utilities within proposed rights -of -way must be included within a franchise approved by the King County Council prior to final plat recording. This condition has been met by action taken by the developer and the City of Renton. 12. The applicant or subsequent owner shall comply with King County Code 14.75, Mitigation Payment System (MPS), by paying the required MPS fee and administration fee as determined by the applicable fee ordinance. The applicant has the option to either: (1) pay the MPS fee at final plat recording, or (2) pay the MPS fee at the time of building permit issuance. If the first option is chosen, the fee paid shall be the fee in effect at the time of plat application and a note shall be placed on the face of the plat that reads, "All fees required by King County Code 14.75, Mitigation Payment System (MPS), have been paid." If the second option is chosen, the fee paid shall be the amount in effect as of the date of building permit application. 13. As a result of the annexation of this project into the City of Renton all fees are required and will be12aid prior to Final Plat approval. 14. Lots within this subdivision are subject to King County Code 21A.43, which imposes impact fees to fund school system improvements needed to serve new development. As a condition of final approval, fifty percent (50%) of the impact fees due for the plat shall be assessed and collected immediately prior to recording, using the fee schedules in effect when the plat receives final approval. The balance of the assessed fee shall be allocated evenly to the dwelling units in the plat and shall be collected prior to building permit issuance. The property is within the Kent School District. A 50% impact fee due at recording and final 50% due when the building permit is issued shall be collected. 15. The planter islands (if any) within the cul-de-sacs shall be maintained by the abutting lot owners or homeowners association. This shall be stated on the face of the final plat. The required note has been included on the Final Plat. 16. Suitable recreation space shall be provided consistent with the requirements of KCC 21A.14.180 and KCC 21A.14.190 (i.e., sport court[s], children's play equipment, picnic table[s], benches, etc.). a. A detailed recreation space plan (i.e., area calculations, dimensions, landscape specifications, equipment specifications, etc.) shall be submitted for review and approval by DDES and King County Parks prior to or concurrent with the submittal of the engineering plan. This plan must not conflict with the Significant Tree Inventory & Mitigation Plan. The required plans have been submitted and approved by King County and provide for the necessary requirement The approved landscape plans have been included with the submittal of the Final Plat. b. A performance bond for recreation space improvements shall be posted prior to recording of the plat. The recreation space improvements have been completed therefore a performance bond is not required for recording the plat. 17. A homeowners' association or other workable organization shall be established to the satisfaction of DDES which provides for the ownership and continued maintenance of the recreation, open space and/or sensitive area tract(s). The Talbot Ridge Estates Homeowners Association is incorporated under the Secretary of State's Certification. A copy of the Covenants, Conditions and Restrictions for the homeowners association has been included with the submittal for Final Plat and will be recorded concurrently. 18. Street trees shall be provided as follows (per KCRS 5.03 and KCC 21A.16.050): a. Trees shall be planted at a rate of one tree for every 40 feet of frontage along all roads. Spacing may be modified to accommodate sight distance requirements for driveways and intersections. b. Trees shall be located within the street right-of-way and planted in accordance with Drawing No. 5-009 of the 1993 King County Road Standards, unless King County Department of Transportation determines that trees should not be located in the street right-of-way. c. If King County determines that the required street trees should not be located within the right-of-way, they shall be located no more than 20 feet from the street right-of-way line. These conditions have been met through the review and approval process of the landscape plans for this project. d. The trees shall be owned and maintained by the abutting lot owners or the homeowners association or other workable organization unless the County has adopted a maintenance program. Ownership and maintenance shall be noted on the face of the final recorded plat. The required note has been included on the Final Plat. e. The species of trees shall be approved by DDES if located within the right-of- way, and shall not include poplar, cottonwood, soft maples, gum, any fruit - bearing trees, or any other tree or shrub whose roots are likely to obstruct sanitary or storm sewers, or that is not compatible with overhead utility lines. These conditions have been met through the review and approval process of the landscape plans for this project. f. The applicant shall submit a street tree plan and bond quantity sheet for review and approval by DDES prior to engineering plan approval. Condition has been met through the review and approval process of the landscape plans for the project. g. The applicant shall contact Metro Service Planning at 684-1622 to determine if SE 192nd Street and/or 102nd Avenue SE are on a bus route. If SE 192nd Street and/or 102nd Avenue SE are a bus route, the street tree plan shall also be reviewed by Metro. These conditions have been met through the review and approval process of the engineering_plans. h. The street trees must be installed and inspected, or a performance bond posted prior to recording of the plat. If a performance bond is posted, the street trees must be installed and inspected within one year of recording of the plat. At the time of inspection, if the trees are found to be installed per the approved plan, a maintenance bond must be submitted or the performance bond replaced with a maintenance bond, and held for one year. After one year, the maintenance bond may be released after DDES has completed a second inspection and determined that the trees have been kept healthy and thriving. Street trees have been installed. The City of Renton will complete all inspections. i. A landscape inspection fee shall also be submitted prior to plat recording. The inspection fee is subject to change based on the current County fees. The landscaping has been installed. 19. To implement SO-220 pursuant to former KCC 21A.38.230, a detailed tree retention plan shall be submitted with the engineering plans for the subject plat. The tree retention and engineering plans shall be consistent with the requirements of SO-220. No clearing of the site is permitted until the tree retention plan is approved by DDES. Flagging and temporary fencing of trees to be retained shall be provided, consistent with SO-220. The placement of impervious surfaces, fill material, excavation work, or the storage of construction materials is prohibited with the fenced areas around preserved trees, except as may be permitted under the provisions of SO-220. These conditions have been met by action taken by the developer. A note shall be placed on the Final Plat indicating that the trees shown to be retained on the tree retention plan shall be maintained by the future owners of the proposed lots consistent with KCC 21A.38.230(B)(6). The tree retention plan shall be included as part of the final engineering plans for the subject plat. The tree retention does not show any trees to be retained on individual lots. The note is not necessary and has not been shown on the plat. 20. In the event that any archaeological objects are uncovered on the site, the applicant shall comply with RCW Chapter 27.53, Archaeological Sites and Resources. Immediate notification and consultation with the State Office of Archaeology and Historical Preservation, King County Office of Cultural Resources and relevant tribes (including the Suquamish, Puyallup and Muckleshoot tribes) is required if discovered materials are prehistoric and a site is present. The developer compiled with this condition. No archaeological objects were uncovered. 21. The subdivision shall conform to KCC 16.82 relating to grading on private property. Not Applicable. 22. Development of the subject property may require registration with the Washington State Department of Licensing, Real Estate Division. Not Applicable. 23. Preliminary approval of this application does not limit the applicant's responsibility to obtain any required permit or license from the State or other regulatory body. This may include, but not limited to the following: a. Forest Practice Permit from the Washington State Department of Natural Resources. b. National Pollutant Discharge Elimination System (NPDES) Permit from WSDOE. c. Water Quality Certification (401) Permit from the US Army Corps of Engineers. The Developer obtained an NPDES Construction Storm Water General Permit from WSDOE. CONCLUSIONS: The Final Plat generally appears to satisfy the conditions imposed by the preliminary plat process and therefore should be approved by the City Council. RECOMMENDATION: 1. The City Council to approve the Final Plat with the following conditions: a) All plat fees shall be paid prior to the recording of the plat. b) All plat improvements shall be either constructed or deferred to the satisfaction of City staff prior to the recording of the plat. SUBMITTED THIS 1st DAY OF September, 2009. RICK MORENO ' DEVELOPMENT SERVICES DIVISION cc: Kayren Kittrick LUA-07-01 G-FP CITY OF RENTON PLANNINGBUILDING/PUBLIC WORKS MEMORANDUM DATE: June 11, 2009 TO: Bob Mac Onie, Technical Services Sonja Fesser, Technical Services FROM: Rick Moreno, x 7278 r SUBJECT: TALBOT RIDGE ESTATES FINAL PLAT LUA 07 —150 FP SW CORNER @192ND STREET /102ND AVE SE FINAL REVIEW & APPROVAL FORM Enclosed are the latest corrections to the final plat per your previous memo. Attached is the revised plat. If all concerns have been addressed and you recommend recording of the mylars, please sign this memo below and return to me. Thank you. Approval: Approval: Name, cc: Yellow File 0 '6` oVAj._ eD Et-3JECT ` c, `jl-i PUBLIC WORKS DEPARTMENT v ,. M E M O R A N D U M DATE: June 11, 2009 TO: Rick Moreno FROM: Sonja J. Fesser SUBJECT: Talbot Ridge Estates, LUA-08-150-FP Format and Legal Description Review Bob Mac Onie and I have reviewed the above referenced final plat submittal and have the following additional comment: Comments for the Applicant: See the attachment for a circled portion of the "CITY OF RENTON APPROVALS" block that needs to be removed. As a final plat, the surveyor's stamp must be signed pursuant to WAC 196-23-020, or the document must be stamped as "PRELIMINARY". VITile Sys\LND -Land Subdivision & Surveying Records\L.ND-10 - Plats\0474\RV090608.doc )VERNMENT LOT 4, SECTION 5, NCE, DESCRIBED AS FOLLOWS: J QUARTER 33.66 FEET SOUTH OF WEST ALONG THE WEST LINE OF JCE; THENCE ALONG SAID FENCE 99.07 FEET AND SOUTH 88'12'26" E OF SAID NORTHWEST QUARTER TION ,SIGNED OWNERS IN FEE SIMPLE OF DEDICATE TO THE USE OF THE AND THE USE THEREOF FOR ALL 4ECESSARY SLOPES FOR CUTS AND THE ORIGINAL REASONABLE D FURTHER DEDICATE TO THE USE OR ALL PUBLIC PURPOSES AS > AND DRAINAGE. AND UTILITIES FOR THE BENEFIT HEREBY CONVEYED UPON THE 18, 19, 20, 21 AND 22. OWNERSHIP INTEREST IN TRACT A NTENANCE OF SAID TRACT. > AND UTILITIES FOR THE BENEFIT ' CONVEYED UPON THE RECORDING 15. OWNERSHIP OF SAID LOTS TRACT B, AND AN EQUAL AND RACT. )T RIDGE ESTATES HOMEOWNERS' R PRIVATE RECREATION AND STORM IP AND MAINTENANCE OF SAID CATED TO THE CITY OF RENTON FOR PUBLIC STORM DRAINAGE FACILITIES ►J 1 1l 1 Ju ►� A PORTION _ s'v'T LONW 1 /4 OF THE NW 1 /4), SECTION 5, 7-7-MNSHIP '' �• aRTH, RANGE 5 EAST, W.M., CiT` —'= ==`* NTON, r;: ;0 COUNTY, WASHINGTON CITY OF RENTON APPROVALS CITY CITY OF RENTO FEMt4 uBL IC WORKS DEPARTMENT I HEREB ASSESS! EXAMINED AND APPROVED j 'S DAY OF _-_ _--__—. 2009. CONTAIP THIS _. CITY OF RENTON ADMINISTRATOR, DEPARTMENT OF PUBLIC WORKS FINANC CITY OF RENTON MAYOR EXAMINED AND APPROVED _— DAY OF --__ 2009. MAYOR ----.------ — — ---- -- KINI I HERE SPECIA ASSES' CITY OF RENTON CONTA ATTEST: THIS _— DAY _ ---- 2009. THIS . CITY CLERK ACKNOWLEDGMENTS STATE OF WASHINGTON ) )SS COUNTY OF ) I CERTIFY THAT I KNOW OR HAVE SATISFACTC�- ' V'DENCE THAT --- - - IS THE PERSON THAT APPEARED BEFORE ME, A'D SA:D P RSON ACKNOWLEDGED THAT HE/SHE SIGNED THIS INSTRUMENT; ON OATH STATED 7HA- HE/SHE" WAS AUTHORIZED TO EXECUTE THE INSTRUMENT; AND ACKNOWLEDGED IT AS THE -___—__ OF TALBOT Oa Ar 0 BE THE FREE AND RIDGE ESTATES LLC, A WASHINGTON LIMITED . AE' L'T'" MPI "Y• VOLUNTARY ACT OF SUCH PARTY FOR THE USES AND PURPOSES MENTIONED IN THE INSTRUMENT. DATED: ____—_ 2009. NAME: ------- ---------- PRINTED MANA DE] EXAM KING PARC NOTARY PUBLIC IN AND FOR THE STATE OF WASHINGTON 1 14 I 18 I 20 IF I I I 1 I 1? 1e ?l `--- 15 le RM PACE 11 17 22 I I 'I �I ......... r� .r..v� L OT LA POUT 1" 100' Q Q O Q o 3S d O O ,u N S 0810 W �, 0 � m 4. h rR CITY OF RENTON, WASHINGTON RESOLUTION NO. A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, APPROVING FINAL PLAT (TALBOT RIDGE ESTATES FINAL PLAT; FILE NO. LUA07-150FP). WHEREAS, a petition for the approval of a final plat for the subdivision of a certain tract of land as hereinafter more particularly described, located within the City of Renton, has been duly approved by the Department of Community and Economic Development; and WHEREAS, after investigation, the Administrator of the Department of Community and Economic Development has considered and recommended the approval of the final plat, and the approval is proper and advisable and in the public interest; and WHEREAS, the City Council has determined that appropriate provisions are made for the public health, safety, and general welfare and for such open spaces, drainage ways, streets or roads, alleys, other public ways, transit stops, potable water supplies, sanitary wastes, parks and recreation, playgrounds, schools, school grounds, sidewalks and other planning features that assure safe walking conditions for students who walk to and from school; and WHEREAS, the City Council has determined that the public use and interest will be served by the platting of the subdivision and dedication; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DOES RESOLVE AS FOLLOWS: SECTION I. The above findings are true and correct in all respects. SECTION II. The final plat approved by the Department of Community and Economic Development pertaining to the.following described real estate, to wit: See Exhibit "A" attached hereto and made a part hereof as if fully set forth 1 RESOLUTION NO. (The property, consisting of adpproximately 4.3 acres, is located in the vicinity of the southwest corner at 192" Street and 102nd Avenue SE.) is hereby approved as such plat, subject to the laws and ordinances of the City of Renton, and subject to the findings, conclusions, and recommendation of the Department of Community and Economic Development dated September 8, 2009. PASSED BY THE CITY COUNCIL this day of 2009. Bonnie I. Walton, City Clerk APPROVED BY THE MAYOR this day of 2009. Approved as to form: Lawrence J. Warren, City Attorney RES:1419:9/14/09:scr Denis Law, Mayor 2 EXHIBIT "A" LEGAL DESCRIPTION THE NORTH HALF OF THE NORTWEST QUARTER OF GOVERNMENT LOT 4, SECTION 5, TOWNSHIP 22 NORTH, RANGE 5 EAST, W.M. IN KING COUNTY, WASHINGTON. EXCEPT 192ND STREET AND 102ND AVENUE SOUTHEAST: ALSO EXCEPT THAT PORTION LYING SOUTH OF AN EXISTING FENCE, DESCRIBED AS FOLLOWS: BEGINNING AT A POINT ON THE WEST LINE OF SAID NORTHWEST QUARTER 33.66 FEET SOUTH OF THE NORTWEST CORNER THEROF: THENCE SOUTH 00° 22'25" WEST ALONG THE WEST LINE OF SAID NORTHWEST QUARTER 261.46 FEET TO SAID EXISTING FENCE; THENCE ALONG SAID FENCE SOUTH 88' 28' 15" EAST 215.76 FEET, SOUTH 88° 4751" EAST 299.07 FEET AND SOUTH 88' 12'26" EAST AND EXTENSION THEREOF 139.20 FEET TO THE EAST LINE OF SAID NORTHWEST QUARTER OF GOVERNMENT LOT 4, AND TERMINUS OF SAID LINE. CITY OF RENTON COUNCIL AGENDA BILL Submitting Data: Dept/Div/Board.. Finance & IT Department Staff Contact...... George McBride, Information Technology Subject: Fiber Optics Consortium Interlocal Agreement Exhibits: 1. Issue Paper 2. Addendum #51 to Fiber Optics Installation Projects Recommended Action: Council Concur Al #: , For Agenda of: October 5, 2009 Agenda Status Consent .............. Public Hearing.. Correspondence.. Ordinance ............. Resolution............ Old Business........ New Business....... Study Sessions...... Information......... Approvals: Legal Dept......... Finance Dept...... Other ............... Fiscal Impact: Expenditure Required... 0 Transfer/Amendment....... Amount Budgeted....... 0 Revenue Generated......... Total Project Budget 0 City Share Total Project.. X X SUMMARY OF ACTION: Approval of a Fiber Optics Project Interlocal Agreement Addendum #51 that would add the City of Puyallup as a partner to the existing consortium partners for the sharing of fiber optics installation projects. By adding an additional partner to the consortium, the number of partners is increased, spreading future potential costs of getting fiber to the other valley cities and Valley Communications. There are no costs to the City for this project. STAFF RECOMMENDATION: Approve Interlocal Agreement Addendum #51 that adds the City of Puyallup to the existing consortium partners. H:\Finance\Council\01_AgendaBills\2009\2009_Utility Leak Adjustment.doc FINANCE AND city of INFORMATION SERVICES ww�D (6 (S M E M O R A N D U M DATE: September 28, 2009 TO: Randy Corman, Council President Members of the Renton City Council VIA: Denis Law, Mayor FROM: Iwen Wang, FIT Administrator STAFF CONTACT: George McBride, Information Technology SUBJECT: Fiber Consortium Interlocal Agreement Addendum #51 ISSUE Should the City execute an Interlocal Agreement Addendum adding the City of Puyallup as a partner to the Fiber Consortium? RECOMMENDATION Staff recommends approval of Addendum #51 to the Fiber Optics Interlocal Agreement. BACKGROUND Several years ago the City joined the Fiber Consortium, a group of local government agencies comprised of local cities, hospitals, schools, and utilities. The attached Fiber Optics Project Agreement Addendum #51 (FOPA) supplements the original agreement by adding the City of Puyallup to the Fiber Consortium as a partner. By adding valley cities to the consortium, the number of partners is increased, spreading future potential costs of getting fiber to the other valley cities and Valley Communications. There are no costs to the City for this project. Cc: Jay Covington, CAO Marty Wine, Assistant CAO George McBride, Information Technology h:\finance\council\02_issuepapers_memos to council or mayor\2009_fiberinterlocal agreement #51 issue paper.doc ADDENDUM #51 GENERAL TERMS and CONDITIONS For Sharing of Fiber Optic Installation Projects WHEREAS, the City of Bellevue, the City of Kirkland, the City of Renton, the City of Auburn, the Lake Washington School District, the Renton School District, the Bellevue School District, the University of Washington, Bellevue Community College, Evergreen Hospital, and Seattle Public Utilities, (the Participating Agencies) have entered into the General Terms and Conditions for Sharing of Fiber Optic Installation Projects, and; WHEREAS, the City of Puyallup, desires to participate in the planned and future Fiber Optic Projects but cannot because it is not a Participating Agency subject to the General Terms and Conditions for Sharing of Fiber Optic Installation Projects, and; WHEREAS, the current Participating Agencies desire to amend the General Terms and Conditions for Sharing of Fiber Optic Installation Projects to add the City of Puyallup as a Participating Agency for participation in the planned and future Fiber Optic Projects; NOW THEREFORE, the parties hereby agree as follows: 1) All terms in this Addendum shall have the same meaning as the defined terms in the General Terms and Conditions for Sharing of Fiber Optic Installation Projects. 2) City of Puyallup hereby acknowledges that it has read, understands and accepts the General Terms and Conditions for Sharing of Fiber Optic Installation Projects, hereby incorporated by reference as if fully set forth, and agrees to be bound by them. 3) As provided in Section IX, paragraph N, the current Participating Agencies hereby amend the General Terms and Conditions for Sharing of Fiber Optic Installation Projects to add City of Puyallup as a Participating Agency, and City of Puyallup, by executing this agreement, consents to becoming a Participating Agency. IN WITNESS WHEREOF, the parties hereto have executed this Addendum to the General Terms and Conditions For Sharing of Fiber Optic Installation Projects on the respective dates indicated below. Approved as to Form: David Ramsay Date City Attorney City Manager, City of Kirkland Approved as to Form: Resolution No. 2137 Valley Cities BTOP Grant Application Steve Sarkozy Date City Manager, City of Bellevue Weldon Ihrig Executive Vice President University of Washington Date Barbara Posthumus Date Coordinator Business Services Lake Washington School District Tom Martin Chief Information Officer Evergreen Hospital Date ,lack McLeod Date Director, Facilities and Information Services Bellevue School District City Attorney Approved as to Form: Denis Law Date City Attorney Mayor, City of Renton Stanley Morency Date Director of Information Services Renton School District 403 Approved as to form: Resolution No. 2137 Valley Cities BTOP Grant Application Approver! as to form: B. Jean Floten Date Assistant Attorney General President Bellevue Community College William M. Schrier Date Chief Technology Officer City of Seattle Approved as to Form: Pete Lewis Date City Attorney Mayor, City of Auburn W. r N lJ n' Gary N. Mqkean ° City Mana er, City of Puyallup Resolution No. 2137 Valley Cities BTOP Grant Application CITY OF RENTON COUNCIL AGENDA BILL Submitting Data: Dept/Div/Board.. Finance & IT Department Staff Contact...... George McBride, IT Subject: Operating Lease Agreement with IKON Office Solutions, Inc. Exhibits: 1. Issue Paper 2. IKON Master Agreement #1007115ML Recommended Action: Council Concur Fiscal Impact: Expenditure Required. Amount Budgeted....... Total Project Budget $109,613/yr (approx.) $120,000 $109,613/yr (approx.) Al #: i For Agenda of: October 5, 2009 Agenda Status Consent .............. Public Hearing.. Correspondence.. Ordinance ............. Resolution............ Old Business........ New Business....... Study Sessions...... Information......... Approvals: Legal Dept......... X Finance Dept...... Other ............... Transfer/Amendment....... Revenue Generated......... City Share Total Project.. X SUMMARY OF ACTION: Approval of a Master Agreement with IKON Office Solutions, Inc. for the next five years that would replace 27 copiers of the existing Canon rental copiers in the City's copier fleet with new Ricoh copiers. This agreement is projected to save the City $14,000 per year, when compared to current contract cost. STAFF RECOMMENDATION: Approve the Master Agreement with IKON Office Solutions, Inc. H:\Finance\Council\01_AgendaBills\2009\2009_lkon Copier Agreement Agenda bill.doc 0 FINANCE AND city of INFORMATION SERVICES D Mum ' M E M O R A N D U M DATE: September 28, 2009 TO: Randy Corman, Council President Members of the Renton City Council VIA: pL Denis Law, Mayor FROM: Iwen Wang, FIT Administrator STAFF CONTACT: George McBride, Information Technology SUBJECT: Operating Lease Agreement with IKON Office Solutions, Inc. ISSUE Should the City execute an Operating Lease Agreement with IKON Office Solutions, Inc. for the next five years that would replace 27 copiers? RECOMMENDATION Staff recommends approval of Master Agreement #1007115ML. BACKGROUND The City currently maintains a fleet of 61 copiers/multifunction devices that are a mix of rented and City owned machines. We have completed a review of each machine with its life cycle usage, annual copy productions counts, and costs. The Operating Lease Agreement is.for the next five years at a cost of $8,304 per month or $99,648 per year plus applicable tax. This would allow replacement of 27 of the existing Canon rental copiers in the City's fleet currently costing $10,024 per month or $120,285 per year with new Ricoh copiers. This is an annual savings of $14,000 with improved features and performance available to the staff. Cc: Jay Covington, CAO Marty Wine, Assistant CAO George McBride, Information Technology h:\finance\council\02_issuepapers_memos to council or mayor\2009_ikon copiers agreement issue paper.doc STATE AND LOCAL GOVERNMENT Document Efficiency Product Schedule At Work.` A RICOH COMPANY Product Schedule Number: Master Agreement Number: 1007115ML This Schedule ("Schedule") is made part of the Master Agreement ("Master Agreement") identified on this Schedule between IKON Office Solutions, Inc. ("we" or "us") and City of Renton , as Customer ("you"). All terms and conditions of the Master Agreement are incorporated into this Schedule and made a part hereof. It is the intent of the parties that this Schedule be separately enforceable as a complete and independent agreement, independent of all other Product Schedules to the Master Agreement. CUSTOMER INFORMATION City of Renton City of Renton Customer (Bill To) Product Location 1055 S. Grady Way Suite 110 1055 S Grady Way Address Address Renton KING WA 98055 Renton King WA 98055 City County State Zi City County State Zip Customer Contact Name: Customer Telephone Number: Fax Nutnber/E-mail Address: Chris Catt 42543a6887 PRODUCT DESCRIPTION ("Products") Ouantitv I Description: Make, Model & Serial Number Quantitv Description: Make, Model & Serial Number 5 Ricoh 6001 1 Pro 1050 Sn # 56WE00534 8 Ricoh 4000 9 Ricoh 3350 1 Ricoh C 3300 2 Ricoh Pro EX 550 PAYMENT SCHEDULE Minimum Term (mos.) 60 months Minimum Payment Without Tax) $8304.00 Payment Due: =Monthly Quarterly =Other Advance Payment (with tax) =apply to I" Month's Pint. Other Sales Tax Exempt: ❑ Yes (Attach Exemption Certificate) Customer Billing Reference Number (P.O. ii, etc.) Addendum(s) attached: ❑ Yes (check if yes and indicate total number of pages: TERMS AND CONDITIONS 1. The first Payment will be due on the Effective Date. The delivery date is to be indicated by signing a separate acceptance form. 2. You, the undersigned Customer, have applied to us to rent the above -described items ("Products") for commercial (non -consumer) purposes. Except with respect to the express non -appropriations rights set forth in the Agreement, THIS IS AN UNCONDITIONAL, NON -CANCELABLE AGREEMENT FOR THE MINIMUM TERM INDICATED ABOVE. If we accept this Schedule, you agree to rent the above Product(s) from us, and we agree to rent such Product(s) to you, on all the terms hereof, including the Terms and Conditions on the Master Agreement. THIS WILL ACKNOWLEDGE THAT YOU HAVE READ AND UNDERSTAND THIS SCHEDULE AND THE MASTER AGREEMENT AND HAVE RECEIVED A COPY OF THIS SCHEDULE AND THE MASTER AGREEMENT. 3. Additional Provisions (if any) are: PROPERTY TAX INCLUDED. Operating lease issued pursuant to State of Washington RFP # 03706. THE PERSON SIGNING THIS AGREEMENT ON BEHALF OF THE CUSTOMER REPRESENTS THAT HE/SHE HAS THE AUTHORITY TO DO SO. . X Title: Authorized Signer (Authorized Signer's printed name) Accepted by: IKON OFFICE SOLUTIONS, INC. Date. X Title: Date: Authorized Signer (Authorized Signer's printed name) 1-888-ASK-IKON nvvcikon.cont IKON Office Solution.•i's and IKON: Doetu mat Efficiency At \fork / A Ricoh Conyany are trademarks of IKON Office Solutions, Inc. Ricoh k is a registered trademark of' Ricoh Company, Ltd. SLG P;S 06,09 Current Contract Information (CCI), Effective Date: July 7, 2009 Contract No. 03706 for Multifunctional Document Devices, Standalone and Networked Page 21 of 100 SPECIAL TERMS AND CONDITIONS 1. Survivability Placements made using the authority provided by this Contract will survive the Contract itself. Those customers renting or leasing the equipment will continue to receive ongoing service from the Contractor at the agreed upon Contract rate through the term of their placement contract agreement. The Contract terms and conditions will survive the authorizing contract through that final term. Those customers purchasing equipment will receive ongoing service from the Contractor at the agreed upon Contract rate until the expiration of the Contract. Upon the Contract termination, customers and Contractors may agree to further extend a placement. Such further extensions will not be for more than twelve month terms, and the State will reserve the right to terminate these placements with 30 days notice and without termination penalties. 2. Equipment Additions/Deletions During the term of the contract, Contractors may add or delete contract equipment introduced or removed from the market by the manufacturer provided the equipment falls within the scope of the Contractor's awarded contract. Contractor shall update its dedicated contract website to reflect this change. New equipment must be adequately described and the associated price list must be updated to reflect the new equipment's prices. Pricing must utilize the same pricing structure as was used for other equipment falling into the same product category. 3. Equipment Installation/Removal The installation and/or removal of contract equipment shall be performed in a professional manner. The customer's premises shall be left in a clean condition. The Contractor may be required to repair all damage and/or provide full compensation for damage to the customer's premises that occurred during equipment installation/removal. All cables used to connect the equipment must be pre -approved by customer's Information Services (IS) staff in advance of order finalization and placement. Installation and removal costs shall be included in equipment pricing, except in the specific cases where delivery and self installation is identified on the order. In those cases equipment is to be delivered to the customer's identified delivery point at no additional charge (i.e. — shipped freight prepaid FOB destination and included in contract price). However, extraordinary delivery requirements and their associated extra costs may be charged to the purchaser as a separate line item on the invoice, when pre -approved by the purchaser. Installation of equipment to be networked must be coordinated with the customer's internal IS personnel in charge of the computer network and telephone system to which the machine may be connected. Connectivity service support is to be available to coordinate installation with agency personnel and be available to answer questions and concerns on the equipment installed. Personnel in charge of the installation must be available to coordinate installation with ordering agency internal staff in charge of the customer's network. Service support personnel, knowledgeable in digital equipment and in networking equipment, will be required to provide all necessary maintenance and repair. 4. Training on Equipment Contractor shall provide ordering agencies up to two (2) hours free in-house training at the time of equipment installation or by appointment within five (5) working days as arranged with agency personnel. Training to include, but not limited to, standard functional use of machine to networked users as well as training to any assigned agency personnel to enable them to instruct others. Such training shall be provided at no additional charge to the customer. Current Contract Information (CCI), Effective Date: July 7, 2009 Contract No. 03706 for Multifunctional Document Devices, Standalone and Networked Page 22 of 100 5. Operator's Manual Instruction and maintenance manuals shall be furnished for all contract equipment and software delivered and installed. Electronic instructional media will be furnished for all software provided. Manuals shall contain, but not be limited to, the following: • A section describing the capability of the equipment. • A section on machine specifications. • A section describing operating instructions. • A section describing the installation and use criteria of the equipment. • A section describing general maintenance instructions. • A section describing software installation and user guides. 6. Newly Installed Machine Performance Problems Ordering agency will evaluate the performance of newly installed equipment for a 30-day period after installation. If the machine's performance is unsatisfactory, the ordering agency will immediately contact the Contractor to pursue corrective action and resolution of the problem. Resolution of machine performance problems may result in: • The replacement of the machine with another machine of the same brand and model, at no additional cost (including delivery and installation) to the customer, or • Return of the machine and cancellation of the order at no charge to the customer. 7. Equipment Loaners The Contractor shall be responsible for any delivery, installation/removal charges associated with equipment loaners. Equipment Repair: Contract equipment under any rental or maintenance agreement which is non -operational and cannot be repaired within 24 working hours of notification that service is required, at customer's request will be replaced within two (2) working days by a loaner unit until repairs are completed. Loaner equipment does not have to be the same model, but must perform the same functions as the equipment being repaired. Partial Operability: In the case of machines needing repair, but which are still partially operable, requirements and arrangements for loaner equipment will be made between the Contractor and customer. If no agreement can be reached, the Contract Administrator administering this Contract will make a final determination. Late Equipment Delivery: If requested equipment (purchased, rented or leased) cannot be supplied within the Contractor's specified delivery time, substitute equipment, of equal or greater performance capabilities must be temporarily installed pending the installation of the ordered new equipment. In issues of dispute, the Contract Administrator administering this Contract will make a final determination. Trial Placements: • May not exceed thirty (30) days • May run in conjunction with another vendor's ongoing placement but may not offset the cost of an early termination penalty 8. Equipment Relocation/Transfer Contract users shall be afforded the option to move or transfer contract equipment from one agency location t another agency location (within the same agency, or to another agency) as deemed necessary with no change to rental or maintenance plans. For agency self -moves, no installation or removal charges will be billed to either location for customer's self relocated/transferred equipment. The customer will be responsible for required Current Contract Information (CCI), Effective Date: July 7, 2009 Contract No. 03706 for Multifunctional Document Devices, Standalone and Networked Page 23 of 100 repairs or damage that occurred during the transfer. Contractor/dealer shall be notified of the move to insure continued maintenance service and accurate record keeping. Alternately, agencies may elect to have their dealer move the equipment and pay a move and set-up fee. The dealer will provide a moving price prior to the move and hold the price firm. No other fees apply and the dealer is responsible for repairs required following such transfer. Movement of equipment must be coordinated with agency's internal Information Services (IS) personnel in charge of the computer network and telephone system to which the machine may be connected or disconnected. 9. Excessive Service and Downtime Equipment, including all accessories and software, supplied through this contract shall be capable of continuous operation. Therefore, Contractor shall guarantee that all contract equipment will be operational at least 95% of normal business hours. Equipment that develops a trend of requiring an excessive number of service calls shall be reported by the agency to the Contractor or by the Contractor to the agency as the situation warrants. Should the equipment, any accessories, or software become inoperable for a period of twenty-four (24) consecutive working hours, the Contractor shall, at the agency's option, provide, at no charge, a loaner or accessory of equal capability of non -performing piece of equipment while repairs are being completed. Contractors are to maintain a service log for each machine serviced describing maintenance and repair services provided. A no -cost copy of service logs/reports must be provided to the customer and/or the Contract Administrator within five (5) working days of request. 10. Materials and Workmanship Contractors shall be required to furnish all materials, equipment and services necessary to perform contractual requirements. Materials and workmanship in the construction of equipment for this contract shall conform to all codes, regulations and requirements for such equipment, specifications contained herein, and the normal uses for which intended. Materials shall be manufactured in accordance with the best commercial practices and standards for this type of equipment. 11. Contractor Performance General Requirements: OSP and ordering agencies monitor and maintain records on Contractor performance. Said performance shall be a factor in evaluation and award of this and all future contracts. Agencies will be provided with product/service performance report forms to complete and submit to the Contract Administrator to assist in monitoring Contractor's contract performance. Damages: Ordering Agencies have an ongoing requirement for the materials, equipment and services specified herein. Vendors are urged to give careful consideration to the Ordering Agency's requirements, to the manufacturer's production capabilities and to its performance capabilities when establishing dates for equipment delivery and on -site installation and set-up. Note order lead-times specified in Contractor Information section. Damages will be assessed in the amount of actual damages incurred by the ordering agency as a result of Contractor's failure to make timely delivery and installation. Further, Ordering Agencies are entitled to recover actual costs associated with Contractor's failure to perform the contract as specified herein. 12. Equipment Inspection/Testing/Acceptance Inspections, tests, measurements, or other acts or functions performed by the Ordering Agency shall in no manner be construed as relieving the Contractor from full compliance with contract requirements. At a minimum, an installed device must demonstrate the capability of providing the functions and services specified in the manufacturer's published literature. Current Contract Information (CCI), Effective Date: July 7, 2009 Contract No. 03706 for Multifunctional Document Devices, Standalone and Networked Page 24 of 100 Any equipment delivered through this contract that fails to perform to manufacturer's specifications may, within fifteen (15) days of equipment receipt and at the Ordering Agency's request, be replaced with a new unit or the defective unit be repaired under manufacturer's warranty. 13. Installation Site Requirements Prior to order acceptance, Contractor must advise Ordering Agency of any and all specialized installation and environmental customer site requirements for the delivery and installation of contract equipment. This information should include, but is not limited to the following: • Air conditioning; • Electrical requirements; • Special grounding; • Cabling requirements; • Space requirements; • Humidity and temperature limits; • Noise level, and; • Any other considerations critical to the installation. 14. Availability of Repair Parts Vendor must guarantee the availability of repair parts for a minimum of five (5) years subsequent to Ordering Agency's acceptance of the contract equipment. All branded equipment components, spare parts, application software, and ancillary equipment purchased and supplied under this contract must conform to manufacturer specifications. The Contractor is responsible for ensuring that these items are operable and installed in accordance with manufacturer's specifications. 15. Service and Maintenance Support Service Technicians: Contractors shall have a service organization staffed by be full-time employees of the Contractor or designated by the Contractor as their full-time authorized representative. Service representatives shall be factory -trained technicians. All warranty or maintenance services to be performed on contract products as well as any associated hardware or software shall be performed by qualified technicians properly trainer and/or authorized by the manufacturer to perform such services. Maintenance: Maintenance is defined as the service required to maintain contract equipment at performance levels equal to or greater than the performance specified and published by the manufacturer or the specifications specifically stated herein. Maintenance is to include all service components and consumable supplies (excluding paper) including drums, developer, toner and staples. Rye air Parts: In the event that the performance of maintenance services under the contract results in a need to replace defective parts, such items may only be replaced by new OEM parts. In no instance shall the Contractor be permitted to replace defective items with refurbished, remanufactured, or surplus items without prior written authorization of the customer. The Contractor must maintain an adequate supply of spare parts and components. Preventative/Scheduled Maintenance: Preventative/scheduled maintenance shall be based on the specific needs of individual machines as determined by the manufacturer and shall be performed in accordance with the manufacturer's recommendations. The Contractor shall schedule regular preventative maintenance (PM) serv' as scheduled in advance with the Agency. Scheduled PM calls will not be considered downtime. The PM call, shall include, but not be limited to, routine cleaning, lubrication, necessary adjustments, and replacement of unserviceable parts. Current Contract Information (CCI), Effective Date: July 7, 2009 Contract No. 03706 for Multifunctional Document Devices, Standalone and Networked Page 25 of 100 Costs: Maintenance costs shall be expressed and charged for on a "cost per copy" basis for all purchased, rented or leased equipment. Maintenance Performed During Warranty Period: On all equipment (purchased, rented, or leased) obtained through this contract, maintenance service charges (on a "cost -per -copy" basis) shall apply during the manufacturer's warranty period. Maintenance Caused by Operator Error, Misuse or Abuse: Should the cause of the service call be determined by mutual consent to be an operator error, misuse or abuse by the agency, the Contractor may charge for the service call at the rate specified herein for "Additional Installation/Network Labor Rate." Maintenance Agreements: Contractor may request that Contract customers sign Maintenance Agreements provided any terms or conditions in the agreement that are in conflict with the terms and conditions of this Contract shall be unenforceable. Reporting to Customer: When on site, the Contractor's service technician must report to the customer's designated coordinator prior to and after each service call. Equipment maintenance or upgrades which may affect equipment performance/service must be coordinated with the customer's coordinator a minimum of 48 hours in advance. Maintenance or upgrades which might affect equipment performance/service will not normally be conducted during office hours. 16. Dealers/Distributors During the Contract period, the Contractor or Contract Administrator may remove a dealer or distributor from the list of those designated to service this Contract at any time without further explanation or process. The Contractor may propose dealer/distributor additions for consideration and does agree to provide interim service should any listed resource become unavailable or deemed unsuitable by the Contract Administrator. The decision about the suitability of dealers/distributors, sales representatives and outlets will be solely that of the Contract Administrator. 17. Lack of Timely Repair Service Response In cases where the Contractor is not able to respond to repair service requests within the specified contract time frame, the contract customer shall have the option of acquiring repair services from another manufacturer certified source and the Contractor shall be responsible for full reimbursement of costs incurred by the customer. Repair services provided by another manufacturer certified source when the Contractor fails to respond in a timely manor would not constitute grounds to void the manufacturer's warranty. 18. Equipment Warranty(ies) Contractor shall submit a copy of the manufacturer's standard warranty with all equipment delivered under this Contract. A full on -site parts and labor warranty shall be for a minimum period of ninety (90) calendar days after receipt and acceptance of equipment by the Ordering Agency. This warranty must cover all common equipment, accessories, hardware, parts, labor, travel, software, and all other necessary ancillary equipment required to maintain the equipment in proper operation. In the event of any conflict between Contract terms and conditions and any of the terms and conditions included in the manufacturer's warranty, to afford the State maximum benefits, the Contract terms and conditions shall prevail. 19. Special Promotions Contractors may offer discounted special pricing on their website. Specials will run for one or more calendar months, be plainly visible and be available to all contract customers during the promotional period. The Current Contract Information (CCI), Effective Date: July 7, 2009 Contract No. 03706 for Multifunctional Document Devices, Standalone and Networked Page 26 of 100 Contractor will furnish a summary of placements made during the promotion to Contract Administrator for file within thirty (30) days of promotion completion. 20. Bulk Placements Contractors may offer discounts or price breaks on the services, purchase prices, leases and rental plans to those customers who require placement of five (5) or more machines at one time, or who through their actions are modifying a fleet of five or more machines. Modifications may be in the form of alternate payment structures, or alternate service requirements. Such modifications must offer users a program at least as valuable as that established in the award of the contract. Proposals involving modifications which add additional value elements, must be approved in advance of order placement by the Contract Administrator. Thirty days are to be allotted for this consideration. B. Bulk buy proposals may contain a minor amount of material not specifically specified in the contract. Qualifying material would be accessories, software, cable, and attendant machines or devices needed to complete the intended placement. This additional material must be such that it is normally and customarily offered by the Contractor. In no case shall the value of such additions exceed twenty percent of the value of the new equipment, or represent equipment listed on another mandatory state contract. The price fo; such additions must represent a reasonable value in the opinion of the Contract Administrator. C. Before taking advantage of the Bulk Placement provision, users and Contractors will attach documentation to their PO copies of the Contract Administrator's letter of approval and maintain it for auditor's review. Clients are encouraged to seek a print assessment to baseline their print needs, and are encouraged to seek proposals for Bulk Placements from several Contractors. 21. Rentals The following rental plans are to be available with each commencing on the date of installation or after an agreed upon qualifying trial period (not to exceed thirty (30) days): • Twenty-four (24) Month Rental, • Thirty-six (36) Month Rental, • Forty-eight (48) Month Rental, and • Sixty (60) Month Rental. Some Contract customers may require month to month (not to exceed nine (9) months) rental terms. Although not specifically priced in the Contract, Contractors may offer these rental programs to those who require them. Pricing for such rental terms is to be consistent with established contract pricing methodology listed in the contract. Should the customer be asked to sign a rental agreement, any conflict between the provisions of the Contractor's rental agreement and the terms and conditions of this Contract shall be resolved in favor of what is most beneficial to the customer. Rental periods may extend beyond the expiration or termination of this Contract. Current Contract Information (CCI), Effective Date: July 7, 2009 Contract No. 03706 for Multifunctional Document Devices, Standalone and Networked Page 27 of 100 22. Expiration/Renewal of Rental Agreement The Contractor will send e-mail notification of pending end of term at ninety (90) days and again at sixty (60) days prior to end of rental term. Customers may choose one of the following three (3) options at the end of the rental term: • They may conclude the rental and return the machine to the Contractor. Customer shall not be responsible for pickup, shipping or transportation charges to return the equipment to the Contractor. • They may continue the placement with a continuation of the same terms and commitment but with the lower mutually agreed to monthly rental rate on a month to month basis, or for an additional fixed period of time. • They may convert to month to month rental at the same rental rate. However, if Contractor has not notified the customer that the end of the rental term has been reached or if the customer has not notified the Contractor of which of the above options they have selected, the rental shall automatically be converted to a month to month rental at the same rental rate. The cost of maintenance service shall continue unchanged. For rental terms that extend beyond a total of sixty (60) months, the Contractor may, with thirty (30) days written notice, unilaterally terminate the rental and remove the machine at no additional cost to the customer should the Contractor's service technicians be unable to maintain the device in good working order. 23. Rental Machine Upgrades and Downgrades A term placement may be concluded before it has run full term to upgrade or downgrade. When the agency replaces the equipment with equipment from the same Contractor, a four (4) month payment penalty will apply, unless the Contractor reduces or waives the penalty. When a new Contractor is selected, thirty (30) days notice to the current Contractor is required and a four (4) month penalty will apply. New Contractors may not waive or offset the penalty. 24. Operating Leases Customers may obtain Contract equipment through an Operating Lease (where no ownership in the equipment' transfers to the customer during or at the end of the lease period) at rate(s) established in the Contract. A maintenance service program shall be charged for separately on a cost per copy basis as provided for herein. During the term of the lease agreement, the lease may not be cancelled unless the Contractor fails to maintain the equipment in good working order as specified herein or for non -appropriation of funds. Such cancellation shall be permitted without penalty with thirty (30) days written notification to the Contractor. The following operating lease plans are to be available to Contract customers. Each plan shall commence on the date of equipment installation or after an agreed upon qualifying trial period (not to exceed thirty (30) days): • Thirty-six (36) Month Operating Lease, • Forty-eight (48) Month Operating Lease, and • Sixty (60) Month Operating Lease. With a minimum thirty (30) day notice prior to the end of the operating lease agreement, Contractor shall remove the equipment and return it to the Contractor's facility at no additional cost to the customer. Customer may not purchase the machine at the end of the term of the operating lease. However, customer may continue using the machine on a month -to -month rental basis until the machine is picked up and returned to the Contractor. Should the customer be asked to sign an operating lease agreement, any conflict between the provisions of the Contractor's lease agreement and the terms and conditions of this Contract shall be resolved in favor of what is most beneficial to the customer. Current Contract Information (CCI), Effective Date: July 7, 2009 Contract No. 03706 for Multifunctional Document Devices, Standalone and Networked Page 28 of 100 25. Standard Leases Political subdivision customers may obtain Contract equipment under the Contractor's standard lease provisions and rates established for Standard Equipment Leases (where ownership in the equipment transfers to the customer during and/or at the end of the lease period). The purchase price(s) specified in the Contract shall be used when establishing lease rates. For this reason standard leases shall be reported by the Contractor as contract activity and the payment of a Purchasing Fee shall apply to this transaction. There may be limited opportunity for the customer to cancel the lease during its term depending on the provisions of the Contractor's standard lease agreement. Standard lease purchases by State agency customers must be arranged through the Washington State Office of the Treasurer. If approved by the Office of the Treasurer, the equipment will be purchased from the Contractor and State agency will make periodic payments to the Office of the State Treasurer. Any State agency lease not arranged through the Washington State Office of the Treasurer may be canceled and the equipment returned to the supplier at any time without further financial obligation to the supplier or leaseholder. Should the equipment be returned following such cancellation, the Contractor will be liable for any transportation and storage charges as well as damages to the product that occurs during the return of the equipment to the Contractor/leaseholder or its representative. 26. Early Termination Charges Agencies that wish to terminate a term rental plan may do so with sixty (60) days written notice to the Contractor. Early termination charges may be assessed if an approved rental agreement is canceled prior to the end of the rental term or is otherwise inconsistent with cancellation terms. Payment of a four (4) month rental penalty w''_ apply. Termination charges will not apply to those rental plans canceled due to non -appropriation of funds (whether at agency or local level), where upgrading or downgrading models by the same manufacturer, or in cases where the Contract Administrator finds non-performance or reduced funding to be the cause of termination. The Contract Administrator reserves the right to reduce or waive early termination fees. Unresolved site service problems will be a consideration. It is the intent of the State that agencies complete the terms of each rental as was agreed. 27. Payment of Property Taxes Contractors shall be responsible for the payment of property taxes when customers have obtained Contract equipment under a rental or operating lease authorized by the Contract. Customers who have obtained Contract equipment under the terms of the Contractor's Standard Lease Agreement will be responsible for payment of property taxes when separately listed on the invoice. 28. Risk of Loss or Damage The Ordering Agency shall be relieved from risks of loss or damage to all equipment purchased, rented or leased during shipment prior to equipment installation at the customer's designated location. Ordering Agencies will be responsible for risks of loss or damage to the equipment once it has been delivered/installed and signed for by customer's representative. Contractors shall clearly demonstrate they have informed customers of this responsibility prior to order placement. 29. Customer Pricing Verification For those Vendors whose pricing reflects a discount off of the Manufacturer's Suggested Retail Price, it shall required that the Vendor provide the customer with a copy of the Buyer's Laboratory report showing associat,_ pricing so that the customer will be able to validate the price being quoted by the Vendor. For those Vendors whose pricing reflects a fixed price amount, the customer may validate pricing by referring to the Current Contract Information (CCI) document. CITY OF RENTON COUNCIL AGENDA BILL Submitting Data: Dept/Div/Board.. Staff Contact...... Subject: 2010 Budget Exhibits: Finance & IT Department Iwen Wang, Administrator Budget Meeting Calendar Al #: For Agenda of: October 5, 2009 Agenda Status Consent .............. Public Hearing.. Correspondence.. Ordinance ............. Resolution............ Old Business........ New Business....... Study Sessions...... Information......... X X Recommended Action: Approvals: • Refer to Committee of the Whole Legal Dept......... • Set Public Hearing on 2010 Revenue Sources and Finance Dept...... X Preliminary Budget for October 26, 2009 Other ............... • Set final Public Hearing on proposed 2010 Budget for November 16, 2009 Fiscal Impact: Expenditure Required... Transfer/Amendment....... Amount Budgeted....... Revenue Generated......... Total Project Budget City Share Total Project.. SUMMARY OF ACTION: In compliance with RCW 35.33.051, the proposed 2010 Budget will be submitted to the City Council, and City Clerk by October 19, 2009. This agenda bill sets the time and place for two public hearings, October 26 and November 16, 2009. The following Ordinances will be presented in November as part of the 2010 Budget public hearing process: 1. 2010 Budget 2. 2010 Property Tax 3. Proposed Fees and Rate ordinances (prepared by departments implementing fees/rate changes.) STAFF RECOMMENDATION: Set public hearing dates of October 26 and November 16, 2009, to consider the 2010 Budget, with potential adoption of the ordinances by November 23 to establish the 2010 Budget. QA2010 BUDGET\2010 Budget Calendar.doc CITY OF RENTON PRELIMINARY 2010 BUDGET MEETING CALENDAR All meetings will be held at City Hall, 1055 S. Grady Way, Renton, Washington 98057. OCTOBER 5, 2009 — Regular Council Meeting — 7:00 p.m. ■ 2010 Budget Public Hearing Dates Set for 10/26 & 11/16; Budget Referred to Committee of the Whole OCTOBER 19, 2009 — Regular Council Meeting — 7:00 p.m. ■ Mayor Delivers Preliminary Budget Message and transmits Proposed Budget to Council OCTOBER 22, 2009 — SPECIAL Committee of the Whole — 8:00 —11: 30 a.m. ■ Budget Overview OCTOBER 26, 2009 — Regular Committee of the Whole — 5:00 p.m. ■ City Service Areas and Department Presentations OCTOBER 26, 2009 — Regular Council Meeting — 7:00 p.m. ■ PUBLIC HEARING — 2010 Revenue Sources and Preliminary Budget OCTOBER 30, 2009 — SPECIAL Committee of the Whole —1:00 - 5:00 p.m. ■ City Service Areas and Department Presentations NOVEMBER 2, 2009 — Regular Committee of the Whole — 5:00 p.m. ■ City Service Areas and Department Presentations ■ Follow up to Council Questions NOVEMBER 2, 2009 — Regular Council Meeting — 7:00 p.m. ■ Proposed 2010 Utility Rates -Referred to Utilities Committee for 11/5, 10am Special Meeting November 5, 2009 —SPECIAL Committee of the Whole —1:00 - 5:00 p.m. ■ City Service Areas and Department Presentations NOVEMBER 9, 2009 — Regular Committee of the Whole — 5:00 p.m. (If needed) ■ City Service Areas and Department Presentations ■ Follow up to Council Questions NOVEMBER 9, 2009 — Regular Council Meeting — 7:00 p.m. ■ Utilities Committee Report and First reading 2010 Utility Rates Ordinance NOVEMBER 16, 2009 — Regular Council Meeting — 7:00 p.m. ■ PUBLIC HEARING — 2010 Budget (required by RCW 35A.34) ■ Enactment ordinance - 2010 Utility Rates Ordinance - 2nd reading and adoption ■ COTW Committee report and 1st reading of 2010 budget ordinance ■ COTW Committee report and 1st reading of 2010 property tax levy ordinance ■ COTW Committee report and 1st reading 2010 fee amendment ordinances NOVEMBER 23, 2009 — Regular Council Meeting — 7:00 p.m. ■ Enactment ordinance 2010 budget — 2nd reading and adoption ■ Enactment ordinance 2010 property tax Levy— 2nd reading and adoption ■ Enactment ordinance fee amendment —2nd reading and adoption Q:\2010 BUDGET\2010 Budget Calendar.doc CITY OF RENTON COUNCIL AGENDA BILL Submitting Data: Dept/Div/Board.. Public Works/Utility Systems Division/Surface Water Section Staff Contact...... Ron Straka, x7248 Subject: FY 2010-2011 Phase II Stormwater Pass -through Grants Program — Ecology Grant Agreement No. G1000245 Exhibits: Issue Paper Grant Agreement # G1000245 Al #: 77, A , For Agenda of: October 5, 2009 Agenda Status Consent .............. Public Hearing.. Correspondence.. Ordinance .............. Resolution.......... Old Business........ New Business....... Study Sessions...... Information......... KI Recommended Action: Approvals: Council Concur Legal Dept......... X Finance Dept...... X Other ............... Fiscal Impact: Expenditure Required... $50,000 (2009/2011) Transfer/Amendment....... Amount Budgeted....... $0 Revenue Generated......... $50,000 (2009-2011) Total Project Budget $0 City Share Total Project.. $0 SUMMARY OF ACTION: The City of Renton is eligible to receive $50,000 in non -matching grant funding between 2009 and 2011 from the Washington State Department of Ecology. This grant will assist the Surface Water Utility and the city to implement the requirements associated with the new NPDES Phase II Municipal Stormwater permit. The grant funding will be used in the implementation of an illicit discharge, detection and elimination program activities, and public education and public involvement activities. This grant does not require the local government to match and is 100 percent funded by the Washington State Department of Ecology with the effective date of the grant funds provided from July 1, 2009 to June 30, 2011 per the agreement. STAFF RECOMMENDATION: Approve and authorize the Mayor and City Clerk to sign the Ecology Grant Agreement No. G1000245 and the "Signature Authorization Form for Grant/Loan Recipients." The amendments to the Surface Water Utility 407 and 427 fund revenue and expenditure budgets for the Ecology FY 2010-2011 Phase II Stormwater Pass -through Grant funding will be included in the City's quarterly budget amendment ordinance, which is prepared by the Finance Division. H:\File Sys\SWP - Surface water Projects\SWP-27 - Surface Water Projects (CIP)\27-3058 2003 NPDES Phase II Permit\5000 Grants\50k_DOE_Grant\DOE Pass Thru Grant Agenda Bill.doc\EMaw PUBLIC WORKS DEPARTMENT pR, ^City f 0 lm M E M O R A N D U M DATE: September 28, 2009 TO: Randy Corman, Council President Members of Renton City Council VIA: -��' Denis Law, Mayor FROM: Gregg Zimmerma�W Ilic Works Administrator STAFF CONTACT: Ron Straka, Surface Water Utility Supervisor (ext. 7248) SUBJECT: FY 2010-2011 Phase II Stormwater Pass -through Grants Program — Ecology Grant Agreement No. G1000245 ISSUE: Should the City of Renton enter into a grant agreement with the Washington State Department of Ecology for non -matching grant funds to be used by the city to assist with implementing the Phase II Municipal Stormwater National Pollutant Discharge Elimination System (NPDES) permit? RECOMMENDATION: Approve and authorize the Mayor and City Clerk to sign the Ecology Grant Agreement No. G1000245 and the "Signature Authorization Form for Grant/Loan Recipients." The amendments to the Surface Water Utility 407 and 427 fund revenue and expenditure budgets for the Ecology FY 2010-2011 Phase II Stormwater Pass -through Grant funding will be included in the city's quarterly budget amendment ordinance, which is prepared by the Finance Division. BACKGROUND: This grant will assist the Surface Water Utility and the city to implement the requirements associated with the new NPDES Phase II Municipal Stormwater permit. The grant funding will be used in the implementation of an illicit discharge, detection and elimination program activities, and public education and public involvement activities. This grant does not require the local government to match and is 100 percent funded by the Washington State Department of Ecology with the effective date of the grant funds provided from July 1, 2009 to June 10, 2011 per the agreement. The amendments to the Surface Water Utility 407 and 427 fund revenue and expenditure budgets for the Ecology FY 2010-2011 Phase II Stormwater Pass -through Grant funding will be included in the city's quarterly budget amendment ordinance, which is prepared by the Finance Division. Randy Corman, Council President September 28, 2009 Page 2 of 2 CONCLUSION: The non -matching grant with the Washington State Department of Ecology, in the amount of up to $50,000, would assist the city in complying with the federal NPDES permit. cc: Lys Hornsby, Utilities System Director Edward Mulhern, Surface Water Utility Engineer File H:\File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-3058 2003 NPDES Phase II Permit\5000 Grants\50k_DOE_Grant\DOE Pass Thru Grant Issue Paper.doc\EMaw FY 2010-2011 PHASE II STORMWATER PASS -THROUGH GRANTS PROGRAM GRANT AGREEMENT BETWEEN THE DEPARTMENT of STATE OF WASHINGTON DEPARTMENT OF ECOLOGY ECOLOGY AND State of Washington The City of Renton THIS is a binding agreement entered into, by, and between the state of Washington Department of Ecology (DEPARTMENT), and The City of Renton (RECIPIENT). The purpose of this agreement is to provide funds to the RECIPIENT to carry out the requirements described herein. PART I. GENERAL INFORMATION Project Title: Grant Number: RECIPIENT Name and Address: RECIPIENT Contact: Telephone Number: Fax Number: E-Mail Address: RECIPIENT Billing Contact: Telephone Number: Fax Number: E-Mail Address: RECIPIENT Federal ID Number: DEPARTMENT Project/Financial Manager: Mailing Address: Telephone Number: Fax Number: E-Mail Address: DESIGNATED LOCAL GOVERNMENT PARTNERS (if applicable) Phase II Stormwater Pass -through Grant Program G1000245 Dennis Law, Mayor City of Renton 1055 South Grady Way Renton, WA 98057 Edward Mulhern 425-430-7323 425-430-7241 emulhem@Rentonwa.gov Teresa Phelan 425-430-7332 425-430-7241 tphelan@Rentonwa.gov 916001271 Water Quality Program Washington State Department of Ecology P.O. Box 47600 Olympia, WA 98504-7600 360- 407-6502 360-407-7151 None ECY 070-357 (Rev. 9/09) Phase II Stormwater Pass -through Grant For partnerships, the lead government and partners must submit a copy of the signed agreement in Appendix B with each copy of the grant agreement. DEPARTMENT Funding Source: 2010-2011 Biennial Operating Budget/Local Toxics Control Account Total Cost (up to $50,000 each recipient): $ 50,000 Total Eligible Cost (up to $50,000 each Recipient): $ 50,000 DEPARTMENT Share ($50,000 each Recipient): $ 50,000 DEPARTMENT Maximum Percentage: 100% The effective date of this grant agreement is July 1, 2009. Any work performed prior to the effective date of this agreement will be at the sole expense and risk of the RECIPIENT. This agreement expires on June 30, 2011. PART H. PERFORMANCE MEASURES 01 B. C. Water Quality. Improved stormwater management and water quality protection associated with development and implementation of a stormwater management program. Proiect Outcomes. Local Government Stormwater Grants for local governments to receive grants for municipal stormwater programs, including but not limited to implementation of Phase II municipal stormwater National Pollutant Discharge Elimination System (NPDES) permits. Post Project Assessment. The RECIPIENT agrees to submit a brief survey three years after project completion regarding the key project outcomes and the status of environmental results or goals from the project. The DEPARTMENT's Performance Measures Lead will e-mail the RECIPIENT the Post Project Assessment Survey. The DEPARTMENT may conduct on -site interviews and inspections, and may otherwise evaluate the Project. The DEPARTMENT will enter the information provided into its performance measures database to be provided to the Washington State Legislature, United States Environmental Protection Agency, and other natural resource agencies. Approximate Post Project Assessment Date: June 30, 2012 Page 2 of 17 Phase II Stormwater Pass -through Grant PART III. PROJECT DESCRIPTION The RECIPIENT's stormwater project will address implementation or management of municipal stormwater programs. PART IV. PROJECT BUDGET Phase H Stormwater Pass -through Grant Program ELEMENTS TOTAL ELIGIBLE COST (TEC)* Task 1 — Project Administration/Management (limited to 10% of total) $ Task 2 — Implementation and management of Stormwater Program $ 50,000 Total (limited to $50,000 per Recipient partner) $ 50,000 *The DEPARTMENT's Fiscal Office will track to the Total Eligible Project Cost. MATCHING REQUIREMENTS (There are no matching requirements) DEPARTMENT Share FY 2010-11 (100% of TEC) $ 50,000 Payment Request Submittals. Payment requests will not be submitted more often than monthly, unless allowed by the DEPARTMENT's Project/Financial Manager. The DEPARTMENT's Project/Financial Manager may require the RECIPIENT to submit regular payment requests to ensure efficient and timely use of funds. Payment Schedule. Payments will be made on a cost -reimbursable basis. PART V. SCOPE OF WORK The RECIPIENT shall ensure that this project is completed according to the details of this agreement. The RECIPIENT may elect to use its own forces or it may contract for professional services necessary to perform and complete project related work. The RECIPIENT certifies by signing this agreement that all applicable requirements have been satisfied in the procurement of any professional services. Eligible and ineligible project costs are separate and identifiable for billing purposes. If professional services are contracted, the RECIPIENT shall submit a copy of the final contract to the DEPARTMENT's Project/Financial Manager. Task 1 - Proiect Administration/Management A. The RECIPIENT shall administer the project. Responsibilities will include, but not be limited to: maintenance of project records; submittal of payment vouchers, fiscal forms, and progress reports; compliance with applicable procurement, contracting, and interlocal agreement requirements; application for, receipt of, and compliance with all required Page 3 of 17 Phase II Stormwater Pass -through Grant permits, licenses, easements, or property rights necessary for the project; and submittal of required performance items. B. The RECIPIENT shall manage the project. Efforts will include: conducting, coordinating, and scheduling project activities and assuring quality control. Every effort will be made to maintain effective communication with the RECIPIENT's designees; the DEPARTMENT; all affected local, state, or federal jurisdictions; and any interested individuals or groups. The RECIPIENT shall carry out this project in accordance with any completion dates outlined in this agreement. C. The RECIPIENT shall submit all invoice voucher submittals and supportive documentation, to the DEPARTMENT's Project/Financial Manager. Copies of all applicable forms shall be included with an original A19-1A, and shall be submitted to the DEPARTMENT. Blank forms are found in Administrative Requirements for Recipients of Ecology Grants and Loans at htto://www.ecy.wa.gov/biblio/9118.html Required Forms: Form A19-1A (original signature) Form B2 (ECY 060-7) Form C2 (ECY 060-9) Form D (ECY 060-11) Where Eligible Costs Have Incurred: Form E (ECY 060-12) Form.F (ECY 060-13) Form G (ECY 060-14) Form H (F-21) Form I (ECY 060-15) D. If work conducted results in a report, the RECIPIENT shall submit the following to the DEPARTMENT's Project/Financial Manager and in the quantities identified: • Draft project completion reports — one electronic copy • Final project completion reports — five copies • Electronic copy of final project completion report The RECIPIENT shall submit two copies of any document(s) which requires DEPARTMENT approval. Once approval is given, one copy will be returned to the RECIPIENT. If the RECIPIENT needs more than one approved copy, the number of submittals should be adjusted accordingly. Task 2 — Implementation of Stormwater Plannine and Manazement Needs A. The RECIPIENT shall address stormwater management needs that protect or restore water quality. The RECIPIENT may conduct work related to implementation of activities required by the municipal stormwater National Pollutant Discharge Elimination System (NPDES) permits. Page 4 of 17 Phase II Stormwater Pass -through Grant B. Check the boxes that represent the activities funded under this grant: ® Public education and outreach activities ® Public involvement and participation activities ® Illicit discharge detection and elimination (IDDE) program activities, including: ❑ Mapping or geographic information systems of municipal separate storm sewer systems (MS4s); ❑ Staff training ❑ Activities to identify and remove illicit stormwater discharges; ❑ Dry weather outfall screening procedures and field activities; ❑ Complaint hotline database or tracking system improvements. ❑ Activities to support programs to control runoff from new development, redevelopment, and construction sites, including: ❑ Development of an ordinance and associated technical manual ❑ Inspections before, during, and upon completion of construction, or for post - construction long-term maintenance. ❑ Training for plan review and/or inspection staff ❑ Pollution prevention, good housekeeping, and operation and maintenance program activities, such as: ❑ Inspecting and/or maintaining the MS4 infrastructure ❑ Developing and/or implementing policies, procedures, or stormwater pollution prevention plans at municipal properties or facilities. ❑ Annual reporting activities, including developing a summary of identified barriers to the use of low impact development. ❑ Establishing and refining stormwater utilities, including stable rate structures. ❑ Water quality monitoring to implement permit requirements for a Water Cleanup Plan (TMDL). Note that any monitoring funded by this program requires submittal of a Quality Assurance Project Plan that Ecology approves prior to awarding funding for monitoring. ❑ Developing a report to plan for monitoring the next permit cycle. ❑ Equipment purchases that result directly in improved compliance with permit requirements. Allowed costs for equipment purchases must be specific to implementing a permit requirement (such as a vactor truck) rather than general use (such as a general us pick-up truck). Qualified equipment purchases include but are not limited to: ❑ Illicit discharge testing equipment and materials ❑ Vactor truck or sweeper truck for MS4 maintenance activities ❑ Electronic devices dedicated to mapping of MS4 facilities and attributes ❑ Software dedicated to tracking permit implementation activities ❑ Other activities consistent with the funding purposes of this program that support stormwater management programs or permit compliance, which can be completed by the June 30, 2011, deadline. Provide brief description in the space below: Page 5 of 17 Phase II Stormwater Pass -through Grant PART VI. SPECIAL, TERMS AND CONDITIONS A. Commencement of Work. In the event that the RECIPIENT fails to commence work on the project funded herein within four months after the effective date of this agreement, or by any date mutually agreed upon in writing for commencement of work, the DEPARTMENT reserves the right to terminate this agreement. B. DEPARTMENT Funding Recognition. The RECIPIENT shall acknowledge and inform the public about DEPARTMENT funding participation in this project as appropriate. Examples include project signs and/or acknowledgement in published materials and reports, the news media, or other public announcements. Projects addressing site -specific locations must utilize appropriately sized and weather -resistant signs. C. Equipment Purchase. The purchase of equipment may be eligible under this project. If the RECIPIENT determines that equipment is needed to achieve the project outcomes, a request must be made to the DEPARTMENT. All equipment purchases must have prior approval by the DEPARTMENT. Allowable equipment purchases include equipment needed to implement permit requirements (such as a vactor truck) rather than for general use (such as general use pick-up truck). D. Indirect Rate. To acknowledge overhead costs, the RECIPIENT may charge an indirect rate up to 25 percent based on RECIPIENT employee's direct salary and benefit costs incurred while conducting project related work, provided that prior to signature of this agreement, the DEPARTMENT's Project/Financial Manager may require a list of items included in the indirect rate during negotiations or thereafter. Items that are generally included in an indirect rate are identified in Administrative Requirements for Recipients of Ecology Grants and Loans. E. Meetin s/Light Refreshments. The RECIPIENT may spend up to $50 per meeting for light refreshments associated with this project. The total amount spent for light refreshments under this agreement cannot exceed $300. F. Minority and Women's Business Participation. The RECIPIENT agrees to solicit and recruit, to the extent possible, certified minority -owned (MBE) and women -owned (WBE) businesses in purchases and contracts initiated after the effective date of this agreement. Contract awards or rejections cannot be made based on MBE or WBE participation. M/WBE participation is encouraged, however, and the RECIPIENT and all prospective bidders or persons submitting qualifications should take the following steps, when possible, in any procurement initiated after the effective date of this agreement: 1. Include qualified minority and women's businesses on solicitation lists. 2. Assure that qualified minority and women's businesses are solicited whenever they are potential sources of services or supplies. 3. Divide the total requirements, when economically feasible, into smaller tasks or quantities, to permit maximum participation by qualified minority and women's businesses. Page 6 of 17 Phase II Stormwater Pass -through Grant 4. Establish delivery schedules, where work requirements permit, which will encourage participation of qualified minority and women's businesses. 5. Use the services and assistance of the State Office of Minority and Women's Business Enterprises (OMWBE) and the Office of Minority Business Enterprises of the U.S. Department of Commerce, as appropriate. The RECIPIENT shall report to the DEPARTMENT at the time of submitting each invoice, on forms provided by the DEPARTMENT, payments made to qualified firms. Please include the following information: 1. Name and state OMWBE certification number (if available) of any qualified firm receiving funds under the invoice, including any sub -and/or sub -subcontractors. 2. The total dollar amount paid to qualified firms under this invoice. G. Progress ss Reports. The RECIPIENT shall submit quarterly Progress Reports to the DEPARTMENT's Project/Financial Manager. Payment requests will not be processed without a Progress Report. Reporting Periods. • January 1 through March 31 • April 1 through June 30 • July 1 through September 30 • October 1 through December 31 Reporting Due Date. Quarterly Progress Reports are due 15 days following the end of the quarter. Report Content. At a minimum, all Progress Reports must contain a comparison of actual accomplishments to the objectives established for the period, the reasons for delay if established objectives were not met, analysis and explanation of any cost overruns, and any additional pertinent information specified in this agreement. H. Water Quality Monitoring. Prior to initiating water quality monitoring activities, the RECIPIENT must prepare a Quality Assurance Project Plan (QAPP) that follows Ecology's Guidelines and Specifications for Preparing Quality Assurance Project Plans for Environmental Studies, February 2001 (Ecology Publication No. 01-03-003). The RECIPIENT must submit the QAPP to the DEPARTMENT for review, comment, and must be approved before starting the environmental monitoring activities. The RECIPIENT must use an environmental laboratory accredited by Ecology to analyze water samples for all parameters to be analyzed that require bench testing. The RECIPIENT should manage all monitoring data collected or acquired under this agreement in order to be available to secondary users and meet the "ten-year rule." Monitoring Data Submittal / Environmental Information Management System. Funding recipients that collect water quality monitoring data must submit all appropriate data to Ecology through the Environmental Information Management System (EIM). Page 7 of 17 Phase II Stormwater Pass -through Grant PART VII. ALL WRITINGS CONTAINED HEREIN This agreement, the appended GENERAL TERMS AND CONDITIONS, the DEPARTMENT's current edition of Administrative Requirements for Recipients of Ecology Grants and Loans ("Yellow Book'), and the Local Government Stormwater Grants Program FY 2008 contain the entire understanding between the parties, and there are no other understandings or representations other than as set forth or incorporated by reference, herein. No subsequent modification(s) or amendment(s) of this agreement shall be of any force or effect unless signed by authorized representatives of the RECIPIENT and DEPARTMENT and made a part of this agreement, EXCEPT that in response to a request from the RECIPIENT, the DEPARTMENT may redistribute the grant budget. The DEPARTMENT or RECIPIENT may change their respective staff contacts without the concurrence of either party. IN WITNESS WHEREOF, the parties hereby execute this Grant: STATE OF WASHINGTON DEPARTMENT OF ECOLOGY DATE KELLY SUSEWIND, P.E., P.G. WATER QUALITY PROGRAM MANAGER APPROVED AS TO FORM ONLY ASSISTANT ATTORNEY GENERAL (Revised 8/14/09) City of Renton JURISDICTION NAME: Denis Law TITLE: Mayor DATE Page 8 of 17 Phase II Stormwater Pass -through Grant Appendix A GENERAL TERMS AND CONDITIONS Pertaining to Grant and Loan Agreements of the Department of Ecology A. RECIPIENT PERFORMANCE All activities for which grant/loan funds are to be used shall be accomplished by the RECIPIENT and RECIPIENT's employees. The RECIPIENT shall only use contractor/consultant assistance if that has been included in the agreement's final scope of work and budget. B. SUBGRANTEE/CONTRACTOR COMPLIANCE The RECIPIENT must ensure that all subgrantees and contractors comply with the terms and conditions of this agreement. C. THIRD PARTY BENEFICIARY The RECIPIENT shall ensure that in all subcontracts entered into by the RECIPIENT pursuant to this agreement, the state of Washington is named as an express third -party beneficiary of such subcontracts with full rights as such. D. CONTRACTING FOR SERVICES (BIDDING) Contracts for construction, purchase of equipment and professional architectural and engineering services shall be awarded through a competitive process, if required by State law. RECIPIENT shall retain copies of all bids received and contracts awarded, for inspection and use by the DEPARTMENT. E. ASSIGNMENTS No right or claim of the RECIPIENT arising under this agreement shall be transferred or assigned by the RECIPIENT. F. COMPLIANCE WITH ALL LAWS 1. The RECIPIENT shall comply fully with all applicable Federal, State and local laws, orders, regulations and permits. Prior to commencement of any construction, the RECIPIENT shall secure the necessary approvals and permits required by authorities having jurisdiction over the project, provide assurance to the DEPARTMENT that all approvals and permits have been secured, and make copies available to the DEPARTMENT upon request. 2. Discrimination. The DEPARTMENT and the RECIPIENT agree to be bound by all Federal and State laws, regulations, and policies against discrimination. The RECIPIENT further agrees to affirmatively support the program of the Office of Minority and Women's Business Enterprises to the maximum extent possible. If the agreement is federally -funded, the RECIPIENT shall report to the DEPARTMENT the percent of grant/loan funds available to women or minority owned businesses. 3. Wages And Job Safety. The RECIPIENT agrees to comply with all applicable laws, regulations, and policies of the United States and the State of Washington which affect wages and job safety. 4. Industrial Insurance. The RECIPIENT certifies full compliance with all applicable state industrial insurance requirements. If the RECIPIENT fails to comply with such laws, the Page 9 of 17 Phase II Stormwater Pass -through Grant DEPARTMENT shall have the right to immediately terminate this agreement for cause as provided in Section K.1, herein. G. KICKBACKS The RECIPIENT is prohibited from inducing by any means any person employed or otherwise involved in this project to give up any part of the compensation to which he/she is otherwise entitled or, receive any fee, commission or gift in return for award of a subcontract hereunder. H. AUDITS AND INSPECTIONS 1. The RECIPIENT shall maintain complete program and financial records relating to this agreement. Such records shall clearly indicate total receipts and expenditures by fund source and task or object. All grant/loan records shall be kept in a manner which provides an audit trail for all expenditures. All records shall be kept in a common file to facilitate audits and inspections. Engineering documentation and field inspection reports of all construction work accomplished under this agreement shall be maintained by the RECIPIENT. 2. All grant/loan records shall be open for audit or inspection by the DEPARTMENT or by any duly authorized audit representative of the State of Washington for a period of at least three years after the final grant payment/loan repayment or any dispute resolution hereunder. If any such audits identify discrepancies in the financial records, the RECIPIENT shall provide clarification and/or make adjustments accordingly. 3. All work performed under this agreement and any equipment purchased, shall be made available to the DEPARTMENT and to any authorized state, federal or local representative for inspection at any time during the course of this agreement and for at least three years following grant/loan termination or dispute resolution hereunder. 4. RECIPIENT shall meet the provisions in OMB Circular A-133 (Audits of States, Local Governments & Non Profit Organizations), including the compliance Supplement to OMB Circular A-133, if the RECIPIENT expends $500,000 or more in a year in Federal funds. The $500,000 threshold for each year is a cumulative total of all federal funding from all sources. The RECIPIENT must forward a copy of the audit along with the RECIPIENT'S response and the final corrective action plan to the DEPARTMENT within ninety (90) days of the date of the audit report. I. PERFORMANCE REPORTING The RECIPIENT shall submit progress reports to the DEPARTMENT with each payment request or such other schedule as set forth in the Special Conditions. The RECIPIENT shall also report in writing to the DEPARTMENT any problems, delays or adverse conditions which will materially affect their ability to meet project objectives or time schedules. This disclosure shall be accompanied by a statement of the action taken or proposed and any assistance needed from the DEPARTMENT to resolve the situation. Payments may be withheld if required progress reports are not submitted. Quarterly reports shall cover the periods January 1 through March 31, April 1 through June 30, July 1 through September 30, and October 1 through December 31. Reports shall be due within thirty (30) days following the end of the quarter being reported. J. COMPENSATION Page 10 of 17 Phase II Stormwater Pass -through Grant 1. Method of compensation. Payment shall normally be made on a reimbursable basis as specified in the grant agreement and no more often than once per month. Each request for payment will be submitted by the RECIPIENT on State voucher request forms provided by the DEPARTMENT along with documentation of the expenses. Payments shall be made for each task/phase of the project, or portion thereof, as set out in the Scope of Work when completed by the RECIPIENT and approved as satisfactory by the Project Officer. The payment request form and supportive documents must itemize all allowable costs by major elements as described in the Scope of Work. Instructions for submitting the payment requests are found in "Administrative Requirements for Ecology Grants and Loans", part IV, published by the DEPARTMENT. A copy of this document shall be furnished to the RECIPIENT. When payment requests are approved by the DEPARTMENT, payments will be made to the mutually agreed upon designee. Payment requests shall be submitted to the DEPARTMENT and directed to the Project Officer assigned to administer this agreement. 2. Period of Compensation. Payments shall only be made for actions of the RECIPIENT pursuant to the grant/loan agreement and performed after the effective date and prior to the expiration date of this agreement, unless those dates are specifically modified in writing as provided herein. 3. Final Request(s) for Payment. The RECIPIENT should submit final requests for compensation within forty-five(45) days after the expiration date of this agreement and within fifteen (15) days after the end of a fiscal biennium. Failure to comply may result in delayed reimbursement. 4. Performance Guarantee. The DEPARTMENT may withhold an amount not to exceed ten percent (10%) of each reimbursement payment as security for the RECIPIENT's performance. Monies withheld by the DEPARTMENT may be paid to the RECIPIENT when the project(s) described herein, or a portion thereof, have been completed if, in the DEPARTMENT's sole discretion, such payment is reasonable and approved according to this agreement and, as appropriate, upon completion of an audit as specified under section J.6. herein. 5. Unauthorized Expenditures. All payments to the RECIPIENT may be subject to final audit by the DEPARTMENT and any unauthorized expenditure(s) charged to this grant/loan shall be refunded to the DEPARTMENT by the RECIPIENT. 6. Mileage and Per Diem. If mileage and per diem are paid to the employees of the RECIPIENT or other public entities, it shall not exceed the amount allowed under state law for state employees. 7. Overhead Costs. No reimbursement for overhead costs shall be allowed unless provided for in the Scope of Work hereunder. Page 11 of 17 Phase II Stormwater Pass -through Grant K. TERMINATION 1. For Cause. The obligation of the DEPARTMENT to the RECIPIENT is contingent upon satisfactory performance by the RECIPIENT of all of its obligations under this agreement. In the event the RECIPIENT unjustifiably fails, in the opinion of the DEPARTMENT, to perform any obligation required of it by this agreement, the DEPARTMENT may refuse to pay any further funds thereunder and/or terminate this agreement by giving written notice of termination. A written notice of termination shall be given at least five working days prior to the effective date of termination. In that event, all finished or unfinished documents, data studies, surveys, drawings, maps, models, photographs, and reports or other materials prepared by the RECIPIENT under this agreement, at the option of the DEPARTMENT, shall become Department property and the RECIPIENT shall be entitled to receive just and equitable compensation for any satisfactory work completed on such documents and other materials. Despite the above, the RECIPIENT shall not be relieved of any liability to the DEPARTMENT for damages sustained by the DEPARTMENT and/or the State of Washington because of any breach of agreement by the RECIPIENT. The DEPARTMENT may withhold payments for the purpose of setoff until such time as the exact amount of damages due the DEPARTMENT from the RECIPIENT is determined. 2. Insufficient Funds. The obligation of the DEPARTMENT to make payments is contingent on the availability of state and federal funds through legislative appropriation and state allotment. When this agreement crosses over state fiscal years the obligation of the DEPARTMENT is contingent upon the appropriation of funds during the next fiscal year. The failure to appropriate or allot such funds shall be good cause to terminate this agreement as provided in paragraph K.1 above. When this agreement crosses the RECIPIENT's fiscal year, the obligation of the RECIPIENT to continue or complete the project described herein shall be contingent upon appropriation of funds by the RECIPIENT's governing body; Provided, however, that nothing contained herein shall preclude the DEPARTMENT from demanding repayment of ALL funds paid to the RECIPIENT in accordance with Section O herein. 3. Failure to Commence Work. In the event the RECIPIENT fails to commence work on the project funded herein within four months after the effective date of this agreement, or by any date mutually agreed upon in writing for commencement of work, the DEPARTMENT reserves the right to terminate this agreement. L. WAIVER Waiver of any RECIPIENT default is not a waiver of any subsequent default. Waiver of a breach of any provision of this agreement is not a waiver of any subsequent breach and will not be construed as a modification of the terms of this agreement unless stated as such in writing by the authorized representative of the DEPARTMENT. M. PROPERTY RIGHTS 1. Copyrights and Patents. When the RECIPIENT creates any copyrightable materials or invents any patentable property, the RECIPIENT may copyright or patent the same but the DEPARTMENT retains a royalty -free, nonexclusive and irrevocable license to reproduce, publish, recover or otherwise use the material(s) or property and to authorize others to use the same for federal, state or local government purposes. Page 12 of 17 Phase II Stormwater Pass -through Grant Where federal funding is involved, the federal government may have a proprietary interest in patent rights to any inventions that are developed by the RECIPIENT as provided in 35 U.S.C. 200-212. 2. Publications. When the RECIPIENT or persons employed by the RECIPIENT use or publish information of the DEPARTMENT; present papers, lectures, or seminars involving information supplied by the DEPARTMENT; use logos, reports, maps or other data, in printed reports, signs, brochures, pamphlets, etc., appropriate credit shall be given to the DEPARTMENT. 3. Tangible Property Rights. The DEPARTMENT's current edition of "Administrative Requirements for Ecology Grants and Loans", Part V, shall control the use and disposition of all real and personal property purchased wholly or in part with funds furnished by the DEPARTMENT in the absence of state, federal statute(s), regulation(s), or policy(s) to the contrary or upon specific instructions with respect thereto in the Scope of Work. 4. Personal Property Furnished by the DEPARTMENT. When the DEPARTMENT provides personal property directly to the RECIPIENT for use in performance of the project, it shall be returned to the DEPARTMENT prior to final payment by the DEPARTMENT. If said property is lost, stolen or damaged while in the RECIPIENT's possession, the DEPARTMENT shall be reimbursed in cash or by setoff by the RECIPIENT for the fair market value of such property. 5. Acquisition Projects. The following provisions shall apply if the project covered by this agreement includes funds for the acquisition of land or facilities: a. Prior to disbursement of funds provided for in this agreement, the RECIPIENT shall establish that the cost of land/or facilities is fair and reasonable. b. The RECIPIENT shall provide satisfactory evidence of title or ability to acquire title for each parcel prior to disbursement of funds provided by this agreement. Such evidence may include title insurance policies, Torrens certificates, or abstracts, and attorney's opinions establishing that the land is free from any impediment, lien, or claim which would impair the uses contemplated by this agreement. 6. Conversions. Regardless of the contract termination date shown on the cover sheet, the RECIPIENT shall not at any time convert any equipment, property or facility acquired or developed pursuant to this agreement to uses other than those for which assistance was originally approved without prior written approval of the DEPARTMENT. Such approval may be conditioned upon payment to the DEPARTMENT of that portion of the proceeds of the sale, lease or other conversion or encumbrance which monies granted pursuant to this agreement bear to the total acquisition, purchase or construction costs of such property. N. SUSTAINABLE PRODUCTS In order to sustain Washington's natural resources and ecosystems, the RECIPIENT is encouraged to implement sustainable practices where and when possible. These practices include use of clean energy, and purchase and use of sustainably produced products (e.g. recycled paper). For more information, see www.ecy.wa.gov/sustainability.. O. RECOVERY OF PAYMENTS TO RECIPIENT The right of the RECIPIENT to retain monies paid to it as reimbursement payments is contingent upon satisfactory performance of this agreement including the satisfactory completion of the project described in the Scope of Work. In the event the RECIPIENT fails, for any reason, to perform obligations required of it by this agreement, the RECIPIENT may, at the Page 13 of 17 Phase II Stormwater Pass -through Grant DEPARTMENT's sole discretion, be required to repay to the DEPARTMENT all grant/loan funds disbursed to the RECIPIENT for those parts of the project that are rendered worthless in the opinion of the DEPARTMENT by such failure to perform. Interest shall accrue at the rate of twelve percent (12%) per year from the time the DEPARTMENT demands repayment of funds. If payments have been discontinued by the DEPARTMENT due to insufficient funds as in Section K.2 above, the RECIPIENT shall not be obligated to repay monies which had been paid to the RECIPIENT prior to such termination. Any property acquired under this agreement, at the option of the DEPARTMENT, may become the DEPARTMENT'S property and the RECIPIENT'S liability to repay monies shall be reduced by an amount reflecting the fair value of such property. P. PROJECT APPROVAL The extent and character of all work and services to be performed under this agreement by the RECIPIENT shall be subject to the review and approval of the DEPARTMENT through the Project Officer or other designated official to whom the RECIPIENT shall report and be responsible. In the event there is a dispute with regard to the extent and character of the work to be done, the determination of the Project Officer or other designated official as to the extent and character of the work to be done shall govern. The RECIPIENT shall have the right to appeal decisions as provided for below. Q. DISPUTES Except as otherwise provided in this agreement, any dispute concerning a question of fact arising under this agreement which is not disposed of in writing shall be decided by the Project Officer or other designated official who shall provide a written statement of decision to the RECIPIENT. The decision of the Project Officer or other designated official shall be final and conclusive unless, within thirty days from the date of receipt of such statement, the RECIPIENT mails or otherwise furnishes to the Director of the DEPARTMENT a written appeal. In connection with appeal of any proceeding under this clause, the RECIPIENT shall have the opportunity to be heard and to offer evidence in support of this appeal. The decision of the Director or duly authorized representative for the determination of such appeals shall be final and conclusive. Appeals from the Director's determination shall be brought in the Superior Court of Thurston County. Review of the decision of the Director will not be sought before either the Pollution Control Hearings Board or the Shoreline Hearings Board. Pending final decision of dispute hereunder, the RECIPIENT shall proceed diligently with the performance of this agreement and in accordance with the decision rendered. R. CONFLICT OF INTEREST No officer, member, agent, or employee of either party to this agreement who exercises any function or responsibility in the review, approval, or carrying out of this agreement, shall participate in any decision which affects his/her personal interest or the interest of any corporation, partnership or association in which he/she is, directly or indirectly interested; nor shall he/she have any personal or pecuniary interest, direct or indirect, in this agreement or the proceeds thereof. S. INDEMNIFICATION 1. The DEPARTMENT shall in no way be held responsible for payment of salaries, consultant's fees, and other costs related to the project described herein, except as provided in the Scope of Work. Page 14 of 17 Phase II Stormwater Pass -through Grant 2. To the extent that the Constitution and laws of the State of Washington permit, each party shall indemnify and hold the other harmless from and against any liability for any or all injuries to persons or property arising from the negligent act or omission of that party or that party's agents or employees arising out of this agreement. T. GOVERNING LAW This agreement shall be governed by the laws of the State of Washington. U. SEVERABILITY If any provision of this agreement or any provision of any document incorporated by reference V. PRECEDENCE In the event of inconsistency in this agreement, unless otherwise provided herein, the inconsistency shall be resolved by giving precedence in the following order: (a) applicable Federal and State statutes and regulations; (b) Scope of Work; (c) Special Terms and Conditions; (d) Any terms incorporated herein by reference including the "Administrative Requirements for Ecology Grants and Loans"; and (e) the General Terms and Conditions. SS-010 Rev. 04/04 Page 15 of 17 Phase II Stormwater Pass -through Grant Appendix B PARTNERSHIP AGREEMENT FOR ECOLOGY GRANTS FY2010-2011 PHASE II STORMWATER PASS -THROUGH GRANTS The cities, towns, and counties listed below agree to partner under one grant agreement for the FY2010 -2011 Phase II Stormwater Pass -through Grants. The grant shall be administered on behalf of the partners by the Lead Phase II Local Government. Each partner local government is a city, town, or county permittee under the Phase II Western Washington Municipal Stormwater General Permit or the Phase II Eastern Washington Municipal Stormwater General Permit. Lead Phase II Local Government: Phase II permit coverage number: Signature of authorized representative: Title Date Partner Local Government # 1: Phase II permit coverage number: Signature of authorized representative: Title Date Partner Local Government #2: Phase II permit coverage number: Signature of authorized representative: Title Date Page 16 of 17 Phase II Stormwater Pass -through Grant Partner Local Government #3: Phase II permit coverage number: Signature of authorized representative: Partner Local Government #4: Phase II permit coverage number: Signature of authorized representative: Title Date Title Date If you require special accommodations or need this document in a format for the visually impaired, call the Water Quality Program at 360-407-6502. Persons with hearing loss can call 711 for Washington Relay Service. Persons with a speech disability can call 877-833-6341. Page 17 of 17 SIGNATURE AUTHORIZATION FORM FOR GRANT/LOAN RECIPIENTS Department of Ecology Water Quality Program PO Box 47600 Olympia, WA 98504-7600 Phone: (360) 407-6600 FAX: (360) 407-7151 Name of Organization Date Submitted City of Renton Project Title Agreement Number FY 2010-2011 Phase II Stormwater Pass- through Grants Program Ecology Grant Agreement No. G1000245 AUTHORIZING SIGNATORY Signature Print Title/Term of Office Denis Law Mayor AUTHORIZED TO SIGN AGREEMENT AMENDMENTS Signature Print Title Ron Straka, P.E. Surface Water Utility Engineer Supervisor Lys Hornsby, P.E. Utility Systems Director AUTHORIZED TO SIGN REQUEST FOR REIMBURSEMENT Signature Print Title Ron Straka Surface Water Utility Supervisor Edward Mulhern Surface Water Utility Engineer CITY OF RENTON, WASHINGTON RESOLUTION NO. A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, APPROVING FINAL PLAT (TALBOT RIDGE ESTATES FINAL PLAT; FILE NO. LUA07-150FP). WHEREAS, a petition for the approval of a final plat for the subdivision of a certain tract of land as hereinafter more particularly described, located within the City of Renton, has been duly approved by the Department of Community and Economic Development; and WHEREAS, after investigation, the Administrator of the Department of Community and Economic Development has considered and recommended the approval of the final plat, and the approval is proper and advisable and in the public interest; and WHEREAS, the City Council has determined that appropriate provisions are made for the public health, safety, and general welfare and for such open spaces, drainage ways, streets or roads, alleys, other public ways, transit stops, potable water supplies, sanitary wastes, parks and recreation, playgrounds, schools, school grounds, sidewalks and other planning features that assure safe walking conditions for students who walk to and from school; and WHEREAS, the City Council has determined that the public use and interest will be served by the platting of the subdivision and dedication; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DOES RESOLVE AS FOLLOWS: SECTION 1. The above findings are true and correct in all respects. SECTION II. The final plat approved by the Department of Community and Economic Development pertaining to the following described real estate, to wit: See Exhibit "A" attached hereto and made a part hereof as if fully set forth 1 RESOLUTION NO. (The property, consisting of approximately 4.3 acres, is located in the vicinity of the southwest corner at 192"d Street and 102na Avenue SE.) is hereby approved as such plat, subject to the laws and ordinances of the City of Renton, and subject to the findings, conclusions, and recommendation of the Department of Community and Economic Development dated September 8, 2009. PASSED BY THE CITY COUNCIL this day of , 2009. Bonnie I. Walton, City Clerk APPROVED BY THE MAYOR this day of 2009. Approved as to form: Lawrence J. Warren, City Attorney RES:1419:9/14/09:scr Denis Law, Mayor N EXHIBIT "A" LEGAL DESCRIPTION THE NORTH HALF OF THE NORTWEST QUARTER OF GOVERNMENT LOT 4, SECTION 5, TOWNSHIP 22 NORTH, RANGE 5 EAST, W.M. IN KING COUNTY, WASHINGTON. EXCEPT 192ND STREET AND 102ND AVENUE SOUTHEAST: ALSO EXCEPT THAT PORTION LYING SOUTH OF AN EXISTING FENCE, DESCRIBED AS FOLLOWS: BEGINNING AT A POINT ON THE WEST LINE OF SAID NORTHWEST QUARTER 33.66 FEET SOUTH OF THE NORTWEST CORNER THEROF: THENCE SOUTH 00' 22'25" WEST ALONG THE WEST LINE OF SAID NORTHWEST QUARTER 261.46 FEET TO SAID EXISTING FENCE; THENCE ALONG SAID FENCE SOUTH 88' 28' 15" EAST 215.76 FEET, SOUTH 88- 4751" EAST 299.07 FEET AND SOUTH 880 12'26" EAST AND EXTENSION THEREOF 139.20 FEET TO THE EAST LINE OF SAID NORTHWEST QUARTER OF GOVERNMENT LOT 4, AND TERMINUS OF SAID LINE. CITY OF RENTON, WASHINGTON RESOLUTION NO. D� A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, APPROVING FINAL PLAT (TALBOT RIDGE ESTATES FINAL PLAT; FILE NO. LUA07-1S0FP). WHEREAS, a petition for the approval of a final plat for the subdivision of a certain tract of land as hereinafter more particularly described, located within the City of Renton, has been duly approved by the Department of Community and Economic Development; and WHEREAS, after investigation, the Administrator of the Department of Community and Economic Development has considered and recommended the approval of the final plat, and the approval is proper and advisable and in the public interest; and WHEREAS, the City Council has determined that appropriate provisions are made for the public health, safety, and general welfare and for such open spaces, drainage ways, streets or roads, alleys, other public ways, transit stops, potable water supplies, sanitary wastes, parks and recreation, playgrounds, schools, school grounds, sidewalks and other planning features that assure safe walking conditions for students who walk to and from school; and WHEREAS, the City Council has determined that the public use and interest will be served by the platting of the subdivision and dedication; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DOES RESOLVE AS FOLLOWS: SECTION I. The above findings are true and correct in all respects. SECTION II. The final plat approved by the Department of Community and Economic Development pertaining to the following described real estate, to wit: See Exhibit "A" attached hereto and made a part hereof as if fully set forth 1 RESOLUTION NO. (The property, consisting of approximately 4.3 acres, is located in the vicinity of the southwest corner at 192nd Street and 102nd Avenue SE.) is hereby approved as such plat, subject to the laws and ordinances of the City of Renton, and subject to the findings, conclusions, and recommendation of the Department of Community and Economic Development dated September 8, 2009. PASSED BY THE CITY COUNCIL this day of , 2009. Bonnie I. Walton, City Clerk APPROVED BY THE MAYOR this day of Approved as to form: Lawrence J. Warren, City Attorney RES:1419:9/14/09:scr Denis Law, Mayor 2009. 2 EXHIBIT "A" LEGAL DESCRIPTION THE NORTH HALF OF THE NORTWEST QUARTER OF GOVERNMENT LOT 4, SECTION 5, TOWNSHIP 22 NORTH, RANGE 5 EAST, W.M. IN KING COUNTY, WASHINGTON. EXCEPT 192ND STREET AND 102ND AVENUE SOUTHEAST: ALSO EXCEPT THAT PORTION LYING SOUTH OF AN EXISTING FENCE, DESCRIBED AS FOLLOWS: BEGINNING AT A POINT ON THE WEST LINE OF SAID NORTHWEST QUARTER 33.66 FEET SOUTH OF THE NORTWEST CORNER THEROF: THENCE SOUTH 00° 22'25" WEST ALONG THE WEST LINE OF SAID NORTHWEST QUARTER 261.46 FEET TO SAID EXISTING FENCE; THENCE ALONG SAID FENCE SOUTH 88` 28' 15" EAST 215.76 FEET, SOUTH 88- 4751" EAST 299.07 FEET AND SOUTH 88' 12'26" EAST AND EXTENSION THEREOF 139.20 FEET TO THE EAST LINE OF SAID NORTHWEST QUARTER OF GOVERNMENT LOT 4, AND TERMINUS OF SAID LINE. CITY OF RENTON, WASHINGTON ORDINANCE NO. � 9� AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, AMENDING CHAPTER 1, ADMINISTRATION AND ENFORCEMENT; CHAPTER 4, CITY-WIDE PROPERTY DEVELOPMENT STANDARDS; AND CHAPTER 11, DEFINITIONS, OF TITLE IV (DEVELOPMENT REGULATIONS) OF ORDINANCE NO. 4260 ENTITLED "CODE OF GENERAL ORDINANCES OF THE CITY OF RENTON, WASHINGTON-, TO AMEND THE REGULATIONS REGARDING SIGN PERMIT FEES, SIGN REGULATIONS AND THE DEFINITION OF "SIGN, REAL ESTATE" BY ADDING DEFINITIONS FOR "REAL ESTATE SIGN KIOSK" AND "REAL ESTATE SIGN KIOSK DIRECTIONAL PANEL". WHEREAS, the City recognizes that real estate directional signs are a means of wayfinding for potential home buyers in Renton; and WHEREAS, the City recognizes that these real estate directional signs are typically located within public rights -of -way along major thoroughfares at or near key intersections and are oriented toward automobile drivers; and WHEREAS, due to subdivision activity some areas of the City have become particularly notable for these signs; and WHEREAS, the Master Builders Association of King and Snohomish Counties represents home builders and has proposed a Real Estate Sign Kiosk Pilot Program and has proposed a Real Estate Sign Kiosk Pilot Program as a means of providing a uniform wayfinding system throughout the City for new housing developments; and WHEREAS, real estate sign kiosk programs instituted by municipalities in Arizona, California and Nevada have operated successfully for over 20 years and have reduced or eliminated visual clutter and the signs have been used as a wayfinding system long after the homes have been sold; and 1 ORDINANCE NO. WHEREAS, the City seeks to set standards for real estate sign kiosks to provide a uniform wayfinding system throughout the City for new housing developments; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DOES ORDAIN AS FOLLOWS: SECTION I. Subsection 4-1-140M.3, Temporary and Portable Signs, of Chapter 1, Administration and Enforcement, of Title IV (Development Regulations) of Ordinance No. 4260 entitled "Code of General Ordinances of the City of Renton, Washington", is hereby amended to read as follows: 3: TEMP'ORARY AND PORTABLE SIGNS: Fee Amount Real Estate Directional Signs, pursuant $50.00 per sign, permit valid for a to RMC 4-4-100J2 12-month period Real Estate Sign Kiosks, pursuant to $100.00 per sign kiosk, permit valid RMC 4-4-J2biv for a 12-month period Grand Opening Event Signs, pursuant $25.00 per site, per opening to RMC 4-4-100J6d(1) Event Signs, pursuant to RMC 4-4- $15.00 per type of sign identified in 100J6d(2) and (3) RMC 4-4-100J6b, per promotion A -Frame Signs, pursuant to RMC 4-4- $100.00 for the first sign and $50.00 100.15 for each additional sign, for a 12- month period Commercial Property Real Estate $50.00 per sign, permit valid for a Banner 12-month period Decorative Flags $50.00 per entrance, permit valid until flag(s) removed SECTION II. Subsection 4-4-100B.6.p, Real Estate Signs, of Chapter 4, City -Wide Property Development Standards, of Title IV (Development Regulations), of Ordinance No. 4260 2 ORDINANCE NO. entitled "Code of General Ordinances of the City of Renton, Washington", is hereby amended to read as follows: p. Real Estate Signs: Open house signs as described in subsection J2b(i) of this Section and freestanding real estate signs as described in subsection J2c of this Section. SECTION III. Subsection 4-4-100C.9, Signs on Public Right -of -Way, of Chapter 4, City - Wide Property Development Standards, of Title IV (Development Regulations), of Ordinance No. 4260 entitled "Code of General Ordinances of the City of Renton, Washington", is hereby amended to read as follows: 9. Signs on Public Right -of -Way: Signs on public right-of-way other than real estate kiosk signs, temporary and portable signs allowed by subsection J of this Section; and subsections 136b, City Sponsored Signs; 136c, City Sponsored or Co - Sponsored Signs and Displays; 66o, Public Service Signs; 136q, Safety Information Signs; and I, Signs on Public Right -of -Way, of this Section. SECTION IV. Subsection a of subsection 4-4-100C.16, Real Estate Signs, of Chapter 4, City -Wide Property Development Standards, of Title IV (Development Regulations), of Ordinance No. 4260 entitled "Code of General Ordinances of the City of Renton, Washington" is hereby amended to read as follows: a. Any off -premises real estate sign, except open house, real estate directional, and real estate sign kiosk signs. SECTION V. Subsection 4-4-1001, Signs On the Public Right -Of -Way, of Chapter 4, City - Wide Property Development Standards, of Title IV (Development Regulations), of Ordinance 3 ORDINANCE NO. No. 4260 entitled "Code of general Ordinances of the City of Renton, Washington" is hereby amended to add a new subsection 5, to read as follows: 5. Real Estate Sign Kiosks: Subject to the requirements of subsection J2 of this Section and subject to Chapter 9-2 RMC, Excess Right -of -Way Use. SECTION VI. Subsection 4-4-100J.2.b, Off -Premises Real Estate Signs, of Chapter 4, City -Wide Property Development Standards, of Title IV (Development Regulations) of Ordinance No. 4260 entitled "Code of General Ordinances of the City of Renton, Washington" is hereby amended by adding a new subsection iv, to read as follows: iv. Real Estate Sign Kiosks: (a) Permit Requirements: Sign and Excess Right -of -Way Use Permits are required for installation of each kiosk. Individual real estate sign kiosk directional panels and panel changes do not require a permit. Fees for each kiosk shall be one hundred dollars ($100.00). (b) Maximum Display Period: Permits for real estate sign kiosks shall be issued for a limited period of time in twelve (12) month increments. This period commences on November 8, 2009, and will end sunset on November 8, 2012, unless extended by City Council action. Permits shall not be issued beyond November 8 30, 2012, unless the maximum display period is extended by City Council action. 4 ORDINANCE NO. (c) Allowed Use: Real estate sign kiosk directional panels on a City approved kiosk structure may be authorized for the purpose of providing directional information to residential developments with units for sale, lease, or exchange (including assisted living developments) located only within the corporate limits of the City of Renton. (d) Allowable Sign Type: Kiosks shall be of a uniform style throughout the City, shall be freestanding and non -illuminated, and shall contain a maximum of ten (10) real estate sign kiosk directional panels. Individual real estate sign kiosk sign directional panels shall contain only the name of the subdivision or residential development, or developer, or development logo, and a logo(s) regarding an award, special certification, and a directional arrow. Two of these real estate sign kiosk directional panels may identify community/public facilities (city hall, library, parks, districts, historic sites, etc.), at the discretion of the City. One additional panel at the top of the real estate sign kiosk shall identify the City of Renton. (e) Permitted Size: Real estate sign kiosk directional panels shall be five (5) square feet in total area and shall measure a maximum five (5) feet horizontal length by one (1) foot vertical height. 5 ORDINANCE NO. (f) Permitted Locations: Sign panels shall be located on designated kiosk structures within the public right-of-way. If available kiosk structures will not permit adequate directional information, kiosk structures may be approved on private property with the permission of the property owner granted through an easement. A kiosk location plan shall be prepared showing the site of each kiosk and shall be submitted to the Planning Director for review and decision with the sign permit applications. (g) Maximum Number Per Intersection: A maximum of two (2) real estate sign kiosks shall be allowed at any one (1) intersection and only one (1) sign panel per development shall be allowed on each sign face. (h) Maximum Height: The kiosk sign structure shall not exceed ten (10) feet from finished grade to the top of the title panel which identifies the City of Renton. (i) Design Standards: Colors, fonts, etc. shall conform to design standards approved by the Planning Director. SECTION VII. Subsection 4-4-10012.b.ii.(g), Maximum Number Per Intersection, of Chapter 4, City -Wide Property Development Standards, of Title IV (Development Regulations) of Ordinance No. 4260 entitled "Code of General Ordinances of the City of Renton, Washington" is hereby amended to read as follows: ORDINANCE NO. (g) Maximum Number Per Intersection: A maximum of two (2) real estate directional signs shall be allowed at any one (1) intersection and only one (1) sign per development shall be allowed at each intersection except that no real estate directional signs shall be placed at intersections where an approved real estate sign kiosk is situated. SECTION Vill. Section 4-11-190, Definitions S, of Chapter 11, Definitions, of Title IV (Development Regulations) of Ordinance No. 4260 entitled "Code of General Ordinances of the City of Renton, Washington" is hereby amended so the definition of "Sign, Real Estate" is amended to read as follows: SIGN, REAL ESTATE: A sign advertising and/or directing individuals to the sale, rent or lease of property. A. Commercial Real Estate Banner Sign: A sign of any shape made of lightweight fabric or similar material that is mounted to a building by any means, and indicating that the property is for sale, rent, or lease. National flags, state or municipal flags, holiday flags, or the official flag of any institution or business shall not be considered banners. B. Decorative Real Estate Flag: A portion of lightweight fabric or similar material, supported by a vertical or horizontal staff, intended to flutter in the wind, and is used to attract attention to any type of residential development for sale, rent, or lease. National flags, state or municipal flags, holiday flags, or the official flag of any institution or business shall not be considered banners. 7 ORDINANCE NO. C. Freestanding Real Estate Signs: Any type of nonilluminated freestanding sign, indicating that the property on which it is located, is for sale, rent, or lease. This sign type includes yardarm or ground signs. D. Open House Sign: A nonilluminated type of portable sign comprised of hinged panels configured in the shape of the alphabetic letter "A," no larger than thirty two inches wide by thirty six inches high (32" by 36") per each sign face. The sign text for an open house sign contains the phrase: "open" or "for sale" or "for rent" or "for lease." E. Real Estate Directional Sign: Any nonilluminated type of freestanding sign that provides direction to property(ies) for sale, rent, or lease. Within the City Center Sign Regulation Boundaries (as shown in RMC 4-4-1001-13), real estate directional signs may also include portable signs comprised of hinged panels configured in the shape of the alphabetic letter "A." F. Real Estate Sign Kiosk: A City -approved monument style sign in the public right-of-way or on private property consolidating numerous real estate directional signs and designed to reduce sign clutter. G. Real Estate Sign Kiosk Directional Panel: A sign affixed within an approved Real Estate Sign Kiosk indicating direction to various real estate developments. SECTION IX. This ordinance is effective upon its passage, approval and thirty (30) days after publication. ORDINANCE NO. ICIL this day of , 2009. Approved as to form: Lawrence J. Warren, City Attorney Date of Publication: ORD:1585:9/10/09:scr Bonnie I. Walton, City Clerk this day of , 2009. Denis Law, Mayor 9