HomeMy WebLinkAboutCO 22
CAG-20-126, CO #22-22
Approved by Cheryl Beyer via 1/31/2022 email
Change Order No. 22
Contract Title: Lake Washington Loop Trail
Contract No. CAG -20-126
Page 2 of 3
THE CONTRACT IS MODIFIED AS FOLLOWS:
Description of Change:
Change to Contract Plans:
As required in FWD No 25, the Contractor is directed perform additional landscape work along the north
side of Airport Way between Sta 3+50 and St 11+00 to include the following: Remove weeds that have
grown in disturbed grass areas, rototill 3-inches of fine compost into the native soils and add install sod
per the soil preparation for sod detail on sheet L6.07 in the five areas disturbed due to the irrigation
system connections at back of sidewalk and also in the five areas within the planter strip area at the new
curb/gutter installations. The Contractor is directed to rake out the construction debris from the existing
planter strip and install topsoil type A in depressed areas to make a smooth grade and furnish and install
seeding, fertilizing and mulching over the entire planter strip area except newly sodded areas.
Reason for Change:
Contract Plans:
The City would like to improve the lawn areas along the project limits.
Materials:
Seeding, Fertilizing and Mulching per WSDOT Standard Specifications 8-02.
Plans:
Plan Sheets L6-02 rev 1, L6-03 Rev 1, L6-04 Rev 2 and L6-04 Rev 2.
Estimated Change Order Cost:
This Change Order does include an equitable adjustment per Section 1-09.4 of the 2020
WSDOT/APWA Standard Specifications.
Payment will be measured and paid under the respective unit prices for the bid items of
Fine Compost, Topsoil Type A and Sod Installation. The existing Proposal quantities are
sufficient for this added work. In addition the extra work to perform the seeding,
fertilizing and mulching will be paid under a lump sum item for the fixed price of
$2,803.57.
See attached.
Extension of Time:
The Time for Completion is extended 0 Working Days.
Price was negotiated with ACI and agreed upon.
Protect exposed areas along project limits to prevent erosion.
Change Order No. 22
Contract Title: Lake Washington Loop Trail
Contract No. CAG -20-126
Page 3 of 3
Sections 1-04.4 and 1-04.5 of the 2020 WSDOT/APWA Standard Specifications shall govern
this Change Order. The Work of the referenced Contract is modified to include the changes
detailed herein. The payment provided for herein shall constitute the complete and final
settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all
other claims that may be made by the Contractor as a result of this change.
Attachments:
Forms to be attached to Change Order
܈ Plans
܈Equitable Adjustment Determination
New
Lump
Sum Item
No. Description Quantity Unit
Lump Sum
Price Cost
CO22-1 Seeding, Fertilizing and Mulching 1
LS $2,803.57 $2,803.57
$2,803.57
$2,803.57
Lump Sum Cost
Change Order Cost
Lump Sum Item
By:
Date: 1/12/22
Equitable Adjustment Determination CO 22
Project Name: Lake Washington Loop Trail
Contractor: Active Construction Inc.
Federal Aid No: TAP-1070(008)
Contract No: CAG 20-126
Construction Manager: Tani Stafford, PE
CITY OF RENTONBY: DATE:APPROVED FOR CONSTRUCTIONOF11241 Willows Road NE, Suite 200Redmond, WA 98052425.822.4446www.otak.comAdditional Rake out of construction debris, add topsoilto gouged areas and then hydroseedAdditional weed removal of disturbed area, add 3" finecompost and install sod turf per detail on L6.0711 FWD No 25 Revisions - Hydroseed and sod TLS 9/29/21
CITY OF RENTONBY: DATE:APPROVED FOR CONSTRUCTIONOF11241 Willows Road NE, Suite 200Redmond, WA 98052425.822.4446www.otak.comAdditional Rake out of construction debris, add topsoilto gouged areas and then hydroseedAdditional weed removal of disturbed area, add 3" finecompost and install sod turf per detail on L6.071 FWD No 25 Revisions - Hydroseed and sod TLS 9/29/211
CITY OF RENTONBY:DATE:APPROVED FOR CONSTRUCTIONOF11241 Willows Road NE, Suite 200Redmond, WA 98052425.822.4446www.otak.comAdd bark mulch todisturbed areasDelete sod if this areawas not disturbed,confirm in the field2 FWD No 25 Revisions - Add Bark, Delete Sod TLS 9/29/2122
CITY OF RENTONBY: DATE:APPROVED FOR CONSTRUCTIONOF11241 Willows Road NE, Suite 200Redmond, WA 98052425.822.4446www.otak.com2 FWD No 25 Revisions - Add Bark at Car Lot, Delete Plantings TLS 9/29/212