Loading...
HomeMy WebLinkAboutMFP22001689.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP22001689 IVR Number: 22001689 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:04/04/2022Application Date:3342103464Parcel Number: 1616 NE 30TH ST Permit Type:04/21/2022Issue Date:Franchise Permit Work Class:04/21/2023Expiration Date:Major Utility Job Number: 101114032Franchise Type:Electric Description: Puget Sound Energy Electric REPLACE EXPIRED PERMIT MFP18006587 CREW TO REPLACE TERMINATIONS AND SPLICES ALONG WITH REPLACING (3) PRIMARY CABLES IN CONDUIT SPANNING ± 803'. THIS PROJECT ALSO REQUIRES A WSDOT PERMIT WHICH WAS APPLIED FOR IN SEPTEMBER. WILL REQUIRE CLOSURE OF ONE WESTBOUND LANE OF KENNEWICK PL NE APPROCHING I 405 AND ANOTHER CLOSURE ON THE OTHER SIDE OF I 405 AT THE EASTBOUND NE 30TH ST RIGHT HAND TURN LANE ADJACENT TO SOUTHBOUND I 405 ENTRANCE. PRE CONSTRUCTION MEETING REQUIRED. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL BARAKAH LLC 1616 NE 30TH ST RENTON , WA 98056 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering 4 4 4 4 4 4 4 4 4 4 4 101114032 1616 NE 30TH ST POTELCO, INC 425 892 0416 MIGUEL.REYNA@PSE.COM 6905 S. 228TH ST KENT, WA 98032 MFP22001689 Scott Warlick CED 4/20/2022 This work shall take place on Saturday or at night. Night work will require a noise variance because we are within 300-feet of a residential zone. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date CORRIE RYDBERG Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 03/08/2022 101114032 7 1616 NE 30TH ST, RENTON, 98056, WA YURIY BASHTOVOY (425) 424-6603 Yuriy.Bashtovoy@PSE.COM 1 OF 4 TEMPORARY TRAFFIC CONTROL PLAN WSDOT NOTES & TABLES Puget Sound Energy Traffic Control Supervisor: Yuriy S. Bashtovoy Card No. 011687 Card Exp. 06/30/2022 Yuriy.Bashtovoy@pse.com (425)424-6603 ”” – VICINITY MAP NE 30TH STKENNEWICK PL NE11111121 BUSONLYPV2ARRW-BRD BUSSTOPW4-2LRIGH T L A N ECLOSE D AHEAD W20-5R100'100'100'ROADWORKAHEAD W20-1 SI D E W A L K C L O S E D R9-9SIDEWALKCLOSEDR9-9ROADWORKAHEADW20-1 100' R9-11SID EWAL KCLOSEDAHEA DNE 29TH STR9-11SIDEWALKCLOSEDAHEADDETOURM4-9bPARK AVE NPO1PV1INTERSTATE405INTERSTATE405 ROADWORKAHEADW20-1X' 111122 SPOTTER SHALLESCORT PEDESTRIANSAROUND WORK AREAROADWORKAHEADW20-1100'11 1111 11 ARCOGasStationChevronGas StationSW1PT1PT2OTHER SIDES/W CLOSEDOTHER SIDE S/W CLOSED2121 1122 NE 30TH STONLYR3-5RONLYR3-5RONLYR3-5RONLYR3-5RONE WAY R3-6RONE WAY ONE WAY ONE WAY LBIKE LANE CLOSED DATETIMEX DAYS RAMP WILL BE R11-1501EXIT CLOS E D INSTALL3 DAYSPRIOR TOCLOSURERAMP CLOSEDAHEAD W20-3RAMPCLOSEDAHEADW20-3100'TEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDWORK PITTRAFFIC FLOWSIGN LOCATIONFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPCHEVRONARROW BOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYNotes:1. Notify WSDOT (206) 440-4467 at least 5 daysprior to scheduled projects.2. All advanced warning signs and spacing to conform to theMUTCD and WSDOT standards.3. Channelizing devices shall be traffic drums (barrels) withsteady burning Type C lights on all State Routes andHwys.4. All signs are 48" x 48", Black legend on Orange background.Use class B signs unless otherwise specified.5. Flaggers shall be in radio contact with each other at alltimes; flagger stations shall be illuminated during hoursof darkness with minimum 150w lights6. All lane closures shall not infringe upon adjacentlanes.7. Alert affected residents and businesses if existing onWSDOT roadways. All sidewalks, driveways, exits andegresses shall be completely clear unless otherwiseindicated.8. Work areas will be noted as per distances betweenState Route milepost markers.9. See sheet 1 for WSDOT Notes and Tables.0'90'45'PRINT ON11X17" SHEETS ONLYNProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV03/08/2022 10111403271616 NE 30TH ST, RENTON, 98056, WA YURIY BASHTOVOY (425) 424-6603 Yuriy.Bashtovoy@PSE.COM2 OF 4Puget Sound EnergyTraffic Control Supervisor:Yuriy S. BashtovoyCard No. 011687Card Exp. 06/30/2022Yuriy.Bashtovoy@pse.com(425)424-6603TRAFFIC CAFETY DRUMSWITH TYPE C LIGHTSMATCHLINESHEET 3SHEET 2this traffic controlplan will requireWSDOT approval 12 12 12 12 12 12L/3500'SHOULDERWORKW21-5ROADWORKAHEADW20-1TYPE-3 R11-201 RAMPCLOSED PLACE PCMS BOARDS 1 MILE BEFORE WORK AREA. TWO-SECOND SEQUENCE 2-LINE, 8 CHARACTER MESSAGES WILL READ: 1) 2) EXIT 6 CLOSED USE EXIT 5 1 MILEBEFOREWORK AREAPCMSTYPE-3 R11-201 RAMPCLOSED 100'100'100'SHOULDERCLOSEDW21-5ARAMPCLOSEDAHEADW20-3BIKE LANE CLOSED DATE TIME X DAYS RAMP WILL B E R11-1501 INSTALL 3 DAYS PRIOR TO CLOSUR E Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 03/08/2022 101114032 7 1616 NE 30TH ST, RENTON, 98056, WA YURIY BASHTOVOY (425) 424-6603 Yuriy.Bashtovoy@PSE.COM 3 OF 4 TEMPORARY TRAFFIC CONTROL PLAN Puget Sound Energy Traffic Control Supervisor: Yuriy S. Bashtovoy Card No. 011687Card Exp. 06/30/2022 Yuriy.Bashtovoy@pse.com (425)424-6603 0'90'45' PRINT ON 11X17" SHEETS ONLYN MATCHLINE SHEET 3 SHEET 2 28" TRAFFIC CONE LEGEND WORK PIT TRAFFIC FLOW SIGN LOCATION FLAGGER UNIFORMEDPOLICE OFFICERPOLICE STOP CHEVRONARROW BOARD WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY Notes: 1. Notify WSDOT (206) 440-4467 at least 5 days prior to scheduled projects. 2. All advanced warning signs and spacing to conform to the MUTCD and WSDOT standards. 3. Channelizing devices shall be traffic drums (barrels) with steady burning Type C lights on all State Routes and Hwys. 4. All signs are 48" x 48", Black legend on Orange background. Use class B signs unless otherwise specified. 5. Flaggers shall be in radio contact with each other at all times; flagger stations shall be illuminated during hours of darkness with minimum 150w lights 6. All lane closures shall not infringe upon adjacent lanes. 7. Alert affected residents and businesses if existing on WSDOT roadways. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 8. Work areas will be noted as per distances between State Route milepost markers. 9. See sheet 1 for WSDOT Notes and Tables. TRAFFIC CAFETY DRUMS WITH TYPE C LIGHTS this traffic control plan will require WSDOT approval NE 30TH STKENNEWICK PL NE111111 2121 BUSONLYBUSSTOPPARK AVE N10SIDEWALKCLOSEDR9-9SIDEWALK CLOSEDR9-9DETOURM4-9bR9-11SIDEWALKCLOSEDAHEADDETOURM4-9b1111 ROADWORKAHEAD W20-1100'ROADWORKAHEADW20-1100'INTERSTATE405INTERSTATE40511 11 11 1121SPOTTER SHALLESCORT PEDESTRIANSAROUND WORK AREAROADWORKAHEADW20-1X'X'X'RIGHT LANECLOSEDAHEADW20-5RM6-2ARCOGasStationChevronGas StationPV1P01PV221R3-6RONE WAY ONE WAY ONE WAY ONE WAYNotes:1. Notify WSDOT (206) 440-4467 at least 5 daysprior to scheduled projects.2. All advanced warning signs and spacing to conform to theMUTCD and WSDOT standards.3. Channelizing devices shall be traffic drums (barrels) withsteady burning Type C lights on all State Routes and Hwys.4. All signs are 48" x 48", Black legend on Orange background.Use class B signs unless otherwise specified.5. Flaggers shall be in radio contact with each other at alltimes; flagger stations shall be illuminated during hours ofdarkness with minimum 150w lights6. All lane closures shall not infringe upon adjacent lanes.7. Alert affected residents and businesses if existing onWSDOT roadways. All sidewalks, driveways, exits andegresses shall be completely clear unless otherwiseindicated.8. Work areas will be noted as per distances between StateRoute milepost markers.9. See sheet 1 for WSDOT Notes and Tables.0'90'45'PRINT ON11X17" SHEETS ONLYNProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV03/08/2022 10111403271616 NE 30TH ST, RENTON, 98056, WA YURIY BASHTOVOY (425) 424-6603 Yuriy.Bashtovoy@PSE.COM4 OF 4Puget Sound EnergyTraffic Control Supervisor:Yuriy S. BashtovoyCard No. 011687Card Exp. 06/30/2022Yuriy.Bashtovoy@pse.com(425)424-6603TEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDWORK PITTRAFFIC FLOWSIGN LOCATIONFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPCHEVRONARROW BOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYTRAFFIC CAFETY DRUMSWITH TYPE C LIGHTS WORK SITE 319238-166345 NEW AØEHR874 NEW BØEHR875 NEW CØEHR876 319228-166270 X0607 R HLWS 319230-166277 ROWROWROWROWROW ROW ROW ROW R O W ROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROW 319228-166270 X0607 R HLWS 319235-166342 U0329 319230-166277 336.4 MCMACSR WSDOT SERVICE CABINET E.O.P. E.O.P.E.O.P. E.O.P. E.O.P. E.O. P .E.O . P .E.O.P.E.O.P.E.O.P.E.O.P.E.O.P.E.O.P.E.O.P.E.O.P.I-405 EXITI-405 EXITI-405 ENTRANCEI-405 ENTRANCES/WS/W S/W S/W S/W S/W S/W S/W S/WEND OF BRIDGEEND OF BRIDGE GAS PHONE CABLE TV N/A N/A N/A N/A N/A 108108034 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service Relocation Removal TUT Retirement Job Order Distribution HP Main HP Svc/MSA PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" X X X X THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773)101114032Owner / Developer Contact Info officeATTN: N Vicinity Map NOT TO SCALE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Correct QC Checklist(s) reviewed. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE MAP#: 2405E136 UNDERGROUND CIRCUIT MAP SCALE: 1" = 50' MAP#: 2405E127 11445846 101114032 SITE MAP SCALE: 1" = 50' THOMAS GUIDE 626-D4 9. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. POWER GENERAL NOTES SITE SPECIFIC NOTES PT1 & PT2 -CREW TO LOCATE EDGE OF BRIDGE TO APPROACH SLABS ON EAST & WEST SIDE OF BRIDGE -SAW CUT ASPHALT (2) 5'X10' -PITS NOT TO ENCROACH INTO BRIDGE ABUTMENT OR APPROACH SLABS TO AVOID COMPROMISE OF ANY STRUCTURAL INTEGRITY OR DISTURBANCE OF SOIL BENEATH -EXCAVATE DIRT W/ VAC TRUCK APPROX. 5' DEEP TO EXPOSE BROKEN CONDUIT -NO INJECTION OF WATER INTO THE SOIL IN THE IMMEDIATE VICINITY OF BRIDGE ABUTMENTS/APPROACH SLABS IS PERMITTED -CUT DAMAGED CONDUIT & WIRE -PULL EXISTING WIRE OUT THROUGH THE HANDHOLES -INSTALL NEW PORTION OF CONDUIT & ATTACH TO THE EXISTING NON-DAMAGED CONDUIT -COMPACT BACK FILL AREA & COLD PATCH/ASPHALT REPAIR SW1 (319235-166342) -REPLACE (3) 750 MCM TERMINATIONS ON P0S. (TER750C) PER STD. 6041.3000 PV1 (319230-166277) -REMOVE (3) 750 MCM HAMMERHEAD SPLICES -INSTALL (3) NEW 750 MCM STRAIGHT SPLICES (SPL750) PER STD. 6041.2000 PV2 (319229-166341) -REMOVE (3) 750 MCM HAMMERHEAD SPLICES **CREW TO PULL NEW CABLE STRAIGHT THROUGH VAULT TO SWITCH **EXISTING RUN OF 1/0 CABLES IN VAULT. WILL NEED TO DE-ENERGIZE AT J-BOX **COMMERCIAL OUTAGE REQUIRED P01 (319228-166270) -REPLACE (3) 750 MCM TERMINATIONS (TSU3NF1) PER STD. 6043.1020 **SHRUB REMOVAL REQUIRED ENCOMPASSING ENTIRE AREA BETWEEN SW1 & PV2 **WSDOT FACILITIES INCLUDING SERVICE CABINET AND ITS POWER OPERATION WILL NOT BE DISTURBED. SPAN SPECIFIC NOTES SW1 TO P01 -DIG (2) 5'x10'-15' PITS & REPAIR CONDUIT IN BOTH (PITS#1 & 2) W/ NEW CONDUIT AS NECESSARY ON EACH SIDE OF BRIDGE -REPLACE B/O 750 MCM FEEDER CABLES IN CONDUIT, L = ± 803' -INSTALL NEW CABLE TAGS AØEHR874, BØEHR875, CØEHR876 -SAW-CUT ROAD (APPROX. 5'X10'-15') -HYDRO EXCAVATE DIRT TO EXPOSE THE CONDUIT (CONDUIT IS USUALLY BURIED AT 48") TO AVOID DISTURBANCE OF BRIDGE ABUTMENTS & APPROACH SLABS -CUT DAMAGED CONDUIT & WIRE -PULL EXISTING WIRE THROUGH THE HANDHOLES -INSTALL NEW PORTION OF CONDUIT & ATTACH TO THE EXISTING NON-DAMAGED CONDUIT -COMPACT BACK FILL AREA & COLD PATCH/ASPHALT REPAIR **PER STANDARDS CONDUIT IS BURIED AT A MAX 48". THIS CAN BE MORE SINCE THE SETTLING OF THE BRIDGE MIGHT OF CAUSED THE CONDUIT TO BE DEEPER **THE SIZE OF THE TWO TRENCHES WILL BE APPROXIMATELY 5'X10'-15'X48'. RESTORATION WILL BE TO COMPACT BACKFILL OF 1' LIFTS PER CONSTRUCTION CODE **NO OTHER GROUND DISTURBING WORK OUTSIDE OF THE TWO PITS FOR CONDUIT REPAIR CIRCUIT FEET ADDED: NONE DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP M. REYNA 425-748-6365 08/06/18 S. FOX 714-893-2405 08/06/18 D. FIELDS 714-893-2405 08/06/18 N/A RENTON / WSDOT HIG-15, CREW2, 1616 NE 30TH ST REPLACE B/O FEEDER CABLES 1616 NE 30TH ST, RENTON, 98056 ASPLUNDH CONSTRUCTION CORP. O-443883 101114032 AS NOTED 1/1 KING FAC-SVC SW 32-24N-05E 2405E127 2405E136 HIG-152405E127 E-Mail: Cell Phone: Project Manager Contact Information: Manager:MIGUEL REYNA 425-429-1201 MIGUEL.REYNA@PSE.COM PRIMARY CABLE REMOVAL TABLE LOCATION PRIMARY CABLE ASBUILT INFORMATION Cable LENGTH Design (ft) Cable Numbers Please Record Foreman - Complete FROM TO Size A B C Manufacturer Year Actual Amount Installed (Conduit & Cable) SW1 P01 750 803'31106 31107 31108 PRIMARY CABLE TABLE - INSTALL LOCATION CABLE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO QT Y. BENDS PULL (LBS) PULL REV (LBS) CABLE SIZE DESIG N LENGT H (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED 90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CABLE SW1 PV1 3 2 750 755'-0"EHR874 EHR875 EHR876 PV1 P01 3 1 750 48'-0"EHR874 EHR875 EHR876 TOTAL 803'-0" FOREMAN PLEASE FILL IN YEAR MANUFACT: CABLE #: MANUFACTURER: LENGTH: EHR874 FOREMAN PLEASE FILL IN YEAR MANUFACT: CABLE #: MANUFACTURER: LENGTH: EHR875 FOREMAN PLEASE FILL IN YEAR MANUFACT: CABLE #: MANUFACTURER: LENGTH: EHR876 Pre-Construction meeting required RESTORATION PER CITY OF RENTON STANDARDS MFP22001689 This permit is for Major construction work in the ROW and will be billed at an additional $60/HR for inspections. After hours and weekend work will be billed at $125/HR