HomeMy WebLinkAboutCouncil 06/23/2003f
AGENDA
RENTON CITY COUNCIL
REGULAR MEETING
June 23, 2003
Monday, 7:30 p.m.
1. PLEDGE OF ALLEGIANCE
2. CALL TO ORDER AND ROLL CALL
3. SPECIAL PRESENTATION: Municipal Arts Commission Retired Members Recognition
4. ADMINISTRATIVE REPORT
5. AUDIENCE COMMENT (Speakers must sign up prior to the Council meeting. Each speaker is
allowed five minutes. The comment period will be limited to one-half hour. The second audience
comment period later on in the agenda is unlimited in duration.)
When you are recognized by the Presiding Officer, please walk to the podium and state your name
and address for the record, SPELLING YOUR LAST NAME.
6. CONSENT AGENDA
The following items are distributed to Councilmembers in advance for study and review, and the
recommended actions will be accepted in a single motion. Any item may be removed for further
discussion if requested by a Councilmember.
a. Approval of Council meeting minutes of June 16, 2003. Council concur.
b. City Clerk reports bid opening on 6/10/2003 for CAG-03-073, East Valley Lift Station
Replacement; two bids; engineer's estimate $415,137.28; and submits staff recommendation to
award the contract to low bidder, Stouder General Construction, LLC, in the amount of
$607,321.60 (budgeted amount $497,000). Staff also recommends that $250,000 be transferred
from the Central Plateau Interceptor project to cover the additional costs. Refer to Utilities
Committee.
c. City Clerk reports bid opening on 6/17/2003 for CAG-03-083, NE loth St. & Anacortes Ave. NE
Detention Pond and Storm System Improvement; nine bids; engineer's estimate $990,416.19; and
submits staff recommendation to award the contract to low bidder, Santana Trucking &
Excavating, Inc., in the amount of $798,548.48. Council concur.
d. Planning/Building/Public Works Department recommends approval of an intergovernmental
cooperative purchasing agreement with the City of Everett to enable the City to purchase a
replacement Vactor Truck E-93 (used to clean out wastewater and stormwater pipelines) on
Everett's contract in the amount of $276,804.56. Council concur. (See 9.a. for resolution.)
e. Transportation Systems Division recommends approval of a grant application with the Federal
Aviation Administration for a $2,240,385 grant for the Airport 2003 Taxiway Paving, Lighting
and Signage Project. The City's cost share is $248,932. Council concur. (See 9.b. for
resolution.)
f. Transportation Systems Division submits the annual update of the Six -Year Transportation
Improvement Program (TIP). Refer the TIP to the Transportation (Aviation) Committee; set a
public hearing on July 7, 2003, to consider the TIP.
7. CORRESPONDENCE
(CONTINUED ON REVERSE SIDE)
r'
OLD BUSINESS
Topics listed below were discussed in Council committees during the past week. Those topics
marked with an asterisk (*) may include legislation. Committee reports on any topics may be held by
the chairman if further review is necessary.
a. Planning & Development Committee: Acceptance of St. Anthony's Parish Alley Dedication;
Compensation Determination for St. Anthony's Street Vacations
b. Utilities Committee: NE loth St./Anacortes Ave. NE Storm System Improvement Project Fund
Transfer; East Kennydale Special Assessment District*
9. ORDINANCES AND RESOLUTIONS
Resolutions:
a. City of Everett cooperative purchasing agreement (see 6.d.)
b. FAA grant for Airport Taxiway Paving, Lighting & Signage project (see 6.e.)
Ordinance for first reading:
Establishing the East Kennydale Sanitary Sewer Infill Phase I Special Assessment District (see 8.b.)
Ordinance for second and final reading:
Remission of utility rates and water meter related charges (1st reading 6/16/2003)
10. NEW BUSINESS (Includes Council Committee agenda topics; call 425-430-6512 for recorded
information.)
11. AUDIENCE COMMENT
12. ADJOURNMENT
COMMITTEE OF THE WHOLE
AGENDA
(Preceding Council Meeting)
Council Chambers
7:00 p.m.
King County Solid Waste Interlocal Agreement
* Hearing assistance devices for use in the Council Chambers are available upon request to the City Clerk *
CITY COUNCIL MEETINGS ARE TELEVISED LIVE ON GOVERNMENT ACCESS CHANNEL 21 AND ARE RE-CABLECAST
TUES. & THURS. AT 11:00 AM & 9:00 PM, WED. & FRI. AT 9:00 AM & 7:00 PM AND SAT. & SUN. AT 1:00 PM & 9:00 PM '
RENTON CITY COUNCIL
Regular Meeting
June 23, 2003
Council Chambers
Monday, 7:30 p.m.
MINUTES Renton City Hall
CALL TO ORDER
Mayor Jesse Tanner led the Pledge of Allegiance to the flag and called the
meeting of the Renton City Council to order.
ROLL CALL OF
KATHY KEOLKER-WHEELER, Council President; DAN CLAWSON; TONI
COUNCILMEMBERS
NELSON; RANDY CORMAN; DON PERSSON; KING PARKER; TERRI
BRIERE.
CITY STAFF IN
JESSE TANNER, Mayor; LAWRENCE J. WARREN, City Attorney; BONNIE
ATTENDANCE
WALTON, City Clerk; GREGG ZIMMERMAN, Planning/Building/Public
Works Administrator; NEIL WATTS, Development Services Director; RYAN
ZULAUF, Airport Manager; DENNIS CULP, Community Services
Administrator; SYLVIA ALLEN, Recreation Director; MIKE WEBBY, Human
Resources Administrator; ACTING COMMANDER CHARLES MARSALISI,
Police Department.
SPECIAL PRESENTATION Recreation Director Sylvia Allen introduced Diana Hagan, Municipal Arts
Board/Commission: Municipal Commission Chair, who recognized retiring Municipal Arts Commission
Arts Commission Retiring members Eileen Cunio and Virginia Corder. Ms. Hagan described the
Member Recognition
contributions both members have made to the commission and to the City; and
she presented each with a certificate of appreciation and a framed picture of the
downtown Renton library.
ADMINISTRATIVE
City Clerk Bonnie Walton reviewed a written administrative report
REPORT
summarizing the City's recent progress towards goals and work programs
adopted as part of its business plan for 2003 and beyond. Items noted included:
• Red, white, and blue decorations will adorn Gene Coulon Beach Park and
spectacular fireworks will reflect off Lake Washington for the 2003
Freddie's Fabulous Fourth of July event and fireworks display on Friday,
July 4.
• The Kidd Valley Summer Concert Series begins Wednesday, June 25, at
Gene Coulon Beach Park, with free concerts being held each Wednesday
beginning at 7:00 p.m.
• On Sunday evenings, July through August, a series of films will be shown
at the Piazza. A band will perform prior to each film and the free Cinema
in the Park will open for seating at 7:00 p.m., with movies starting at dusk.
AUDIENCE COMMENT
Diane Mitchell, 2224 NE 24th St., Renton, 98056, expressed her unhappiness
Citizen Comment: Mitchell -
with the cutting down and shearing of trees located on her property and' on the
Short Plat Development (NE
public right-of-way as a result of a short plat development next to her residence.
24th St) Problems (Tree
She stated that she was unaware that trees might be cut down or trimmed for the
Cutting, Landscaping,
development, and had she known, she would have relayed her concern during
Construction)
the public hearing process for the project. Ms. Mitchell reported additional
problems caused by the development construction including the breaking of the
sewer stub on her property line, the blocking of her driveway due to excavation
work, the lack of a flagger directing traffic on NE 24th St., and the removal of
landscaping from the public right-of-way.
June 23, 2003 Renton City Council Minutes I Page 222
Development Services Director Neil Watts stated that the construction
occurring in the right-of-way is for the extension of utilities for the plat and the
landscaping should be restored; however, the tree will not be replaced due to
the placement of utilities in that area. He noted that her driveway should not
have been blocked and staff will address that issue. Mr. Watts also noted that
the closing of one lane of traffic for traffic control measures on a residential
street is typical, and with appropriate signage, a flagger is not required.
In regards to tree preservation, Mr. Watts indicated that no trees were identified
for retention during the public land use process for this plat. As for the
trimming of the trees, he explained that the roots and branches trespassed over
the adjoining property line and were trimmed for the installation of sewer and
storm pipelines near the property line. Mr. Watts stated that the issues
concerning the blockage of property, landscape restoration, and sewer stub
breakage will be investigated.
Council President Keolker-Wheeler stated that if City Code is unclear, it should
be reviewed. Mr. Watts agreed, saying that the City Code section regarding
land clearing needs to be revisited and confirmed that the matter is on the
docket for review.
Ms. Keolker-Wheeler pointed out that the infill of new housing developments is
difficult on nearby residents and City Code needs to be clear and
understandable as to how and when residents can voice their concerns.
Councilman Clawson added that residents may not understand how a proposed
land use action may affect them, and suggested including the potential impacts
of a project on the public notices.
CONSENT AGENDA
Items on the consent agenda are adopted by one motion which follows the
listing.
Council Meeting Minutes of
Approval of Council meeting minutes of June 16, 2003. Council concur.
June 16, 2003
CAG: 03-073, East Valley Lift
City Clerk reported bid opening on 6/10/2003 for CAG-03-073, East Valley
Station Replacement, Stouder
Lift Station Replacement; two bids; engineer's estimate $415,137.28; and
General Construction
submitted staff recommendation to award the contract to low bidder, Stouder
General Construction, LLC, in the amount of $607,321.60 (budgeted amount
$497,000). Staff also recommended that $250,OOO be transferred from the
Central Plateau Interceptor project to cover the additional costs. Refer to
Utilities Committee.
CAG: 03-083, NE loth City Clerk reported bid opening on 6/17/2003 for CAG-03-083, NE loth St.
St/Anacortes Ave NE Storm and Anacortes Ave. NE Detention Pond and Storm System Improvement; nine
System Improvement, Santana bids; engineer's estimate $990,416.19; and submitted staff recommendation to
Trucking & Excavating award the contract to low bidder, Santana Trucking & Excavating, Inc., in the
amount of $798,548.48. Council concur.
Public Works: City of Everett Planning/Building/Public Works Department recommended approval of an
Purchasing Agreement, Vactor intergovernmental cooperative purchasing agreement with the City of Everett to
Truck enable the City to purchase a replacement Vactor Truck E-93 (used to clean
wastewater and stormwater pipelines) on Everett's contract in the amount of
$276,804.56. Council concur. (See page 227 for resolution.)
June 23, 2003 1 Renton City Council Minutes Page 223
Airport: Runway/Taxiway Transportation Systems Division recommended approval of a grant application
Lighting Signage & Paving with the Federal Aviation Administration for a $2,240,385 grant for the Airport
Project, FAA Grant 2003 Taxiway Paving, Lighting and Signage Project. The City's cost share is
Application $248,932. Council concur. (See page 227 for resolution.)
Transportation: TIP (2004- Transportation Systems Division submitted the annual update of the Six -Year
2009) Transportation Improvement Program (TIP). Refer the TIP to the
Transportation (Aviation) Committee; set a public hearing on July 7, 2003 to
consider the TIP.
MOVED BY KEOLKER-WHEELER, SECONDED BY PERSSON,
COUNCIL APPROVE THE CONSENT AGENDA AS PRESENTED.
CARRIED.
OLD BUSINESS Council President Keolker-Wheeler presented a Committee of the Whole report
Committee of the Whole regarding the King County solid waste interlocal agreement. The
King County: Solid Waste Administration has informed Council that King County is planning to pay, from
Interlocal Agreement its Solid Waste Enterprise fund, to its current expense fund, the sum of $7
million per year for the use of the Cedar Hills Regional Landfill. These
payments will start in 2004, and will be provided for by service reductions
rather than raising solid waste rates. King County is also planning on charging
past rent for the period of 1992-2003. The City of Renton and other Suburban
Cities are participants in the solid waste interlocal agreement with King County
that controls the relationship between the parties. The City of Renton, pursuant
to that agreement, has the option of re -opening that agreement for review and
renegotiations before July 1 of this year.
The Council hereby authorizes the Mayor to send a letter to King County
requesting review and renegotiation of the provisions of the solid waste
interlocal agreement prior to July 1, 2003, in order to keep the City's options
open while the King County Executive's proposals are being evaluated by the
Suburban Cities Association.
The Council further authorizes the Mayor to suggest to the Suburban Cities
Association that it review and evaluate the real estate transactions leading to
King County obtaining title to the land for the Cedar Hills Landfill, obtain a
review of the appraisal and the assumptions, underline that appraisal, and
further review the legality of the rental being proposed by the King County
Executive.
The Council further authorizes the Mayor to spend up to $10,000 to join with
other Suburban Cities in obtaining legal counsel and other assistance to review
and renegotiate the provisions of the solid waste interlocal agreement and to
review and evaluate the proposed rental arrangement for the Cedar Hills
Landfill. MOVED BY KEOLKER-WHEELER, SECONDED BY BRIERE,
COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED.
MOVED BY KEOLKER-WHEELER, SECONDED BY CORMAN,
COUNCIL REFER THE KING COUNTY SOLID WASTE INTERLOCAL
AGREEMENT TO THE UTILITIES COMMITTEE FOR ONGOING
MONITORING. CARRIED.
Utilities Committee Utilities Committee Chair Corman presented a report recommending
SAD: East Kennydale Sanitary concurrence in the staff recommendation that the East Kennydale Sanitary
Sewer Infill Phase I Sewer Infill Phase I Special Assessment District No. 24 be approved. The
Special Assessment District will establish connection charges of $6,122.35 per
June 23, 2003 Renton City Council Minutes I Page 224
single-family unit that are within the boundary of the assessment district. In
addition, simple interest will accrue at a rate of 4.86% for a period of ten years.
The Committee further recommended that the ordinance finalizing the East
Kennydale Sanitary Sewer Infill Phase I Special Assessment District be
presented for first reading.*
Councilman Corman noted that homeowners only pay the connection fee when
they hook-up to the sewer system.
*MOVED BY CORMAN, SECONDED BY CLAWSON, COUNCIL
CONCUR IN THE COMMITTEE REPORT. CARRIED. (See page 227 for
ordinance.)
Utility: NE loth St/Anacortes Utilities Committee Chair Corman presented a report recommending Council
Ave NE Storm System concur with the staff recommendation to approve a $150,000 fund transfer from
Improvement, Fund Transfer the SW 7th St. Storm System Improvement Project to the NE loth St. and
Anacortes Ave. NE Detention. Pond and Storm System Improvement Project for
funding of construction cost increases due to change orders and changes in bid
item quantities, if needed. MOVED BY CORMAN, SECONDED BY
CLAWSON, COUNCIL CONCUR IN THE COMMITTEE REPORT.
CARRIED.
Planning & Development Planning and Development Committee Chair Briere presented a report
Committee recommending acceptance of St. Anthony's Parish dedication of the portion of
Development Services: St. the alley (four feet parallel to the south side of the east -west alley between
Anthony's Parish, Alley Shattuck and Whitworth Avenues S.) agreed upon as part of the exchange of
Dedication, Shattuck & right-of-way set forth by the development agreement, dated March 11, 2003,
Whitworth Aves S between the City of Renton and St. Anthony's Parish. The Committee further
recommended that the Council authorize the Mayor and City Clerk to execute
the deed of dedication. MOVED BY BRIERE, SECONDED BY CLAWSON,
COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED.
Planning & Development
Majority Report: Planning and Development Committee Chair Briere
Committee Majority Report
presented a majority report regarding the determination of compensation for St.
Vacation: Compensation,
Anthony's Parish street vacations for portion of Whitworth Ave. S. and a
Whitworth Ave S & Alley, St.
portion of the alley running north and south between Whitworth and Morris
Anthony's Parish, VAC-00-003
Avenues S. and S. 3rd and 4th Streets (VAC-00-003 and VAC-03-001).
& VAC-03-001
As part of implementing the approved master plan for St. Anthony's Parish
campus, Council approval was obtained for the vacation of specific portions of
right-of-way situated within the campus boundaries. At the time of the initial
street vacation request, State law regarding compensation for vacated rights -of -
way allowed Council to set compensation at 50% of the appraised value of the
vacated property. However, current State law allows the amount of
compensation to be determined by the City Council and to be no more than the
full appraised value. This was reiterated in Section 1.2 of the development
agreement entered into by the City of Renton and St. Anthony's Parish on
March 11, 2003.
The Committee recognized the benefits to be gained from the development of a
unified campus for St. Anthony's Parish by both the citizens of Renton, as well
as for the City's downtown core. Therefore, the Committee (majority)
recommended a reduction in the amount of compensation to be required for
street vacation VAC-00-003 ($183,360 full value) and VAC-03-001 ($19,200
full value).
June 23, 2003 Renton City Council Minutes Page 225
Pointing out that although staff proposed setting compensation for the full
amount of the appraised value, Councilwoman Briere stated in discussion of the
majority report, that she believed the square foot value was too high and
proposed a 20% reduction in compensation for a total of $162,048.
Planning & Development
Minority Report: Councilman Parker presented a minority report regarding
Committee Minority Report
the determination of compensation for St. Anthony's Parish street vacations for
Vacation: Compensation,
portion of Whitworth Ave. S. and a portion of the alley running north and south
Whitworth Ave S & Alley, St.
between Whitworth and Morris Avenues S. and S. 3rd and 4th Streets (VAC -
Anthony's Parish, VAC-00-003
00-003 and VAC-03-001). The Committee (minority) recommended
& VAC-03-001
concurrence in the staff recommendation that Council accept the appraisal and
set compensation at $183,360 for street vacation VAC-00-003 and $19,200 for
street vacation VAC-03-001.
The minority felt that St. Anthony's Parish should pay the full appraised value
and to pay less than this full and fair value would set a precedent.. The portions
of roadway being vacated are fully improved rights -of -way. Although the
petition for street vacation VAC-00-003 was submitted when State law and City
Code only allowed Council to set compensation at 50% of the appraised value,
State law and City Code have since changed to allow for compensation in the
amount of the full appraised value if a street or alley has been a dedicated
public right-of-way for 25 years or more. Section 1.2 of the development
agreement between the City and St. Anthony's Parish signed on March 11,
2003, addressed the issue of compensation by determining that compensation
for both vacations would be set pursuant to the current State law which allows
Council to set compensation at no more than the full appraised value. In
signing the development agreement, St. Anthony's Parish was fully aware that it
could be required to pay the full appraised value if Council so determined.
In addition to the minority's belief that St. Anthony's Parish is not abiding by
the contractual arrangements set forth in the development agreement in asking
for compensation to be set at 50% of the appraised value, it was the minority
position that Council would not be keeping faith with the rest of the citizens of
Renton if St. Anthony's Parish paid anything less than the full and fair
appraised value. When the vacated streets become church property, this
property will not become part of the City's tax roll. The City does not give
public schools concessions such as those being sought by St. Anthony's Parish.
The Renton School District pays the full fees and full payment for associated
street and utility improvements. Similar requests for fee reductions from other
non-profit organizations have been denied. And although the St. Anthony's
Parish development may have indirect benefits to business activity and may
spur additional improvements in the surrounding area, the church is not a
revenue -generating organization and thus is not comparable to the businesses
that typically qualify for fee waivers. The City will not recoup any reductions
given to St. Anthony's Parish through income generated from property taxes or
sales taxes.
Therefore, the Committee (minority) recommended that Council accept the
appraisal and set compensation at $183,360 for street vacation VAC-00-003
and $19,200 for street vacation VAC-03-001.
Discussion of the reports followed. Voicing his support for the street vacation
and acknowledging the benefit it will have on the community, Councilman
Parker expressed his concern regarding reducing the compensation of property
for a faith -based organization. He stated that full value for the property should
June 23, 2003 Renton City Council Minutes I Page 226
be paid for the reasons stated in the report, and recommended that Council
concur in the minority report. Mr. Parker emphasized that the City needs to
keep faith with the rest of the citizens of Renton by setting the compensation
for this City asset at 100% of the appraised value as clearly allowed in the
signed development agreement.
Councilman Clawson noted that the church did not specifically ask that
compensation be set at 50% of the appraised value. Instead, a reduction in
compensation was requested. Pointing out that the vacation will benefit the
surrounding community in indirect ways, he stated that Renton has monetarily
supported Renton School District projects in the past and it should not matter
whether this is for a faith -based or secular school. Mr. Clawson expressed his
support for the majority report and agreed with Councilwoman Briere in setting
compensation in the total amount of $162,048.
Councilwoman Briere noted that the City will no longer have the cost of
maintaining the street, and Council President Keolker-Wheeler pointed out that
the property is not part of the City's tax roll now, therefore the City will not be
losing any tax revenue.
In response to Ms. Keolker-Wheeler's comments regarding the timing of the
street vacation, City Attorney Larry Warren confirmed that St. Anthony's Parish
requested the initial street vacation when State law established the amount of
compensation at up to 50% of the appraised property value, and between the
time of the public hearing and the execution of the development agreement,
State law had changed to allow for compensation in the amount of the full
appraised value if the street has been a dedicated public right-of-way for 25
years or more. Thus the development agreement reflects this by stating that
Council determines the amount of compensation and it cannot be set at more
than the full appraised value for the vacated property.
Councilman Corman pointed out two issues: 1) if this is a gift from the City to
the church, care must be taken to follow established procedures such as review
by the Human Services Advisory Committee; and 2) some may feel that the
appraisal is not exactly right and this is an extraordinary property. Mr. Corman
suggested that if the calculation is based on the assistance the City is providing,
then it should go through the Human Services Advisory Committee.
Mr. Warren stated that this is not a gift and the matter falls under a different
area of the law. He noted that Council has a great deal of discretion in how to
establish the amount of compensation since State law does not set any
perimeters other than stating that compensation cannot be set at more than the
appraised value.
Council President Keolker-Wheeler stated that the fundamental question is
whether compensation should be set at 50%, 100%, or something in between,
and that the decision would not be precedent -setting. She noted that Council
has not set its own policy regarding the determination of compensation for
vacations.
Mayor Tanner stated that unless a revenue stream results from the sale of the
property, the Administration will always recommend to Council that
compensation be set at full appraised value.
Councilman Persson commented that there are many ways to judge the
economic value of something and pointed out that this project will benefit the
June 23, 2003 Renton City Council Minutes Page 227
community in various ways including protecting the children's safety, as they
will no longer have to cross a busy street to get to their classes.
In response to Mr. Persson's inquiry, Councilwoman Briere stated that although
she did feel the appraisal was slightly high, the reduced compensation amount
she proposed was mainly a result of trying to find a balance between the 50%
and 100% amounts.
Responding to Ms. Keolker-Wheeler's inquiry, Mr. Warren stated that this was
the only ongoing vacation at the time the law changed. Development Services
Director Neil Watts pointed out that the City did not cause the delay during the
vacation process.
MOVED BY BRIERE, SECONDED BY CLAWSON, COUNCIL CONCUR
IN THE MAJORITY REPORT AS PRESENTED AND SET
COMPENSATION FOR BOTH VACATIONS IN THE TOTAL AMOUNT OF
$162,048. *
Council President Keolker-Wheeler recommended splitting the difference and
setting compensation for the properties at 75% of the appraised value.
Councilman Clawson agreed with her recommendation.
Councilman Parker stated that there was no way to know that State law would
change during the vacation process, but it did, giving Council discretion of up
to 100%. He urged Council to set compensation for this City asset at the full
appraised value.
MOVED BY BRIERE, SECONDED BY CLAWSON, COUNCIL AMEND
THE MOTION AND SET COMPENSATION FOR BOTH PROPERTIES AT
75% OF THE APPRAISED VALUE. CARRIED.
*MAIN MOTION AS AMENDED: ROLL CALL:, FIVE AYES: KEOLKER-
WHEELER, CLAWSON, NELSON, PERSSON, BRIERE; TWO NAYS:
CORMAN, PARKER. CARRIED.
ORDINANCES AND
The following resolutions were presented for reading and adoption:
RESOLUTIONS
Resolution #3642
A resolution was read authorizing the Mayor and City Clerk to enter into an
Public Works: City of Everett
intergovernmental cooperative purchasing agreement with the City of Everett.
Purchasing Agreement, Vactor
MOVED BY KEOLKER-WHEELER, SECONDED BY BRIERE, COUNCIL
Truck
ADOPT THE RESOLUTION AS READ. CARRIED.
Resolution #3643
A resolution was read authorizing the Administration to complete and file an
Airport: Runway/Taxiway
application with the Federal Aviation Administration for a grant for the Airport
Lighting Signage & Paving
Runway/Taxiway Lighting, Paving, and Signage Project. MOVED BY
Project, FAA Grant
KEOLKER-WHEELER, SECONDED BY PERSSON, COUNCIL ADOPT
Application
THE RESOLUTION AS READ. CARRIED. '
The following ordinance was presented for first reading and referred to the
Council meeting of 7/07/2003 for second and final reading:
SAD: East Kennydale Sanitary An ordinance was read establishing an assessment district for sanitary sewer
Sewer Infill Phase I service for properties adjacent to Monterey Ct. NE, NE 16th St., Blaine Ave.
NE, Camas Ave. NE, Dayton Ave. NE, Edmonds Ave. NE, and Monterey Ave.
NE, and establishing the amount of the charge upon connection to the facilities.
June 23, 2003 Renton City Council Minutes I Page 228
MOVED BY KEOLKER-WHEELER, SECONDED BY BRIERE, COUNCIL
REFER THE ORDINANCE FOR SECOND AND FINAL READING ON
7/07/2003. CARRIED.
The following ordinance was presented for second and final reading and
adoption:
Ordinance #5013
An ordinance was read amending Section 4-1-180, of Chapter 1, Administration
Utility: City Code Amends re
and Enforcement, of Title IV (Development Regulations); and Sections 8-2-1,
Utility Rates Remission &
of Chapter 2, Storm and Surface Water Drainage, and 8-4-10, 11, 12, 18, 26,
Water Meter Service Charges
33, and 34, of Chapter 4, Water, and 8-5-15 and 8-5-16, of Chapter 5, Sewers,
of Title VIII (Health and Sanitation) of City Code to clarify remission of rates,
increase charges to shut off and turn on water meters, and add an after-hours
charge to turn on meters. MOVED BY KEOLKER-WHEELER, SECONDED
BY BRIERE, COUNCIL ADOPT THE ORDINANCE AS READ. ROLL
CALL: ALL AYES. CARRIED.
NEW BUSINESS
Councilman Clawson announced that he will be speaking on the subject of
Community Event: Highlands
fireworks at the Highlands Community Association meeting on June 26. Also
Community Association
in attendance at the meeting will be Deputy Fire Chief Glen Gordon and
Meeting re Fireworks
Deputy Police Chief Kevin Milosevich.
EXECUTIVE SESSION
MOVED BY KEOLKER-WHEELER, SECONDED BY NELSON, COUNCIL
AND ADJOURNMENT
RECESS INTO EXECUTIVE SESSION FOR APPROXIMATELY 20
MINUTES TO DISCUSS LABOR NEGOTIATIONS WITH NO OFFICIAL
ACTION TO BE TAKEN AND THE COUNCIL MEETING BE
ADJOURNED WHEN THE EXECUTIVE SESSION IS ADJOURNED.
CARRIED. Time: 9:03 p.m.
Executive session was conducted. There was no action taken. The executive
session and the Council meeting adjourned at 9:25 p.m.
BONNIE 1. WALTON, City Cl k
Recorder: Michele Neumann
June 23, 2003
• CITY COUNCIL COMMITTEE MEETING CALENDAR
Office of the City Clerk
COUNCIL COMMITTEE MEETINGS SCHEDULED AT CITY COUNCIL MEETING
June 23, 2003
COMMITTEEXHAIRMAN DATE/TIME AGENDA
COMMITTEE OF THE WHOLE MON., 7/07 Emerging Issues;
(Keolker-Wheeler) 6:00 p.m. Long Range Financial Forecast;
*Council Revenue Report;
Conference Boeing Environmental Impact Statement
Room* Update
COMMUNITY SERVICES
(Nelson)
FINANCE MON., 7/07 Vouchers
(Parker) 5:30 p.m.
PLANNING & DEVELOPMENT
(Briere)
PUBLIC SAFETY
(Clawson)
TRANSPORTATION (AVIATION) THURS., 6/26 Six -Year Transportation Improvement
(Persson) 3:00 p.m. Program Annual Update
UTILITIES THURS., 6/26 Transfer of Funds for East Valley Lift
(Corman) 4:00 p.m. Station Replacement Project;
Urban Craft Development Request for
Cost Participation
NOTE: Committee of the Whole meetings are held in the Council Chambers. All other committee meetings are held in the Council Conference Room
unless otherwise noted.
CITY OF RENTON
MEMORANDUM
DATE: June 23, 2003
TO: Kathy Keolker-Wheeler, Council President
Members of the Renton City Council
FROM: Jesse Tanner, Mayor
Jay Covington, Chief Administrative Officer
SUBJECT: Administrative Report
In addition to our day to -day activities, the following items are worthy of note for this week:
ADMINISTRATIVE, JUDICIAL, AND LEGAL SERVICES DEPARTMENT
• Red, white, and blue decorations will adorn Gene Coulon Beach Park and spectacular fireworks will reflect
off Lake Washington for the 2003 Freddie's Fabulous Fourth of July event and fireworks display on Friday,
July 4"'. A car show will kick off the day in mid -morning, followed by a variety of activities for kids and
exciting stage entertainment. The event will end with a 20+ minute fireworks display to be launched from a
barge on Lake Washington. Event parking will be available at the Boeing parking lot and the north lot of
Fry's Electronics, with free Shuttle Express service provided from the parking area to Coulon Beach Park
from 12:00 p.m. to approximately midnight. For additional details, call 425-430-6500 or visit the City's
website at www.ci.renton.wa.us.
COMMUNITY SERVICES DEPARTMENT
• During the summer, children of all ages are invited to participate in Books in Bloom, a free reading program
at the Renton public libraries. Participants will receive free stickers for each book read or every 15 minutes
read. Those who fill their posters with stickers will have their names on display at each library and receive
a free paperback book. For more information call 425-430-6610.
• The Kidd Valley Summer Concert Series begins this Wednesday, June 25t', at Coulon Beach Park. These
free concerts will be held each Wednesday beginning at 7:00 p.m. The big band sounds of the Renton City
Concert Band will kick off the series. For the entire summer entertainment line-up, visit the Spotlight
section of the City's website at www.ci.renton.wa.us.
• The Free Summer Lunch Program will begin today at three Renton sites - Tiffany Park Elementary School,
Super Fun (221 Hardie Avenue NW), and the Renton Housing Authority (limited to residents of Cole
Manor and Sunset Terrace only). This program, coordinated by the Human Services Division, provides a
well-balanced lunch to children ages 1 to18 through the end of August. Recreation programs and field trips
are also scheduled. For program details, please call 425-430-6650.
• Twenty-nine Senior Activity Center participants attended a Meet Your Pen Pal party on June le,
concluding a yearlong program that started in October. Senior citizens are paired with 5`s grade students
from Maplewood Heights Elementary School and they write five letters during the course of the school
year. This program is a successful win -win situation for all involved.
Administrative Report
6/23/03
Page 2
• Special Populations began their summer softball program last week with 68 athletes. The teams will
practice Mondays and Wednesdays through the first week of August, finishing the season with the Metro
Parks Invitational Softball Tournament on August 9`b.
• Our youth tee -ball program for boys and girls ages 5 and 6 begins tonight. This program has grown from 72
participants in 2001 to 177 participants in 2003.
• The summer recreation program is underway this week with nine different day camp programs serving
children ages 3 to 14 years. These fee -based programs include Itty Bitty Camp, Great Escape Teen Camp,
Kidz Kaleidoscope, Camp Sum-R-Crazed, Skyhawks Sports Camps for soccer and basketball, Jr. Hawks,
and Mini -Hawks.
• The Summerfest 2003 Playground Program is offered at five sites and will run for eight weeks from 11:00
a.m. to 3:00 p.m., Monday through Friday. This drop -in program offers summer -time fun activities for boys
and girls ages 6 to 10, and includes creative crafts, great games, crazy contests, and much more.
ECONOMIC DEVELOPMENT, NEIGHBORHOODS, & STRATEGIC PLANNING DEPARTMENT
• On Saturday evenings, July through August, downtown Renton will be in the spotlight as a series of films
are shown on the silver screen at the Piazza, located on South 3rd Street between Burnett Avenue South and
Logan Avenue South. A band will perform prior to each film and the free Cinema on the Piazza will open
for seating at 7:00 p.m., with movies starting at dusk. Bring your own seating and blankets. Only low -back
chairs and blankets will be allowed in the front section of the viewing area. Food, soft drinks, and popcorn
will be available for purchase, and there will also be contests for best urban campsite and best movie theme
costume! For details, visit www.gorenton.com or call 425-226-4560.
PLANNING/BUILDING/PUBLIC WORKS DEPARTMENT
• Mosquito season in the Pacific Northwest means the potential return of the West Nile Virus, a mosquito -
borne virus that can cause encephalitis or meningitis, first detected in Washington State last fall. The King
County Health Department is the lead agency for responding to the West Nile Virus; however, the City of
Renton has developed a response plan to augment the Department of Health's program. The City's strategy
emphasizes prevention as the best protection from West Nile Virus. For details, visit the Spotlight section
of the City's website at www.ci.renton.wa.us.
• Upon invitation from Mayor Lewis of Auburn and Mayor White of Kent, Mayor Tanner will meet with
Senator Horn, and possibly other state legislators, in Auburn on Thursday, June 26t', to attempt to gain
support for projects selected for funding by the Freight Mobility Strategic Investment Board (FMSIB).
Renton's Strander Blvd./SW 27th Street Extension project has been recommended for a $4 million FMSIB
grant, but FMSIB projects did not receive state funding as part of the recently adopted legislative
transportation budget. This meeting was organized by Karen Schmidt, Chair of FMSIB, and will involve
presentation of the projects to the legislators and also a bus tour of the proposed projects.
• St. Anthony's Church has submitted building permit plans for their campus expansion project, and
construction is now expected to begin in mid -July. Upon completion of the appraisal and when the building
permits are ready to issue, the final street vacations will be returned to Council for review/approval. The
utility work can begin prior to the finalization of the street vacations.
• It is hoped that the pile driving for the Sam's Club project on Grady Way will be completed by the end of
June.
• It now appears that the grand opening for Fry's Electronics will occur by late July or early August.
Administrative Report
6/23/03
Page 3
POLICE DEPARTMENT
• During the week of June 24-30, the Police Department will be conducting traffic emphasis in the following
areas:
Renton Police Department Traffic Enforcement Emphasis
June 24-30
Date
6:00 a.m. to Noon
Noon to 6:00 p.m.
All Da
Motorcycles
Cars
Motorcycles
Cars
Radar Trailer
June 24
Maple Valley Hwy
1400 blk, Houser
Rainier Ave N
Maple Valley Hwy
500 blk, Stevens
Tuesday
Seed
Way Speed
Seed
Seed
Ave SW
June 25
1400 blk, Houser
2400 blk, Edmonds
1400 blk, Houser
Maple Valley Hwy
500 blk, Stevens
Wednesday
Way Seed
Ave NE Seed
Way Seed
Speed
Ave SW
June 26
900 blk, Aberdeen
Williams/Grady Way
300 blk, Taylor Ave
1400 blk, Houser
300 blk, Taylor
Thursday
NE Seed
Stop sin
NW Seed
Way Seed
Ave NW
June 27
Rainier/Grady Way
Lk Wash Blvd
500 blk, Stevens
Rainier Ave N
300 blk, Taylor
Friday
Red lights
Seed
Ave SW Seed
Seed
Ave NW
June 30
Maple Valley Hwy
Maple Valley Hwy
Rainier Ave N
1400 blk, Houser
300 blk, Taylor
Monday
Seed
Seed
Seed
Way Seed
Ave NW
CITY OF RENTON COUNCIL AGENDA BILL
SUBMITTING DATA:
Dept/Div/Board.. City Clerk
Staff Contact... Bonnie Walton
SUBJECT:
Bid opening on June 10, 2003, for CAG-03-073,
East Valley Lift Station Replacement Project
EXHIBITS:
Staff Recommendation
Bid Tabulation Sheet (two bids)
RECOMMENDED A
Refer to Utilities Committee
Al11 #:
AGENDA OF: June 23,
AGENDA STATUS:
Consent......... X
Public Hearing..
Correspondence..
Ordinance.......
Resolution......
Old Business....
New Business....
Study Session...
Other...........
APPROVALS:
Legal Dept......
Finance Dept..
Other...........
FISCAL IMPACT:
Expenditure Required... $607,321.60 Transfer/Amendment.. $250,000.00
Amount Budgeted........ $497,000.00 Revenue Generated...
ISUMMARY OF ACTION:
Project Estimate: $415,137.28
RECOMMENDED ACTION:
In accordance with Council procedure, bids submitted at the subject bid opening met the following
criteria: There was more than one bid, and there were no irregularities. The low bid submitted by Stouder
General Construction, LLC in the amount of $607,321.60, however, was above the amount budgeted for
the project.
Staff recommends awarding the project to Stouder General Construction, LLC in the amount of
$607,321.60, and recommends that funds totaling $250,000 be transferred from Wastewater Utility
Account 421.000400.018.5960.0035.65.045000 (WO# 45365 Central Plateau Interceptor) to cover the
additional costs.
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
MEMORANDUM
DATE: June 16, 2003
TO: Kathy Keolker-Wheeler, Council President
Members of the Renton City Council
VIA: Mayor Jesse Tanner
FROM: Gregg Zimmerman; Administrator
STAFF CONTACT: Mike Benoit (x-7206)
SUBJECT: Bid Award
RE: East Valley Lift Station Replacement
ISSUE:
The Wastewater Utility has advertised for and received bids for a proposed project to replace
the East Valley Lift Station. We received two bids on the project. The low bidder was
Stouder General Construction, LLC, with a bid amount of $607,321.60. This bid amount is
above the engineer's estimate of $415,137.28. The existing budget authority for the project
is $497,000.
RECOMMENDATION:
• The Utility Systems Division of the Planning/Building/Public Works Department
recommends the East Valley Lift Station Replacement project be awarded to Stouder
General Construction, LLC, in the amount of $607,321.60.
• The Utility Systems Division of the Planning/Building/Public Works Department further
recommends that funds totaling $250,000 be transferred from Wastewater account 45365
(Central Plateau Interceptor) to cover the additional costs.
BACKGROUND SUMMARY:
The East Valley Lift Station was constructed in 1977. The expected life of a sewage lift
station is 25 years. East Valley is considered a permanent lift station, which will serve
existing and future commercial developments within a major portion of the Renton Industrial
Subbasin. It does not meet current design codes because it lacks full redundancy of its
June 17, 2003
Page 2 '
vacuum priming system. If the vacuum priming system were to fail, the station would not
operate.
The Wastewater Utility has advertised for and received bids for the project to replace the East
Valley Lift Station. We received two bids on the project. The low bidder was Stouder
General Construction, LLC, with a bid amount of $607,321.60. This bid amount is above
the engineer's estimate of $415,137.28. The existing budget authority for the project is
$497, 000.
After receiving the bids, we reviewed the engineer's estimate and determined that it was
below what it should have been in a couple of major areas. The low bid is still slightly above
what it is anticipated that it should cost, but it is within an acceptable range.
We also re-evaluated the design of the project and determined that it was sound and took care
of the varied needs and requirements of the facility in a cost efficient manner. We did not
see any potential changes that would save significant cost while maintaining the integrity of
the sewer facility design requirements.
We have reviewed the low bidder's references and they would appear to meet all necessary
qualifications.
To cover the costs of the project, we are recommending that $250,000 be transferred from
Wastewater Utility Account 421.000400.018.5960.0035.65.045000 (WO# 45365 Central
Plateau Interceptor) to Wastewater Utility Account 421.000400.018.5960.0035.65.045010
(WO# 45360 East Valley Lift Station Replacement). The new budget amount of $747,000
for the East Valley Lift Station project will be sufficient to cover the construction contract,
staff time, and engineering services during construction. Earlier in the year it had been
decided to reduce the total scope of the Central Plateau Interceptor project. Therefore, the
remaining balance of $750,000 in account 45365 is sufficient to cover anticipated
construction costs for that project
CONCLUSION:
The project should be awarded to Stouder General Construction, LLC, and budget authority
should be adjusted to cover the cost of the project.
W:\WWP-27-2906 East Valley Lift Station\ISSUEOI.doc\MAB:lf
CITY OF RENTON
BID TABULATION SHEET
'ROJECT: East Valley Lift Station Replacement; CAG-03-073
DATE: June 10, 2003
ENGINEER'S ESTIMATE TOTAL: $415,137.28
LEGEND:
Forms: Triple Form: Non -Collusion Affidavit, .Anti -Trust Claims, Minimum Wage
CITY OF RENTON COUNCIL AGENDA BILL
SUBMITTING DATA:
Dept/Div/Board.. City Clerk
Staff Contact... Bonnie Walton
SUBJECT:
Bid opening on June 17, 2003, for CAG-03-083,
NE loth St./Anacortes Ave. NE Detention Pond
and Storm System Improvement Project
EXHIBITS:
Staff Recommendation
Bid Tabulation Sheet (nine bids)
GENDA OF: June 23, 2003
AGENDA STATUS:
Consent......... X
Public Hearing..
Correspondence..
Ordinance.......
Resolution......
Old Business....
New Business....
Study Session...
Other...........
RECOMMENDED ACTION: APPROVALS:
Legal Dept......
Council concur Finance Dept....
Other...........
'ISCAL IMPACT:
Expenditure Required... $798,548.48 Transfer/Amendment..
Amount Budgeted........ $965,000.00 (entire project) Revenue Generated...
ISUMMARY OF ACTION:
Project Estimate: $990,416.19
RECOMMENDED ACTION:
In accordance with Council procedure, bids submitted at the subject bid opening met the following three
criteria: There was more than one bid, the low bid was within the project budget, and there were no
irregularities. Therefore, staff recommends acceptance of the low bid submitted by Santana Trucking &
Excavating, Inc. in the amount of $798,548.48.
CITY OF RENTON
PLANNING/ BUILDING/ PUBLIC WORKS
MEMORANDUM
DATE: June 18, 2003
TO: !!�� Bonnie Walton, City Clerk
FROM: /ff on Straka, Surface Water Utility Supervisor, ext. 7248
i
STAFF CONTACT: Daniel Carey, Project Manager, ext. 7293
SUBJECT: NE loth St / Anacortes Ave NE Detention Pond and Storm
System Improvement Project
Construction Bid Award Recommendation
The bid opening for the NE loth St / Anacortes Ave NE Detention Pond and Storm System
Improvement Project was held on June 17, 2003 at 2:30 p.m. Nine (9) bids were submitted. The
Engineer's Estimate for the project construction cost is $990,416.19.
The low bid for the project was $798,548.48 from Santana Trucking & Excavating, Inc. The
Surface Water Utility has reviewed the low bid for completeness, inclusion of all required forms,
acknowledgments of addenda, bid bond, and mathematical correctness of the bid. All the
paperwork seems to be in order. Santana's bid had a minor addition mistake of $0.52. Their bid
total was submitted as $798,547.94. The corrected amount is actually $798,548.48. The
difference is not significant.
The low bid of $798,548.48 (including sales tax) is within the amount that the Surface Water
Utility has budgeted for the project. The approved 2003 CIP budget for the project is $965,000
and the funds are available in the project account number 421.000600.018.5 960.003 8.65.065 145.
There is currently $870,736 of unencumbered funds remaining in the project budget to fund the
project construction and staff costs.
The low bid meets the following conditions for award:
1. The low bid must be within the total project budget.
2. There must be more than one bidder.
3. The lowest, responsible, responsive bid contains no significant irregularities.
The Surface Water Utility, therefore, recommends that this item be placed on the June 23, 2003
consent agenda for Council concur. Staff further recommends that Council award the
HAFile Sys\SWP -Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27-2266NE IOth St - Anacortes\O1—Pond Design 2003\1000-
1 CORRESPD-General\030618 Award-Clerk.doc\DWC\tb
June 18, 2003
Page 2
construction contract to the lowest responsive, responsible bidder, Santana Trucking &
Excavating, Inc., for the amount of $798,548.48.
Attached for your reference is a bid tabulation showing the Engineer's Estimate, the low bid, and
the other 8 bids submitted.
At the June 16, 2003 Council meeting the Surface Water Utility requested that Council approve
the transfer of $250,000 to the project budget to provide sufficient funds to cover the estimated
construction cost, along with estimated staff and remaining consultant contract costs. Due to the
low bid being lower than estimated, there are sufficient funds to allow the contract to be awarded
without the budget transfer. However, the funding transfer is still proposed to provide
construction contingency funds and is not needed for the bid award. It is anticipated that the
funding transfer item will also be reported out from the Utilities Committee at the June 23, 2003
Council meeting as Old Business.
If you have any questions, please contact Daniel Carey at x-7293.
Cc: Gregg Zimmerman
Lys Hornsby
Project Title NE 10th St / Anacortes Ave NE Detention Pond, Storm Imprvmt
BID DATE: June 17, 2003 2:30 P.M.
Item Description Unit Est.
No. Quantity
Project
City of Renton
Engineer's Estimate
Unit Bid
Price Amount
Low Bidder
Santana Trucking &
Excavating, Inc.
Unit Bid
Price Amount
Gary Merlino
Consrtuction Co.
Unit Bid I
Price Amount
1
Construction Survey, Staking, and As -built Drawir
L.S.
1
18,000.00
18,000.00
13,500.00
13,500.00
15,000.00
15,000.00
2
Stormwater Pollution and Prevention Plan
L.S.
1
4,000.00
4,000.00
2,500.00
2,500.00
500.00
500.00
3
Utility Potholing
Ea
18
300.00
5,400.00
200.00
3,600.00
500.00
9,000.00
4
Mobilization and Demobilization
L.S.
1
55,559.00
55,559.00
35,000.00
35,000.00
14,000.00
14,000.00
5
Temporary Traffic Control Plan
L.S.
1
16,000.00
16,000.00
50,000.00
50,000.00
5,000.00
5,000.00
6
Clearing and Grubbing
Ac
1.1
3,000.00
3,300.00
3,300.00
3,630.00
30,000.00
33,000.00
7
Remove / Relocate Existing Fence
LF
250
10.00
2,500.00
10.50
2,625.00
10.00
2,500.00
8
Remove Concrete Sidewalk and Curb
SY
220
5.00
1,100.00
16.00
3,520.00
5.00
1,100.00
9
Remove Catch Basin
Ea
26
200.00
5,200.00
300.00
7,800.00
100.00
2,600.00
10
Remove Piping
LF
1,410
7.00
9,870.00
11.75
16,567.50
5.00
7,050.00
11
Sawcutting
LF
12,500
1.50
18,750.00
1.00
12,500.00
1.00
12,500.00
12
Embankment Compaction
CY
1,060
2.00
2,120.00
1.00
1,060.00
1.00
1,060.00
13
Pond Embankment Fill Incl. Haul
Ton
1,950
6.50
12,675.00
10.75
20,962.50
12.00
23,400.00
14
Pond Excavation Incl. Haul
CY
8,000
20.00
160,000.00
7.00
56,000.00
10.00
80,000.00
15
Control Density Fill
CY
55
115.00
6,325.00
75.00
4,125.00
75.00
4,125.00
16
Construction Geotextile For Permanent Erosion C
SY
570
7.00
3,990.00
2.00
1,140.00
2.00
1,140.00 1
17
Crushed surfacing Top Course (or Base Course)
TN
750
20.00
15,000.00
18.00
13,500.00
25.00
18,750.00
18
Asphalt Conc. Pavement Cl. B
TN
700
62.00
43,400.00
85.00
59,500.00
70.00
49,000.00
19
CPEP Storm Pipe 12-Inch Diameter
LF
565
35.00
19,775.00
28.70
16,215.50
50.00
28,250.00
20
CPEP Storm Pipe 18-Inch Diameter
LF
585
40.00
23,400.00
32.75
19,158.75
60.00
35,100.00
21
CPEP Storm Pipe 30-Inch Diameter
LF
1,485
65.00
96,525.00
45.65
67,790.25
80.00
118,800.00
22
Debris Barrier
Ea
1
150.00
150.00
300.00
300.00
1,500.00
1,500.00 I
23
Ductile Iron Storm Pipe 12-Inch Diameter
LF
220
40.00
8,800.00
44.50
9,790.00
55.00
12,100.00
24
Ductile Iron Storm Pipe 18-Inch Diameter
LF
27
50.00
1,350.00
73.30
1,979.10
65.00
1,755.00
25
Catch basin Type 1
Ea
20
850.00
17,000.00
600.00
12,000.00
1,000.00
20,000.00
26
Catch basin Type 1 L
Ea
4
950.00
3,800.00
710.00
2,840.00
900.00
3,600.00
27
Catch Basin Type 2 48 In. Diam.
Ea
7
2,000.00
14,000.00
1,255.00
8,785.00
1,500.00
10,500.00
28
Catch Basin Type 2 48 In. Diam. - over 9' deep
Ea
1
2,500.00
2,500.00
2,100.00
2,100.00
3,000.00
3,000.00
29
Catch Basin Type 2 54 In. Diam.
Ea
9
2,600.00
23,400.00
1,595.00
14,355.00
2,500.00
22,500.00
30
Catch Basin Type 2 54 In. Diam. - over 9' deep
Ea
5
1 3,000.00
15,000.00
2,610.00
13,050.00
3,500.00
17,500.00 ;
9ID TAB NE10th.xls Oage 1 of 15
Project Title NE 10th St / Anacortes Ave NE Detention Pond, Storm Imprvmt
BID DATE: June 17, 2003 2:30 P.M.
Item Description Unit Est.
No. Quantity
Project
City of Renton
Engineer's Estimate
Unit Bid
Price Amount
Low Bidder
Santana Trucking &
Excavating, Inc.
Unit Bid
Price Amount
Gary Merlino 1
Consrtuction Co.
Unit Bid I
Price Amount
31
Catch Basin Type 2 72 In. Diam.
Ea
1
5,000.00
5,000.00
2,575.00
2,575.00
5,000.00
5,000.00
32
Catch Basin Type 2 72 In. Diam. - over 9' deep
Ea
1
6,000.00
6,000.00
3,950.00
3,950.00
8,500.00
8,500.00
33
Concrete Inlet
Ea
1
850.00
850.00
580.00
580.00
700.00
700.00 1
34
Modular Block Wall
Ea
55
70.00
3,850.00
105.00
5,775.00
75.00
4,125.00
35
Flow Control Structure
Ea
1
4,500.00
4,500.00
2,715.00
2,715.00
5,000.00
5,000.00
36
Overflow Structure
Ea
1
3,000.00
3,000.00
2,680.00
2,680.00
5,000.00
5,000.00
37
Shoring or Extra Excavation Class B
SF
21,000
1.50
31,500.00
0.50
10,500.00
0.50
10,500.00
38
Plugging Existing Pipe
Ea
18
70.00
1,260.00
125.00
2,250.00
100.00
1,800.00
39
Bank Run Gravel for Trench Backfill
TN
5,200
6.40
33,280.00
12.50
65,000.00
6.00
31,200.00
40
Concrete Deadman Anchor Blocks
CY
12
190.00
2,280.00
125.00
1,500.00
150.00
1,800.00
41
Relocate 6 In. Water Main
Ea
2
5,000.00
10,000.00
3,715.00
7,430.00
3,000.00
6,000.00
42
Relocate 8 In. Water Main
Ea
1
5,000.00
5,000.00
3,800.00
3,800.00
3,500.00
3,500.00
43
Relocate 10 In. Water Main
Ea
1
6,000.00
6,000.00
4,195.00
4,195.00
4,000.00
4,000.00
44
Abandon Septic System, Install Side Sewer
LS
1
8,000.00
8,000.00
4,715.00
4,715.00
2,500.00
2,500.00
45
Relocate Side Sewer
LF
510
30.00
15,300.00
39.40
20,094.00
50.00
25,500.00
46
Stabilized Construction Entrance
SY
180
10.00
1,800.00
12.50
2,250.00
10.00
1,800.00
47
Erosion Control Blanket
SY
1,000
2.50
2,500.00
2.50
2,500.00
2.00
2,000.00
48
Temporary Water Pollution/Erosion Control
LS
1
25,000.00
25,000.00
2,000.00
2,000.00
5,000.00
5,000.00
49
Catch Basin Filter
Ea
42
50.00
2,100.00
50.00
2,100.00
85.00
3,570.00
50
Clearing Limit Fence
LF
630
2.50
1,575.00
3.50
2,205.00
5.00
3,150.00
51
Seeding, Fertilizing, and Mulching
Ac
1
1,000.00
1,000.00
900.00
900.00
1,800.00
1,800.00
52
Silt Fence
LF
370
1.50
555.00
4.00
1,480.00
5.00
1,850.00
53
Street Cleaning
HR
80
200.00
16,000.00
90.00
7,200.00
100.00
8,000.00
54
PSIPE Western Red Cedar (Thja Plicata)
EA
7
45.00
315.00
75.00
525.00
45.00
315.00
55
PSIPE Leyland Cypress (Cupressocyparis Leylan
EA
8
90.00
720.00
144.00
1,152.00
210.00
1,680.00
56
PSIPE Douglas -Fir (Pseudotsuga Menziesii)
EA
7
45.00
315.00
75.00
525.00
45.00
315.00
57
PSIPE Mock Orange (Philadelphus Lewisii)
EA
7
90.00
630.00
30.00
210.00
35.00
245.00
58
PSIPE Oregon Ash (Fraxinus Latifolia)
EA
11
40.00
440.00
30.00
330.00
35.00
385.00
59
PSIPE Red Osier Dogwood (Corpus sericea Var.
EA
8
40.00
320.00
30.00
240.00
35.00
280.00
60
PSIPE Camellia (Camellia Japonica)
EA
29
45.00
1,305.00
58.00
1,682.00
75.00
2,175.00
A01-BID TAB NE10th.xls Page 2 of 15
Project Titl
BID DATE
Item
No.
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
By:
NE 10th St / Anacortes Ave NE Detention Pond, Storm Imprvmt Project
June 17, 2003 2:30 P.M. City of Renton
Engineer's Estimate
Description Unit Est. Unit Bid
Quantity Price Amount
Santana Trucking &
Excavating, Inc.
Unit Bid
Price Amount
Gary Merlino
Consrtuction Co.
Unit Bid
Price Amount
PSIPE Evergreen Clematis (Clematis Armandii)
EA
9
25.00
225.00
30.00
270.00
45.00
405.00
Topsoil Type A
CY
1,250
25.00
31,250.00
18.00
22,500.00
25.00
31,250.00
Cement Conc. Curb and Gutter
LF
200
12.00
2,400.00
24.00
4,800.00
25.00
5,000.00
Coated Chain Link Fence Type 1
LF
930
30.00
27,900.00
17.25
16,042.50
15.00
13,950.00
Double 20 Ft. Coated Chain Link Gate
Ea
1
1,400.00
1,400.00
1,500.00
1,500.00
1,000.00
1,000.00
Reset Monument
Ea
9
400.00
3,600.00
250.00
2,250.00
300.00
2,700.00
Cement Conc. Sidewalk
SY
110
22.00
2,420.00
33.00
3,630.00
50.00
5,500.00
Sidewalk Ramp Type 2A
SY
80
28.00
2,240.00
48.70
3,896.00
60.00
4,800.00
Control of Water
LS
1
10,000.00
10,000.00
500.00
500.00
500.00
500.00
Quarry Spalls
Ton
130
25.00
3,250.00
27.50
3,575.00
50.00
6,500.00
Riprap
Ton
30
25.00
750.00
30.00
900.00
50.00
1,500.00
Compaction Testing
EA
60
55.00
3,300.00
170.00
10,200.00
100.00
6,000.00
Remove Siphon and Culverts
LS
1
2,000.00
2,000.00
2,450.00
2,450.00
2,500.00
2,500.00
Plug Large Culverts
EA
4
400.00
1,600.00
2,350.00
9,400.00
500.00
2,000.00
Remove, Replace, Wood Fence and Dumpster C(
LF
55
50.00
2,750.00
25.00
1,375.00
30.00
1,650.00
Remove Trees, Restore Planting Strip
LS
1
2,000.00
2,000.00
600.00
600.00
500.00
500.00
Sod Installation
SY
300
8.00
2,400.00
5.70
1,710.00
10.00
3,000.00 1
Ductile Iron Storm Pipe 8-Inch Diameter
LF
26
40.00
1,040.00
41.15
1,069.90
50.00
1,300.00
Restore Pavement Markings
LS
1
1,000.00
1,000.00
1,500.00
1,500.00
500.00
500.00
Television Inspection
LS
1
4,500.00
4,500.00
1,840.00
1,840.00
500.00
500.00
Minor Changes
LS
1
5,000.00
5,000.00
5,000.00
5,000.00
5,000.00
5,000.00
I
Subtotal $910,309.00
Subtotal $733,960.00
Subtotal
$798,075.00
Tax
$80,107.19
Tax
$64,588.48
Tax
$70,230.601
i
��-0-3
Total
$990,416.19
Total
$798,548.48
Total
$868,305.60
Daniel Carey
rJ
A02-B B NE10th.xls F of 15
Project Title NE 10th St / Anacortes Ave NE Detention Pond, Storm Impn D.D.J. Construction
BID DATE: June 17, 2003 2:30 P.M. 11 Co., Inc.
Item
No.
Description
1 Construction Survey, Staking, and As -built Drawir
2 Stormwater Pollution and Prevention Plan
3 Utility Potholing
4 Mobilization and Demobilization
5 Temporary Traffic Control Plan
6 Clearing and Grubbing
7 Remove / Relocate Existing Fence
8 Remove Concrete Sidewalk and Curb
9 Remove Catch Basin
10 Remove Piping
11 Sawcutting
12 Embankment Compaction
13 Pond Embankment Fill Incl. Haul
14 Pond Excavation Incl. Haul
15 Control Density Fill
16 Construction Geotextile For Permanent Erosion C
17 Crushed surfacing Top Course (or Base Course)
18 Asphalt Conc. Pavement Cl. B
19 CPEP Storm Pipe 12-Inch Diameter
20 CPEP Storm Pipe 18-Inch Diameter
21 CPEP Storm Pipe 30-Inch Diameter
22 Debris Barrier
23 Ductile Iron Storm Pipe 12-Inch Diameter
24 Ductile Iron Storm Pipe 18-Inch Diameter
25 Catch basin Type 1
26 Catch basin Type 1 L
27 Catch Basin Type 2 48 In. Diam.
28 Catch Basin Type 2 48 In. Diam. - over 9' deep
29 Catch Basin Type 2 54 In. Diam.
30 Catch Basin Type 2 54 In. Diam. - over 9' deep
Unit Est.
Quant
L.S.
L.S.
Ea
L.S.
L.S.
Ac
LF
SY
Ea
LF
LF
CY
Ton
CY
CY
SY
TN
TN
LF
LF
LF
Ea
LF
LF
Ea
Ea
Ea
Ea
Ea
Ea
1
1
18
1
1
1.1
250
220
26
1,410
12,500
1,060
1,950
8,000
55
570
750
700
565
585
1,485
1
220
27
20
4
7
1
9
5
Unit Bid
Price Amount
25,000.00
1,000.00
2,500.00
27,000.00
2,000.00
6,000.00
10.00
8.00
250.00
1.00
0.18
1.00
11.50
10.75
60.00
3.00
15.00
85.00
27.70
45.00
88.00
325.00
47.75
50.00
825.00
925.00
2,450,00
2,600.00
3,200.00
3,950.00
25,000.00
1,000.00
45,000.00 1
27,000.00
2,000.00
6,600.00
2,500.00
1,760.00
6,500.00
1,410.00
2,250.00 1
1,060.00
22,425.00
86,000.00 1
3,300.00
1,710.00
11,250.00
59,500.00
15,650.50
26,325.00
130,680.00
325.00
10, 505.00
1,350.00
16,500.00
3,700.00
17,150.00 1
2,600.00
28,800.00
19,750.00 1
Archer Construction, Inc. 1
I
Unit Bid
Price Amount
Westwater
Construction Co. i
1
Unit Bid i
Price Amount "
21,000.00
21,000.00 :15,000.00
15,000.00
2,000.00
2,000.00 1
2,000.00
2,000.00
375.00
6,750.00
500.00
9,000.00
87,000.00
87,000.00 i80,000.00
80,000.00
32,000.00
32,000.00 120,000.00
20,000.00
4,000.00
4,400.00 110,000.00
11,000.00 1
6.00
1,500.00 1
10.00
2,500.00
4.00
880,00 1
3.00
660.00
150.00
3,900.00 1
80.00
2,080.00
3.50
4,935.00
1.00
1,410.00
0.30
3,750.00 1
0.60
7,500.00 1
3.30
3,498.00
1.00
1,060.00
11.00
21,450.00
8.00
15,600.00 i
13.00
104,000.00 1
9.00
72,000.00 1
70.00
3,850.00
90.00
4,950.00
1.00
570.00
1.00
570.00 1
24.00
18,000,00
12.00
9,000.00
65.00
45,500.00 1
55.00
38,500.00
48.00
27,120.00
80.00
45,200.00
52.00
30,420.00
90.00
52,650.00
68.00
100,980.00
216.00
320,760.00
300.00
300.00 1
500.00
500.00 1
55.00
12,100.00
85.00
18,700.00
65.00
1,755.00
95.00
2,565.00
800.00
16,000.00
600.00
12,000.00
915.00
3,660.00
700.00
2,800.00
2,200.00
15,400.00
1,500.00
10,500.00 1
2,800.00
2,800.00
1,800.00
1,800.00
2,600.00
23,400.00
2,000.00
18,000.00
3,300.00
16,500.00 1
2,500.00
12, 500.00 1
A01-BID TAB NE10th.xls Page 4 of 15
Project Title NE 10th St / Anacortes Ave NE Detention Pond, Storm Impn D.D.J. Construction
BID DATE: June 17, 2003 2:30 P.M. Co., Inc.
Item Description Unit Est. Unit Bid i
No. Quantity Price Amount
Archer Construction, Inc. ;
Unit Bid
Price Amount
Westwater
Construction Co.
Unit Bid
Price Amount
31
Catch Basin Type 2 72 In. Diam.
Ea
1
2,600.00
2,600.00 1
3,700.00
3,700.00
3,000.00
3,000.00
32
Catch Basin Type 2 72 In. Diam. - over 9' deep
Ea
1
3,800.00
3,800.00
4,800.00
4,800.00
4,000.00
4,000.00
33
Concrete Inlet
Ea
1
700.00
700.00 1
660.00
660.00 1
600.00
600.00
34
Modular Block Wall
Ea
55
90.00
4,950.00 1
90.00
4,950.00
25.00
1,375.00
35
Flow Control Structure
Ea
1
2,800.00
2,800.00 i
3,700.00
3,700.00
4,000.00
4,000.00
36
Overflow Structure
Ea
1
3,800.00
3,800.00
3,400.00
3,400.00
2,000.00
2,000.00 1
37
Shoring or Extra Excavation Class B
SF
21,000
0.10
2,100.00
0.10
2,100.00
0.10
2,100.00 1
38
Plugging Existing Pipe
Ea
18
100.00
1,800.00
400.00
7,200.00
20.00
360.00
39
Bank Run Gravel for Trench Backfill
TN
5,200
3.00
15,600.00
8.00
41,600.00
1.00
5,200.00
40
Concrete Deadman Anchor Blocks
CY
12
85.00
1,020.00
700.00
8,400.00
700.00
8,400.00
41
Relocate 6 In. Water Main
Ea
2
3,500.00
7,000.00
4,000.00
8,000.00
3,000.00
6,000.00
42
Relocate 8 In. Water Main
Ea
1
3,500.00
3,500.00
4,500.00
4,500.00
3,500.00
3,500.00
43
Relocate 10 In. Water Main
Ea
1
4,200.00
4,200.00
5,200.00
5,200.00
4,500.00
4,500.00
44
Abandon Septic System, Install Side Sewer
LS
1
8,800.00
8,800.00 1
7,000.00
7,000.00
7,000.00
7,000.00 1
45
Relocate Side Sewer
LF
510
73.00
37,230.00 1
26.00
13,260.00
40.00
20,400.00
46
Stabilized Construction Entrance
SY
180
15.00
,
2,700.00
10.00
1,800.00
3.00
540.00
47
Erosion Control Blanket
SY
1,000
2.00
2,000.00
1.50
1,500.00
3.00
3,000.00 1
48
Temporary Water Pollution/Erosion Control
LS
1
500.00
500.00
7,500.00
7,500.00 1
5,000.00
5,000.00
49
Catch Basin Filter
Ea
42
30.00
1,260.00
65.00
2,730.00
60.00
2,520.00
50
Clearing Limit Fence
LF
630
3.50
2,205.00
2.50
1,575.00
2.00
1,260.00
51
Seeding, Fertilizing, and Mulching
Ac
1
1,850.00
1,850.00
1,700.00
1,700.00 1
1,500.00
1,500.00
52
Silt Fence
LF
370
4.50
1,665.00
3.70
1,369.00
7.00
2,590.00 1
53
Street Cleaning
HR
80
85.00
6,800.00
100.00
8,000.00
75.00
6,000.00
54
PSIPE Western Red Cedar (Thja Plicata)
EA
7
50.00
350.00
35.00
245.00 1
100.00
700.00
55
PSIPE Leyland Cypress (Cupressocyparis Leylan
EA
8
50.00
400.00
300.00
2,400.00 1
260.00
2,080.00 1
56
PSIPE Douglas -Fir (Pseudotsuga Menziesii)
EA
7
50.00
350.00
35.00
245.00 1
90.00
630.00
57
PSIPE Mock Orange (Philadelphus Lewisii)
EA
7
50.00
350.00
400.00
2,800.00
300.00
2,100.00
58
PSIPE Oregon Ash (Fraxinus Latifolia)
EA
11
50.00
550.00
20.00
220.00 1
35.00
385.00
59
PSIPE Red Osier Dogwood (Corpus sericea Var.
EA
8
50.00
400.00
35.00
280.00
40.00
320.00
60
PSIPE Camellia (Camellia Japonica)
EA
29
30.00
870.00
65.00
1,885.00 1
40.00
1,160.00
P' 131D TAB NE10th.xls page 5 of 15
Project Title NE 10th St / Anacortes Ave NE Detention Pond, Storm ImprN D.D.J. Construction Archer Construction, Inc. Westwater
BID DATE: June 17, 2003 2:30 P.M. Co., Inc. Construction Co.
Item Description Unit Est. Unit Bid 1 Unit Bid Unit Bid
No. Quantity_ Price Amount Price Amount 1 Price Amount ;
61
PSIPE Evergreen Clematis (Clematis Armandii)
EA
9
50.00
62
Topsoil Type A
CY
1,250
25.00
63
Cement Conc. Curb and Gutter
LF
200
35.00
64
Coated Chain Link Fence Type 1
LF
930
17.00
65
Double 20 Ft. Coated Chain Link Gate
Ea
1
1,250.00
66
Reset Monument
Ea
9
650.00
67
Cement Conc. Sidewalk
SY
110
55.00
68
Sidewalk Ramp Type 2A
SY
80
65.00
69
Control of Water
LS
1
500.00
70
Quarry Spalls
Ton
130
20.00
71
Riprap
Ton
30
50.00
72
Compaction Testing
EA
60
100.00
73
Remove Siphon and Culverts
LS
1
2,500.00
74
Plug Large Culverts
EA
4
700.00
75
Remove, Replace, Wood Fence and Dumpster C(
LF
55
75.00
76
Remove Trees, Restore Planting Strip
LS
1
2,000.00
77
Sod Installation
SY
300
12.00
78
Ductile Iron Storm Pipe 8-Inch Diameter
LF
26
15.00
79
Restore Pavement Markings
LS
1
2,500.00
80
Television Inspection
LS
1
1,200.00
81
Minor Changes
LS
1
1 5,000.00
By:
Daniel Carey
450.00 1
30.00
31,250.00
20.00
7,000.00
24.00
15,810.00
17.00
1,250.00
1,250.00
5,850.00
200.00
6,050.00
31.00
5,200.00
45.00
500.00 1
15,000.00
2,600.00
17.00
1,500.00
27.00
6,000.00
215.00
2,500.00
1,000.00
2,800.00
500.00
4,125.00
16.00
2,000.00
2,900.00
3,600.00 1
10.00
390.00
30.00
2,500.00
1,500.00
1,200.00 1
1,000.00
5,000.00
5,000.00
Subtotal $809,325.50
Tax $71,220.64
Total $880,546.14
270.00 1 20.00
25,000.00 25.00
4,800.00 35.00
15,810.00 1 18.00
1,250.00 1,200.00
1,800.00 500.00
3,410.00 60.00
3,600.00 60.00
15,000.00 1 4,000.00
2,210.00 20.00
810.00 50.00
12,900.00 1 80.00
1,000.00 1,000.00
2,000.00 200.00
880.00 20.00
2,900.00 1,500.00
3,000.00 1 7.00
780.00 90.00
1,500.00 500.00
1,000.00 1 3,000.00
5,000.00 5,000.00
180.00 1
31,250.00
7,000.00
16,740.00 1
1,200.00
4,500.00
1
6,600.00 1
4,800.00
4,000.00
2,600.00
1,500.00
4,800.00
1,000.00
800.00 1
1,100.00
1,500.00
2,100.00
2.340.00
500.00
3,000.00 1
5,000.00
Subtotal $873,057.00 1 Subtotal $995,535.00
Tax $76,829.02 Tax $87,607.08
Total $949,886.02 1
Total $1,083,142.08 1
A01-BID TAB NE10th.xls Page 6 of 15
Project Title NE 10th St / Anacortes Ave NE Detention Pond, Storm Impn Frank Coluccio James W. Fowler
BID DATE: June 17, 2003 2:30 P.M. II Construction Co. Company
Item
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Description
Construction Survey, Staking, and As -built Drawir
Stormwater Pollution and Prevention Plan
Utility Potholing
Mobilization and Demobilization
Temporary Traffic Control Plan
Clearing and Grubbing
Remove / Relocate Existing Fence
Remove Concrete Sidewalk and Curb
Remove Catch Basin
Remove Piping
Sawcutting
Embankment Compaction
Pond Embankment Fill Incl. Haul
Pond Excavation Incl. Haul
Control Density Fill
Construction Geotextile For Permanent Erosion C
Crushed surfacing Top Course (or Base Course)
Asphalt Conc. Pavement Cl. B
CPEP Storm Pipe 12-Inch Diameter
CPEP Storm Pipe 18-Inch Diameter
CPEP Storm Pipe 30-Inch Diameter
Debris Barrier
Ductile Iron Storm Pipe 12-Inch Diameter
Ductile Iron Storm Pipe 18-Inch Diameter
Catch basin Type 1
Catch basin Type 1 L
Catch Basin Type 2 48 In. Diam.
Catch Basin Type 2 48 In. Diam. - over 9' deep
Catch Basin Type 2 54 In. Diam.
Catch Basin Type 2 54 In. Diam. - over 9' deep
Unit Est.
Quant
Unit Bid ; Unit Bid
Price Amount Price Amount
L.S.
1
20,000.00
20,000.00 125,000.00
L.S.
1
300.00
300.00
1,500.00
Ea
18
200.00
3,600.00
250.00
L.S.
1
70,000.00
70,000.00 :95,000.00
L.S.
1
22,000.00
22,000.00 136,000.00
Ac
1.1
25,000.00
1
27,500.00 ;
6,500.00
LF
250
10.00
2,500.00
13.00
SY
220
10.00
2,200.00 1
8.00
Ea
26
50.00
1,300.00
225.00
LF
1,410
6.00
8,460.00
3.00
LF
12,500
1.50
18,750.00
0.50
CY
1,060
7.00
7,420.00
3.00
Ton
1,950
15.00
29,250.00
18.00
CY
8,000
17.00
1
136,000.00
16.00
CY
55
70.00
3,850.00
64.00
SY
570
3.00
1,710.00
3.00
TN
750
14.00
10,500.00
18.00
TN
700
76.00
53,200.00
110.00
LF
565
56.00
31,640.00 1
37.00
LF
585
70.00
40,950.00 ;
42.00
LF
1,485
127.00
188,595.00 1
58.00
Ea
1
1,600.00
1
1,600.00
1,000.00
LF
220
69.00
15,180.00
50.00
LF
27
125.00
3,375.00
80.00
Ea
20
600.00
12,000.00 ;
1,350.00
Ea
4
800.00
3,200.00
1,500.00
Ea
7
2,400.00
1
16,800.00 1
2,600.00
Ea
1
2,900.00
2,900.00 ;
3,000.00
Ea
9
2,500.00
22,500.00
3,400.00
Ea
5
3,300.00
16,500.00
3,900.00
Rodarte
Construction, Inc
1
Unit Bid
1
Price Amount
25,000.00 :17,000.00
1,500.00 1,000.00
4,500.00 1,500.00
95,000.00 :25,000.00
36,000.00 128,000.00
I
7,150.00 ; 7,000.00
3,250.00 12.00
1,760.00 17.00
5,850.00 200.00
4,230.00 10.00
6,250.00 1.50
3,180.00 4.50
35,100.00 1 16.00
;
128,000.00 ; 12.25
3,520.00 125.00
1,710.00 1.50
13,500.00 20.00
77,000.00 76.00
20,905.00 45.00
24,570.00 48.00
86,130.00 106.00
1
1,000.00 ; 550.00
11,000.00 65.00
2,160.00 1 200.00
27,000.00 ; 800.00
6,000.00 i 1,000.00
1
18,200.00 ; 2,200.00
3,000.00 3,200.00
30,600.00 3,200.00
19,500.00 4,500.00
1
1
17,000.00
1
1,000.00
27,000.00
25,000.00
28,000.00
1
7,700.00
3,000.00
3,740.00
5,200.00
14,100.00
18,750.00
4,770.00
31,200.00
1
98,000.00
6,875.00
855.00
15,000.00
53,200.00
25,425.00
28,080.00
157,410.00
550.00
14,300.00
5,400.00
16,000.00
4,000.00
15,400.00
3,200.00 -
28,800.00
22,500.00
BID TAB NE10th.xls Page 7 of 15
Project Title NE 10th St / Anacortes Ave NE Detention Pond, Storm Impn Frank Coluccio James W. Fowler Rodarte
BID DATE: June 17, 2003 2:30 P.M. Construction Co. I Company Construction, Inc.
Item
No.
Description
Unit
Est. (
Quantity
Unit
Price
31
Catch Basin Type 2 72 In. Diam.
Ea
1
3,400.00
32
Catch Basin Type 2 72 In. Diam. - over 9' deep
Ea
1
4,300.00
33
Concrete Inlet
Ea
1
600.00
34
Modular Block Wall
Ea
55
100.00
35
Flow Control Structure
Ea
1
3,000.00
36
Overflow Structure
Ea
1
2,100.00
37
Shoring or Extra Excavation Class B
SF
21,000
0.10
38
Plugging Existing Pipe
Ea
18
100.00
39
Bank Run Gravel for Trench Backfill
TN
5,200
7.50
40
Concrete Deadman Anchor Blocks
CY
12
500.00
41
Relocate 6 In. Water Main
Ea
2
5,700.00
42
Relocate 8 In. Water Main
Ea
1
7,900.00
43
Relocate 10 In. Water Main
Ea
1
6,800.00
44
Abandon Septic System, Install Side Sewer
LS
1
5,000.00
45
Relocate Side Sewer
LF
510
21.00
46
Stabilized Construction Entrance
SY
180
15.00
47
Erosion Control Blanket
SY
1,000
1.50
48
Temporary Water Pollution/Erosion Control
LS
1
2,500.00
49
Catch Basin Filter
Ea
42
50.00
50
Clearing Limit Fence
LF
630
5.00
51
Seeding, Fertilizing, and Mulching
Ac
1
1,600.00
52
Silt Fence
LF
370
7.00
53
Street Cleaning
HR
80
75.00
54
PSIPE Western Red Cedar (Thja Plicata)
EA
7
50.00
55
PSIPE Leyland Cypress (Cupressocyparis Leylan
EA
8
300.00
56
PSIPE Douglas -Fir (Pseudotsuga Menziesii)
EA
7
50.00
57
PSIPE Mock Orange (Philadelphus Lewisii)
EA
7
400.00
58
PSIPE Oregon Ash (Fraxinus Latifolia)
EA
11
500.00
59
PSIPE Red Osier Dogwood (Cornus sericea Var.
EA
8
50.00
60
PSIPE Camellia (Camellia Japonica)
EA
29
70.00
Bid 1 Unit Bid
Amount I Price Amount
3,400.00 14,000.00
4,300.00
5,500.00
600.00
1,100.00
5,500.00
375.00
3,000.00
3,750.00
2,100.00
2,400.00
2,100.00
0.10
1,800.00
175.00
39,000.00
16.00
6,000.00
725.00
11,400.00
3,200.00
7,900.00
3,700.00
6,800.00
5,600.00
5,000.00
7,000.00
10,710.00
22.00
2,700.00
12.00
1,500.00
2.00
2,500.00
3,500.00
2,100.00
70.00
3,150.00
1.50
1,600.00
1,900.00
2,590.00
2.50
6,000.00
95,00
350.00
110.00
2,400.00 I
235.00
350.00
90.00
2,800.00
485.00
5,500.00
50.00
400.00
60.00
2,030.00
80.00
Unit Bid
Price Amount
4,000.00 l 4,500.00
5,500.00 8,000.00
1,100.00 1,000.00
20,625.00 275.00
3,750.00 5,000.00
2,400.00 3,500.00
2,100.00 1.50
3,150.00 165.00
83,200.00 { 9.00
8,700.00 500.00
6,400.00 6,000.00
3,700.00 6,000.00
5,600.00 8,000.00
7,000.00 8,000.00
11,220.00 58.00
2,160.00 12.00
2,000,00 2.00
3,500.00 4,600.00
2,940.00 100.00
945.00 4.00
1,900.00 1,800.00
925.00 6.00
7,600.00 95.00
770.00 40.00
1,880.00 350.00
630.00 40.00
3,395.00 450.00
550.00 23.00
480.00 40.00
2,320.00 75.00
I
4,500.00
8,000.00
1,000.00
15,125.00
5,000.00
3,500.00
31, 500.00
2,970.00
46, 800.00
6,000.00
12,000.00 1
6,000.00
8,000.00
8,000.00
29,580.00
2,160.00
2,000.00
4,600,00
4,200.00
2,520.00
1,800.00
2,220.00
7,600.00 ;
280.00
2,800.00
280.00
3,150.00
253.00
320.00
2,175.00
A01-BID TAB NE10th.xls Page 8 of 15
Project Title NE 10th St / Anacortes Ave NE Detention Pond, Storm Impn, Frank Coluccio James W. Fowler Rodarte
BID DATE: June 17, 2003 2:30 P.M. (I Construction Co. Company Construction, Inc.
Item
No.
Description
Unit
Est.
Quantity
Unit
Price
Bid
Amount
Unit
Price
Bid
Amount
Unit
Price
Bid
Amount
61
PSIPE Evergreen Clematis (Clematis Armandii)
EA
9
50.00
450.00
70.00
630.00
32.00
288.00 1
62
Topsoil Type A
CY
1,250
20.00
25,000.00
26.00
32,500.00
22.00
27,500.00
63
Cement Conc. Curb and Gutter
LF
200
28.00
5,600.00
28.00
5,600.00
24.00
4,800.00
64
Coated Chain Link Fence Type 1
LF
930
17.00
15,810.00 1
18.00
16,740.00 1
20.00
18,600.00
65
Double 20 Ft. Coated Chain Link Gate
Ea
1
1,000.00
1,000.00 1
1,000.00
1,000.00 1
1,400.00
1,400.00
66
Reset Monument
Ea
9
300.00
2,700.00 1
150.00
1,350•.00 1
400.00
3,600.00
67
Cement Conc. Sidewalk
SY
110
40.00
4,400.00 1
60.00
6,600.00 1
42.00
4,620.00
68
Sidewalk Ramp Type 2A
SY
80
49.00
3,920.00 1
60.00
4,800.00
65.00
5,200.00
69
Control of Water
LS
1
1,000.00
1,000.00 1
3,000.00
3,000.00 112,500.00
12,500.00 1
70
Quarry Spalls
Ton
130
20.00
2,600.00
34.00
4,420.00 1
35.00
4,550.00
71
Riprap
Ton
30
20.00
600.00
30.00
900.00 i
50.00
1,500.00
72
Compaction Testing
EA
60
40.00
2,400.00
135.00
8,100.00
78.00
4,680.00 1
73
Remove Siphon and Culverts
LS
1
4,000.00
4,000.00
2,200.00
2,200.00
1,500.00
1,500.00
74
Plug Large Culverts
EA
4
200.00
800.00
750.00
3,000.00
2,300.00
9,200.00 1
75
Remove, Replace, Wood Fence and Dumpster C(
LF
55
25.00
1,375.00
32.00
1,760.00
50.00
2,750.00
76
Remove Trees, Restore Planting Strip
LS
1
2,000.00
2,000.00
1,700.00
1,700.00
600.00
600.00
77
Sod Installation
SY
300
10.00
3,000.00
8.50
2,550.00 1
11.00
3,300.00 1
78
Ductile Iron Storm Pipe 8-Inch Diameter
LF
26
65.00
1,690.00
50.00
1,300.00 1
135.00
3,510.00
79
Restore Pavement Markings
LS
1
1,500.00
1,500.00
2,100.00
2,100.00 1
5,500.00
5,500.00
80
Television Inspection
LS
1
10,000.00
10,000.00 1
7,000.00
7,000.00 1
3,500.00
3,500.00
81
Minor Changes
LS
1
5,000.00
5,000.00
I
5,000.00
5,000.00
I
5,000.00
5,000.00
By:
Daniel Carey
Subtotal $1,014,205.00
Tax $89,250.04
Total $1,103,455.04
Subtotal $1,015,255.00
Tax $89,342.44
Total $1,104,597.44
Subtotal $1,029,886.00
Tax $90,629.97
Total $1,120,515.97
P'" 91D TAB NE10th.xls Dage 9 of 15
Project Title NE 10th St / Anacortes Ave NE Detention Pond, Storm Imprr Fury Construction Co.
BID DATE: June 17, 2003 2:30 P.M. 11
Item
No.
Description
Unit Est.
Quant
Unit Bid
Price Amount
1
Construction Survey, Staking, and As -built Drawir
L.S.
1
25,000.00
25,000.00
2
Stormwater Pollution and Prevention Plan
L.S.
1
250.00
250.00 1
3
Utility Potholing
Ea
18
375.00
6,750.00
4
Mobilization and Demobilization
L.S.
1
50,000.00
50,000.00
5
Temporary Traffic Control Plan
L.S.
1
50,000.00
50,000.00
6
Clearing and Grubbing
Ac
1.1
6,500.00
7,150.00
7
Remove / Relocate Existing Fence
LF
250
12.00
3,000.00
8
Remove Concrete Sidewalk and Curb
SY
220
9.00
1,980.00
9
Remove Catch Basin
Ea
26
450.00
11,700.00
10
Remove Piping
LF
1,410
10.00
14,100.00
11
Sawcutting
LF
12,500
1.75
21,875.00
12
Embankment Compaction
CY
1,060
1.00
1,060.00
13
Pond Embankment Fill Incl.• Haul
Ton
1,950
14.00
27,300.00
14
Pond Excavation Incl. Haul
CY
8,000
12.00
96,000.00
15
Control Density Fill
CY
55
110.00
6,050.00
16
Construction Geotextile For Permanent Erosion C
SY
570
1.00
570.00
17
Crushed surfacing Top Course (or Base Course)
TN
750
18.00
13,500.00
18
Asphalt Conc. Pavement Cl. B
TN
700
72.00
50,400.00
19
CPEP Storm Pipe 12-Inch Diameter
LF
565
68.00
38,420.00
20
CPEP Storm Pipe 18-Inch Diameter
LF
585
75.00
43,875.00
21
CPEP Storm Pipe 30-Inch Diameter
LF
1,485
88.50
131,422.50
22
Debris Barrier
Ea
1
2,600.00
2,600.00
23
Ductile Iron Storm Pipe 12-Inch Diameter
LF
220
90.00
19,800.00
24
Ductile Iron Storm Pipe 18-Inch Diameter
LF
27
98.00
2,646.00 1
25
Catch basin Type 1
Ea
20
850.00
17,000.00
26
Catch basin Type 1 L
Ea
4
900.00
3,600.00
27
Catch Basin Type 2 48 In. Diam.
Ea
7
2,800.00
19,600.00
28
Catch Basin Type 2 48 In. Diam. - over 9' deep
Ea
1
3,200.00
3,200.00
29
Catch Basin Type 2 54 In. Diam.
Ea
9
3,300.00
29,700.00 I
30 Catch Basin Type 2 54 In. Diam. - over 9' deep Ea 5 4,000.00 20,000.00
A01-BID TAB NE10th.xls Page 10 of 15
Project Title NE 10th St / Anacortes Ave NE Detention Pond, Storm Impry Fury Construction Co.
BID DATE: June 17, 2003 2:30 P.M. 11
Item
No.
Description
Unit Est.
Unit Bid
Price Amount
31
Catch Basin Type 2 72 In. Diam.
Ea
1
4,600.00
4,600.00 i
32
Catch Basin Type 2 72 In. Diam. - over 9' deep
Ea
1
5,200.00
5,200.00
33
Concrete Inlet
Ea
1
800.00
800.00 1
34
Modular Block Wall
Ea
55
45.00
2,475.00
35
Flow Control Structure
Ea
1
4,200.00
4,200.00
36
Overflow Structure
Ea
1
5,000.00
5,000.00
37
Shoring or Extra Excavation Class B
SF
21,000
0.15
3,150.00
38
Plugging Existing Pipe
Ea
18
275.00
4,950.00
39
Bank Run Gravel for Trench Backfill
TN
5,200
12.00
62,400.00
40
Concrete Deadman Anchor Blocks
CY
12
200.00
2,400.00
41
Relocate 6 In. Water Main
Ea
2
5,000.00
10,000.00
42
Relocate 8 In. Water Main
Ea
1
5,600.00
5,600.00
43
Relocate 10 In. Water Main
Ea
1
6,600.00
6,600.00
44
Abandon Septic System, Install Side Sewer
LS
1
5,000.00
5,000.00
45
Relocate Side Sewer
LF
510
95.00
48,450.00
46
Stabilized Construction Entrance
SY
180
12.00
2,160.00
47
Erosion Control Blanket
SY
1,000
2.00
2,000.00 1
48
Temporary Water Pollution/Erosion Control
LS
1
250.00
250.00
49
Catch Basin Filter
Ea
42
70.00
2,940.00 1
50
Clearing Limit Fence
LF
630
3.00
1,890.00
51
Seeding, Fertilizing, and Mulching
Ac
1
2,000.00
2,000.00
52
Silt Fence
LF
370
6.50
2,405.00
53
Street Cleaning
HR
80
85.00
6,800.00
54
PSIPE Western Red Cedar (Thja Plicata)
EA
7
110.00
770.00
55
PSIPE Leyland Cypress (Cupressocyparis Leylan
EA
8
225.00
1,800.00
56
PSIPE Douglas -Fir (Pseudotsuga Menziesii)
EA
7
100.00
700.00
57
PSIPE Mock Orange (Philadelphus Lewisii)
EA
7
500.00
3,500.00
58
PSIPE Oregon Ash (Fraxinus Latifolia)
EA
11
55.00
605.00 1
59
PSIPE Red Osier Dogwood (Corpus sericea Var.
EA
8
58.00
464.00
60
PSIPE Camellia (Camellia Japonica)
EA
29
76.00
2,204.00
V ' 91D TAB NE10th.xls
''age 11 of 15
Project Title NE 10th St I Anacortes Ave NE Detention Pond, Storm Impn Fury Construction Co.
BID DATE:
Item
No.
June 17, 2003 2:30 P.M.
Description
Unit
Est.
Quantity
Unit
Price
Bid
Amount ;
61
PSIPE Evergreen Clematis (Clematis Armandii)
EA
9
66.00
594.00
62
Topsoil Type A
CY
1,250
28.00
35,000.00
63
Cement Conc. Curb and Gutter
LF
200
18.00
3,600.00
64
Coated Chain Link Fence Type 1
LF
930
18.00
16,740.00
65
Double 20 Ft. Coated Chain Link Gate
Ea
1
1,250.00
1,250.00
66
Reset Monument
Ea
9
350.00
3,150.00
67
Cement Conc, Sidewalk
SY
110
32.00
3,520.00
68
Sidewalk Ramp Type 2A
SY
80
40.00
3,200.00
69
Control of Water
LS
1
1,000.00
1,000.00
70
Quarry Spalls
Ton
130
25.00
3,250.00
71
Riprap
Ton
30
28.00
840.00
72
Compaction Testing
EA
60
95.00
5,700.00 1,
73
Remove Siphon and Culverts
LS
1
4,600.00
4,600.00
74
Plug Large Culverts
EA
4
400.00
1,600.00
75
Remove, Replace, Wood Fence and Dumpster Ci
LF
55
30.00
1,650.00
76
Remove Trees, Restore Planting Strip
LS
1
1,000.00
1,000.00
77
Sod Installation
SY
300
8.00
2,400.00
78
Ductile Iron Storm Pipe 8-Inch Diameter
LF
26
89.00
2,314.00
79
Restore Pavement Markings
LS
1
2,000.00
2,000.00
80
Television Inspection
LS
1
20,000.00
20,000.00
81
Minor Changes
LS
1
5,000.00
5,000.00
Subtotal $1,038,269.50
Tax $91,367.72
By: Total $1,129,637.22
Daniel Carey
A01-BID TAB NE10th.xls Page 12 of 15
Project Title NE 10th St / Anacortes Ave NE Detention Pond, Storm Impn
BID DATE: June 17, 2003 2:30 P.M.
Item Description Unit Est.
No. Quantity
Engineer's
Estimate
Unit Price
STATISTICAL
Low
Bidder
Unit Price
SUMMARY
Average Average
Five All Bids
Lowest Bids
Unit Price Unit Price
Median
All Bids
Unit Price
1
Construction Survey, Staking, and As -built Drawir
L.S.
1
18,000.00
13,500.00
17,900.00 ?
19,611.11
20,000.00
2
Stormwater Pollution and Prevention Plan
L.S.
1
4,000.00
2,500.00
1,600.00
1,227.78 '
1,000.00
3
Utility Potholing
Ea
18
300.00
200.00
815.00
711.11
375.00
4
Mobilization and Demobilization
L.S.
1
55,559.00
35,000.00
48,600.00
53,666.67
50,000.00
5
Temporary Traffic Control Plan
L.S.
1
16,000.00
50,000.00
21,800.00
27,222.22
28,000.00
6
Clearing and Grubbing
Ac
1.1
3,000.00
3,300.00
10,660.00
10,922.22
6,500.00
7
Remove / Relocate Existing Fence
LF
250
10.00
10.50
9.30
10.39
10.00
8
Remove Concrete Sidewalk and Curb
Sy
220
5.00
16.00
7.20
8.89 ?
8.00
9
Remove Catch Basin
Ea
26
200.00
300.00
176.00
200.56
200.00
10
Remove Piping
LF
1,410
7.00
11.75
4.45 i
5.69 I
5.00
11
Sawcutting
LF
12,500
1.50
1.00
0.62
0.93
1.00
12
Embankment Compaction
CY
1,060
2.00
1.00
1.46
2.53
1.00
13
Pond Embankment Fill Incl. Haul
Ton
1,950
6.50
10.75
10.65 1
12.92
12.00
14
Pond Excavation Incl. Haul
CY
8,000
20.00
7.00
9.95
11.89
12.00
15
Control Density Fill
CY
55
115.00
75.00
74.00 '
82.11
75.00
16
Construction Geotextile For Permanent Erosion C
SY
570
7.00
2.00
1.80
1.94
2.00
17
Crushed surfacing Top Course (or Base Course)
TN
750
20.00
18.00
18.80
18.22
18.00
18
Asphalt Conc. Pavement Cl. B
TN
700
62.00
85.00
72.00
77.11
76.00
19
CPEP Storm Pipe 12-Inch Diameter
LF
565
35.00
28.70
46.88 t
48.93
48.00
20
CPEP Storm Pipe 18-Inch Diameter
LF
585
40.00
32.75
55.95 '
57.19
52.00
21
CPEP Storm Pipe 30-Inch Diameter
LF
1,485
65.00
45.65
99.53
97.46
88.00
22
Debris Barrier
Ea
1
150.00
300.00
585.00
963.89
550.00
23
Ductile Iron Storm Pipe 12-Inch Diameter
LF
220
40.00
44.50
57.45
62.36
55.00
24
Ductile Iron Storm Pipe 18-Inch Diameter
LF
27
50.00
73.30
69.66
94.59 '
80.00
25
Catch basin Type 1
Ea
20
850.00
600.00
765.00 €
825.00
800.00
26
Catch basin Type 1 L
Ea
4
950.00
710.00
830.00 €
927.78
900.00
27
Catch Basin Type 2 48 In. Diam.
Ea
7
2,000.00
1,255.00
1,781.00
2,100.56
2,200.00
28
Catch Basin Type 2 48 In. Diam. - over 9' deep
Ea
1
2,500.00
2,100.00
2,460.00
2,733.33
2,900.00
29
Catch Basin Type 2 54 In. Diam.
Ea
9
2,600.00
1,595.00
2,379.00
2,699.44
2,600.00
30
Catch Basin Type 2 54 In. Diam. - over 9' deep
Ea
5
3,000.00
2,610.00
3,172.00
3,506.67
3,500.00
91D TAB NE10th.xls image 13 of 15
Project Title NE 10th St / Anacortes Ave NE Detention Pond, Storm Impn
BID DATE: June 17, 2003 2:30 P.M.
Item Description Unit Est.
No. Quantity
Engineer's
Estimate
Unit Price
STATISTICAL
Low
Bidder
Unit Price
SUMMARY
Average Average
Five All Bids
Lowest Bids
Unit Price Unit Price
Median
All Bids
Unit Price
31
Catch Basin Type 2 72 In. Diam.
Ea
1
5,000.00
2,575.00
3,375.00
3,708.33
3,700.00
32
Catch Basin Type 2 72 In. Diam. - over 9' deep
Ea
1
6,000.00
3,950.00
5,010.00
5,338.89
4,800.00
33
Concrete Inlet
Ea
1
850.00
580.00
648.00
748.89
700.00
34
Modular Block Wall
Ea
55
70.00
105.00
77.00
131.11 `
90.00
35
Flow Control Structure
Ea
1
4,500.00
2,715.00
3,643.00
3,796.11 1
3,750.00
36
Overflow Structure
Ea
1
3,000.00
2,680.00
3,376.00
3,320.00
3,400.00
37
Shoring or Extra Excavation Class B
SF
21,000
1.50
0.50
0.26
0.35
0.10
38
Plugging Existing Pipe
Ea
18
70.00
125.00
149.00
162.22
125.00
39
Bank Run Gravel for Trench Backfill
TN
5,200
6.40
12.50
6.10
8.33
8.00
40
Concrete Deadman Anchor Blocks
CY
12
190.00
125.00
352.00
409.44
500.00
41
Relocate 6 In. Water Main
Ea
2
5,000.00
3,715.00
3,443.00
4,123.89
3,715.00
42
Relocate 8 In. Water Main
Ea
1
5,000.00
3,800.00
3,760.00 1
4,666.67
3,800.00
43
Relocate 10 In. Water Main
Ea
1
6,000.00
4,195.00
4,419.00
5,455.00
5,200.00
44
Abandon Septic System, Install Side Sewer
LS
1
8,000.00
4,715.00
6,003.00
6,112.78
7,000.00
45
Relocate Side Sewer
LF
510
30.00
39.40
45.68
47.16
40.00
46
Stabilized Construction Entrance
SY
180
10.00
12.50
10.10 €
11.28
12.00
47
Erosion Control Blanket
SY
1,000
2.50
2.50
2.20
2.06
2.00
48
Temporary Water Pollution/Erosion Control
LS
1
25,000.00
2,000.00
4,000.00
3,427.78
3,500.00
49
Catch Basin Filter
Ea
42
50.00
50.00
58.00
64.44
65.00
50
Clearing Limit Fence
LF
630
2.50
3.50
3.30
3.33
3.50
51
Seeding, Fertilizing, and Mulching
Ac
1
1,000.00
900.00
1,550.00
1,672.22
1,800.00
52
Silt Fence
LF
370
1.50
4.00
4.84
5.13
5.00
53
Street Cleaning
HR
80
200.00
90.00
90.00
88.89
90.00
54
PSIPE Western Red Cedar (Thja Plicata)
EA
7
45.00
75.00
61.00
68.33
50.00
55
PSIPE Leyland Cypress (Cupressocyparis Leylan
EA
8
90.00
144.00
192.80
230.44
235.00
56
PSIPE Douglas -Fir (Pseudotsuga Menziesii)
EA
7
45.00
75.00
59.00
63.89
50.00
57
PSIPE Mock Orange (Philadelphus Lewisii)
EA
7
90.00
30.00
163.00
294.44
400.00
58
PSIPE Oregon Ash (Fraxinus Latifolia)
EA
11
40.00
30.00
34.00
88.67
35.00
59
PSIPE Red Osier Dogwood (Cornus sericea Var.
EA
8
40.00
30.00
38.00 1
44.22
40.00
60
PSIPE Camellia (Camellia Japonica)
EA
29
1 45.00
58.00
53.60
63.22
70.00
A01-BID TAB NE10th.xls Page 14 of 15
Project Title NE 10th St / Anacortes Ave NE Detention Pond, Storm Impn
BID DATE:
Item
No.
June 17, 2003 2:30 P.M.
Description
Unit
Est.
Quantity
Engineer's
Estimate
Unit Price
61
PSIPE Evergreen Clematis (Clematis Armandii)
EA
9
25.00
62
Topsoil Type A
CY
1,250
25.00
63
Cement Conc. Curb and Gutter
LF
200
12.00
64
Coated Chain Link Fence Type 1
LF
930
30.00
65
Double 20 Ft. Coated Chain Link Gate
Ea
1
1,400.00
66
Reset Monument
Ea
9
400.00
67
Cement Conc. Sidewalk
SY
110
22.00
68
Sidewalk Ramp Type 2A
SY
80
28.00
69
Control of Water
LS
1
10,000.00
70
Quarry Spalls
Ton
130
25.00
71
Riprap
Ton
30
25.00
72
Compaction Testing
EA
60
55.00
73
Remove Siphon and Culverts
LS
1
2,000.00
74
Plug Large Culverts
EA
4
400.00
75
Remove, Replace, Wood Fence and Dumpster C(
LF
55
50.00
76
Remove Trees, Restore Planting Strip
LS
1
2,000.00
77
Sod Installation
SY
300
8.00
78
Ductile Iron Storm Pipe 8-Inch Diameter
LF
26
40.00
79
Restore Pavement Markings
LS
1
1,000.00
80
Television Inspection
LS
1
4,500.00
81
Minor Changes
LS
1
5,000.00
(A
$910,309.00
$80,107.19
By. II $990,416.19
Daniel Carey
A^" 81D TAB NE10th.xls
STATISTICAL
Low
Bidder
Unit Price
SUMMARY
Average Average
Five All Bids
Lowest Bids
Unit Price Unit Price
Median
All Bids
Unit Price
30.00
35.00 J
43.67
45.00
18.00
22.60
23.22
25.00
24.00
28.60
26.78
25.00
17.25
16.85
17.47
17.25
1,500.00
1,240.00
1,205.56
1,250.00
250.00
380.00 i
344.44
i
300.00
33.00
45.80
44.78
42.00
48.70
55.74
54.74
60.00
500.00
4,100.00
4,222.22
1,000.00
27.50
26.90
27.61
25.00
30.00
41.40
37.22
30.00
170.00
133,00
112.56
100.00
2,450.00
1,890.00
2,416.67
2,450.00
2,350.00
850.00
877.78
500.00
25.00
33.20
33.67
30.00
600.00
1,500.00
1,422.22
1,500.00
5.70
8.94
9.13
10.00
41.15
45.23
62.79 '
50.00
1,500.00
1,300.00
1,955.56
1,500.00
1,840.00
1,508.00
5,337.78
3,000.00
5,000.00
5,000.00
5,000.00
5,000.00
ages below from Bid Subtotals, NOT calculated from unit prices above)
$733,960.00 $841,990.50 $923,063.11 $995,535.00
$64,588.48 $74,095.16 $81,229.55 $87,607.08
$798.548.48 1 $916,085.66 $1,004,292.66 1$1,083,142.08
-age 15 of 15
CITY OF RENTON
BID TABULATION SHEET Page I of 2
PROJECT: NE loth St./Anacortes Ave. NE Detention Pond & Storm System Improvement; CAG-03-083
DATE: June 17, 2003
FORMS
BID
BIDDER
Triple
Bid
Subcontractor
Includes 8.8% Sales Tax
Form
Bond
List
Archer Construction, Inc.
X
X
X
$949,886.02
7855 S. 206th St.
Kent, WA 98032-1354
Wade Archer
D.D.J. Const. Co., Inc.
X
X
X
$880,546.14
11301 186th Ave. SE
Issaquah, WA 98027
John Malaspina
Frank Coluccio Const. Co.
X
X
X
$1,103,455.04
9600 M.L. King Jr. Way S.
Seattle, WA 98118
Franco Coluccio
Fury Const. Co.
X
X
X
$1,129,637.22
PO Box 1198
North Bend, WA 98045
Denis Fury
Gary Merlino Const. Co., Inc.
X
X
X
$868,305.60
9125 loth Ave. S.
Seattle, WA 98108
Brian J. Kittleson
James W. Fowler Co.
X
X
X
$1,104,597.44
PO Box 489
Dallas, OR 97338
John B. Fowler
Rodarte Const., Inc.
X
X
X
$1,120,515.97
PO Box 1875
Auburn, WA 98071-1875
Frank Rodarte
Santana Trucking & Excavating, Inc.
X
X
X
$79 `�4 *corrected
23316 NE Red -Fall Rd., Ste 647
$798,548.48
Redmond, WA 98053
R.B. Phillips, Jr.
LEGEND:
Foms: Tiiple Foun: Non -Collusion Affidavit, And -Trust Claims, Minimum Wage (see reverse side)
CITY OF RENTON
BID TABULATION SHEET Page 2 of 2
PROJECT: NE 10th St./Anacortes Ave. NE Detention Pond & Storm System Improvement; CAG-03-083
DATE: June 17, 2003
FORMS
BID
BIDDER
Triple
Bid
Subcontractor
Includes 8.8% Sales Tax
Form
Bond
List
Westwater Const. Co.
X
X
X
$1,083,142.08
31833 Kent Black Diamond Rd.
Auburn, WA 98092
Thomas J. Caplis
ENGINEER'S ESTIMATE
LEGEND:
Forms: Triple Form: Non -Collusion Affidavit, Anti -Trust Claims, Minimum Wage
TOTAL:
$990,416.19
CITY OF RENTON COUNCIL AGENDA BILL
Al #: ' C
Submitting Data: Gregg Zimmerman (x-7311)
For Agenda of: June 23, 2003
Dept/Div/Board.. PBPW Department
Agenda Status
Staff Contact...... Bill Walker, 430-7400
Consent .............. X
Public Hearing..
Subject:
Intergovernmental Cooperative Purchasing Agreement
Correspondence..
with the City of Everett to purchase E-93, the new
Ordinance .............
Vactor Truck for the Wastewater/Surface Water
Resolution............ X
Section
Old Business........
New Business.......
Exhibits:
Issue Paper
Study Sessions......
Resolution
Information........ .
Agreement
Recommended Action:
Council Concur
Approvals:
Legal Dept ......... X
Finance Dept ...... X
Other ...............
Fiscal Impact:
Expenditure Required... $276,804.56 Transfer/Amendment....... $0
Amount Budgeted....... $276,804.56 Revenue Generated......... $0
Total Project Budget $1,166,900 (Equipment Rental City Share Total Project.. $276,804.56
Fund 501 Capital Outlay)
SUMMARY OF ACTION:
The Wastewater/Surface Water Vactor Truck E-93 needs to be replaced. This purchase is
included in the 2003 Equipment Rental Fund 501 Capital Outlay budget. By entering into an
Intergovernmental Cooperative Purchasing Agreement with the City of Everett pursuant to
RCW 39.24 and using their contract for this purchase we can save the time and expense of
bidding and yet meet the legal requirements for this purchase.
STAFF RECOMMENDATION:
Staff recommends that the City Council concur with the recommendation that the City enter into
an Intergovernmental Cooperative Purchasing Agreement with the City of Everett to purchase
replacement Vactor Truck E-93, and adopt a resolution authorizing the Mayor and City Clerk
to execute the said agreement.
Rentonnet/agnbill/ bh
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS DEPT.
MEMORANDUM
DATE: June 10, 2003
TO: Kathy Keolker-Wheeler, Council President
Members of the Renton City Council
VIA: % Jesse Tanner, Mayor
IJ
FROM: Gregg Zimmermk7311)
STAFF CONTACT: Bill Walker (430-7400)
SUBJECT: Enter into an Intergovernmental Cooperative Purchasing
Agreement with the City of Everett to Purchase
Replacement Vactor Truck E-93
ISSUE:
The City needs to replace Vactor Truck E-93, which is used by the Maintenance Services
Division Surfacewater/Wastewater Section to clean out the City's wastewater and storm
water pipelines and maintain them in good operating condition. Time and money could
be saved by executing an Intergovernmental Cooperative Purchasing Agreement with the
City of Everett and buying this equipment on their contract, pursuant to RCW 39.24.
RECOMMENDATION:
Staff recommends that the City Council approve the recommendation that the City enter
into an Intergovernmental Cooperative Purchasing Agreement with the City of Everett to
purchase replacement Vactor Truck E-93, and adopt a resolution authorizing the Mayor
and City Clerk to execute the said agreement.
BACKGROUND:
The adopted 2003 Equipment Rental Fund (501) includes funding to purchase a
replacement Vactor Truck (vehicle E-93). The current truck has deteriorated to the point
where it is no longer reliable for cleaning out the City's sewer and stormwater lines.
Several years ago it was estimated that replacement of this vehicle would cost $250,000,
however this estimate is now low due to inflation and the fact that the trade in value for
the old truck ($30,000) is less than anticipated. The Equipment Rental Fund has
sufficient funds to pay for the cost of this replacement vehicle ($276,804.56). By
executing an Intergovernmental Cooperative Purchasing Agreement with the City of
Everett we can save the time and expense of bidding and yet meet the legal requirements
for this purchase.
HADivision.s\ADMIN\GREGG\vactor purchase 2.doc\cor
CITY OF RENTON, WASHINGTON
RESOLUTION NO.
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON
AUTHORIZING THE MAYOR AND CITY CLERK TO ENTER INTO AN
INTERGOVERNMENTAL COOPERATIVE PURCHASING AGREE-
MENT WITH THE CITY OF EVERETT.
WHEREAS, both the City of Renton and the City of Everett periodically have the need to
obtain supplies, material, equipment or services; and
WHEREAS, both cities periodically obtain bids and contracts for such supplies, material,
equipment and services; and
WHEREAS, pursuant to state law, one city may use the bids or contracts of another
governmental entity for supplies, material, equipment and services; and
WHEREAS, the cities of Renton and Everett wish to enter into a contract covering the
use of each others bids and contracts for supplies, material, equipment and services.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASHINGTON, DO RESOLVE AS FOLLOWS:
SECTION I. The above findings are true and correct in all respects.
SECTION H. The Mayor and City Clerk are hereby authorized to enter into an
intergovernmental cooperative purchasing agreement with the City of Everett.
1
COPY
RESOLUTION NO.
PASSED BY THE CITY COUNCIL this day of , 2003,
Bonnie I. Walton, City Clerk
APPROVED BY THE MAYOR this day of 12003.
Approved as to form:
Lawrence J. Warren, City Attorney
RES.988:6/5/030:tmj
2
Jesse Tanner, Mayor
11
INTERGOVERNMENTAL COOPERATIVE PURCHASING AGREEMENT
Pursuant to Chapter 39.34 RCW and to other applicable laws,
THE CITY OF RENTON and, THE CITY OF EVERETT,
both political subdivisions of the State of Washington, hereby agree to cooperative governmental
purchasing upon the following terms and conditions:
1. This Agreement pertains to bids and contracts for supplies, material, equipment, or services
that may be required from time to time both by the City of Renton and the City of Everett.
2. Each of the parties from time to time goes out to public bid and contracts to purchase
supplies, material, equipment, and services. Each of the parties hereby agrees to extend to
the other party the right to purchase pursuant to such bids and contracts to the extent
permitted by law, and to the extent agreed upon between each party and the bidder,
contractor, vendor, supplier, or service provider.
3. Each of the parties shall comply with all applicable laws and regulations governing its own
purchases.
4. Each of the parties shall contract directly with the bidder, contractor, vendor, supplier, or
service provider, and pay directly in accordance with its own payment procedures for its
own purchases. Each party will indemnify and hold the other party harmless as to any claim
arising out of its participation in this Agreement.
5. Any purchase made pursuant to this Agreement is not a purchase from either of the parties.
This Agreement shall create no obligation to either of the parties to purchase any particular
good or service, nor create to either of the parties any assurance, warranty, or other
obligation from the other party with respect to purchasing or supplying any good or service.
6. No separate legal or administrative entity is intended to be created pursuant to this
Agreement. No obligation, except as stated herein, shall be created between the parties or
between the parties and any applicable bidder or contractor.
7. The Maintenance Buyer of the City of Renton and the Purchasing Manager of the City of
Everett shall be representatives of the entities for carrying out the terms of this Agreement.
8. This Agreement shall continue in force until canceled by either party, which cancellation
may be effected upon receipt by one of the parties of the written notice of cancellation of the
other party.
INTERGOVERNMENTAL COOPERATIVE PURCHASING AGREEMENT (Cont.)
APPROVED this
CITY OF RENTON
BY:
Name:
Title:
_day of
20
Subscribed and sworn to me this
day of , 20
Notary Public in and for the State of
Washington, residing at
My commission expires
APPROVED AS TO FORM:
APPROVED this
CITY OF EVERETT
Frank E. Anderson
Mayor
_day of
20
Subscribed and sworn to me this
day of , 20
Notary Public in and for the State of
Washington, residing at
My commission expires
APPROVED AS TO FORM:
Name: Mark Some
Title: City Attorney
ATTEST:
ATTEST:
Name: Sharon Marks
Title: City Clerk
CITY OF RENTON COUNCIL AGENDA BILL
AI #.
Submitting Data: Planning/Building/Public Works
For Agenda of:
Dept/Div/Board.. Transportation Division
June 23, 2003
Agenda Status
Staff Contact...... Ryan Zulauf
X-7471
Consent ............. X
Public Hearing..
Subject:
Approval and Acceptance of FAA Airport
Correspondence..
Improvement
Ordinance .............
Program Grant for 2003 Paving, Lighting and Signage
Resolution............ X
Project
Old Business........
New Business.......
Study Sessions......
Exhibits: Issue Paper
FAA Airport Improvement Program Grant
Resolution (Forthcoming)
Information.........
Recommended Action:
Council Concur
Approvals:
Legal Dept.........
Finance Dept......
Other ...............
X
Fiscal Impact:
Expenditure Required... $3,275,000 Transfer/Amendment.......
Amount Budgeted....... $3,275,000 Revenue Generated......... $2,240,385
Total Project Budget $3,275,000 City Share Total Project.. $ 248,932
SUMMARY OF ACTION:
The Federal Aviation Administration has designated a $2,240,385 Airport Improvement
Program grant to the Renton Airport for making improvements to the runway and taxiway
pavement, lighting and signage. The project is primarily to perform pavement overlay, but
includes drainage, lighting and sign removal and installation within the overlay area.
STAFF RECOMMENDATION:
The Transportation Division staff recommends that Council authorize the Mayor and City Clerk
execute the Federal Aviation Administration Airport Improvement Program Grant application,
related documents, and approve the Resolution accepting the Federal Aviation Administration
grant funding.
DIV:Transp:Airport: RZ: ps
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
MEMORANDUM
DATE: June 13, 2003
TO: Kathy Keolker-Wheeler, Council President
Members of the City Council
VIA:, Mayor Tanner
FROM: Gregg Zimmerman`, Administrator
STAFF CONTACT: Ryan Zulauf, X-7471
SUBJECT: Approval and Acceptance of FAA Improvement Grant for 2003
Taxiway Paving, Lighting and Signage Project
ISSUE:
A maintenance project funded by the Federal Aviation Administration (FAA) is scheduled for
Construction in the summer of 2003. The project involves taxiway improvements to the
Renton Municipal Airport. The project is primarily for a pavement overlay, but is to include
drainage, lighting and signage removal and installation within the overlay area. Acceptance
of an FAA grant in the amount of $2,240,385 is necessary to help fund the project.
RECOMMENDATION:
The Transportation Division staff recommends that Council authorize the Mayor and City
Clerk execute the Federal Aviation Administration Airport Improvement Program Grant
application, related documents, and approve the resolution accepting the Federal Aviation
Administration grant funding.
BACKGROUND:
The Federal Aviation Administration has designated a $2,240,385 Airport Improvement
Program grant to the Renton Airport for making improvements to the runway and taxiway
pavement, lighting and signage. The project is primarily to perform pavement overlay, but
includes drainage, lighting and sign removal and installation within the overlay area.
Acceptance of a federal grant from the FAA is necessary to fund ninety percent of the
construction costs for Schedules A and B, project design, project management and
miscellaneous costs.
cc: Leslie Lahndt
Ryan Plut
Sam Star
Susan Campbell
OMB ADaroval No. 0348-0043
APPLICATION FOR
2. DATE SUBMITTED
Applicantldentifier
June 11, 2003
FEDERAL ASSISTANCE
J TYPE OF
'SUBMI',S`SION
3. DATE RECEIVED BY STATE
State Application Identifier
Prea
Application Pplication
s
�C4,tls(i�lCtoh .4.... ❑ Construction
4. DATE RECEIVED BY FEDERAL AGENCY
Federal Identifier
❑ Non -Construction ❑ Non -Construction
3-53-0055-13
5. APPLICANT INFORMATION
Legal Name:
Organizational Unit
City of Renton
Renton Municipal Airport
Address (give city, county, state, and zip code)
Name and telephone number of the person to be contracted on matters involving
Renton City Hall
this application (give area code)
1055 South Grady Way
Ryan C. Zulauf
Renton, WA 98055
616 West Perimeter Road 425430-7471
Renton, WA 98055-1348
EMPLOYER IDENTIFICATION NUMBER (EIN):
7. TYPE OF APPLICANT: (enter appropriate letter in box) C
_ 11 G 3 a 11 1] �
A. State H. Interdependent School District
B. County 1. State Controlled Institution of Higher Learning
C. Municipal J. Private University
D. Township K. Indian Tribe
E. Interstate L. Individual
8, TYPE OF APPLICATION:
®F.
New ❑ Continuation ❑ Revision
Intermunicipal M. Profit Organization
G. Special District N. Other (Specify)
If Revision, enter appropriate letters) in box(es): ❑ ❑
A Increase Award B Decrease Award C Increase Duration
D Decrease Duration Other (specify)
9. NAME OF FEDERAL AGENCY
Federal Aviation Administration
10. CATALOG OF FEDERAL DOMESTIC
11. DESCRIPTIVE TITLE OF APPLICANTS PROJECT:
ASSISTANCE NUMBER a 1�1
p
a n
The project consists of an asphalt overlay on parallel
TITLE: Airport Improvement t� �� •
Taxiway A, Taxiway H and Taxiway G. Taxiway E will be
Program AIP
reconstructed. Airport lighting and signing for the runway
and west of the runway, with the exception of the distance -
12. AREAS AFFECTED BY PROJECT (cities, counties, states, eta):
City of Renton
King County, Washington
to -go signs, will be removed and replaced with new systems.
State of Washington
13. PROPOSED PROJECT
14. CONGRESSIONAL DISTRICTS OF
Start Date
Ending Date
a. Applicant
b. Project
7/1/03
12/31/03
Seventh (7ei)
Seventh (7th)
15. ESTIMATED FUNDING
16. IS APPLICATION SUBJECT TO REVIEW BY STATE EXECUTIVE ORDER 12372 PROCESS
a. YES, THIS PREAPPLICATIOWAPPLICATION WAS MADE AVAILABLE TO THE
a. Federal
$ 2,240,385
STATE EXECUTIVE ORDER 12372 PROCESS FOR REVIEW ON
DATE:
b. NO ® PROGRAM IS NOT COVERED BY E. O. 12372
❑ OR PROGRAM HAS NOT BEEN SELECTED BY STATE FOR REVIEW
b. Applicant
$ 248,932
c State
$
d. Local
b
e.Other
$
f. Program income
$
17. IS THE APPLICANT DELINQUENT ON ANY FEDERAL DEBT?
❑ Yes If yes, attach an explanation ® No
g. TOTAL
$ 2,489,317
18. TO THE BEST OF MY KNOWLEDGE AND BELIEF, ALL DATA IN THIS APPLICATION ARE TRUE AND CORRECT, THE DOCUMENT HAS BEEN DULY
AUTHORIZED BY THE GOVERNING BODY OF THE APPLICANT AND THE APPLICANT WILL COMPLY WITH THE ATTACHED ASSURANCES IF THE ASSISTANCE IS
AWARDED
a. Typed Name of Authorized Representati!7TMayor
Title
c. Telephone number
Jesse Tanner
425-43M500
d. Signature of Authorized Representative
e. Date Signed
Nrevious taiuons Not usaDle Standard Form 424 (REV 4-88)
Authorized for Local Reproduction Prescribed by OMB Circular A-1 02
U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION OMB NO. 80-RO184
PART II
PROJECT APPROVAL
INFORMATION
SECTION A
Item 1
Does this assistance request require State, local,
Name of Governing Body
regional, or other priority rating?
Priority
❑Yes ®No
Item 2.
Does this assistance request require State, local
Name of Agency or Board
advisory, educational or health clearances?
(Attach Documentation)
❑Yes ®No
Item 3
Does this assistance request require clearinghouse review
(Attach Comments)
in accordance with OMB Circular A-95?
.❑Yes ®No
Item 4
Does this assistance request require State, local,
Name of Approving Agency
regional or other planning approval?
Date
❑Yes ®No
Item 5.
Check One: State ❑
Is the proposed project covered by an approved
Local
Regional ❑
comprehensive plan?
®Yes [:]No
Location of plan Airport Master Plan
Item 6.
Will the assistance requested serve a Federal
Name of Federal Installation
installation?
Federal Population benefiting from Project
❑Yes ®No
Item 7
Will the assistance requested be on Federal land
Name of Federal Installation
or installation?
❑Yes ®No
Location of Federal Land
Percent of Project
Item 8
Will the assistance requested have an impact or effect
on the environment?
❑Yes ®No
Item 9.
Number of:
Will the assistance requested cause the displacement of
Individuals
Families
individuals, families, businesses, or farms?
Businesses
❑Yes ®No
Farms
Item 10.
Is there other related Federal assistance on this
project previous, pending, or anticipated?
❑Yes ®NO
FAA Forth 5100-100 (6-73) SUPERSEDES FAA FORM 5100-10 PAGES 1 TNRU 7
Page 2
U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION OMB NO.80-RO184
PART II — SECTION C
The Sponsor hereby represents and certifies as follows:
1. Compatible Land Use. — The Sponsor has taken the following actions to assure compatible usage of land
adjacent to or in the vicinity of the airport
Compatible land use regulations through adoption of airport related height and use restricitions. Section 4-3-020 of the
City of Renton Development Standards, Title IV, Renton Municipal Code. These regulations address FAR Part 77
Surfaces.
2. Defaults. — The Sponsor is not in default on any obligation to the United States or any agency of the United
States Government relative to the development, operation, or maintenance of any airport, except as stated
herewith:
The Sponsor is not in default on any obligation.
3. Possible Disabilities. — There are no facts or circumstances (including the existence of effective or
proposed leases, use agreements or other legal instruments affecting use of the Airport or the existence of
pending litigation or other legal proceedings) which in reasonable probability might make it impossible for the
Sponsor to carry out and complete the Project or carry out the provisions of Part V of this Application, either by
limiting its legal or financial ability or otherwise, except as follows:
Not applicable
4. Land. — (a) The sponsor holds the following property interest in the following areas of land* which are to be
developed or used as part of or in connection with the Airport subject to the following exceptions,
encumbrances, and adverse interests, all of which areas are identified on the aforementioned property map
designated as Exhibit "A":
No exceptions. Not Applicable
*State character of property interest in each area and list and identify for each all exceptions, encumbrances,
and adverse interests of every kind and nature, including liens, easements, leases, etc. The separate areas
of land need only be identified here by the area numbers shown on the property map.
FAA Form 5100-100 (4-76) Page 3a
FAA AC 81-06913
U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION OAS NO. W-R0184
PART II — SECTION C (Continued)
The Sponsor further certifies that the above is based on a title examination by a qualified attorney or title company and that such
attorney or title company has determined that the Sponsor holds the above property interests.
(a)The Sponsor will acquire within a reasonable time, but in any event prior to the start of any
construction work under the Project, the following property interest in the following areas of land* on which
such construction work is to be performed, all of which areas are identified on the aforementioned property
map designated as Exhibit "A":
No land acquisition is needed as a part of this project.
(c) The Sponsor will acquire within a. reasonable time, and if feasible prior to the completion of all
construction work under the Project, the following property interest in the following areas of land* which are to
be developed or used as part of or in connection with the Airport as it will be upon completion of the Project, all
of which areas are identified on the aforementioned property map designated as Exhibit "A":
No land acquisition is needed as a part of this project.
5. Exclusive Rights. — There is no grant of an exclusive right for the conduct of any aeronautical activity
at any airport owned or controlled by the Sponsor except as follows:
There is no grant of exclusive right for the conduct of any aeronautical activity at Renton Municipal Airport.
"State character of property interest in each area and list and identify for each all exceptions, encumbrances,
and adverse interests of every kind and nature, including liens, easements, leases, etc. The separate areas
of land need only be identified here by the area numbers shown on the property map.
FAA Form 5100-100 (4-76) Page 3b
FAA AC 81-06913
U.S. DEPARTMENT OF TRANSPORTAnnu
11Tf1�1
PART III— BUDGET INFORMATION - CONSTRUCTION
SECTION A - GENERAL
1. Federal Domestic Assistance Catalog No ....................
2. Functional or Other Breakout ..............................
SECTION B - CALCULATION OF FEDERAL GRANT
Cost Classification
Use only for revisions
Total
Amount
Required
Latest Approved
Amount
Adjustment
+ or 0
1. Administration Expense
$
$
$ 3,500
2. Preliminary Expense
3. Land, structures, right-of-way
4. Architectural engineering basic fees
218,792
5. Other architectural engineering fees
6. Project inspection fees
145,009
7. Land development
8. Relocation Expenses
9. Relocation payments to individuals and businesses
10. Demolition and removal
11. Construction and project improvement
2,122,016
12. Equipment
13. Miscellaneous
14. Total (Lines 1 through 13)
2,489,317
15. Estimated Income (if applicable)
16. Net Project Amount (Line 14 minus 15)
2,489,317
17. Less: Ineligible Exclusions
18. Add: Contingencies
19. Total Project Amt. (Excluding Rehabilitation Grants)
2,489,317
20. Federal Share requested of Line 19
2,240,385
21. Add Rehabilitation Grants Requested (100 percent)
22. Total Federal grant requested (Lines 20 & 21)
2,240,385
23. Grantee share
248,932
24. Other shares
25. Total project (Lines 22, 23, & 24)
2,489,317
FAA Form 5100-100 (6-73) SUPERSEDES FAA FORM 5100-10 PAGES 1 THRU 7 Page 4
DEPARTMENT OF
26
e.
SECTION C - EXCLUSIONS
Classification I Ineligible for
OMB NO.80-RO184
Excluded from
Contingency Provision
g. Totals
SECTION D - PROPOSED METHOD OF FINANCING NON-FEDERAL SHARE
27. Grantee Share I $ 248,932
a. 5ecumes
b. Mortgages
c. Appropriations (By Applicant)
d. Bonds
e. Tax Levies
L Non Cash
248,932
g .Other (Explain)
h .TOTAL — Grantee share
248,932
28. Other Shares
a. State
b. Other
c. Total Other Shares
29. TOTAL
$ 248,932
SECTION E - REMARKS
I PART IV PROGRAM NARRATIVE (Attach - See Instructions)
FAA Form 5100-100 (6-73) SUPERSEDES FAA FORM 5100-10 PAGES 1 THRU 7 FAA AC 75-023 PAGE
PART IV
PROGRAM NARRATIVE
PROJECT: West Side Improvements and Runway Lighting and Signing
AIRPORT: Renton Municipal Airport
1. Objective:
This project will address existing pavement, lighting and signing at the airport that are in need of repair
and replacement.
2. Benefits Anticipated:
This project will bring the existing lighting and signing up to standard and repair deteriorating
pavements. The improvements will increase safety for the airport users.
3. Approach:
Execute the portion of the project that can be funded as designed and bid for the improvements.
4. Geographic Location:
The physical location of the project is in the City of Renton, Washington at the Renton Municipal Airport.
5. Justification for Force Account Work: (if applicable)
Not applicable.
6: Sponsor's Representative: (incl. address & tel. no.)
Ryan C. Zulauf
616 West Perimeter Road
Renton, WA 90855-1348
Telephone 425-430-7471
Fax 425-430-7472
e-mail rzulauf@ci.renton.wa.us
CIP/PREAPPLICATION DATA SHEET
AIRPORT: Renton Municipal Airport LOCAL PRIORITY: UPDATED: 5/2003
WORK ITEM: West Side Improvements and Runway Lighting & Signing
SKETCH:
SPONSOR SIGNATURE:
COST ESTIMATE: 2,489,317 7 Item
ADMINISTRATION:
ENGINEERING:
INSPECTION:
DATE:(,IJlz-k-3
ion, Paving, etc.)
$ 3,500
1 Construction
$ 2,122,016
4:
$
$ 218,792
2
$
5:
$
$ 145,009
3:
$
TOTAL:
$ 2,489,317
ADO USE:
PREAPP GRANT
NO: NO:
ADO- Form Ala Page 5
NPIAS WORK FAA
CODE: CODE: PRIOR: FED $
ASSURANCES
Airport Sponsors
A. General.
1. These assurances shall be complied with in the performance of grant agreements for airport
development, airport planning, and noise compatibility program grants for airport sponsors.
2. These assurances are required to be submitted as part of the project application by
sponsors requesting funds under the provisions of Title 49, U.S.C., subtitle VII, as amended.
As used herein, the term "public agency sponsor" means a public agency with control of a
public -use airport; the term "private sponsor" means a private owner of a public -use airport;
and the term "sponsor" includes both public agency sponsors and private sponsors.
3. Upon acceptance of the grant offer by the sponsor, these assurances are incorporated in and
become part of the grant agreement.
B. Duration and Applicability.
Airport development or Noise Compatibility Program Projects Undertaken by a Public
Agency Sponsor. The terms, conditions and assurances of the grant agreement shall
remain in full force and effect throughout the useful life of the facilities developed or
equipment acquired for an airport development or noise compatibility program project, or
throughout the useful life of the project items installed within a facility under a noise
compatibility program project, but in any event not to exceed twenty (20) years from the
date of acceptance of a grant offer of Federal funds for the project. However, there shall be
no limit on the duration of the assurances regarding Exclusive Rights and Airport Revenue
so long as the airport is used as an airport. There shall be no limit on the duration of the
terms, conditions, and assurances with respect to real property acquired with federal funds.
Furthermore, the duration of the Civil Rights assurance shall be specified in the assurances.
2. Airport Development or Noise Compatibility Projects Undertaken by a Private
Sponsor. The preceding paragraph 1 also applies to a private sponsor except that the
useful life of project items installed within a facility or the useful life of the facilities
developed or equipment acquired under an airport development or noise compatibility
program project shall be no less than ten (10) years from the date of acceptance of Federal
aid for the project.
Airport Planning Undertaken by a Sponsor. Unless otherwise specified in the grant
agreement, only Assurances 1, 2, 3, 5, 6, 13, 18, 30, 32, 33, and 34 in section C apply to
planning projects. The terms, conditions, and assurances of the grant agreement shall
remain in full force and effect during the life of the project.
C. Sponsor Certification. The sponsor hereby assures and certifies, with respect to this grant that:
General Federal Requirements. It will comply with all applicable Federal laws,
regulations, executive orders, policies, guidelines, and requirements as they relate to the
application, acceptance and use of Federal funds for this project including but not limited to
the following:
Federal Legislation
a. Title 49, U.S.C., subtitle VII, as amended.
b. Davis -Bacon Act - 40 U.S.C. 276(a), et seq.'
C. Federal Fair Labor Standards Act - 29 U.S.C. 201, et seq.
Airport Assurances (9/99) 1
Appendix 1
Appendix 1
d. Hatch Act - 5 U.S.C. 1501, et seq.2
e. Uniform Relocation Assistance and Real Property Acquisition Policies Act
of 1970 Title 42 U.S.C. 4601, et seq.' 2
f. National Historic Preservation Act of 1966 - Section 106 - 16 U.S.C.
470(f).'
g. Archeological and Historic Preservation Act of 1974 - 16 U.S.C. 469
through 469c.'
h. Native Americans Grave Repatriation Act - 25 U.S.C. Section 3001, et seq.
i. Clean Air Act, P.L. 90-148, as amended.
j. Coastal Zone Management Act, P.L. 93-205, as amended.
k. Flood Disaster Protection Act of 1973 - Section 102(a) - 42 U.S.C. 4012a.'
I. Title 49 ,U.S.C., Section 303, (formerly known as Section 4(f))
M. Rehabilitation Act of 1973 - 29 U.S.C. 794.
n. Civil Rights Act of 1964 - Title VI - 42 U.S.C. 2000d through d-4.
o. Age Discrimination Act of 1975 - 42 U.S.C. 6101, et seq.
P. American Indian Religious Freedom Act, P.L. 95-341, as amended.
q. Architectural Barriers Act of 1968 -42 U.S.C. 4151, et seq.'
r. Power plant and Industrial Fuel Use Act of 1978 - Section 403- 2 U.S.C.
8373.'
S. Contract Work Hours and Safety Standards Act - 40 U.S.C. 327, et seq.'
t. Copeland Antikickback Act - 18 U.S.C. 874.'
U. National Environmental Policy Act of 1969 - 42 U.S.C. 4321, et seq.'
V. Wild and Scenic Rivers Act, P.L. 90-542, as amended.
W. Single Audit Act of 1984 - 31 U.S.C. 7501, et seg.2
X. Drug -Free Workplace Act of 1988 - 41 U.S.C. 702 through 706.
Executive Orders
Executive Order 11246 - Equal Employment Opportunity'
Executive Order 11990 - Protection of Wetlands
Executive Order 11998 — Flood Plain Management
Executive Order 12372 - Intergovernmental Review of Federal Programs.
Executive Order 12699 - Seismic Safety of Federal and Federally Assisted New
Building Construction'
Executive Order 12898 - Environmental Justice
Federal Regulations
a. 14 CFR Part 13 - Investigative and Enforcement Procedures.
b. 14 CFR Part 16 - Rules of Practice For Federally Assisted Airport
Enforcement Proceedings.
C. 14 CFR Part 150 - Airport noise compatibility planning.
d. 29 CFR Part 1 - Procedures for predetermination of wage rates.'
e. 29 CFR Part 3 - Contractors and subcontractors on public building or public
work financed in whole or part by loans or grants from the United States.'
f. 29 CFR Part 5 - Labor standards provisions applicable to contracts
covering federally financed and assisted construction (also labor standards
provisions applicable to non -construction contracts subject to the Contract
Work Hours and Safety Standards Act).'
g. 41 CFR Part 60 - Office of Federal Contract Compliance Programs, Equal
Employment Opportunity, Department of Labor (Federal and federally
assisted contracting requirements).'
h. 49 CFR Part 18 - Uniform administrative requirements for grants and
cooperative agreements to state and local governments.3
Airport Assurances (9/99) 2
Appendix 1
i. 49 CFR Part 20 - New restrictions on lobbying.
j. 49 CFR Part 21 - Nondiscrimination in federally -assisted programs of the
Department of Transportation - effectuation of Title VI of the Civil Rights Act
of 1964.
k. 49 CFR Part 23 - Participation by Disadvantage Business Enterprise in
Airport Concessions.
I. 49 CFR Part 24 - Uniform relocation assistance and real property
acquisition for Federal and federally assisted programs.' 2
M. 49 CFR Part 26 — Participation By Disadvantaged Business Enterprises in
Department of Transportation Programs.
M. 49 CFR Part 27 - Nondiscrimination on the basis of handicap in programs
and activities receiving or benefiting from Federal financial assistance.)
n. 49 CFR Part 27 - Nondiscrimination on the basis of handicap in programs
and activities receiving or benefiting from Federal financial assistance.'
o. 49 CFR Part 29 — Government wide debarment and suspension (non -
procurement) and government wide requirements for drug -free workplace
(grants).
p. 49 CFR Part 30 - Denial of public works contracts to suppliers of goods and
services of countries that deny procurement market access to U.S.
contractors.
q. 49 CFR Part 41 - Seismic safety of Federal and federally assisted or
regulated new building construction.'
Office of Management and Budget Circulars
a. A-87 — Cost Principles Applicable to Grants and Contracts with State and
Local Governments.
b. A-133 - Audits of States, Local Governments, and Non -Profit
Organizations
' These laws do not apply to airport planning sponsors.
2 These laws do not apply to private sponsors.
3 49 CFR Part 18 and OMB Circular A-87 contain requirements for State and Local
Governments receiving Federal assistance. Any requirement levied upon State
and Local Governments by this regulation and circular shall also be applicable to
private sponsors receiving Federal assistance under Title 49, United States Code.
Specific assurances required to be included in grant agreements by any of the above laws,
regulations or circulars are incorporated by reference in the grant agreement.
2. Responsibility and Authority of the Sponsor.
a. Public Agency Sponsor: It has legal authority to apply for the grant, and
to finance and carry out the proposed project; that a resolution, motion or
similar action has been duly adopted or passed as an official act of the
applicant's governing body authorizing the filing of the application, including
all understandings and assurances contained therein, and directing and
authorizing the person identified as the official representative of the
applicant to act in connection with the application and to provide such
additional information as may be required.
b. Private Sponsor: It has legal authority to apply for the grant and to finance
and carry out the proposed project and comply with all terms, conditions,
and assurances of this grant agreement. It shall designate an official
representative and shall in writing direct and authorize that person to file
this application, including all understandings and assurances contained
therein; to act in connection with this application; and to provide such
additional information as may be required.
Airport Assurances (9/99) 3
3. Sponsor Fund Availability. It has sufficient funds available for that portion of the project Appendix 1
costs which are not to be paid by the United States. It has sufficient funds available to
assure operation and maintenance of items funded under the grant agreement which it will
own or control.
4. Good Title.
a. It, a public agency or the Federal government, holds good title, satisfactory
to the Secretary, to the landing area of the airport or site thereof, or will give
assurance satisfactory to the Secretary that good title will be acquired.
b. For noise compatibility program projects to be carried out on the property of
the sponsor, it holds good title satisfactory to the Secretary to that portion of
the property upon which Federal funds will be expended or will give
assurance to the Secretary that good title will be obtained.
5. Preserving Rights and Powers.
a. It will not take or permit any action which would operate to deprive it of any
of the rights and powers necessary to perform any or all of the terms,
conditions, and assurances in the grant agreement without the written
approval of the Secretary, and will act promptly to acquire, extinguish or
modify any outstanding rights or claims of right of others which would
interfere with such performance by the sponsor. This shall be done in a
manner acceptable to the Secretary.
b. It will not sell, lease, encumber, or otherwise transfer or dispose of any part
of its title or other interests in the property shown on Exhibit A to this
application or, for a noise compatibility program project, that portion of the
property upon which Federal funds have been expended, for the duration of
the terms, conditions, and assurances in the grant agreement without
approval by the Secretary. If the transferee is found by the Secretary to be
eligible under Title 49, United States Code, to assume the obligations of the
grant agreement and to have the power, authority, and financial resources
to carry out all such obligations, the sponsor shall insert in the contract or
document transferring or disposing of the sponsor's interest, and make
binding upon the transferee all of the terms, conditions, and assurances
contained in this grant agreement.
C. For all noise compatibility program projects which are to be carried out by
another unit of local government or are on property owned by a unit of local
government other than the sponsor, it will enter into an agreement with that
government. Except as otherwise specified by the Secretary, that
agreement shall obligate that government to the same terms, conditions,
and assurances that would be applicable to it if it applied directly to the FAA
for a grant to undertake the noise compatibility program project. That
agreement and changes thereto must be satisfactory to the Secretary. It
will take steps to enforce this agreement against the local government if
there is substantial non-compliance with the terms of the agreement.
d. For noise compatibility program projects to be carried out on privately
owned property, it will enter into an agreement with the owner of that
property which includes provisions specified by the Secretary. It will take
steps to enforce this agreement against the property owner whenever there
is substantial non-compliance with the terms of the agreement.
Airport Assurances (9/99) 4
Appendix 1
If the sponsor is a private sponsor, it will take steps satisfactory to the
Secretary to ensure that the airport will continue to function as a public -use
airport in accordance with these assurances for the duration of these
assurances.
If an arrangement is made for management and operation of the airport by
any agency or person other than the sponsor or an employee of the
sponsor, the sponsor will reserve sufficient rights and authority to insure
that the airport will be operated and maintained in accordance Title 49,
United States Code, the regulations and the terms, conditions and
assurances in the grant agreement and shall insure that such arrangement
also requires compliance therewith.
6. Consistency with Local Plans. The project is reasonably consistent with plans (existing at
the time of submission of this application) of public agencies that are authorized by the
State in which the project is located to plan for the development of the area surrounding the
airport.
7. Consideration of Local Interest. It has given fair consideration to the interest of
communities in or near where the project may be located.
8. Consultation with Users. In making a decision to undertake any airport development
project under Title 49, United States Code, it has undertaken reasonable consultations with
affected parties using the airport at which project is proposed.
9. Public Hearings. In projects involving the location of an airport, an airport runway, or a
major runway extension, it has afforded the opportunity for public hearings for the purpose
of considering the economic, social, and environmental effects of the airport or runway
location and its consistency with goals and objectives of such planning as has been carried
out by the community and it shall, when requested by the Secretary, submit a copy of the
transcript of such hearings to the Secretary. Further, for such projects, it has on its
management board either voting representation from the communities where the project is
located or has advised the communities that they have the right to petition the Secretary
concerning a proposed project.
10. Air and Water Quality Standards. In projects involving airport location, a major runway
extension, or runway location it will provide for the Governor of the state in which the project
is located to certify in writing to the Secretary that the project will be located, designed,
constructed, and operated so as to comply with applicable air and water quality standards.
In any case where such standards have not been approved and where applicable air and
water quality standards have been promulgated by the Administrator of the Environmental
Protection Agency, certification shall be obtained from such Administrator. Notice of
certification or refusal to certify shall be provided within sixty days after the project
application has been received by the Secretary.
11. Pavement Preventive Maintenance. With respect to a project approved after January 1,
1995, for the replacement or reconstruction of pavement at the airport, it assures or certifies
that it has implemented an effective airport pavement maintenance -management program
and it assures that it will use such program for the useful life of any pavement constructed,
reconstructed or repaired with Federal financial assistance at the airport. It will provide such
reports on pavement condition and pavement management programs as the Secretary
determines may be useful.
12. Terminal Development Prerequisites. For projects which include terminal development at
a public use airport, as defined in Title 49, it has, on the date of submittal of the project
Airport Assurances (9/99) 5
grant application, all the safety equipment required for certification of such airport under Appendix 1
section 44706 of Title 49, United States Code, and all the security equipment required by
rule or regulation, and has provided for access to the passenger enplaning and deplaning
area of such airport to passengers enplaning and deplaning from aircraft other than air
carrier aircraft.
13. Accounting System, Audit, and Recordkeeping Requirements.
a. It shall keep all project accounts and records which fully disclose the
amount and disposition by the recipient of the proceeds of the grant, the
total cost of the project in connection with which the grant is given or used,
and the amount or nature of that portion of the cost of the project supplied
by other sources, and such other financial records pertinent to the project.
The accounts and records shall be kept in accordance with an accounting
system that will facilitate an effective audit in accordance with the Single
Audit Act of 1984.
It shall make available to the Secretary and the Comptroller General of the
United States, or any of their duly authorized representatives, for the
purpose of audit and examination, any books, documents, papers, and
records of the recipient that are pertinent to the grant. The Secretary may
require that an appropriate audit be conducted by a recipient. In any case
in which an independent audit is made of the accounts of a sponsor relating
to the disposition of the proceeds of a grant or relating to the project in
connection with which the grant was given or used, it shall file a certified
copy of such audit with the Comptroller General of the United States not
later than six (6) months following the close of the fiscal year for which the
audit was made.
14. Minimum Wage Rates. It shall include, in all contracts in excess of $2,000 for work on any
projects funded under the grant agreement which involve labor, provisions establishing
minimum rates of wages, to be predetermined by the Secretary of Labor, in accordance with
the Davis -Bacon Act, as amended (40 U.S.C. 276a-276a-5), which contractors shall pay to
skilled and unskilled labor, and such minimum rates shall be stated in the invitation for bids
and shall be included in proposals or bids for the work.
15. Veteran's Preference. It shall include in all contracts for work on any project funded under
the grant agreement which involve labor, such provisions as are necessary to insure that, in
the employment of labor (except in executive, administrative, and supervisory positions),
preference shall be given to Veterans of the Vietnam era and disabled veterans as defined
in Section 47112 of Title 49, United States Code. However, this preference shall apply only
where the individuals are available and qualified to perform the work to which the
employment relates.
16. Conformity to Plans and Specifications. It will execute the project subject to plans,
specifications, and schedules approved by the Secretary. Such plans, specifications, and
schedules shall be submitted to the Secretary prior to commencement of site preparation,
construction, or other performance under this grant agreement, and, upon approval of the
Secretary, shall be incorporated into this grant agreement. Any modification to the
approved plans, specifications, and schedules shall also be subject to approval of the
Secretary, and incorporated into the grant agreement.
17. Construction Inspection and Approval. It will provide and maintain competent technical
supervision at the construction site throughout the project to assure that the work conforms
to the plans, specifications, and schedules approved by the Secretary for the project. It
shall subject the construction work on any project contained in an approved project
application to inspection and approval by the Secretary and such work shall be in
Airport Assurances(9199) 6
Appendix 1
accordance with regulations and procedures prescribed by the Secretary. Such regulations
and procedures shall require such cost and progress reporting by the sponsor or sponsors
of such project as the Secretary shall deem necessary.
18. Planning Projects. In carrying out planning projects:
a. It will execute the project in accordance with the approved program
narrative contained in the project application or with the modifications
similarly approved.
b. It will furnish the Secretary with such periodic reports as required pertaining
to the planning project and planning work activities.
C. It will include in all published material prepared in connection with the
planning project a notice that the material was prepared under a grant
provided by the United States.
d. It will make such material available for examination by the public, and
agrees that no material prepared with funds under this project shall be
subject to copyright in the United States or any other country.
e. It will give the Secretary unrestricted authority to publish, disclose,
distribute, and otherwise use any of the material prepared in connection
with this grant.
f. It will grant the Secretary the right to disapprove the sponsor's employment
of specific consultants and their subcontractors to do all or any part of this
project as well as the right to disapprove the proposed scope and cost of
professional services.
g. It will grant the Secretary the right to disapprove the use of the sponsor's
employees to do all or any part of the project.
h. It understands and agrees that the Secretary's approval of this project grant
or the Secretary's approval of any planning material developed as part of
this grant does not constitute or imply any assurance or commitment on the
part of the Secretary to approve any pending or future application for a
Federal airport grant.
19. Operation and Maintenance.
The airport and all facilities which are necessary to serve the aeronautical
users of the airport, other than facilities owned or controlled by the United
States, shall be operated at all times in a safe and serviceable condition
and in accordance with the minimum standards as may be required or
prescribed by applicable Federal, state and local agencies for maintenance
and operation. It will not cause or permit any activity or action thereon
which would interfere with its use for airport purposes. It will suitably
operate and maintain the airport and all facilities thereon or connected
therewith, with due regard to climatic and flood conditions. Any proposal to
temporarily close the airport for non -aeronautical purposes must first be
approved by the Secretary.
In furtherance of this assurance, the sponsor will have in effect
arrangements for-
(1) Operating the airport's aeronautical facilities whenever
required;
(2) Promptly marking and lighting hazards resulting from airport
conditions, including temporary conditions; and
Airport Assurances (9/99) 7
• (3) Promptly notifying airmen of any condition affecting Appendix 1
aeronautical use of the airport.
Nothing contained herein shall be construed to require that the airport be
operated for aeronautical use during temporary periods when snow, flood
or other climatic conditions interfere with such operation and maintenance.
Further, nothing herein shall be construed as requiring the maintenance,
repair, restoration, or replacement of any structure or facility which is
substantially damaged or destroyed due to an act of God or other condition
or circumstance beyond the control of the sponsor.
b. It will suitably operate and maintain noise compatibility program items that it
owns or controls upon which Federal funds have been expended.
20. Hazard Removal and Mitigation. It will take appropriate action to assure that such
terminal airspace as is required to protect instrument and visual operations to the airport .
(including established minimum flight altitudes) will be adequately cleared and protected by
removing, lowering, relocating, marking, or lighting or otherwise mitigating existing airport
hazards and by preventing the establishment or creation of future airport hazards.
21. Compatible Land Use. It will take appropriate action, to the extent reasonable, including
the adoption of zoning laws, to restrict the use of land adjacent to or in the immediate
vicinity of the airport to activities and purposes compatible with normal airport operations,
including landing and takeoff of aircraft. In addition, if the project is for noise compatibility
program implementation, it will not cause or permit any change in land use, within its
jurisdiction, that will reduce its compatibility, with respect to the airport, of the noise
compatibility program measures upon which Federal funds have been expended.
22. Economic Nondiscrimination.
a. It will make the airport available as an airport for public use on reasonable
terms and without unjust discrimination to all types, kinds and classes of
aeronautical activities, including commercial aeronautical activities offering
services to the public at the airport.
b. In any agreement, contract, lease, or other arrangement under which a right
or privilege at the airport is granted to any person, firm, or corporation to
conduct or to engage in any aeronautical activity for furnishing services to
the public at the airport, the sponsor will insert and enforce provisions
requiring the contractor to-
e) furnish said services on a reasonable, and not unjustly discriminatory,
basis to all users thereof, and
(2) charge reasonable, and not unjustly discriminatory, prices for each unit
or service, provided that the contractor may be allowed to make reasonable
and nondiscriminatory discounts, rebates, or other similar types of price
reductions to volume purchasers.
C. Each fixed -based operator at the airport shall be subject to the same rates,
fees, rentals, and other charges as are uniformly applicable to all other
fixed -based operators making the same or similar uses of such airport and
utilizing the same or similar facilities.
d. Each air carrier using such airport shall have the right to service itself or to
use any fixed -based operator that is authorized or permitted by the airport
to serve any air carrier at such airport.
e. Each air carrier using such airport (whether as a tenant, nontenant, or
subtenant of another air carrier tenant) shall be subject to such
nondiscriminatory and substantially comparable rules, regulations,
Airport Assurances (9/99) $
Appendix 1
conditions, rates, fees, rentals, and other charges with respect to facilities
directly and substantially related to providing air transportation as are
applicable to all such air carriers which make similar use of such airport and
utilize similar facilities, subject to reasonable classifications such as tenants
or nontenants and signatory carriers and nonsignatory carriers.
Classification or status as tenant or signatory shall not be unreasonably
withheld by any airport provided an air carrier assumes obligations
substantially similar to those already imposed on air carriers in such
classification or status.
f. It will not exercise or grant any right or privilege which operates to prevent
any person, firm, or corporation operating aircraft on the airport from
performing any services on its own aircraft with its own employees
[including, but not limited to maintenance, repair, and fueling] that it may
choose to perform.
g. In the event the sponsor itself exercises any of the rights and privileges
referred to in this assurance, the services involved will be provided on the
same conditions as would apply to the furnishing of such services by
commercial aeronautical service providers authorized by the sponsor under
these provisions.
h. The sponsor may establish such reasonable, and not unjustly
discriminatory, conditions to be met by all users of the airport as may be
necessary for the safe and efficient operation of the airport.
i. The sponsor may prohibit or limit any given type, kind or class of
aeronautical use of the airport if such action is necessary for the safe
operation of the airport or necessary to serve the civil aviation needs of the
public.
23. Exclusive Rights. It will permit no exclusive right for the use of the airport by any person
providing, or intending to provide, aeronautical services to the public. For purposes of this
paragraph, the providing of the services at an airport by a single fixed -based operator shall
not be construed as an exclusive right if both of the following apply:
a. It would be unreasonably costly, burdensome, or impractical for more than
one fixed -based operator to provide such services, and
b. If allowing more than one fixed -based operator to provide such services
would require the reduction of space leased pursuant to an existing
agreement between such single fixed -based operator and such airport.
It further agrees that it will not, either directly or indirectly, grant or permit any person, firm,
or corporation, the exclusive right at the airport to conduct any aeronautical activities,
including, but not limited to charter flights, pilot training, aircraft rental and sightseeing, aerial
photography, crop dusting, aerial advertising and surveying, air carrier operations, aircraft
sales and services, sale of aviation petroleum products whether or not conducted in
conjunction with other aeronautical activity, repair and maintenance of aircraft, sale of
aircraft parts, and any other activities which because of their direct relationship to the
operation of aircraft can be regarded as an aeronautical activity, and that it will terminate
any exclusive right to conduct an aeronautical activity now existing at such an airport before
the grant of any assistance under Title 49, United States Code.
24. Fee and Rental Structure. It will maintain a fee and rental structure for the facilities and
services at the airport which will make the airport as self-sustaining as possible under the
circumstances existing at the particular airport, taking into account such factors as the
volume of traffic and economy of collection. No part of the Federal share of an airport
development, airport planning or noise compatibility project for which a grant is made under
Title 49, United States Code, the Airport and Airway Improvement Act of 1982, the Federal
Airport Act or the
Airport Assurances (9199) 9
Appendix 1
Airport and Airway Development Act of 1970 shall be included in the rate basis in
establishing fees, rates, and charges for users of that airport.
25. Airport Revenues.
a. All revenues generated by the airport and any local taxes on aviation fuel
established after December 30, 1987, will be expended by it for the capital
or operating costs of the airport; the local airport system; or other local
facilities which are owned or operated by the owner or operator of the
airport and which are directly and substantially related to the actual air
transportation of passengers or property; or for noise mitigation purposes
on or off the airport. Provided, however, that if covenants or assurances in
debt obligations issued before September 3, 1982, by the owner or operator
of the airport, or provisions enacted before September 3, 1982, in
governing statutes controlling the owner or operator's financing, provide for
the use of the revenues from any of the airport owner or operator's facilities,
including the airport, to support not only the airport but also the airport
owner or operator's general debt obligations or other facilities, then this
limitation on the use of all revenues generated by the airport (and, in the
case of a public airport, local taxes on aviation fuel) shall not apply.
b. As part of the annual audit required under the Single Audit Act of 1984, the
sponsor will direct that the audit will review, and the resulting audit report
will provide an opinion concerning, the use of airport revenue and taxes in
paragraph (a), and indicating whether funds paid or transferred to the owner
or operator are paid or transferred in a manner consistent with Title 49,
United States Code and any other applicable provision of law, including any
regulation promulgated by the Secretary or Administrator.
Any civil penalties or other sanctions will be imposed for violation of this
assurance in accordance with the provisions of Section 47107 of Title 49,
United States Code.
26. Reports and Inspections. It will:
a. submit to the Secretary such annual or special financial and operations
reports as the Secretary may reasonably request and make such reports
available to the public; make available to the public at reasonable times and
places a report of the airport budget in a format prescribed by the
Secretary;
b. for airport development projects, make the airport and all airport records
and documents affecting the airport, including deeds, leases, operation and
use agreements, regulations and other instruments, available for inspection
by any duly authorized agent of the Secretary upon reasonable request;
C. for noise compatibility program projects, make records and documents
relating to the project and continued compliance with the terms, conditions,
and assurances of the grant agreement including deeds, leases,
agreements, regulations, and other instruments, available for inspection by
any duly authorized agent of the Secretary upon reasonable request; and
d. in a format and time prescribed by the Secretary, provide to the Secretary
and make available to the public following each of its fiscal years, an annual
report listing in detail:
(i) all amounts paid by the airport to any other unit of government and
the purposes for which each such payment was made; and
Airport Assurances (9/99) 10
Appendix 1
(ii) all services and property provided by the airport to other units of
government and the amount of compensation received for provision of
each such service and property.
27. Use by Government Aircraft. It will make available all of the facilities of the airport
developed with Federal financial assistance and all those usable for landing and takeoff of
aircraft to the United States for use by Government aircraft in common with other aircraft at
all times without charge, except, if the use by Government aircraft is substantial, charge
may be made for a reasonable share, proportional to such use, for the cost of operating
and maintaining the facilities used. Unless otherwise determined by the Secretary, or
otherwise agreed to by the sponsor and the using agency, substantial use of an airport by
Government aircraft will be considered to exist when operations of such aircraft are in
excess of those which, in the opinion of the Secretary, would unduly interfere with use of
the landing areas by other authorized aircraft, or during any calendar month that -
a. Five (5) or more Government aircraft are regularly based at the airport
or on land adjacent thereto; or
b. The total number of movements (counting each landing as a movement) of
Government aircraft is 300 or more, or the gross accumulative weight of
Government aircraft using the airport (the total movement of Government
aircraft multiplied by gross weights of such aircraft) is in excess of five
million pounds.
28. Land for Federal Facilities. It will furnish without cost to the Federal Government for use
in connection with any air traffic control or air navigation activities, or weather -reporting and
communication activities related to air traffic control, any areas of land or water, or estate
therein, or rights in buildings of the sponsor as the Secretary considers necessary or
desirable for construction, operation, and maintenance at Federal expense of space or
facilities for such purposes. Such areas or any portion thereof will be made available as
provided herein within four months after receipt of a written request from the Secretary.
29. Airport Layout Plan.
It will keep up to date at all times an airport layout plan of the airport
showing (1) boundaries of the airport and all proposed additions thereto,
together with the boundaries of all offsite areas owned or controlled by the
sponsor for airport purposes and proposed additions thereto; (2) the
location and nature of all existing and proposed airport facilities and
structures (such as runways, taxiways, aprons, terminal buildings, hangars
and roads), including all proposed extensions and reductions of existing
airport facilities; and (3) the location of all existing and proposed
nonaviation areas and of all existing improvements thereon. Such airport
layout plans and each amendment, revision, or modification thereof, shall
be subject to the approval of the Secretary which approval shall be
evidenced by the signature of a duly authorized representative of the
Secretary on the face of the airport layout plan. The sponsor will not make
or permit any changes or alterations in the airport or any of its facilities
which are not in conformity with the airport layout plan as approved by the
Secretary and which might, in the opinion of the Secretary, adversely affect
the safety, utility or efficiency of the airport.
b. If a change or alteration in the airport or the facilities is made which the
Secretary determines adversely affects the safety, utility, or efficiency of
any federally owned, leased, or funded property on or off the airport and
which is not in conformity with the airport layout plan as approved by the
Secretary, the owner or operator will, if requested, by the Secretary (1)
eliminate such adverse effect in a manner approved by the Secretary; or
(2) bear all costs of relocating such property (or replacement thereof) to a
site acceptable to the Secretary and all costs of restoring such property
Airport Assurances (9/99) 11
Appendix 1
(or replacement thereof) to the level of safety, utility, efficiency, and cost of
operation existing before the unapproved change in the airport or its
facilities.
30. Civil Rights. It will comply with such rules as are promulgated to assure that no person
shall, on the grounds of race, creed, color, national origin, sex, age, or handicap be
excluded from participating in any activity conducted with or benefiting from funds received
from this grant. This assurance obligates the sponsor for the period during which Federal
financial assistance is extended to the program, except where Federal financial assistance
is to provide, or is in the form of personal property or real property or interest therein or
structures or improvements thereon in which case the assurance obligates the sponsor or
any transferee for the longer of the following periods: (a) the period during which the
property is used for a purpose for which Federal financial assistance is extended, or for
another purpose involving the provision of similar services or benefits, or (b) the period
during which the sponsor retains ownership or possession of the property.
31. Disposal of Land.
a. For land purchased under a grant for airport noise compatibility purposes,
it will dispose of the land, when the land is no longer needed for such
purposes, at fair market value, at the earliest practicable time. That portion
of the proceeds of such disposition which is proportionate to the United
States' share of acquisition of such land will, at the discretion of the
Secretary, 1) be paid to the Secretary for deposit in the Trust Fund, or 2)
be reinvested in an approved noise compatibility project as prescribed by
the Secretary.
(32)For land purchased under a grant for airport development purposes
(other than noise compatibility), it will, when the land is no longer
needed for airport purposes, dispose of such land at fair market value
or make available to the Secretary an amount equal to the United
States' proportionate share of the fair market value of the land. That
portion of the proceeds of such disposition which is proportionate to the
United States' share of the cost of acquisition of such land will, (a) upon
application to the Secretary, be reinvested in another eligible airport
improvement project or projects approved by the Secretary at that
airport or within the national airport system, or (b) be paid to the
Secretary for deposit in the Trust Fund if no eligible project exists.
(2) Land shall be considered to be needed for airport purposes under this
assurance if (a) it may be needed for aeronautical purposes (including
runway protection zones) or serve as noise buffer land, and (b) the revenue
from interim uses of such land contributes to the financial self-sufficiency of
the airport. Further, land purchased with a grant received by an airport
operator or owner before December 31, 1987, will be considered to be
needed for airport purposes if the Secretary or Federal agency making such
grant before December 31, 1987, was notified by the operator or owner of
the uses of such land, did not object to such use, and the land continues to
be used for that purpose, such use having commenced no later than
December 15, 1989.
G. Disposition of such land under (a) or (b) will be subject to the retention or
reservation of any interest or right therein necessary to ensure that such
land will only be used for purposes which are compatible with noise levels
associated with operation of the airport.
32. Engineering and Design Services. It will award each contract, or sub -contract for
program management, construction management, planning studies, feasibility studies,
architectural services, preliminary engineering, design, engineering, surveying, mapping or
Airport Assurances 9/99) 12
Appendix 1
related services with respect to the project in the same manner as a contract for
architectural and engineering services is negotiated under Title IX of the Federal Property
and Administrative Services Act of 1949 or an equivalent qualifications -based requirement
prescribed for or by the sponsor of the airport.
33. Foreign Market Restrictions. It will not allow funds provided under this grant to be used to
fund any project which uses any product or service of a foreign country during the period in
which such foreign country is listed by the United States Trade Representative as denying
fair and equitable market opportunities for products and suppliers of the United States in
procurement and construction.
34. Policies, Standards, and Specifications. It will carry out the project in accordance with
policies, standards, and specifications approved by the Secretary including but not limited to
the advisory circulars listed in the Current FAA Advisory Circulars for AIP projects, dated
and included in this grant, and in accordance with applicable state policies,
standards, and specifications approved by the Secretary.
35. Relocation and Real Property Acquisition. (1) It will be guided in acquiring real property,
to the greatest extent practicable under State law, by the land acquisition policies in Subpart
B of 49 CFR Part 24 and will pay or reimburse property owners for necessary expenses as
specified in Subpart B. (2) It will provide a relocation assistance program offering the
services described in Subpart C and fair and reasonable relocation payments and
assistance to displaced persons as required in Subpart D and E of 49 CFR Part 24. (3) It
will make available within a reasonable period of time prior to displacement, comparable
replacement dwellings to displaced persons in accordance with Subpart E of 49 CFR Part
24.
36. Access By Intercity Buses. The airport owner or operator will permit, to the maximum
extent practicable, intercity buses or other modes of transportation to have access to the
airport, however, it has no obligation to fund special facilities for intercity buses or for other
modes of transportation.
37. Disadvantaged Business Enterprises. The recipient shall not discriminate on the basis of
race, color, national origin or sex in the award and performance of any DOT -assisted
contract or in the administration of its DBE program or the requirements of 49 CFR Part 26.
The Recipient shall take all necessary and reasonable steps under 49 CFR Part 26 to
ensure non discrimination in the award and administration of DOT -assisted contracts. The
recipient's DBE program, as required by 49 CFR Part 26, and as approved by DOT, is
incorporated by reference in this agreement. Implementation of this program is a legal
obligation and failure to carry out its terms shall be treated as a violation of this agreement.
Upon notification to the recipient of its failure to carry out its approved program, the
Department may impose sanctions as provided for under Part 26 and may, in appropriate
cases, refer the matter for enforcement under 18 U.S.C. 1001 and/or the Program Fraud
Civil Remedies Act of 1986 (31 U.S.C. 3801).
Airport Assurances (9/99) 13
CURRENT FAA ADVISORY CIRCULARS FOR AIP/PFC PROJECTS
Updated on: 7/1 /99
The following apply to both AIP and PFC Projects
NUMBER
TITLE
70/7460-1J
Obstruction Marking and Lighting
150/5000-13
Announcement of Availability--RTCA Inc., Document RTCA-221, Guidance and
Recommended Requirements for Airport Surface Movement Sensors
150/5210-5B
Painting, Marking and Lighting of Vehicles Used on an Airport
150/5210-7B
Aircraft Fire and Rescue Communications
150/5210-13A
Water Rescue Plans, Facilities, and Equipment
150/5210-14A
Airport Fire and Rescue Personnel Protective Clothing
150/5210-15
Airport Rescue & Firefighting Station Building Design
150/5210-18
Systems for Interactive Training of Airport Personnel
150/5210-19
Driver's Enhanced Vision System (DEVS)
150/5220-4B
Water Supply Systems for Aircraft Fire and Rescue Protection
150/5220-1 OB
Guide Specification for Water/Foam Type Aircraft Rescue and Firefighting Vehicles
150/5220-13B
Runway Surface Condition Sensor Specification Guide
150/5220-16B
Automated Weather Observing Systems for Nonfederal Applications
150/5220-17A
Design Standards for Aircraft Rescue Firefighting Training Facilities
150/5220-18
Buildings for Storage and Maintenance of Airport Snow and Ice Control Equipment and
Materials
150/5220-19
Guide Specification for Small, Dual -Agent Aircraft Rescue and Firefighting Vehicles
150/5220-20CHG 1
Airport Snow and Ice Control Equipment
150/5220-21A
Guide Specification for Lifts Used to Board Airline Passengers With Mobility
Impairments
150/5300-13 CHG 1,
Airport Design
2, 3, 4, 5
150/5300-14
Design of Aircraft Deicing Facilities
150/5320-5B
Airport Drainage
150/5320-6D
Airport Pavement Design and Evaluation
150/5320-12C
Measurement, Construction, and Maintenance of Skid Resistant Airport Pavement
Surfaces
150/5320-14
Airport Landscaping for Noise Control Purposes
150/5320-16
Airport Pavement Design for the Boeing 777 Airplane
150/53254A CHG 1
Runway Length Requirements for Airport Design
150/5340-1 G
Standards for Airport Markings
150/5340-4C
Installation Details for Runway Centerline Touchdown Zone Lighting Systems
CHG 1 & 2
150/5340-SB CHG 1
Segmented Circle Airport Marker System
15015340-14B
Economy Approach Lighting Aids
CHG 1&2
150/5340-17B
Standby Power for Non -FAA Airport Lighting Systems
150/5340-18C CHG 1
Standards for Airport Sign Systems
150/5340-19
Taxiway Centerline Lighting System
150/5340-21
Airport Miscellaneous Lighting Visual Aids
150/5340-23B
Supplemental Wind Cones
150/5340-24 CHG 1
Runway and Taxiway Edge Lighting System
150/5340-27A
Air -to -Ground Radio Control of Airport Lighting Systems
150/5345-31)
Specification for L821 Panels for Remote Control of Airport Lighting
150/5345-5A
Circuit Selector Switch
150/5345-7D
Specification for L824 Underground Electrical Cable for Airport Lighting Circuits
CHG 1
150/5345-10E
Specification for Constant Current Regulators Regulator Monitors
150/5345-12C
Specification for Airport and Heliport Beacon
150/5345-13A
Specification for L841 Auxiliary Relay Cabinet Assembly for Pilot Control of Airport
Lighting Circuits
150/5345-26B
Specification for L823 Plug and Receptacle, Cable Connectors
CHG 1&2
150/5345-27C
Specification for Wind Cone Assemblies
150/5345-28D CHG 1
Precision Approach Path Indicator (PAPI) Systems
150/5345-39B CHG 1
FAA Specification L853, Runway and Taxiway Centerline Retroreflective Markers
150/534542C CHG 1
Specification for Airport Light Bases, Transformer Housings, Junction Boxes and
Accessories
150/534543E
Specification for Obstruction Lighting Equipment
150/534544F CHG 1
Specification for Taxiway and Runway Signs
150/5345-45A
Lightweight Approach Light Structure
150/5345-46A
Specification for Runway and Taxiway Light Fixtures
150/5345-47A
Isolation Transformers for Airport Lighting Systems
150/534549A
Specification L854, Radio Control Equipment
150/5345-50 CHG 1 Specification for Portable Runway Lights
150/5345-51
Specification for Discharge -Type Flasher Equipment
CHG 1
150/5345-52
Generic Visual Glideslope Indicators (GVGI)
150/5345-53A
Airport Lighting Equipment Certification Program
(incl. addendum)
150/5360-9
Planning and Design of Airport Terminal Facilities at NonHub Locations
150/5360-12A
Airport Signing & Graphics
150/5360-13 CHG 1
Planning and Design Guidance for Airport Terminal Facilities
150/5370-2C
Operational Safety on Airports During Construction
150/5370-10A
Standards for Specifying Construction of Airports
CHG 1, 2, 3, 4, 5, 6, 7,
8,9
150/5390-2A
Heliport Design
150/5390-3
Vertiport Design
The following apply to AIP Projects only
NUMBER
TITLE
150/5100-14C
Architectural, Engineering, and Planning Consultant Services for Airport Grant Projects
150/5200-30A
Airport Winter Safety and Operations
CHG 1 & 2
150/5200-33
Hazardous Wildlife Attractants On or Near Airports
150/5300-15
Use of Value Engineering for Engineering Design of Airport Grant Projects
150/5370-11 CHG 1
Use of Nondestructive Testing Devices in the Evaluation of Airport Pavements
150/5370-12
Quality Control of Construction for Airport Grant Projects
150/5370-6B
Construction Progress and Inspection Report -Airport Grant Program
The following apply to PFC Projects only
NUMBER
TITLE
150/5000-12
Announcement of Availability - Passenger Facility Charge (PFC) Application (FAA Form
5500-1)
STANDARD DOT TITLE VI ASSURANCES
The City of Renton (hereinafter referred to as the Sponsor) hereby agrees that as a condition to
receiving Federal financial assistance from the Department of Transportation (DOT), it will comply
with Title VI of the Civil Rights Act of 1964 (42 U.S.C. 2000d et seq.) and all requirements imposed by
49 CFR Part 21, Nondiscrimination in Federally Assisted Programs of the Department of
Transportation -- Effectuation of Title VI of the Civil Rights Act of 1964 (hereinafter referred to as the
"Regulations") to the end that no person in the United States shall, on the ground of race, color, or
national origin, be excluded from participation in, be denied the benefits of, or be otherwise subjected
to discrimination under any program or activity for which the applicant receives Federal financial
assistance and will immediately take any measures necessary to effectuate this agreement. Without
limiting the above general assurance, the Sponsor agrees concerning this grant that:
1. Each "program" and "facility" (as defined in Section 21.23(a) and 21.23(b)) will be conducted or
operated in compliance with all requirements of the Regulations.
2. It will insert the clauses of Attachment 1 of this assurance in every contract subject to the Act and
the Regulations.
3. Where Federal financial assistance is received to construct a facility, or part of a facility, the
assurance shall extend to the entire facility and facilities operated in connection therewith.
4. Where Federal financial assistance is in the form or for the acquisition of real property or an
interest in real property, the assurance shall extend to rights to space on, over, or under such property.
5. It will include the appropriate clauses set forth in Attachment 2 of this assurance, as a covenant
running with the land, in any future deeds, leases, permits, licenses, and similar agreements entered
into by the Sponsor with other parties:
(a) for the subsequent transfer of real property acquired or improved with Federal financial
assistance under this project; and
(b) for the construction or use of or access to space on, over, or under real property acquired or
improved with Federal financial assistance under this Project.
6. This assurance obligates the Sponsor for the period during which Federal financial assistance is
extended to the program, except where the Federal financial assistance is to provide, or is in the form of
personal property or real property or interest therein or structures or improvements thereon, in which
case the assurance obligates the Sponsor or any transferee for the longer of the following periods:
(a) the period during which the property is used for a purpose for which Federal financial assistance
is extended, or for another purpose involving the provision of similar services or benefits; or
(b) the period during which the Sponsor retains ownership or possession of the property.
7. It will provide for such methods of administration for the program as are found by the Secretary of
transportation of the official to whom he delegates specific authority to give reasonable guarantees that
it, other sponsors, subgrantees, contractors, subcontractors, transferees, successors in interest, and
other participants of Federal financial assistance under such program will comply with all
requirements imposed or pursuant to the act, the Regulations, and this assurance.
S. It agrees that the United States has a right to seek judicial enforcement with regard to any matter
arising under the Act, the Regulations, and this assurance.
THIS ASSURANCE is given in consideration of and for the purpose of obtaining Federal financial
assistance for this Project and is binding on its contractors, the Sponsor, subcontractors, transferees,
successors in interest and other participants in the Project. The person or persons whose signatures
appear below are authorized to sign this assurance on behalf of the Sponsor.
DATED
City of Renton, Washington
(Sponsor)
(Signature of Authorized Official)
CONTRACTOR CONTRACTUAL REQUIREMENTS
ATTACHMENT 1
During the performance of this contract, the contractor, for itself, its assignees and successors in
interest (hereinafter referred to as the "contractor") agrees as follows:
1. Compliance with Regulations. The contractor shall comply with the regulations relative to
nondiscrimination in federally assisted programs of the Department of Transportation (hereinafter,
"DOT") Title 49, Code of Federal Regulations, Part 21, as they may be amended from time to time
(hereinafter referred to as the Regulations), which are herein incorporated by reference and made a
part of this contract.
2. Nondiscrimination. The contractor, with regard to the work performed by it during the contract,
shall not discriminate on the grounds of race, color, or national origin in the selection and retention of
subcontractors, including procurements of materials and leases of equipment. the contractor shall not
participate either directly of indirectly in the discrimination prohibited by section 21.5 of the
Regulations, including employment practices when the contract covers a program set forth in
Appendix B of the Regulations.
3. Solicitations for Subcontracts, Including Procurements of Materials and Equipment. In all
solicitations either by competitive bidding or negotiation made by the contractor for work to be
performed under a subcontract, including procurements of materials or lease of equipment, each
potential subcontractor or supplier shall be notified by the contractor of the contractor's obligations
under this contract and the Regulations relative to nondiscrimination on the grounds of race, color, or
national origin.
4. Information and Reports. The contractor shall provide all information and reports required by
the Regulations or directives issued pursuant thereto and shall permit access to its books, records,
accounts, other sources of information, and its facilities as may be determined by the Sponsor or the
Federal Aviation Administration (FAA) to be pertinent to ascertain compliance with such Regulations,
orders, and instructions. Where any information required of a contract is in the exclusive possession
of another who fails or refuses to furnish this information, the contractor shall so certify to the sponsor
or the FAA, as appropriate, and shall set forth what efforts it has made to obtain the information.
5. Sanctions for Noncompliance. In the event of the contractor's noncompliance with the
nondiscrimination provisions of this contract, the sponsor shall impose such contract sanctions as it or
the FAA may determine to be appropriate, including, but not limited to:
a. Withholding of payments to the contractor under the contract until the contractor complies,
and/or
b. Cancellation, termination, or suspension of the contract, in whole or in part.
6. Incorporation of Provisions. The contractor shall include the provisions of paragraphs 1 through
5 in every subcontract, including procurements of materials and leases of equipment, unless exempt by
the Regulations or directives issued pursuant thereto. The contractor shall take such action with
respect to any subcontract or procurement as the sponsor or the FAA may direct as a means of
enforcing such provisions including sanctions for noncompliance. Provided, however, that in the event
a contractor becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a
result of such direction, the contractor may request the Sponsor to enter into such litigation to protect
the interests of the sponsor and, in addition, the contractor may request the United States to enter into
such litigation to protect the interest of the United States.
CLAUSES FOR DEEDS, LICENSES, LEASES, PERMITS OR SIMILAR INSTRUMENTS
ATTACHMENT 2
The following clauses shall be included in deeds, licenses, leases, permits, or similar
instruments entered into by the Sponsor pursuant to the provisions of Assurances 5(a) and
5(b).
1. The (grantee, licensee, permittee, etc., as appropriate) for himself, his heirs,
personal representatives, successors in interest, and assigns, as a part of the
consideration hereof, does hereby covenant and agree (in the case of deeds and
leases add "as a covenant running with the land") that in the event facilities are
constructed, maintained, or otherwise operated on the said property described
in this (deed, license, lease, permit, etc.) for a purpose for which a DOT
program or activity is extended or for another purpose involving the provision
of similar services or benefits, the (grantee, licensee, lessee, permittee, etc.) shall
maintain and operate such facilities and services in compliance with all other
requirements imposed pursuant to 49 CFR Part 21, Nondiscrimination in
Federally Assisted Programs of the Department of Transportation, and as said
Regulations may be amended.
2. The (grantee, licensee, lessee, permittee, etc., as appropriate) for himself, his
heirs, personal representatives, successors in interest, and assigns, as a part of
the consideration hereof, does hereby covenant and agree (in the case of deeds
and leases add "as a covenant running with the land") that: (1) no person on
the grounds of race, color, or national origin shall be excluded from
participation in, denied the benefits of, or be otherwise subjected to
discrimination in the use of said facilities, (2) that in the construction of any
improvements on, over, or under such land and the furnishing of services
thereon, no person on the grounds of race, color, or national origin shall be
excluded from participation in, denied the benefits of, or otherwise be subjected
to discrimination, (3) that the (grantee, licensee, permittee, etc.) shall use the
premises in compliance with all other requirements imposed by or pursuant to
49 CFR Part 21, Nondiscrimination in Federally Assisted Programs of the
Department of Transportation, and as said Regulations may be amended.
REQUIRED STATEMENTS
AIRPORT IMPROVEMENT PROGRAM PROJECTS
AIRPORT: Renton Municipal Airport
LOCATION: Renton, Washington
AIP PROJECT NO.: 3-53-0055-13
STATEMENTS APPLICABLE TO THIS PROJECT:
® a. INTEREST OF NEIGHBORING COMMUNITIES: In formulating this project, consideration has been
given to the interest of communities that are near theRenton Municipal Airport.
® b. THE DEVELOPMENT PROPOSED IN THIS PROJECT will not require the use of publicly owned
land from a public park, recreation area, wildlife and fowl refuge, or a historical site under Federal, State, or
Local jurisdiction.
® C. FBO COORDINATION: The airport development proposed in this project has been coordinated with the
Fixed Base Operator(s) utilizing the Renton Municipal Airport and they have been informed regarding the
scope and nature of this project.
® d. THE PROPOSED PROJECT IS CONSISTENT with existing approved plans for the area surrounding
the airport.
The above statements have been duly considered and are applicable to this project. (Provide comment for any statement not checked).
BY: DATE: Cam' 13
TITLE: �^� a.. _r n,� �. E •. S .� s s -1� . < < �- /
SPONSORING AGENCY: City of Renton, Washington
NOTE: Where opposition is stated to an airport development project, whether expressly or by proposed revision, the following
specific information concerning the opposition to the project must be furnished.
a. Identification of the Federal, state, or local governmental agency, or the person or persons
opposing the project;
b. The nature and basis of opposition;
C. Sponsor's plan to accommodate or otherwise satisfy the opposition;
d. Whether an opportunity for a hearing was afforded, and if a hearing was held, an analysis of the facts
developed at the hearing as they relate to the social, economic, and environmental aspects of the
proposed project and its consistency with the goals and objectives of such urban planning as has been
carried out by the community.
e. If the opponents proposed any alternatives, what these alternatives were and the reason for
nonacceptance;
f. Sponsor's plans, if any, to minimize any adverse effects of the project;
g. Benefits to be gained by the proposed development; and
h. Any other pertinent information which would be of assistance in determining whether to proceed with the
project.
CERTIFICATION FOR CONTRACTS, GRANTS, LOANS,
AND COOPERATIVE AGREEMENTS
The undersigned certifies, to the best of his or her knowledge and belief, that:
1. No Federal appropriated funds have been paid or will be paid, by or on behalf of the
undersigned, to any person for influencing or attempting to influence an officer or employee
of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a
Member of Congress in connection with the awarding of any Federal contract, the making of
any Federal Grant, the making of any Federal loan, the entering into of any cooperative
agreement, and the extension, continuation, renewal, amendment, or modification of any
Federal contract, grant, loan, or cooperative agreement.
2. If any funds other than Federal appropriated funds have been paid or will be paid to any
person for influencing or attempting to influence an officer or employee of any agency, a
Member of Congress, an officer or employee of Congress, or an employee of a Member of
Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the
undersigned shall complete and submit Standard Form LLL "Disclosure of Lobby
Activities", in accordance with its instructions.
3. The undersigned shall require that the language of this certification be included in the
award documents for all subawards at all tiers (including subcontracts, subgrants, and
contracts under grants, loans, and cooperative agreements) and that all subrecipents shall
certify and disclose accordingly.
This certification is a material representation of fact upon which reliance was placed when
this transaction was made or entered into. Submission of this certification is a prerequisite
for making or entering into this transaction imposed by section 1352, title 31, U.S. Code. Any
person who f ' to file the required certification shall be subject to a civil penalty of not less
than $10,00 an not more pth$00,000 for each such failure.
Signed Date
S o sor's ut or' sentative
Title M
CERTIFICATION REGARDING DRUG -FREE WORKPLACE REQUIREMENTS
Alternate I. (Grantees Other Than Individuals)
A. The grantee certifies that it will or will continue to provide a drug -free workplace by:
(a) Publishing a statement notifying employees that the unlawful manufacture,
distribution, dispensing, possession, or use of a controlled substance is prohibited in the
grantee's workplace and specifying the actions that will be taken against employees for
violation of such prohibition:
(b) Establishing an ongoing drug -free awareness program to inform employees about-
(1) The dangers of drug abuse in the workplace;
(2) The grantee's policy of maintaining a drug -free workplace;
(3) Any available drug counseling, rehabilitation, and employee assistance
programs; and
(4) The penalties that may be imposed upon employees for drug abuse
violations occurring in the workplace;
(c) Making it a requirement that each employee to be engaged in the performance of
the grant be given a copy of the statement required by paragraph (a);
(d) Notifying the employee in the statement required by paragraph (a) that, as a
condition of employment under the grant, the employee will-
(1) Abide by the terms of the statement; and
(2) Notify the employer in writing of his or her conviction for a violation of a
criminal drug statute occurring in the workplace no later than five calendar days after such
conviction;
(e) Notifying the agency in writing, within ten calendar days after receiving notice
under paragraph (d)(2) from an employee or otherwise receiving actual notice of such
conviction. Employers of convicted employees must provide notice, including position title, to
every grant officer or other designee on whose grant activity the convicted employee was
working, unless the Federal agency has designated a central point for the receipt of such
notices. Notices shall include the identification number(s) of each affected grant;
(f) Taking one of the following actions, within 30 calendar days of receiving notice
under paragraph (d)(2), with respect to any employee who is so convicted-
(1) Taking appropriate personnel action against such an employee, up to and
including termination, consistent with the requirements of the Rehabilitation Act of 1973, as
amended; or
(2) Requiring such employee to participate satisfactorily in a drug abuse
assistance or rehabilitation program approved for such purposes by a Federal, State, or local
health, law enforcement, or other appropriate agency;
(g) Making a good faith effort to continue to maintain a drug -free workplace through
implementation of paragraphs (a), (b), (c), (d), (e), and (f),
B. The grantee may insert in the space provided below the site(s) for the performance of work
done in connection with the specific grant:
Place of Performance (Street address, city, county, state, zip code)
Renton Municipal Airport
616 West Perimeter Road
Renton, WA 98055
Check if there are workplaces on file that are not identified here.
ature of certifying offigial
t
Title
Date
„A
TITLE VI PRE -AWARD SPONSOR CHECKLIST
Airport/Sponsor: Renton Municipal Airport
AIP #: 3-53-0055-13
Project Description(s): 2003 Taxiway, Lighting, and Signing Improvements
1) Please describe any of the following IF they apply to your project: Title VI issues raised at public hearing(s)
and the conclusions made; EIS data concerning the race, color, or national origin of the affected community;
steps taken or proposed to guard against unnecessary impact on persons on the basis of race, color or
national origin.
M None
2) Please list any airport related Title VI lawsuits or complaints filed in the preceding year against the sponsor.
Include a summary of the findings.
M None (If "None”, continue with questions 3 and 4).
3) Please list any current applications for federal funding (other than FAA) of airport related projects which
exceed the amount for this grant.
M None
4) Please list any airport related Title VI compliance review(s) received by the sponsor in the preceding two
years. Include who conducted the review and any findings of noncompliance.
M None
To be completed by the Civil Rights Staff
Review completed and approved:
Signature
Date:
This checklist is only required for projects that involve one of the following: Environmental Assessment or
Impact Statement (EIS); airport or runway relocation; major runway extension; relocation of any structure of
person; or impact to access or preservation of any burial ceremonial or other sacred or historical structures
or lands of any indigenous or ethnic population.
Return to: FAA, Civil Rights, Northwest Mountain Region; 1601 Lind Ave. SW;
Renton, WA 98055-4056. FAX: (425) 227-1009 Phone (425) 227-2009
For more Title VI information visit the Civil Rights website at
http://www.nw.faa.gov/civiIrights/home.htm
CITY OF RENTON COUNCIL AGENDA BILL
Al
Submitting Data: Planning/Building/Public Works
For Agenda of: June 23, 2003
Dept/Div/Board.. Transportation Systems
Agenda Status:
Staff Contact...... Sharon Griffin, ext. 7232
Consent ..............
Public Hearing......
Subject:
Correspondence.....
Annual Update of the Six -Year Transportation Improvement
Ordinance...........
Program (TIP)
Resolution........... X
Old Business........
New Business.......
Exhibits:
Study Sessions......
Draft TIP (2004-2009)
Information.........
Resolution
Other ................
Interlocal
Recommended Action: Approvals:
Refer to Transportation Committee Legal Dept.......... X
Finance Dept.......
Set July 7, 2003 Public Hearing on the TIP
Fiscal Impact:
Expenditure Required..... Transfer/Amendment.......
Amount Budgeted......... Revenue Generated.........
Summary of Action:
The City is required by law to annually review and adopt by resolution the Six -Year Transportation
Improvement Program (TIP).
The draft TIP will be presented to the Transportation Committee and distributed to the rest of the Council
Members for review well in advance of the public hearing.
Staff Recommendations:
The Transportation Division staff recommends that: 1) the Council refer the annual review of the Six -Year
Transportation Improvement Program to the Transportation Committee and, 2) set July 7, 2003, public
hearing on the TIP.
H:Trans/plane ing/sari ffin/T]Ps/2004_TIP_agendabiI I
,F RENTON, WASHINGTON
OLUTION NO.
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON,
UPDATING THE CITY'S SIX -YEAR TRANSPORTATION
IMPROVEMENT PROGRAM 2004-2009.
WHEREAS, the City of Renton has heretofore adopted a "Six -Year Transportation
Improvement Program" pursuant to Chapter 7, Extraordinary Session Laws of the State of
Washington, and Chapter 195 of the 1961 Session Laws of the State of Washington, as amended
from time to time, and the plan and program having been amended and modified from time to time
as authorized by law; and
WHEREAS, the City Council, after recommendation of its Planning/Building/Public Works
Department, held a public hearing on July 7, 2003, after notice to the public as provided by law
for the purpose of considering adoption, modification, and amendments of the plan and program;
and
WHEREAS, at such public hearing held on July 7, 2003, due consideration was given to
the proposed changes and amendments for the purpose of updating the plan and program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASHINGTON, DO RESOLVE AS FOLLOWS:
SECTION I. The City's "Six -Year Transportation Improvement Program" and
the City's "Arterial Street Plan" are hereby further amended and modified, all as more particularly
shown on the attached Exhibits "A," "B" and "C" incorporated herein as if fully set forth.
SECTION II. The plan and program, as evidenced by said Exhibits, shall be and
constitute the City's "Six -Year Transportation Improvement Program" and the City's "Arterial
1
RESOLUTION NO.
.... _ .an," and shall remain in full force and effect until further revised, amended, and modified
as provided by law.
SECTION III. The Administrator of the Department of Planning/Building/Public
Works and the City Clerk are hereby authorized and directed to file this Resolution, together with
the Exhibits, with the Director of Highways for the State of Washington and as otherwise
provided by law.
PASSED BY THE CITY COUNCIL this day of
APPROVED BY THE MAYOR this
Approved as to form:
Lawrence J. Warren, City Attorney
RES.985:6/2/03:ma
Bonnie I. Walton, City Clerk
day of
Jesse Tanner, Mayor
2003.
2003.
2
6
EXHIBIT `B'
City of Renton
2004 — 2009 Transportation Improvement Program
Map Index
TIP No. Project Title
F Street Overlay Program
2 SR167/SW 27`h Street/ Strander Boulevard
3 Strander Blvd/SW 27`h Street Connection
4 SR169 HOV — SE140`h to SR900
5 Renton Urban Shuttle (RUSH)
6 Transit Program
7 Rainier Avenue Corridor Study and Improvements
.8 NE 3`d/NE 01 Transit
9 Walkway Program
10 Transit Priority Signal System
11 Duvall Avenue NE
12 Sunset/DuvallIntersection
13 Arterial Circulation Program
14 Project Development/Predesign
15 Bridge Inspection and Repair
16 Loop Replacement Program
17 Sign Replacement Program
18 Pole Replacement Program
19 Transit Center Video
20 I-405 HOV Direct Access
21 Traffic Safety Program
22 Traffic Efficiency Program
23 CBD Bicycle and Pedestrian Connections
24 Arterial Rehabilitation Program
25 Railroad Crossing Safety Program
26 Transportation Demand Management Program
27 Lake Washington Boulevard — Coulon to NE 44t'
28 Transportation Concurrency
29 Missing Links Program
30 GIS Needs Assessment
31 Sunset/I-405Interchange
32 Grady Way Corridor Study
33 Bicycle Route Development Program
34 Lake Washington Boulevard — Park Avenue N to Coulon Park
35 Interagency Signal Coordination
36 Environmental Monitoring
37 SW 7`h St./Lind Avenue SW
38 Oakesdale Avenue SW Phase 2
39 Trans -Valley and Soos Creek Corridor
2-2
l09 SIX -YEAR Transportation Improvement Program EXHIBIT `B'
x
TIP No. Project Title
40
Logan Avenue Bridge Seismic Retrofit
41
WSDOT Coordination Program
42
1 % for the Arts Program
43
Arterial HOV Program
44
Park —Sunset HOV
45
Lind Avenue —SW 16`' to SW 43'
46
Benson Road S / S 31St Street
47
South Renton Project
48
NE 4`I' Street/Hoquiam Avenue NE
49
Trans Valley ITS
50
Grady Way Approach to Rainier Avenue
51
Houser Way S — Main to Burnett
52
Lake Washington Boulevard Slip Plane
53
Logan Avenue Concrete Panel Repair
54
Carr/Mill Signal
55
Duvall Avenue NE — King County
2-3
H:WILE SYS\TRP\TRP-24\2004\INDEX
£ooa Svw paluud pSIM.
a 1191HX3 PlsaustA •Q latuo3p •� �' _
WoM atignd/$utPIinB/.2uiuuutd
sag as pmuuaal
SLLHaNdLLS rlvIx21ixV
NO N 2I 30 A,LID
4 II;9Iq
is 4i00Z 3S — 11-
o IS 1 0 3S IS 410 i
v!7 T ►�T 41661 3S
IS 4196t 3S o-------� <
L �✓i a
y
j = 1S PUZ61 35
N
1 15 41061 3S J 15 41061 3S
� o d
m 6
N
d 41991 3S D
IS 4I991 3S
I
i
I
I
I
I
S II I I IIN
1S 4100Z S
a
s
% a
N ry
15 41961 S N
1S 41461 M o
b
IS 419S S
�S
C. IS 4I061 S
C.
�
� a
A
1S 41891 S
IS 41991 S
C.
1S 41961 S
m
IS PuZ61
A
x rn
1S 41061 S
n
n
N
s
1S 4I89I S
'apol0 S
0
n
0
4
1S
SECTION ONE
PURPOSE OF SIX -YEAR TIP PROGRAM
• Purpose of Six -Year TIP 1-1
• Vision Statement 1-2
• Mission Statement 1-2
• City Business Plan 1-2
n
rti
CITY OF RENTON
SIX -YEAR TRANSPORTATION IMPROVEMENT
PROGRAM
2004-2009
PURPOSE
• Mandated by State Law.
• Multi -year work/finding plan for the development of the
transportation facilities within the City.
• Required for State and Federal funding programs.
• Used to coordinate transportation projects and programs
with other jurisdictions and agencies.
• Implements the City of Renton Mission Statement.
• Reflects involvement by citizens and elected officials.
• Vital part of planning under the Growth Management
Act.
1-1
FC OFF
FV_I
Renton: Aworld-class city where
people choose to live, work, and play
L MISSION
The City of Renton, in partnership with residents,
businesses, and schools is dedicated to:
• Providing a healthy atmosphere to live and raise families
• Encouraging responsible growth and promoting economic vitality
• Creating a positive community work environment
• Meeting service demands through innovation and commitment to
�2009 excellence
BUSINESS PLAN GOALS
Promote citywide economic development
• Continue aggressive redevelopment efforts downtown
• Facilitate quality development of waterfront land
• Recruit and retain businesses to ensure a diversified employment base
• Transition surplus industrial properties to their highest and best use
Promote neighborhood revitalization
• Create a more viable business district in the Highlands
• Support the vitality of neighborhoods through community involvement and
improved infrastructure
• Ensure quality development in South Renton
Promote the City's image in the community and region
• Broaden the City's marketing efforts through expanded partnerships
• Encourage all City employees to promote Renton's image through service delivery
• Build physical amenities that enhance quality of life
Meet the service demands that contribute to the livability of the communit
• Maintain quality City infrastructure, amenities, and services
• Provide services more efficiently through partnering, innovation, and
outcome management and communicate those efficiencies to the public
• Support productivity through training, tools, and technology
Influence regional decisions that impact the City
• Aggressively pursue transportation and other regional improvements and services that
benefit Renton
• Respond to transfer of service responsibilities, annexation
requests, and other agreements in ways that benefit Renton R E N T O N
• Actively oppose unfunded mandates and other
proposals that negatively impact Renton
SECTION TWO
SIX -YEAR TIP MAP
• TIP Map
2-1
• Map Index 2-2
EXHIBIT `B'
City of Renton
2004 — 2009 Transportation Improvement Program
Map Index
TIP No. Project Title
1
Street Overlay Program
2
SR167/SW 27`" Street/ Strander Boulevard
3
Strander Blvd/SW 27 h Street Connection
4
SR169 HOV — SE140t'to SR900
5
Renton Urban Shuttle (RUSH)
6
Transit Program
7
Rainier Avenue Corridor Study and Improvements
8
NE P/NE 4`h Transit
9
Walkway Program
10
Transit Priority Signal System
11
Duvall Avenue NE
12
Sunset/DuvallIntersection
13 Arterial Circulation Program
14 Project Development/Predesign
15 Bridge Inspection and Repair
16 Loop Replacement Program
17 Sign Replacement Program
18 Pole Replacement Program
19 Transit Center Video
20 I-405 HOV Direct Access
21 Traffic Safety Program
22 Traffic Efficiency Program
23 CBD Bicycle and Pedestrian Connections
24 Arterial Rehabilitation Program
25 Railroad Crossing Safety Program
26 Transportation Demand Management Program
27 Lake Washington Boulevard — Coulon to NE 44t'
28 Transportation Concurrency
29 Missing Links Program
30 GIS Needs Assessment
31 Sunset/I-405Interchange
32 Grady Way Corridor Study
33 Bicycle Route Development Program
34 Lake Washington Boulevard — Park Avenue N to Coulon Park
35 Interagency Signal Coordination
36 Environmental Monitoring
37 SW 7`' St./Lind Avenue SW
38 Oakesdale Avenue SW Phase 2
39 Trans -Valley and Soos Creek Corridor
2-2
2004 — 2009 SIX -YEAR Transportation Improvement Program
Map Index
TIP No. Project Title
40
Logan Avenue Bridge Seismic Retrofit
41
WSDOT Coordination Program
42
1% for the Arts Program
43
Arterial HOV Program
44
Park —Sunset HOV
45
Lind Avenue —SW 16'h to SW 43rd
46
Benson Road S / S 3 1 " Street
47
South Renton Project
48
NE 4`h Street/Hoquiam Avenue NE
49
Trans Valley ITS
50
Grady Way Approach to Rainier Avenue
51
Houser Way S — Main to Burnett
52
Lake Washington Boulevard Slip Plane
53
Logan Avenue Concrete Panel Repair
54
Carr/Mill Signal
55
King County Duvall
2-3
EXHIBIT SB'
H:WILE SYS\TRP\TRP-24\2004UNDEX
SECTION THREE
DEVELOPMENT & PRIORITIZATION
OF THE SIX- YEAR TIP
• General Programming Criteria 3-1
• Specific TIP Development Activities 3-3
• Summary Table of Projects and Programs: 3-5
DEVELOPMENT AND PRIORITIZATION OF THE SIX -YEAR TIP
I. General Programming Criteria
The yearly update of the Six -Year Transportation Improvement Program (TIP) is part of an on-
going process intrinsically linked with the development of the City's Capital Improvement Program.
The Six -Year TIP is also linked with various state and federal funding programs, regional/inter-
jurisdictional planning and coordination processes and the City's Growth Management Act
Comprehensive Land Use Plan.
Projects are developed and prioritized based on both specific goals to be achieved by the program
and on general programming considerations. Those general programming considerations are:
Planning. How, on both a local and regional level, a project fits with or addresses identified future
transportation goals, demands and planning processes must be evaluated. This is strongly
influenced by ongoing land use decisions and by regional highway and transit system plans.
Financing. Many projects are dependent on acquisition of outside grants, formation of LID's or the
receipt of mitigation funds. Prioritization has to take into account the peculiarities of each of the
various fund sources and the probabilities of when, and how much, money will be available.
Scheduling. If a project is interconnected with, or interdependent on, other projects taking place,
this is reflected in their relative priorities.
Past Commitment. The level of previous commitment made by the City in terms of resources,
legislative actions or inter -local agreements also must be taken into consideration in prioritizing TIP
projects.
In addition to the general considerations discussed above, there are five specific project categories
through which the TIP is evaluated and analyzed. They are:
• Preservation of Existing Infrastructure
• Multi -Modal and Transportation Demand Management
• Community Livability and Enhancement
• Economic Development
• Operations and Safety
These categories provide a useful analysis tool and represent goals developed through an evaluation
of the City's transportation program in response to input from citizens and local officials and to
State and Federal legislation.
Taken as a whole, the five categories provide a framework for evaluating projects both individually
and as part of a strategy that seeks to meet and balance the transportation needs of Renton during a
3-1
time of increasing transportation demand, decreasing revenues and growing environmental
concerns.
Although each project can be identified with an important concern that allows it to be classified into
one of the five categories, most projects are intended to address, and are developed to be compatible
with, multiple goals.
Preservation of the Existing Infrastructure is a basic need that must be met by the program. The
Mayor, City Council and Citizens Transportation Advisory Committee have all addressed the
importance of sustaining strong programs in this project category. The state Growth Management
Act also requires jurisdictions to assess and address the funding required to maintain their existing
transportation system.
Multi -modal and Transportation Demand Management (TDM) projects and programs are
oriented toward "moving people" through a balanced transportation system that involves multiple
modes of transportation and provides alternatives to the existing heavy reliance on the single
occupant vehicle (SOV). Included are facilities that facilitate the movement of transit and carpools,
and programs that promote the use of high occupancy vehicles (HOV's) and reduce the number of
SOV's. The Federal Transportation Efficiency Act (TEA-21), the State and Federal Clean Air
legislation and the State Commute Trip Reduction Act (CTR) have added momentum to regional
efforts and placed requirements on local jurisdictions such as Renton to promote these
transportation elements.
Community Livability and Enhancement consists of projects that have been developed with
major emphasis on addressing community quality of life issues by improving and/or protecting
residential livability while providing necessary transportation system improvements. Bicycle and
pedestrian projects are included in this category.
Economic Development projects and programs involve transportation improvements necessitated
by new development that is taking place. Thus, a significant source of local funding for these
projects is projected to come from mitigation payments and from specific access needs financed by
new development.
Operations and Safety projects and programs are developed through on -going analyses of the
transportation system and are directed mainly toward traffic engineering concerns such as safety and
congestion. Projects are identified not only by analysis of traffic counts, accident records and
geometric data, but also through review and investigation of citizen complaints and requests.
Following this text are tables that display and summarize the six -year funding plan broken out in
accordance with the five program categories.
TIP FUND.doc 3-2
Below is a more specific discussion of the activities involved in TIP development.
II. Specific TIP Development Activities
TIP project and financial development activities are intricately intertwined and involve interactions
with many groups and agencies at the local, regional, state and federal levels.
Within the Transportation Systems Division of the City of Renton, project development involves
year -around coordination among the Maintenance and Operations Section, the Planning and
Program Section and the Design Section.
The Transportation Maintenance and Operations Section compiles accident and traffic count data,
performs level of service calculations needed to identify operational/congestion problems and tracks
all transportation -related complaints, suggestions and requests that come into the City.
The Transportation Design Section, through the TIP's "Overlay Program" and "Bridge Inspection
and Repair Program", works closely with the Maintenance Services Division and with its Pavement
Management System to establish structural ratings for the City's roads and bridges.
These and other data are being used by the Planning and Program Section to develop transportation
improvement projects, prepare grant applications, interface with ongoing state and federal
transportation programs, and develop a TIP that supports the goals of the City's long range
Comprehensive Plan and short range business plan.
Two important examples of how this data is used are:
1. To complete Transportation Improvement Board (TIB) Arterial Inventory Worksheet
forms for each section of each arterial in the City and
2. To complete Washington State Bridge Inventory System (WSBIS) forms for each
bridge.
These forms provide a ranking of overall deficiency both within the City and in comparison with
similar facilities elsewhere in the state. These rankings, in turn, become important elements in
securing funding from the TIB's Transportation Partnership Program (TPP) and Arterial
Improvement Program (AIP) and from the federal bridge program.
The data are also used in making other grant applications for hazard elimination and safety projects
and for railroad crossing upgrades and other federal programs under TEA-21.
The Transportation Planning Section works with Metro Transit, the Puget Sound Regional Council,
Sound Transit and other groups and agencies to assure consistency between Renton's transportation
policies and programs and those of the region. Such consistency is required by the Growth
Management Act and related legislation and by federal and state grant programs.
TIP FUND.doc 3-3
On -going transportation planning activities, such as updating the Transportation Element and traffic
model, coordinating with the City's Comprehensive Plan and the development of sub -area plans,
such as the Central Business District, the Valley and the North Renton areas, play an important part
in identifying and prioritizing transportation improvement projects. State and regional
transportation projects also play an important role such as those involving Sound Transit, the
Metropolitan Transportation Plan and the State Systems Plan.
Within the City of Renton, there are actions and interactions involving other departments and
divisions, the private sector, the City Council and Administration, which strongly influence the
direction of the transportation program.
For example, the transportation system is significantly impacted by land use decisions, private
development proposals and by public water and sewer extensions which increase transportation
demand by making possible higher density and/or intensity of land uses. Such proposals need to be
monitored and analyzed in regard to how they individually and collectively create the need for
transportation improvements.
All departments and divisions in the City, the City Council, the Administration and the Mayor's
Citizens Transportation Advisory Committee are solicited each year to provide input, discuss and
comment on the Six -Year TIP.
Additional input is also gathered through interactions with other public and private organizations
and through public meetings held in the community concerning specific transportation projects and
programs.
At the City, State and Federal level there are new laws and regulations that create the need for new
or different kinds of transportation projects and programs. Examples include the Transportation
Efficiency Act (TEA-21), the Growth Management Act, the Clean Air Act, the Commute Trip
Reduction law, the Endangered Species Act and the Surface Water Management Ordinance. All of
these laws have tremendous impacts on the development and costs of transportation projects.
Interconnection and/or interdependence among TIP projects and with projects by other City
departments and by other jurisdictions is another important element that affects the development,
the prioritization and the timing of transportation projects. Equally important is the likelihood, the
time frame and the amount of outside funding that will be obtainable to finance transportation
projects.
In summary, with its heavy dependence on many different and unpredictable sources of outside
funding and with the significant impacts created by on -going local and regional land use decisions,
transportation project development is a continuous activity comprised of a multitude of diverse
elements.
TIP FUNDAm 3-4
CITY OF RENTON
SIX YEAR T.I.P.
2004-2009
Y
♦ � 4
Draft
LAKE WASHINGTON
ZW
4
EXHIBIT 'A'
CITY OF RENTON - PLANNING / BUILDING/ PUBLIC CS - TRANSPORTATION SYSTEMS DIVISION - 2004-2009 TIP
Type
TIP
Project Title
Previous
Costs
2004
2005
2006
2007
2008
2009
Six -Year
Period Total
Total Project
Cost
Funded
Unfunded
1
Street Overlay Program
1,387,528
430,600
405,000
405,000
405,000
405,000
40700
2,455,600
3,843,128
3,843,128
11
Duvall Ave NE
393,300
799,500
2,242,000
3,041,500
3,434,800
3,434,800
15
Bridge Inspection &Repair
48,661
19,000
140,000
614,000
40,000
19,000
40,000
872,000
920,661
364,661
556,000
19
Loop Replacement Program
47,285
20.000
20,000
20,000
20,000
20,000
20,000
120,000
167,285
167,285
`
17
Sign Replacement Program
8,588
7,500
7,500
7,500
7,500
7,500
7,500
45,000
53,588
53,588
18
Pole Program
1 49,352
48,400
48,4001
25,000
25,000
25,000
25,000
196,800
246,1521
246,152
2
24
Arteri&Prog.. Prog.
474,200
103,500
113,000
300,900287,000
95,600153,500
1,053,500
1,527,700
1,527,700
3o
GIS Nessment
30,478
10,000
10,000
10,000
10,000
10,000
10,000
60,000
90,478
90,478
36
EnvirMonitoring
282,934
100,000
75,000
50,000
25,000
25,000
25, 000
300,000
582,934
582,934
ao
Logange Seismic Retrofit
233,899
2,500
2,500
236,399
236,399
a7
SouthProject
40,000
135,000
135,000
175,000
175,000
52
Lake Slip Plane
14,600
100,000
147,000
378,400
625,400
640,000
261,600
378,400
53
Loganrete Panel Repair
460,000
460,000
460,000
460,00055
Duval -King County
134,298
926,500
1,928,802
1,680,4001
4,535,702
4,670.000
4,670,000
2
SW
SR167 / SW 27th SU Strander By
357,574
10,000
10,000
10,000
10,000
1Q000
10,000
60,000
417,574
417,574
4
SR169 -140th to SR900
1,052,440
37,560
3,519,000
3,400,000
6,956,560
8,009,000
1,705,947
6,303,053
5
Renton Urban Shuttle (RUSH)
25,000
60,000
55,000
55,000
55,000
55,000
55,000
335,000
360,000
360,000
s
Transit Program
36,631
40,000
35,000
35,000
80,000
80,000
80,000
350,000
386,631
296,631
90,000
7
Rainier AV Corridor Study / Improv
102,909
160,000
20.000
20.000
920,000
5,120,000
4,020,000
10,260,000
10,362,909
362,909
10,000,000
s
NE3rd / NE 4th Corridor
161,192
184,000
315,300
807,508
3,017,000
2,000,000
2,100,000
8,423,808
8,585,000
1,748,200
6,836,800
0
13
Arterial Circulation Program
254,080
200,000
200,000
200,000
200,000
250,000
250,000
1,300,000
1,554,080
1,554,080
14
Project Development/Predesign
237,227
175,000
175,000
200,000
200,000
200,000
200,000
1,150,000
1,387,227
1,387,227
75
zo
Id05 HOV Direct Access
22,376
20,000
10,000
5,000
35,000
57,376
57,376
�
2s
TDM Program
122,893
64,200
64,200
64,200
64,200
64,200
64,200
385,200
508,093
508,093
32
GradyWyCorridorStudy
30,000
45,000
120,000
70,000
520,000
1,270,000
1,270,000
3,295,000
3,325,000
325,000
3,000,000
3s
Trans -Valley & Soos Creek Corr.
11,500
17,000
17,000
28,500
28,500
41
WSDOT Coordination Program
17,860
10,000
10,000
10,000
10,000
10,000
10,000
60,000
77,860
77,860
43
Arterial HOV Program
132,354
30,000
10,000
40,000
172,354
172,354
44
ParkSunsetCorridor
5,000
5,000
50,000
100,000
1,190,000
650,000
1,995,000
2,000,000
200,000
1,800,000
s
Walkway Program
88,194
250,000
250,000
250,000
250,000
250,000
250,000
1,500,000
1,588,194
1,348,194
240,000
D
27
Lake Wash. By Coulon to NE 44tt1
20,275
10,000
10,000
1
20,000
40,275
40,275
33
Bicycle Route Dev.Program
22,976
20,000
18,000
18,000
110,000
80,000
80,000
326,000
348,976
258,976
90,000
42
1 % for the Arts
74,750
50,000
30,000
30,000
50,000
30,000
30,000
220,000
294,750
294,750
>
G
3
Strander BvISW 27th St Connect.
400,000
1,400,000
700,000
517,104
3,982,896
30,700,000
28,700,000
66,000,000
66,400,000
5,025,204
61,374,796
`-
2a
CBD Bike & Ped. Connections
42,550
68,000
10,000
10,000
590,000
410,000
5,000
1,093,000
1,135,550
509,050
626,500
29
Trans Concurrency
8,212
40,000
10,000
10,000
40,000
10,000
10,000
120,000
128,212
128,212
0
31
SunseVl-4051nterchange
60,000
10,000
10,000
70,000
70,000
0
34 ILake
Wash. By -Park to Coulon Pk
543,500
15,000
15,000
558,500
558,500
uw
38 10akesdale
Ave. SWPhase 2
2,193,106
20,000
20,000M222,839222,839
2,213,106
10
Transit Priority Signal System
1,021,770
238,500
238,5000
1,260,270
12
Suns eUDuvallIntersection
59,000
381,000
381,0000
440,000
19
Transit Center Video
40,000
20,000
20,000
60,000
21
Traffic Safety Program
155,199
109,100
40,000
40,000
40,000
40,000
40,000
309,1009
464,299
a
22
Traffic Efficiency Program
159,700
251,900
252,000
30,000
30,000
30,000
30,000
623,900
783,600
25
RR Crossing Safety Prog.
192,839
5,000
5,000
10,000
10,000
30,000
222,83929
Missing Links Program
35,000
30,000
30,000
30,000
30,000
30,000
30,000
180,000
215,000
35
Interagency Signal Coord.
22,572
12,000
12,000
34,572
34,572
0
37
SW 7th StJLind Ave SW
288,000
12,000
12,000
300,000
300,000
45
Lind AvSW 16th - SW 43rd
5,000
10,000
1,914,000
626,000
2,555,000
2,555,000
15,000
2,540,050
o
4s
Benson Rd S / S 31st St
138,000
62,000
62,000
200,000
200,000
as
NE 4th S am Av NE
42,000
358,000
358,000
400,000
400,000
4s
Trans Valley ITS ley IT
45,000
5,000
5,000
50,000
50,000
50
Grady Wy-Approach at Rainier AV
600,000
20,000
20,000
620,000
620,000
51
Houser Wy S - Main to Burnett
810,000
810,000
810,000
810,000
54
Carr/Mill Signal
5,000
10,000
20,000
3240,000
400,000
775,000
775,000
35,000
740,000
ota SO
66 02
6 6
6 2
6 2
2 6
2 00
93
2 0 0
36 8
0 3
SECTION FOUR
EXPENDITURES & REVENUES
• Total Project Expenditure Summary
4-1
• Summary of Funding Sources
4-2
• Itemized Funding Sources:
■ %2 Cent Gas Tax
4-3
■ Business License Fee
4-4
■ Vehicle License Fee
4-5
■ Grants In -hand
4-6
■ Mitigation In -Hand
4-7
■ L.I.D.'s Formed
4-8
■ Other In -Hand
4-9
■ Grants Proposed
4-10
■ Mitigation Proposed
4-11
■ L.I.D.'s Proposed
4-12
■ Other Proposed
4-13
■ Undetermined
4-14
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Six -Year Project Cost Summary *
TIP
Project Title
2004
2005
2006
2007
2008
2009
Period
Total
1
Street Overlay Program
430,600
405,000
405,000
405,000
405,000
405,000
2,455,600
2
SR167 / SW 27th St/ Strander By
10,000
10,000
10,000
10,000
10,000
10,000
60,000
3
Strander By/SW 27th St Connect.
1,400,000
700,000
517,104
3,982,896
30,700,000
28,700,000
66,000,000
4
SR169 HOV -140th to SR900
37,560
3,519,000
3,400,000
6,956,560
5
Renton Urban Shuttle (RUSH)
60,000
55,000
55,000
55,000
55,000
55,000
335,000
6
Transit Program
40,000
35,000
35,000
80,000
80,000
80,000
350,000
7
Rainier Av Corridor Study / Improv
160,000
20,000
20,000
920,000
5,120,000
4,020,000
10,260,000
8
NE3rd / NE 4th Corridor
184,000
315,300
807,508
3,017,000
2,000,000
2,100,000
8,423,808
9
Walkway Program
250,000
250,000
250,000
250,000
250,000
250,000
1,500,000
10
Transit Priority Signal System
238,500
238,500
11
Duvall Ave NE
799,500
2,242,000
3,041,500
12
Sunset/DuvallIntersection
381,000
381000
13
Arterial Circulation Program
200,000
200,000
200,000
200,000
250,000
250,000
1,300,000
14
Project Development/Predesign
175,000
175,000
200,000
200,000
200,000
200,000
1,150,000
15
Bridge Inspection & Repair
19,000
140,000
614,000
40,000
19,000
40,000
872,000
16
Loop Replacement Program
20,000
20,000
20,000
20,000
20,000
20,000
120,000
17
Sign Replacement Program
7,500
7,500
7,500
7,500
7,500
7,500
45,000
18
Pole Program
48,400
48,400
25,000
25,000
25,000
25,000
196,800
19
Transit Center Video
20,000
20,000
20
1-405 HOV Direct Access
20,000
10,000
5,000
35,000
21
Traffic Safety Program
109,100
40,000
40,000
40,000
40,000
40,000
309,100
22
Traffic Efficiency Program
251,900
252,000
30,000
30,000
30,000
30,000
623,900
23
CBD Bike & Ped. Connections
68,000
10,000
10,000
590,000
410,000
5,000
1,093,000
24
Arterial Rehab. Prog.
153,500
113,000
300,900
287,000
95,600
153,500
1,053,500
25
RR Crossing Safety Prog.
5,000
5,000
10,000
10,000
30,000
26
TDM Program
64,200
64,200
64,200
64,200
64,200
64,200
385,200
27
Lake Wash. Bv-Coulon to NE 44th
10,000
10,000
20,000
28
Trans Concurrency
40,000
10,000
10,000
40,000
10,000
10,000
120,000
29
Missing Links Program
30,000
30,000
30,000
30,000
30,000
30,000
180,000
30
GIS Needs Assessment
10,000
10,000
10,000
10,000
10,000
10,000
60,000
31
Sunset/1 405 Interchange
10,000
10,000
32
Grady Wy Corridor Study
45,000
120,000
70,000
520,000
1,270,000
1,270,000
3,295,000
33
Bicycle Route Dev. Program
20,000
18,000
18,000
110,000
80,000
80,000
326,000
34
Lake Wash. By -Park to Coulon Pk
15,000
15,000
35
Interagency Signal Coord.
12,000
12,000
36
Environmental Monitoring
100,000
75,000
50,000
25,000
25,000
25,000
300,000
37
SW 7th St./Lind Ave SW
12,000
12,000
38
Oakesdale Ave. SW Phase 2
20,000
20,000
39
Trans -Valley & Soos Creek Corr.
17,000
17,000
40
Logan Av Bridge Seismic Retrofit
2,500
2,500
41
WSDOT Coordination Program
10,000
10,000
10,000
10,000
10,000
10,000
60,000
42
1% for the Arts
50,000
30,000
30,000
50,000
30,000
30,000
220,000
43
Arterial HOV Program
30,000
10,000
40,000
44
Park -Sunset Corridor
5,000
50,000
100,000
1,190,000
650,000
1,995,000
45
Lind Av-SW 16th - SW 43rd
5,000
10,000
1,914,000
626,000
2,555,000
46
Benson Rd S / S 31 st St
62,000
62,000
47
South Renton Project
135,000
135,000
48
NE 4th St/Hoquiam Av NE
358,000
358,000
49
Trans Valley ITS
51000
5,000
50
Grady Wy Approach at Rainier Av
20,000
20,000
51
Houser Wy S - Main to Burnett
810,000
810,000
52
Lake Wash. By Slip Plane
100,000
147,000
378,400
625,400
53
Logan Av Concrete Panel Repair
460,000
460,000
54
Carr/Mill Signal
5,000
10,000
20,000
340,000
400,000
775,000
55
Duvall Ave NE - King County
926,500
1,928,802
1,680,400
4,535,702
Total Expenditures
6,776,760
7,967,202
5,654,612
19,629,996
46,322,300
37,930,200
124,281,070
�.-Y<� aq s� 'Including unfunded amounts.
ON17/1003 6.13
4-1 DRAFT
CITY OF RENTON
PLAN NINGIBUILDINGIPUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
SUMMARY OF FUNDING SOURCES
Period
ITEM
Period Total
2004
2005
2006
2007
2008
2009
SIX -YEAR PROJECT COSTS:
Project Development
3,666,300
913,400
631,100
534,200
534,200
529,200
524,200
Precon Eng/Admin
8,544,868
2,415,160
1,117,900
829,612
3,589,196
441,000
152,000
R-O-W (includes Admin)
6,819,702
1,192,300
248,402
3,079,000
2,300,000
Construction Contract Fee
93,971,730
1,557,030
5,180,600
3,740,600
10,892,400
38,908,100
33,693,000
Construction Eng/Admin
9,939,200
225,500
591,300
398,700
1,342,700
3,992,500
3,388,500
Other
1,339,270
473,370
197,900
151,500
192,500
151,500
172,500
Sub - TOTAL SIX -YEAR COST
124,281,070
6,776,760
7,967,202
5,654,612
19,629,996
46,322,300
37,930,200
SOURCE OF FUNDS:
1/2 Cent Gas Tax
2,091,000
348,500
348,500
348,500
348,500
348,500
348,500
Business License Fee
11,280,000
1,880,000
1,880,000
1,880,000
1,880,000
1,880,000
1,880,000
* This revenue is at risk.
Vehicle License Fee "
2,100,000
350,000
350,000
350,000
350,000
350,000
350,000
Grants In -Hand
6,933,766
1,840,542
3,549,277
1,151,000
392,947
Mitigation In -Hand
3,207,153
1,205,670
821,647
760,336
419,500
L.I.D.'s Formed
Other In -Hand'"
2,823,602
1,152,048
1,017,778
608,776
15,000
15,000
15,000
Sub -TOTAL SIX -YEAR FUNDED
28,435,521
6,776,760
7,967,202
5,098,612
3,405,947
2,593,500
2,593,500
Grants Proposed
4,103,000
556,000
1,635,000
1,912,000
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
12,420,000
2,637,000
5,753,000
4,030,000
Undetermined
79,322,549
11,952,049
36,063,800
31,306,700
summ_of_source 0611=003 6:13
4-2 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
1/2 Cent Gas Tax
TIP
Project Title
2004
2005
2006
2007
2008
2009
Period
Total
1
Street Overlay Program
348,500
348,500
348,500
348,500
348,500
348,500
2,091,000
2
SR167 / SW 27th St/ Strander By
3
Strander By/SW 27th St Connect.
4
SR169 HOV -140th to SR900
5
Renton Urban Shuttle (RUSH)
6
Transit Program
7
Rainier Av Corridor Study / Improv
8
NE3rd / NE 4th Corridor
9
Walkway Program
10
Transit Priority Signal System
11
Duvall Ave NE
12
Sunset/DuvallIntersection
13
Arterial Circulation Program
14
Project Development/Predesign
15
Bridge Inspection & Repair
16
Loop Replacement Program
17
Sign Replacement Program
18
Pole Program
19
Transit Center Video
20
1-405 HOV Direct Access
21
Traffic Safety Program
22
Traffic Efficiency Program
23
CBD Bike 8T Ped. Connections
24
Arterial Rehab. Prog.
25
RR Crossing Safety Prog.
26
TDM Program
27
Lake Wash. Bv-Coulon to NE 44th
28
Trans Concurrency
29
Missing Links Program
30
GIS Needs Assessment
31
Sunset/1-405Interchange
32
Grady Wy Corridor Study
33
Bicycle Route Dev. Program
34
Lake Wash. By -Park to Coulon Pk
35
Interagency Signal Coord.
36
Environmental Monitoring
37
SW 7th St./Lind Ave SW
38
Oakesdale Ave. SW Phase 2
39
Trans -Valley & Soos Creek Corr.
40
Logan Av Bridge Seismic Retrofit
41
WSDOT Coordination Program
42
1% for the Arts
43
Arterial HOV Program
44
Park -Sunset Corridor
45
Lind Av-SW 16th - SW 43rd
46
Benson Rd S / S 31 st St
47
South Renton Project
48
NE 4th St/Hoquiam Av NE
49
Trans Valley ITS
50
Grady Wy Approach at Rainier Av
51
Houser Wy S - Main to Burnett
52
Lake Wash. By Slip Plane
53
Logan Av Concrete Panel Repair
54
Carr/Mill Signal
55
Duvall Ave NE - King County
Total Sources
348,500
348,500
348,500
348,500
348,500
348,500
2,091,000
6w- Tm 06/172003 613
4-3 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Business License Fee
TIP
Project Title
2004
2005
2006
2007 .
2008
2009
Period
Total
1
Street Overlay Program
82,100
56,500
56,500
56,500
56,500
56,500
364,600.
2
SR167 / SW 27th St/ Strander By
10,000
10,000
10,000
10,000
10,000
50,000
3
Strander By/SW 27th St Connect.
241,024
102,728
280,800
364,200
406,111
1,394,863
4
SR169 HOV -140th to SR900
6,100
50,000
173,000
229,100
5
Renton Urban Shuttle (RUSH)
60,000
55,000
55,000
55,000
55,000
55,000
339,000
6
Transit Program
40,000
35,000
35,000
50,000
50,000
50,000
260,000
7 IRainier
Av Corridor Study / Improv
40,000
20,000
20,000
20,000
20,000
20,000
140,000
8
1 NE3rd / NE 4th Corridor
323,072
100,000
180,200
603,272
9
lWalkway Program
70,000
70,000
250,000
170,000
170,000
170,000
900,000
10
Transit Priority Signal System
500
500
11
Duvall Ave NE
11,000
11,000
12
Sunset/DuvallIntersection
12,376
12,376
13
Arterial Circulation Program
200,000
200,000
200,000
200,000
250,000
250,000
1,300,000
14
Project Development/Predesign
175,000
175,000
200,000
200,000
200,000
200,000
1,150,000
15
Bridge Inspection & Repair
19,000
140,000
58,000
40,000
19,000
40,000
316,000
16
Loop Replacement Program
20,000
20,000
20,000
20,000
20,000
20,000
120,000
17
Sign Replacement Program
7,500
7,500
7,500
7,500
7,500
7,500
45,000
18
Pole Program
48,400
48,400
25,000
25,000
25,000
25,000
196,800
19
Transit Center Video
20,000
20,000
20
1-405 HOV Direct Access
20,000
10,000
5,000
35,000
21
Traffic Safety Program
109,100
40,000
40,000
40,000
40,000
40,000
309,100
22
Traffic Efficiency Program
251,900
252,000
30,000
30,000
30,000
30,000
623,900
23
CBD Bike & Ped. Connections
68,000
10,000
10,000
213,500
10,000
5,000
316,500
24
Arterial Rehab. Prog.
50,489
55,000
50,000
50,000
95,600
100,489
401,578
25
RR Crossing Safety Prog.
5,000
5,0001
10,000
10,000
30,000
26
TDM Program
49,200
49,200
49,200
49,200
49,200
49,200
295,200
27
Lake Wash. Bv-Coulon to NE 44th
10,000
10,000
20,000
28
Trans Concurrency
40,000
10,000
10,000
40,000
10,000
10,000
120,000
29
Missing Links Program
30,000
30,000
30,000
30,000
30,000
30,000
180,000
30
GIS Needs Assessment
10,000
10,000
10,000
10,000
10,000
10,000
60,000
31
Sunset/1-405Interchange
10,000
10,000
32
Grady Wy Corridor Study
45,000
120,000
70,000
20,000
20,000
20,000
295,000
33
Bicycle Route Dev. Program
20,000
18,000
18,000
20,000
80,000
20,000
176,000
34
Lake Wash. By -Park to Coulon Pk
15,000
15,000
35
Interagency Signal Coord.
12,000
12,000
36
Environmental Monitoring
26,000
25,000
25,000
12,500
25,000
25,000
138,500
37
SW 7th St./Lind Ave SW
-279
-279
38
Oakesdale Ave. SW Phase 2
39
Trans -Valley & Soos Creek Corr.
4,790
4,790
40
Logan Av Bridge Seismic Retrofit
2,500
2,500
41
WSDOT Coordination Program
10,000
10,000
10,000
10,000
10,000
10,000
60,000
42
1% for the Arts
50,000
30,000
30,000
50,000
30,000
30,000
220,000
43
Arterial HOV Program
30,000
10,000
40,000
44
Park -Sunset Corridor
30,000
100,000
20,000
20,000
170,000
45
Lind Av-SW 16th - SW 43rd
5,000
5,000
46
Benson Rd S / S 31st St
11,700
11,700
47
South Renton Project
48
NE 4th St/Hoquiam Av NE
90,000
90,000
49
Trans Valley ITS
5,000
5,000
50
Grady Wy Approach at Rainier Av
51
Houser Wy S - Main to Burnett
52
Lake Wash. By Slip Plane
100,000
50,000
1501000
53
Logan Av Concrete Panel Repair
54
Carr/Mill Signal
5,0001
10,000
20,000
35,600
55
Duvall Ave NE - King County
Total Sources
1,880,000
1 1,880,000
1,880,000
1,880,000
1,880,000
1,880,000
11,280,000
Ouv- w
4-4 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Vehicle License Fee *
TIP
Project Title
2004
2005
2006
2007
2008
2009
Period
Total
1
Street Overlay Program
2
SR167 / SW 27th St/ Strander By
10,000
10,000
3
Strander By/SW 27th St Connect.
75,789
62,000
350,000
350,000
350,000
236,989
1,424,778
4
SR169 HOV -140th to SR900
5
Renton Urban Shuttle (RUSH)
6
Transit Program
7
Rainier Av Corridor Study / Improv
8
NE3rd / NE 4th Corridor
75,990
210,000
285,990
9
Walkway Program
10
Transit Priority Signal System
18,000
18,000
11
Duvall Ave NE
100,000
100,000
12
Sunset/DuvallIntersection
13
Arterial Circulation Program
14
Project Development/Predesign
15
Bridge Inspection & Repair
16
Loop Replacement Program
17
Sign Replacement Program
18
Pole Program
19
Transit Center Video
20
1-405 HOV Direct Access
21
Traffic Safety Program
22
Traffic Efficiency Program
23
CBD Bike & Ped. Connections
24
Arterial Rehab. Prog.
53,011
58,000
53,011
164,022
25
RR Crossing Safety Prog.
26
TDM Program
27
Lake Wash. Bv-Coulon to NE 44th
28
Trans Con currency
29
Missing Links Program
30
GIS Needs Assessment
31
Sunset/1.405Interchange
32
Grady Wy Corridor Study
33
Bicycle Route Dev. Program
60,000
60,000
34
Lake Wash. By -Park to Coulon Pk
35
Interagency Signal Coord.
36
Environmental Monitoring
37
SW 7th St./Lind Ave SW
38
Oakesdale Ave. SW Phase 2
39
Trans -Valley & Soos Creek Corr.
12,210
12,210
40
Logan Av Bridge Seismic Retrofit
41
WSDOT Coordination Program
42
1% for the Arts
43
Arterial HOV Program
44
Park -Sunset Corridor
5,000
20,000
25,000
45
Lind Av-SW 16th - SW 43rd
46
Benson Rd S / S 31 st St
47
South Renton Project
48
NE 4th St/Hoquiam Av NE
49
Trans Valley ITS
50
Grady Wy Approach at Rainier Av
51
Houser Wy S - Main to Burnett
52
Lake Wash. By Slip Plane
53
Logan Av Concrete Panel Repair
54
Carr/Mill Signal
55
Duvall Ave NE - King County
Total Sources
350,000
350,000
350,000
350,000
350,000
350,000
2,100,000
" I his revenue is at risk.
4-5 DRAFT
06/120000 6 13
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Grants In -Hand
TIP
Project Title
2004
2005
2006
2007
2008
2009
Period
Total
1 Istreet
Overlay Program
2
SR167 / SW 27th St/ Strander By
3
Strander By/SW 27th St Connect.
505,563
505,563
4
SR169 HOV -140th to SR900
392,947
392,947
5
Renton Urban Shuttle (RUSH)
6
Transit Program
7
Rainier Av Corridor Study / Improv
8 1
NE3rd / NE 4th Corridor
9 lWalkway
Program
10 ITransit
Priority Signal System
50,000
50,000
11
Duvall Ave NE
639,600
1,888,777
2,528,377
12
Sunset/Duvall Intersection
340,500
340,500
13
Arterial Circulation Program
14
Project Development/Predesign
15
Bridge Inspection & Repair
16
Loop Replacement Program
17
Sign Replacement Program
18
Pole Program
19
Transit Center Video
20
1-405 HOV Direct Access
21
Traffic Safety Program
22
Traffic Efficiency Program
23
CBD Bike & Ped. Connections
24
Arterial Rehab. Prog.
25
RR Crossing Safety Prog.
26
TDM Program
27
Lake Wash. Bv-Coulon to NE 44th
28
Trans Concurrency
29
Missing Links Program
30
GIS Needs Assessment
31
Sunset/1-405Interchange
32
Grady Wy Corridor Study
33
Bicycle Route Dev. Program
34
Lake Wash. By -Park to Coulon Pk
35
Interagency Signal Coord.
36
Environmental Monitoring
37
SW 7th St./Lind Ave SW
12,279
12,279
38
Oakesdale Ave. SW Phase 2
39
Trans -Valley & Soos Creek Corr.
40
Logan Av Bridge Seismic Retrofit
41
WSDOT Coordination Program
42
1% for the Arts
43
Arterial HOV Program
44
Park -Sunset Corridor
45
Lind Av-SW 16th - SW 43rd
46
Benson Rd S / S 31st St
47
South Renton Project
48
NE 4th St/Hoquiam Av NE
49
Trans Valley ITS
50
Grady Wy Approach at Rainier Av
51
Houser Wy S - Main to Burnett
52
Lake Wash. By Slip Plane
53
Logan Av Concrete Panel Repair
54
Carr/Mill Signal
55
Duvall Ave NE - King County
633,100
1,320,000
1,151,000
3,104,100
Total Sources
1,840,5421
3,549,2771
1,151,000
392,947
6,933,766
GrertSiMimO
4-6 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Mitigation In -Hand
TIP
Project Title
2004
2005
2006
2007
2008
2009
Period
Total
1
Street Overlay Program
2
SR167 / SW 27th St/ Strander By
3
Strander By/SW 27th St Connect.
300,000
100,000
20,000
420,000
4
SR169 HOV -140th to SR900
31,460
31,460
5
Renton Urban Shuttle (RUSH)
6
Transit Program
7
Rainier Av Corridor Study / Improv
120,000
120,000
8
NE3rd / NE 4th Corridor
108,010
105,300
484,436
697,746
9
Walkway Program
180,000
180,000
360,000
10
Transit Priority Signal System
11
Duvall Ave NE
48,900
353,223
402,123
12
Sunset/DuvallIntersection
28,124
28,124
13
Arterial Circulation Program
14
Project Development/Predesign
15
Bridge Inspection & Repair
16
Loop Replacement Program
17
Sign Replacement Program
18
Pole Program
19
Transit Center Video
20
1-405 HOV Direct Access
21
Traffic Safety Program
22
Traffic Efficiency Program
23
CBD Bike & Ped. Connections
150,000
150,000
24
Arterial Rehab. Prog.
250,900
237,000
487,900
25
RR Crossing Safety Prog.
26
TDM Program
27
Lake Wash. Bv-Coulon to NE 44th
28
Trans Concurrency
29
Missing Links Program
30
GIS Needs Assessment
31
Sunset/1-405Interchange
32
Grady Wy Corridor Study
33
Bicycle Route Dev. Program
34
Lake Wash. By -Park to Coulon Pk
35
Interagency Signal Coord.
36
Environmental Monitoring
74,000
50,000
25,000
12,500
161,500
37
SW 7th St./Lind Ave SW
38
Oakesdale Ave. SW Phase 2
39
Trans -Valley & Soos Creek Corr.
40
Logan Av Bridge Seismic Retrofit
41
WSDOT Coordination Program
42
1% for the Arts
43
Arterial HOV Program
44
Park -Sunset Corridor
45
Lind Av-SW 16th - SW 43rd
5,000
5,000
10,000
46
Benson Rd S / S 31st St
50,300
50,300
47
South Renton Project
48
NE 4th St/Hoquiam Av NE
268,000
268,000
49
Trans Valley ITS
50
Grady Wy Approach at Rainier Av
20,000
20,000
51
Houser Wy S - Main to Burnett
52
Lake Wash. By Slip Plane
53
Logan Av Concrete Panel Repair
54
Carr/Mill Signal
55
Duvall Ave NE - King County
Total Sources
1,205,670
821,647
760,336
419,500
3,207,153
Mi6paU� irYierq
OW]1I06] 6.13
4-7 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
L.I.D.'s Formed
TIP
Project Title
2004
2005
2006
2007
2008
2009
Period
Total
1
Street Overlay Program
2
SR167 / SW 27th St/ Strander By
3
Strander By/SW 27th St Connect.
4
SR169 HOV -140th to SR900
5
Renton Urban Shuttle (RUSH)
6
Transit Program
7
Rainier Av Corridor Study / Improv
8
NE3rd / NE 4th Corridor
9
Walkway Program
10
Transit Priority Signal System
11
Duvall Ave NE
12
Sunset/DuvallIntersection
13
Arterial Circulation Program
14
Project Development/Predesign
15
Bridge Inspection & Repair
16
Loop Replacement Program
17
Sign Replacement Program
18
Pole Program
19
Transit Center Video
20
1-405 HOV Direct Access
21
Traffic Safety Program
22
Traffic Efficiency Program
23
CBD Bike & Ped. Connections
24
Arterial Rehab. Prog.
25
RR Crossing Safety Prog.
26
TDM Program
27
Lake Wash. Bv-Coulon to NE 44th
28
Trans Concurrency
29
Missing Links Program
30
GIS Needs Assessment
31
Sunset/1-405Interchange
32
Grady Wy Corridor Study
33
Bicycle Route Dev. Program
34
Lake Wash. By -Park to Coulon Pk
35
Interagency Signal Coord.
36
Environmental Monitoring
37
1 SW 7th St./Lind Ave SW
38
10akesdale Ave. SW Phase 2
39
Trans -Valley & Soos Creek Corr.
40
Logan Av Bridge Seismic Retrofit
41
WSDOT Coordination Program
42
1% for the Arts
43
Arterial HOV Program
44
Park -Sunset Corridor
45
Lind Av-SW 16th - SW 43rd
46
Benson Rd S / S 31st St
47
South Renton Project
48
NE 4th St/Hoquiam Av NE
49
Trans Valley ITS
50
Grady Wy Approach at Rainier Av
51
Houser Wy S - Main to Burnett
52
Lake Wash. By Slip Plane
53
Logan Av Concrete Panel Repair
54
Carr/Mill Signal
55
Duvall Ave NE - King County
Total Sources
LIDO Formes ON12aW3 6.13
4-8 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Other -in -Hand
TIP
Project Title
2004
2005
2006
2007
2008
2009
Period
Total
1
Street Overlay Program
2
SR167 / SW 27th St/ Strander By
3
Strander By/SW 27th St Connect.
518,648
296,976
64,376
880,000
4
SR169 HOV -140th to SR900
5
Renton Urban Shuttle (RUSH)
6
Transit Program
7
Rainier Av Corridor Study / Improv
8
NE3rd / NE 4th Corridor
9
Walkway Program
10
Transit Priority Signal System
170,000
170,000
11
Duvall Ave NE
12
Sunset/DuvallIntersection
13
Arterial Circulation Program
14
Project Development/Predesign
15
Bridge Inspection & Repair
16
Loop Replacement Program
17
Sign Replacement Program
18
Pole Program
19
Transit Center Video
20
1-405 HOV Direct Access
21
Traffic Safety Program
22
Traffic Efficiency Program
23
CBD Bike & Ped. Connections
24
Arterial Rehab. Prog.
25
RR Crossing Safety Prog.
26
TDM Program
15,000
15,000
15,000
15,000
15,000
15,000
90,000
27
Lake Wash. Bv-Coulon to NE 44th
28
Trans Concurrency
29
Missing Links Program
30
GIS Needs Assessment
31
Sunset/1405Interchange
32
Grady Wy Corridor Study
33
Bicycle Route Dev. Program
34
Lake Wash. By -Park to Coulon Pk
35
Interagency Signal Coord.
36
Environmental Monitoring
37
SW 7th St/Lind Ave SW
38
Oakesdale Ave. SW Phase 2
20,000
20,000
39
Trans -Valley & Soos Creek Corr.
40
Logan Av Bridge Seismic Retrofit
41
WSDOT Coordination Program
42
1% for the Arts
43
Arterial HOV Program
44
Park -Sunset Corridor
45
Lind Av-SW 16th - SW 43rd
46
Benson Rd S / S 31st St
47
South Renton Project
135,000
135,000
48
NE 4th St/Hoquiam Av NE
49
Trans Valley ITS
50
Grady Wy Approach at Rainier Av
51
Houser Wy S - Main to Burnett
52
Lake Wash. By Slip Plane
97,000
97,000
53
Logan Av Concrete Panel Repair
54
Carr/Mill Signal
55 1
Duvall Ave NE - King County
293,4001
608,802
529,400
1,431,602
Total Sources
1,152,048
1,017,778
608,776
15,000
15,0001
15,000
2,823,602
M12QC03 6.13
4-9 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Grants Proposed
TIP
Project Title
2004
2005
2006
2007
2008
2009
Period
Total
1
Street Overlay Program
2
SR167 / SW 27th St/ Strander By
3
Strander By/SW 27th St Connect.
4
SR169 HOV -140th to SR900
665,000
1,132,000
1,797,000
5
Renton Urban Shuttle (RUSH)
6
Transit Program
7
Rainier Av Corridor Study / Improv
8
NE3rd / NE 4th Corridor
9
Walkway Program
10
Transit Priority Signal System
11
Duvall Ave NE
12
Sunset/DuvallIntersection
13
Arterial Circulation Program
14
Project Development/Predesign
15
Bridge Inspection & Repair
556,000
556,000
16
Loop Replacement Program
17
Sign Replacement Program
18
Pole Program
19
Transit Center Video
20
1-405 HOV Direct Access
21
Traffic Safety Program
22
Traffic Efficiency Program
23
CBD Bike & Ped. Connections
120,000
400,000
520,000
24
Arterial Rehab. Prog.
25
RR Crossing Safety Prog.
26
TDM Program
27
Lake Wash. Bv-Coulon to NE 44th
28
Trans Concurrency
29
Missing Links Program
30
GIS Needs Assessment
31
SunseVI-405Interchange
32
Grady Wy Corridor Study
33
Bicycle Route Dev. Program
34
Lake Wash. By -Park to Coulon Pk
35
Interagency Signal Coord.
36
Environmental Monitoring
37
SW 7th St./Lind Ave SW
38
Oakesdale Ave. SW Phase 2
39
Trans -Valley & Soos Creek Corr.
40
1 Logan Av Bridge Seismic Retrofit
41
JWSDOT Coordination Program
42
1% for the Arts
43
Arterial HOV Program
44
Park -Sunset Corridor
220,000
180,000
400,000
45
Lind Av-SW 16th - SW 43rd
630,000
200,000
830,000
46
Benson Rd S / S 31st St
47
South Renton Project
48
NE 4th SVHoquiam Av NE
49
Trans Valley ITS
50
Grady Wy Approach at Rainier Av
51
Houser Wy S - Main to Burnett
52
Lake Wash. By Slip Plane
53
Logan Av Concrete Panel Repair
54
Carr/Mill Signal
55
Duvall Ave NE - King County
Total Sources
556,000
1,635,000
1,912,000
4,103,000
G+mrs_PrcpeseE M1=003 613
4 - 10 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Mitigation Proposed
TIP
Project Title
2004
2005
2006
2007
2008
2009
Period
Total
1
Street Overlay Program
2
SR167 / SW 27th St/ Strander By
3
Strander By/SW 27th St Connect.
4
SR169 HOV -140th to SR900
5
Renton Urban Shuttle (RUSH)
6
Transit Program
7
Rainier Av Corridor Study / Improv
8
NE3rd / NE 4th Corridor
9
Walkway Program
10
Transit Priority Signal System
11
Duvall Ave NE
12
Sunset/Duvall intersection
13
Arterial Circulation Program
14
Project Development/Predesign
15
Bridge Inspection & Repair
16
Loop Replacement Program
17
Sign Replacement Program
18
Pole Program
19
Transit Center Video
20
1-405 HOV Direct Access
21
Traffic Safety Program
22
Traffic Efficiency Program
23
CBD Bike & Ped. Connections
24
Arterial Rehab. Prog.
25
RR Crossing Safety Prog.
26
TDM Program
27
Lake Wash. Bv-Coulon to NE 44th
28
Trans Concurrency
29
Missing Links Program
30
GIS Needs Assessment
31
SunseU1-405Interchange
32
Grady Wy Corridor Study
33
Bicycle Route Dev. Program
34
Lake Wash. By -Park to Coulon Pk
35
Interagency Signal Coord.
36
Environmental Monitoring
37
SW 7th St./Lind Ave SW
38
Oakesdale Ave. SW Phase 2
39
Trans -Valley & Soos Creek Corr.
40
Logan Av Bridge Seismic Retrofit
41
WSDOT Coordination Program
42
1%, for the Arts
43
Arterial HOV Program
44
Park -Sunset Corridor
45
Lind Av-SW 16th - SW 43rd
46
Benson Rd S / S 31st St
TF
South Renton Project
48
NE 4th St/Hoquiam Av NE
49
Trans Valley ITS
50
Grady Wy Approach at Rainier Av
51
Houser Wy S -Main to Burnett
52
Lake Wash. By Slip Plane
53
Logan Av Concrete Panel Repair
Carr/Mill Signal
_5T
55
IDuvall Ave NE - King County
Total Sources
Mio7�an Frelwse0 0611MM3 613
4 -11 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
L.I.D.'s Proposed
TIP
Project Title
2004
2005
2006
2007
2008
2009
Period
Total
1 IStreet
Overlay Program
2
SR167 / SW 27th St/ Strander By
3 1
Strander By/SW 27th St Connect.
4 1
SR169 HOV -140th to SR900
5 lRenton
Urban Shuttle (RUSH)
6 ITransit
Program
7
Rainier Av Corridor Study / Improv
8
NE3rd / NE 4th Corridor
9 lWalkway
Program
10 ITransit
Priority Signal System
11 IDuvall
Ave NE
12
Sunset/DuvallIntersection
13
Arterial Circulation Program
14
Project Development/Predesign
15
Bridge Inspection & Repair
16
Loop Replacement Program
17
Sign Replacement Program
18 jPole
Program
19
Transit Center Video
20
1-405 HOV Direct Access
21
Traffic Safety Program
22
Traffic Efficiency Program
23
CBD Bike & Ped. Connections
24
Arterial Rehab. Prog.
25
IRR Crossing Safety Prog.
26
jTDM Program
27
1 Lake Wash. Bv-Coulon to NE 44th
28
ITrans Concurrency
29
IMissing Links Program
30
IGIS Needs Assessment
31
Sunset/1-405Interchange
32
lGrady Wy Corridor Study
33
1 Bicycle Route Dev. Program
34
ILake Wash. By -Park to Coulon Pk
35
linteragency Signal Coord.
36
jEnvironmental Monitoring
37
1 SW 7th St./Lind Ave SW
38
10akesdale Ave. SW Phase 2
39
Trans -Valley 81 Soos Creek Corr.
40
Logan Av Bridge Seismic Retrofit
41
JWSDOT Coordination Program
42
11% for the Arts
43
jArterial HOV Program
44
Park -Sunset Corridor
45
Lind AvSW 16th - SW 43rd
46
Benson Rd S / S 31st St
47
South Renton Project
48
NE 4th St/Hoquiam Av NE
49
Trans Valley ITS
50
lGrady Wy Approach at Rainier Av
51
1 Houser Wy S - Main to Burnett
52
Lake Wash. By Slip Plane
53
Logan Av Concrete Panel Repair
54
Carr/Mill Signal
55
Duvall Ave NE - King County
Total Sources
LID's Pfopose0 06117R00 613
4-12 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Other Proposed
TIP
Project Title
2004
2005
2006
2007
2008
2009
Period
Total
1
Street Overlay Program
2
SR167 / SW 27th St/ Strander By
3
Strander By/SW 27th St Connect.
4
SR169 HOV -140th to SR900
277,000
173,000
450,000
5
Renton Urban Shuttle (RUSH)
6
Transit Program
30,000
30,000
30,000
90,000
7
Rainier Av Corridor Study / Improv
900,000
5,100,000
4,000,000
10,000,000
8
NE3rd / NE 4th Corridor
9
Walkway Program
10
Transit Priority Signal System
11
Duvall Ave NE
12
Sunset/DuvallIntersection
13
Arterial Circulation Program
14
Project Development/Predesign
15
Bridge Inspection & Repair
16
Loop Replacement Program
17
Sign Replacement Program
18
Pole Program
19
Transit Center Video
20
1-405 HOV Direct Access
21
Traffic Safety Program
22
Traffic Efficiency Program
23
CBD Bike & Ped. Connections
24
Arterial Rehab. Prog.
25
RR Crossing Safety Prog.
26
TDM Program
27
Lake Wash. Bv-Coulon to NE 44th
28
Trans Concurrency
29
Missing Links Program
30
PIS Needs Assessment
31
Sunset/1-405Interchange
32
Grady Wy Corridor Study
33
Bicycle Route Dev. Program
34
Lake Wash. By -Park to Coulon Pk
35
Interagency Signal Coord.
36
Environmental Monitoring
37
SW 7th St./Lind Ave SW
38
Oakesdale Ave. SW Phase 2
39
Trans -Valley & Soos Creek Corr.
40
Logan Av Bridge Seismic Retrofit
41
WSDOT Coordination Program
42
1% for the Arts
43
Arterial HOV Program
44
Park -Sunset Corridor
950,000
450,000
1,400,000
45
Lind Av-SW 16th - SW 43rd
46
Benson Rd S / S 31st St
47
South Renton Project
48
NE 4th St[Hoquiam Av NE
49
Trans Valley ITS
50
Grady Wy Approach at Rainier Av
51
Houser Wy S - Main to Burnett
480,000
480,000
52
Lake Wash. By Slip Plane
53
Logan Av Concrete Panel Repair
54
Carr/Mill Signal
55 IDuvall
Ave NE - King County
Total Sources
2,637,000
5,753,000
4,030,000
12,420,000
0+_pr sa
O6/17l100] 6'.13
4-13 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Undetermined
TIP
Project Title
2004
2005
2006
2007
2008
2009
Period
Total
1
Street Overlay Program
2
SR167 / SW 27th St/ Strander By
3
Strander By/SW 27th St Connect.
3,332,096
29,985,800
28,056,900
61,374,796
4
SR169 HOV -140th to SR900
2,134,053
1,922,000
4,056,053
5
Renton Urban Shuttle (RUSH)
6
Transit Program
7
Rainier Av Corridor Study / Improv
8
NE3rd / NE 4th Corridor
2,917,000
2,000,000
1,919,800
6,836,800
9
Walkway Program
80,000
80,000
80,000
240,000
10
Transit Priority Signal System
11
Duvall Ave NE
12
Sunset/DuvallIntersection
13
Arterial Circulation Program
14
Project Development/Predesign
15
Bridge Inspection & Repair
16
Loop Replacement Program
17
Sign Replacement Program
18
Pole Program
19
Transit Center Video
20
1-405 HOV Direct Access
21
Traffic Safety Program
22
Traffic Efficiency Program
23
CBD Bike & Ped. Connections
106,500
106,500
24
Arterial Rehab. Prog.
25
RR Crossing Safety Prog.
26
TDM Program
27
Lake Wash. Bv-Coulon to NE 44th
28
Trans Concurrency
29
IMissing Links Program
30
IGIS Needs Assessment
31
Sunsettl-405Interchange
32
Grady Wy Corridor Study
500,000
1,250,000
1,250,000
3,000,000
33
Bicycle Route Dev. Program
90,000
90,000
34
Lake Wash. By -Park to Coulon Pk
35
Interagency Signal Coord.
36
Environmental Monitoring
37
SW 7th St./Lind Ave SW
38
Oakesdale Ave. SW Phase 2
39
Trans -Valley & Soos Creek Corr.
40
Logan Av Bridge Seismic Retrofit
41
WSDOT Coordination Program
42
1% for the Arts
43
Arterial HOV Program
44
Park -Sunset Corridor
45
Lind Av-SW 16th - SW 43rd
1,284,000
426,000
1,710,000
46
Benson Rd S / S 31st St
47
South Renton Project
48
NE 4th St/Hoquiam Av NE
49
Trans Valley ITS
50
Grady Wy Approach at Rainier Av
51
Houser Wy S - Main to Burnett
330,000
330,000
52
Lake Wash. By Slip Plane
378,400
378,400
53
Logan Av Concrete Panel Repair
460,000
460,000
54
Carr/Mill Signal
340,000
400,000
740,000
55
Duvall Ave NE - King County
Total Sources
11,952,049
36,063,800
31,306,700
79,322,549
l,M�geO_Sum ON12r2W3 613
4 -14 DRAFT
SECTION FIVE
PROJECT DESCRIPTIONS
• Summary of TIP Projects & Costs 5-la
• Detailed Project Descriptions 5-1 to 5-54
CITY OF RENTON PLANNING / BUILDING / PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2003-2008
Total Proiect Costs
TIP
Project Title
Previous
Costs
2004
2006
2006
2007
2008
2009
Six -Year
Period Total
Total
Cost
Total
Funded
Total
Unfunded
1
Street Overlay Program
1,387,528
430,600
405,000
405.000
405,000
405,000
405,000
2,455,600
3,843,128
3,843,128
2
SR167 / SW 27th St/ Strander By
357,574
10,000
10,000
10,000
10,000
10,000
10,000
60.000
417,574
417,574
3
Strander By/SW 27th St Connect.
400,000
1,400,000
700,000
517,104
3,982,896
30,700,000
28,700,000
66,000,000
66,400,000
5.025,204
61,374,796
4
SR169 HOV.- 140th to SR900
1,052,440
37,560
3,519,000
3,400,000
6,956,560
8,009,000
1,705.947
6,303,053
5
Renton Urban Shuttle (RUSH)
25,000
60,0001
55,000
55.000
55.000
55,000
55,000
335.0001
360,000
360,000
6
Transit Program
36,631
40,0001
35,000
35,000
80,000
80,000
80,000
350,000
386,631
296,631
90,000
7
Rainier Av Corridor Study / Improv.
102,909
160,000
20,000
20,000
920,000
5,120,000
4,020,000
10,260,000
10,362,909
362,909
10,000,000
a
9
NE3rd / NE 4th Corridor
Walkway Program
161.192
88,194
184,000
250,006
315,300
250.000
807,508
250,000
3,017,000
250,000
2,000,000
250.000
2,100,000
250,000
8,423,808
1,500.000
8,585,000
1.588,194
1,748,200
1,348,194
6.836,806
240.000
10
Transit Priority Signal System
1,021,770
238,500
238,500
1,260,270
1,260.270
11
Duvall Ave NE
393,300
799,500
2,242,000
3,041.500
3,434,800
3,434,800
12
Sunset/DuvallIntersection
59,000
381,000
381,000
440,000
440,000
13
Arterial Circulation Program
254,080
200,000
200,000
200,000
200,000
250,000
250,000
1,300,000
1,554,080
1,554,080
14
Project Develo ment/Predesign
237,227
175,000
175,000
200,000
200,000
200,000
200,000
1,150.000
1,387,227
1,387,227
15
Bridge Inspection & Repair
48,661
19,000
140,000
614,000
40,000
19,000
40,000
. 872,000
920,661
364,661
556,000
16
Loop Replacement Program
47,285
20,000
20,000
20,000
20,000
20,000
20,000
120,000
167,285
167,285
17
Sign Replacement Program
8,588
7,5001
7,500
7,500
7,500
7,500
7,5001
45,000
53,588
53,588
18
Pole Program
49,352
48,400
48,400
25,000
25,000
25,000
25,000
196,800
246,152
246,152
1s
Transit Center Video
40,000
20,000
20,000
60.000
60,000
20
1-406 HOV Direct Access
22,376
20,000
10,000
5,000
35,000
57,376
57,376
21
Traffic Safety Program
155,199
109,100
40,000
40,000
40,000
40,000
40,000
309,100
464,299
464,299
22
Traffic Efficiency Program
159,700
251,900
252,000
30.000
30,000
30,000
30,000
623,900
783,600
783,600
23
CBD Bike & Ped. Connections
42,550
68,000
10,0001
10,000
590,000
410,000
5,000
1,093,000
1,135,550
509.050
626,5 00
24
Arterial Rehab. Prog.
474,200
103,500
113,000
300,900
287,000
95,600
153,500
1.053,500
1,527,700
1.527,700
25
RR Crossing Safety Prog.
192.839
5,000
5,000
10.000
10,000
30,000
222,839
222,839
26
TDM Program
122,893
64,200
64,200
64.200
64,200
64,200
64.200
385,200
508,093
508,093
27
Lake Wash. Bv-Coulon to NE 44th
20,275
10,000
10,000
20,000
40,275
40,275
2e
Trans Concurrency
8,212
40,000
10,000
10,000
40,000
10,000
10,000
120,000
128,212
128,212
29
Missing Links Program
35,000
30,000
30,000
30,000
30,000
30,000
30,000
180,000
215,000
215,000
30
GIS Needs Assessment
30,478
10,000
10,000
10,000
10,000
10,000
10,000
60,000
90,478
90,478
31
Sunset/1-406Interchange
60,000
10,000
10,000
70.000
70,000
32
Grady Wy Corridor Study
30,000
45,000
120,000
70,000
520,000
1,270,000
1,270,0001
3,295,000
3,325,000
325,000
3,000,000
33
Bicycle Route Dev. Program
22.976
20,000
18,000
18,000
110,000
1 80,000
80,000
326,000
348,976
258,976
90,000
34
Lake Wash. By -Park to Coulon Pk
543,500
15,000
15,000
558,500
558,500
35
Interagency Signal Coord.
22,572
12,000
12.000
34,572
34,572
36
Environmental Monitoring
282,934
100,000
75,000
50,000
25,000
25,000
25,000
300,000
582,934
582,934
37
SW 7th St./Lind Ave SW
288,000
12,0001
12,000
300.000
300,000
38
Oakesdale Ave. SW Phase 2
2,193,106
20,0001
20,000
2,213,106
2,213,106
39
Trans -Valley & Soos Creek Corr.
11,500
17,000
17,000
28,500
28,500
4o
Logan Av Bridge Seismic Retrofit
233,899
2,500
1
2,500
236,399
236,399
41
WSDOT Coordination Program
17,860
10,000
10,000
10,000
10,000
10.000
10,000
60,000
77,860
77,860
42
1% for the Arts
74,750
50,000
30,000
30,000
50,000
30,000
30,000
220,000
294,750
294,750
43
Arterial HOV Program
132,354
30,000
10,000
40,000
172,354
172,354
44
Park -Sunset Corridor
5,000
5,000
50,000
100,000
1,190,000
650,000
1,995,000
2,000,000
250,000
1,800.050
4s
Lind Av-SW 16th - SW 43rd
5,000
10,000
1,914,000
626,000
2,555,000
2,555,000
15,000
2,540,000
46
Benson Rd S / S 31 st St
138,000
62,000
62,000
200,000
200,000
47
South Renton Project
40.000
135,000
135,000
175,000
175,000
48
NE 4th SUHoquiam Av NE
42,000
358,000
358,000
400,000
400,000
49
Trans Valley ITS
45.000
5,000
5,000
50,000
50.000
50
Grady Wy Ap roach at Rainier Av
600,000
20,000
20,000
620,000
620,000
51
Houser Wy S - Main to Burnett
810,000
810,000
810,000
1
810,000
52
Lake Wash. By Slip Plane
14.600
100,000
147,000
378.400
625,400
640,000
261,6001
378.400
53
Logan Av Concrete Panel Repair
460.000
460,000
460,000
460,000
54
Carr/Mill Signal
5,000
10,000
20,000
340,000
400,000
775,000
775,000
35,000
740,000
55
Duvall Ave NE - King Count
134,2
926,500
1,928,802
1,680,400
4,535,702
4,670,000
4,670,000
Total Sources
11,966,8012
67767601
7,967,2021
5,654,6121
19,629,9961
46,322,3001
37 930 200
124 281 0701
136,247,8721
40,402,323
96 846 649
oen2now 7 0
5-1a FINAL
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Street Overlay Program
Type: 1 - INFRASTRUCTURE
Functional Classification: N/A
Proj. Length: N/A
RANK: 1
CONTACT:
Fund:
Proj:
Bill Wressell
317
12108
425.430.7400
DESCRIPTION:
Annual program for repairing and resurfacing existing roadways, operating the City's Pavement
Management System and providing data for deficiency ratings.
JUSTIFICATION:
ACP overlay, SMA, and slurry seal of streets provide for improved driving surface and are
highly cost effective ways of avoiding expensive repairs and reconstruction. The computerized
Pavement Management System and video inventory of existing roadway conditions greatly
improve the efficiency of the Overlay Program.
STATUS:
Ongoing yearly program. $325,000 of Metro mitigation money spent in 2002.
CHANGES:
2002 Overlay Program to be completed in 2003. $55,200 from 2002 is split between 2003
and 2004 programs. A reduction of $5,000 per year in estimated 1/2 cent gas tax
revenue is reflected in the program.
un e 8 3 28 n un e
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent In 2002
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
Precon Eng/Admen
1,480
,080
9,400
60,000
0, 0
1 ,0
0,000
10,000
10,000
0,000
-O- (includes min
Construction Contract ee
3, ,624
_97T2'4
388,400
T15 ,600
80, 00
3
____33T000
37,000
35 ,000
355,000
Construction ng dmin
T16, 224
38,224
37,800
240,000
40,000
40,000
40,000
40,000
40,000
40,000
Other
I-OTAL EXPENSES
3,843,128
951,928
435,600
2,455,600
430,600
405,000
405,000
405,000
405,000
405,000
SOURCE OF FUNDS:
1 2 Cent Gas Tax
2,778,300
353,500
00
2,091,000
348, 00
348, 00
Business License Fee
540,682
122,6
53,400
364,600
2,1
6, 0
0
6, 00
6, 0
56,500
Vehicle License Fee
Grants In -Hand
Mitigation In -Hand
99, 6
150,
48,400
L..D. s Formed
Other In -Hand 103 etro)
325,000
325,000
Grants Proposed
Mitigation Propose
L.I.D.'s Proposed
Other Proosed
Undetermined
TOTAL SOUR=
3,843,1281
951,928
435,6001
2,455,600
430,600
405,000
405,000
405,000
405,000
405,000
a--y
0WIM003
5-1 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
SR 167 I/C / SW 27th St / Strander By Corridor Functional Classification: Minor Arterial Fund: 317 -
Proj. Length: Proj: 12138
Type: 2 - MULTI -MODAL / TDM RANK: 2 CONTACT: Keith Woolley 425.430.7318
DESCRIPTION:
Planning, coordination and oversight of the corridor project for the entire length. This includes arterial
HOV lanes on SW 27th Street from East Valley Rd. to Oakesdale Av. SW and the extension to West
Valley Hwy. (SR-181), as well as the coordination with WSDOT for a new interchange at SR-167 and
SW 27th Street.
JUSTIFICATION:
There are numerous projects within the Renton Valley, led by a number of different agencies. This
project provides the necessary coordination to ensure future transportation needs within the Renton
Valley are served by the SW 27th St corridor in coordination with: King County Carr Rd project, King
County TransValley project, Sound Transit rail station and ST Express transit service, King County
Metro transit, and WSDOT 1-405 and SR-167 improvements.
STATUS:
Segments 1 and 2 received contract approval in spring of 2003 and proceeded into
design. The City of Tukwila transit oriented development (TOD) project adjacent to the
SW 27th St / Strander By Corridor will be initiated in May 2003.
CHANGES:
Design portion of segments 1 and 2 were shifted to a new TIP project. This corridor
project remains as existing.
u n e 1 n u n e
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent Pre-2003
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
406,354
341,
5,00
60,000
0
0
0
o— 0
Precon ng min
,2
R-O- (includes mm
Construction Contract Fee
Construction ng A mm
Other
TOTAL EXPENSE�
417,574
352,574
5,000
60,000
10,000
10,000
10,000
10,000
10,000
10,000
SOURCE OF FMVD'S—.
1/2 Cent Gas Tax
Business License Fee
57,662
2,662,000
50,000
,0
, 00
0,000
Ve ice License Fee
00
10,00
Grants In -Hand
,9
Mitigation n- an
69,961
L.. . s Formed
Other In -Han
Grants ro osed
Mitigation Propose
s Proposed
Other Proposed
Undetermined
TOTAL SOUR=I
417,5741
352,5741
5,0001
60,000
10,000
10,000
10,000
10,000
10,000
00.000
�d17l1007 6:13 PM
5-2 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Strander Boulevard / SW 27th Street Connection Functional Classification: Minor Arterial Fund: 317
Proj. Length: 1.27 miles Proj: 12239
Type: 4 - ECONOMIC DEVELOPMENT RANK: 3 CONTACT: Rob Lochmiller 425.430.7303
DESCRIPTION:
This project provides a critical four/five lane arterial that will serve as a connector to West Valley
Highway (SR-181) and East Valley Road, as well as an arterial connector to SR-167 from the south.
The project will provide a grade -separated crossing at the Union Pacific Railroad (UPRR) and Burlington
Northern Sante Fe (BNSF) railroad tracks.
JUSTIFICATION:
A new east -west arterial roadway will connect the Cities of .Renton and Tukwila, and provide significant
congestion relief to existing arterials. The new road will provide direct access to the new Tukwila
Station, a multi -modal center being developed immediately north of the new alignment, and to the Boeing
Longacres site. The eventual direct HOV connections to southbound SR-167 will provide significant
advantages to HOV and transit usage. By crossing under the UPRR and BNSF railroads, the new
arterial will provide significant benefits to both freight mobility and to general motorists.
STATUS:
Consultant has been awarded a contract to complete 30% design and complete the
Environmental Impact Statement document by June 2005 for $2,213,349.
CHANGES:
Project Design split away from continued Planning Project. $1,000,000 received from
General Fund in 2003. $745,563 TEA-21 was obligated in May 2003. Note: The design
and construction costs reflect Segments 1 and 2 (West Valley Hwy to East Valley
Road), for a total of $66.4 M rather than $47M last year for Segment 1 only.
un ad:1 5,025,2041 UnFunded96
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent In 2002
2003
Total
2004
2005
2006
2007
2008
2009
Project Deve opment
Precon ng mm
5,000,000
400,00
4,6 0,001,400,000
0517,1048
,89
R-O-W (includes min
00,000
4,000,0002,000,000
Construction ContractFee'_
52,200,000
52,200,000
26,100,000
26,100,000
Construction ng min
5,200,000
5,200,0002,
,0 0
Other
TOTAL EXPENSES
66,400,000
400,000
66,000,000
1,400,000
700,000
517,104
3,982,896
30,700,000
28,700,000
SOURCES OF FUNDZ--.
1/2 Cent Gas Tax
Business License Fee
1,434,863
40,000,8
0
364,200
406,111
Vehicle License Fee
1,424,778
1,424,7788=6,6
0
3 ,98
Grants n- an ( - 1
6
0
63
Itlgatlon in -Hand
4 0,0 0
420,005
0
s orme
Other In -Hand (Generalun
,00 ,000
120, 00
880,000
8,
Grants Proposed
Mitigation ro ose
s Proposed
Other Proosed
Undetermined
96
9
9
TOTAL SOURCES
66,400,000
400,000
66,000,000
1,400,000
700,000
517,104
3,982,896
30,700,000
28,700,000
/VKUEI 0 iV2000 6'.13 AM
5-3 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
SR 169 HOV -140th Way SE to SR-900 Functional Classification: Principal Fund: 317
Proj. Length: N/A Proj: 12175
Type: 2 - MULTI -MODAL / TDM RANK: 4 CONTACT: Rob Lochmiller 425.430.7303
DESCRIPTION:
Construct queue jumps and bypass lanes that provide transit priority traffic signal improvements on the
Maple Valley Highway (SR-169) at 140th Way SE and near the 1-405 vicinity. Involves roadway
widening at intersection approaches and modifications to channelization and traffic signals. Also
includes widening to improve the north -bound on ramp and south -bound off ramp movement at the I-
405/SR 169 interchange. Improve access to Cedar River Park and Stoneway site through traffic
JUSTIFICATION:
This is a high volume, high congestion corridor where providing travel time benefits for transit and
car/van pools can be achieved with high cist effectiveness. Also there are severe congestion and safety
problems that can be addressed by adding a right turn lane west -bound on SR-169 and a protected right
turn lane from the 1-405 northbound off ramp on to east -bound SR-169.
STATUS:
WSDOT has committed $300,000 to design and an additional $450,000 to construction.
King County committed approximately $275,000 to this project by constructing a holding
pond at 140th Way SE for our use. The project is at 60% design.
CHANGES:
Received TEA-21 Countywide grant of $392,947 for right-of-way acquisitions. Some of
the City money funded in 2007 and 2008 is for match money for proposed grants. 2003 is
higher than appropriation, partially due to early payment to Parks.
Fun e 11,705n un e 6 303 053
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent Pre-2003
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
Precon ng/ dmin
800,000
390,4 0
372,005
37,560
37,560
R-O- includes min)
529,000
529,000
529,000
Construction Contract Fee
F610,000
5,610,000
2,610,000
3,000,000
Construction ng/ dmin
780,000
80,000
380,000
00,000
Ot er
290,000
290,000
TOTAL EXPENSES7
8,009,000
390,440
662,000
6,956,560
37,560
3,519,000
3,400,000
SOURCE OF FUND'9_:
1/2 Cent Gas Tax
Business License Fee
, 28
81,5398,889
229,100
6,1000,000
,0 0
Vehicle License Fee
Grants In -Hand
39
9
392,947
Mitigation In -Han
553,472
9 0
324, 12
1, 60
3 6
s Formed
Other In -Hand S O)
300,000
1,201
188,799
Grants Proposed1,797,000
9 ,000
665,000
2,000
Mitigation Propose
L..D. s Proposed
Other ropose S O
4 ,0
00
0
000
Undetermined
6,0 3
3
2
g 0
8,009,0001
390,4401
662,0001
6,956,560 1
37,5601
1
3,519,000
3,400,000
SRI MOV
OQ/17l1001 6: iJ PM
5-4 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Renton Urban Shuttle (RUSH) Program Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12163
Type: 2 - MULTI -MODAL / TDM RANK: 5 CONTACT: Nathan Jones 425.430.7217
DESCRIPTION:
The Renton Urban Shuttle (RUSH) is a shuttle bus service provided by King County Metro that runs
peak hours between Longacres Multi -modal Commuter Station (where the Sounder train arrives
mornings and evenings) and North Renton (Boeing). The City intends to work with Metro and transit
consultants to develop this service into a program that delivers greater benefits to Renton area residents
and employees.
JUSTIFICATION:
Congestion relief, increased travel options and economic development are outcomes dependent upon
increasing transit patronage in Renton. The RUSH shuttle compliments existing transit service by
providing additional local service.
STATUS:
In 2001, Metro assumed full fiscal responsibility for the existing shuttle service.
CHANGES:
Reduced funding by $5,000 each year from 2005 to 2009. In 2003, the City hired a transit
consultant to assess service modifications which would better serve the community and
also to research funding sources for these improvements and enhancements.
un a 360 00 n un e
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent In 2002
2003
Total
2004
2005
2006
2007
2008
2009
Project eve o ment
60,000
25,000
35,000
0
000
000
000
5,000
Precon ng mm
R-O-W (includes dmin
Construction Contract Fee
Construction ng min
Other (RUSH Contract)
300,000
300,00050,000
50,000
50,000
50,000
50,000
95,000
TOTAL EXPENSE�
360,000
25,000
335,000
60,000
55,000
55,000
55,000
55,000
55,000
SOURCE OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
360,000
25,000
335,000
6 ,0
000
00
0
Vehicle License Fee
Grants In -Hand
Mitigation In -Hand
L.. . s Formed
Other In -Hand
Grants Propose
iti anon Proposed
s Proposed
Ot er ropose
Undetermined
TOTAL SOURCES
360,0001
25,0001
335,000
60,000
55,000
55,000
55,000
55,000
55,00
SMttb 06/12=03 t13 M1
5-5 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX-YPAP TIP
Transit Program Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12109
Type: 2 -MULTI-MODAL ! TDM RANK: 6 CONTACT: Nathan Jones 425.430.7217
DESCRIPTION:
STATUS:
Determine and provide funding for short-range and long-range transit needs, routes, and facilities,
Funds budgeted in 2007 through 2009 will be used for potential cost -sharing with Metro to
including park and ride lots, bus shelters, and arterial system improvements required to facilitate transit
provide new bus shelters for the public in areas that do not meet the current Metro
access. Joint projects with King County Metro and Sound Transit will also be pursued to improve local
standards for shelter placement. Additionally, existing shelter facilities will be maintained
and regional transit service in Renton. Work with Metro Transit, Downtown Renton Association, Boeing,
or improved where ridership has dropped below the Metro standard for keeping the
etc., for implementation.
shelter in place.
JUSTIFICATION:
CHANGES:
Transit improvements are a vital component of the transportation system's ability to absorb future traffic
Total funded program cost was decreased by $226,550. Continued coordination between
demand and meet Level -of -Service standards. The City and private developers have invested millions
City staff, Sound Transit and King County Metro has produced service hour enhance -
of dollars in capital improvements in support of transit -oriented development and services. Transit will
ments, as well as bus shelter and park -and -ride lot improvements. Specifically, pending
be one key in meeting the goals of the downtown area as well as industrial and office park development
Sound Transit Board approval, a new route (564) will be added and service hours will be
in other parts of the City. Coordination with Metro and Sound Transit projects and programs will help
increased.
leverage these funds and increase benefits to Renton.
Project Totals Programmed Pre-2004
un e ; 1296,631 IUnFunded90 000
Six -Year Program
ITEM
Programmed
Spent In 2002
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
1,631
,0
0
0
2 ,0 0
000
20,000
Precon ng dmin
R-O- (includes min
Construction Contract Fee
225,000
225,000
0
0
000
0, 000
60,00
0, 000
Construction ng min
Other(Contingency)
TOTAL EXPEN-9M
386,631
16,631
20,000
350,000
0,000
35,000
35,000
80,000
80,000
80,000
SOURCE OF FU1TD7EF.*_
1 2 Cent Gas Tax
Business License Fee
96,631
16,
20,000
260,000
3-5-
Vehicle icense Fee
Grants n- an
itigation In-Hand-
L. s Formed
Other In -Hand
ro ose
VGrants
n ro ose
ro oseropose
n etermine
386,6311
16,631
20,0001
350,000
40,000
35,000
35,000
80,000
80,000
80,000
Transl 06/17l1003 8:13 AM
5-6 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Rainier Ave Corridor Study and Improvements
Type: 2 - MULTI -MODAL / TDM
Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12193
RANK: 7 CONTACT: Nathan Jones 425.430.7217
DESCRIPTION:
Pre -engineering study to evaluate short-term and long-term traffic flow and safety
improvements in this corridor. Included will be access control/consolidation of driveways,
potential for adding HOV lanes, and signing and intersection improvements.
JUSTIFICATION:
This is a critical corridor serving the central Renton area with existing operational problems
and it is projected to experience severe congestion in the future.
STATUS:
The City initiated the corridor study with a consultant to evaluate potential improvements
including those that will offer benefits to transit - increased speed, reliability, and ridership -
as well as HOV and general purpose traffic safety improvements.
CHANGES:
Increase of $210,000 ($260,000 total) for the Corridor Study was approved in 2003 and
split between 2003 and 2004 to cover the expected cost of the consultant's contract. The
project started in April 2003; completion is expected in 2004. An additional $10M is shown
in 2007-2009 for construction; funding is currently under discussion with Sound Transit.
Funded : 1362,909 JUnFunded : 110,000,000
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent Pre-2003
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
362,909
2,909
100,000
260,000
160,000
20,000
20,000
20,000
20,000
20,000
Precon En /Admin
1,000,000
1,000,000
700,000
300,000
R-O-W includes Admin
500,000
500,000
200,000
300,000
Construction Contract Fee
7,600,000
7,600,000
4,000,000
3,600,000
Construction En /Admin
900,000
900,000
500,000
400,000
Other
TOTAL EXPENSES
10,362,909
2,909
100,000
10,260,000
160,000
20,000
20,000
920,000
5,120,000
4,020,000
SOURCE OF FUND��._
1/2 Cent Gas Tax
Business License Fee
192,909
2,909
50,000
140,000
40,000
20,000
20,000
20,000
20,000
20,000
Vehicle License Fee
Grants In -Hand
Mitigation In -Hand
170,000
50,000
120,000
120,000
L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
10,000,000
10,000,000
900,000
5,100,000
4,000,000
Undetermined
Rai er
OB/1211007 8:13 AM
5-7 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 20O9 SIX-YI=AP TIP
NE 3rd/NE 4th Corridor Improvements
Type: 2 - MULTI -MODAL / TDM
Functional Classification: Principal Fund: 317
Proj. Length: N/A Proj: 12176
RANK: 8 CONTACT: Keith Woolley 425.430.7318
DESCRIPTION:
This project involves a series of key improvements in this corridor to improve traffic operations
such as rechannelization and traffic'signal modifications, possible construction of an eastbound
hill -climbing lane from Monterey Ave to east of Edmonds Ave, possible transit priority signal
treatments and possibly queue jumps. This project will seek to meet pedestrain, transit
and bicycle needs.
JUSTIFICATION:
This corridor has a strong potential for transit usage and is experiencing rapid residential and
retail growth.
STATUS:
The NE 3rd/4th Corridor Study was initiated in 2001 and will refine transportation
needs in the corridor, as well as the costs of the improvements.
Project scope increased in 2001 to address the needs of pedestrians, transit users
and bicyclists, as well as the enhancement of the existing streetscape.
CHANGES:
un e 11,748,200 lUnFunded 16,836,800
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent Pre-2003
2003
Total
2004
2005
2006
2007
2008
2009
Project Develoment
229,785
83,
75,0
71,300,0
Precon ng min
255,215
2,
252,508
7,1705U
0, 00
38, 0
R-O-W (includes A min
Construction Contract Fee
Construction ng min
7,300,000
800,000
800,000
00____253_,6UU
0
1,800,000
200,0000
,8 0,000
Ot er
TOTAL EXPENSES
8,585,000
86,192
75,000
8,423,808
184,000
315,300
807,508
3,017,000
2,000,000
2,100,000
SOURCE OF FUNDS:
1 2 Cent Gas Tax
usmess Icense ee
Vehicle License Fee
637,164
350,990
23,89200
,0
60 ,2 2
285,990
323,072
0
180,200
Grants In -Hand
Mitigation In -Hand
6 6
62,
697,746
L..D. s Formed
Other In -Hand
Grants Proposed
MUItigation ro ose
L.. . s ro ose
Ot er ro ose
n etermine
,8 6,80
,8
0
0
9,8 0
8,585,0001
86,1921
75,0001
8,423,808 1
184,0001
315,3001
807,5081
3,017,0001
2900010001
2,100,000
t4EW nE/ln 06/12=03 6.13 Am
5-8 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
gnna - gnna SIX -YEAR TIP
Walkway Program
Type: 3 - COMMUNITY LIVABILITY / ENHANCEMENT
Functional Classification: N/A
Proj. Length: N/A
RANK: 9
Fund: 317
Proj: 9
CONTACT: Dan Hasty 425.430.7246
DESCRIPTION:
This program provides for the design and construction of high priority non -motorized
transportation facilities for pedestrians. Projects will be identified and prioritized in the upcoming
Comprehensive Citywide Walkway Study and through coordination with the City's Neighborhood
Program.
JUSTIFICATION:
Providing safe and convenient non -motorized facilities is an integral part of a complete
transportation network. Specific improvements will respond to the needs of school children, the
aged and persons with disabilities, and will support increased use of transit.
STATUS:
Construction of Park/N30th sidewalks was completed in 2000. Highlands Neighborhood
walkways and curb ramps construction was completed in 2001. Twelve ADA curb ramps
were constructed in downtown Renton in 2001.
CHANGES:
The Comprehensive Citywide Walkway Study was completed in May 2003, and will be
used to select future walkway projects.
un e 3 8 9 n un e 2 0 000
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent In 2002
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
Precon ng min
87,632
180,562
17,
562
50,000
20,00
180,000
0 0
3 0
0,00
30,000
30,000
30,000
-O- (includes min
Construction Contract ee
1,220,000
20,000
1,2 0,00
000
0 0
20 7000
003,000
0 , 0
203,000
Construction ng dmin
100,000
100,000
,000
00
17,000
17,000
,00
,000
1
Ot er
TOTAL EXPE=
1,588,194
38,194
50,000
1,500,000
250,000
250,000
2501000
250,000
250,000
250,000
SOURCE OF FUNDS:
1 Cent Gas Tax
Business License Fee
88,194
9
0905,5062
0, 0
0,000
000
0,000
Vehicle License Fee
Grants In -Hand
Mitigation In -Hand
360,000
360,000
0,0
0
L.. . s Formed
Other In -Hand r etro
Grants Proposed
Mitigation ro ose
L.. . s Proposed
Proposed
-Other
ndetermine
40,000
240,000
8 ,000
80,00080,000
1,588,1941
38,194
50,0001
1,500,000
250,000
250,000
250,000
250,0001
250,000
250,00
0&1=000 6:13 AM
Wekway
5-9 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
701[14 - 9000 SIX -YEAR TIP
Transit Priority Signal System
Type: 5 - OPERATIONS AND SAFETY
Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12174, 00032
RANK: 10 CONTACT: Bob Cavanaugh 425.430.7222
DESCRIPTION:
Purchase and install hardware and software needed to implement Intelligent Transportation
System (ITS) traffic signal programming capable of providing advanced signal operations,
including priority programming for transit vehicles. Includes a new central management
system, work stations, traffic signal controllers and real-time detection and
communication systems.
JUSTIFICATION:
Improved traffic signal operations and coordination are highly cost effective means of improving
traffic flow and safety, and expanding capacity compared to the costs of building and widening
roadways. Renton's current equipment is out of date and incapable of operating new systems'
management programs.
STATUS:
TIB grant funding of $383,600; $270,000 in -kind contribution from King County Metro;
$74,104 from Houser Way HOV project ISTEA grant for video surveillance equipment.
Project in 4 stages: Advanced Traffic Mgmt., Video Traffic Surveillance, Traffic Mgmt.
Center, and King County Metro installation.
CHANGES:
Stages 1, 2 and 3 are in or near construction. $41,200 was added to the project due to
additional design, construction and construction engineering costs.
une 2020 nune
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent Pre-2003
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
Precon ng/ dmm
24 , 662
242,
1,000
R- -W (includes min
Construction Contract Fee
702,750
54,814
642,206
5,730
Construction ng min
44,458
7,
30,000
6,900
00
Other
2 0, 000
44,1_3U
225,870
TOTAL EXPENSE�
1,260,270
348,564
673,206
238,500
238,500
SOURCE OF FUNDS:
1 2 Cent Gas Tax
Business License Fee
313,313
127,2 3
8 ,600
00
500
Vehicle License Fee
18,0000
Grants In -Hand S A
457,704
104,
3 ,8 3
50,000
, 0
Mitigation in -Hand
3
s ro ose
Ot er in -Hand (KingCo.)270,000
100,000
1
170,000
Grants Proposed
Mitigation Proposed
L.. . s Proposed
Other Proposed
Undetermined
TOTAL SOUR=
1,260,2701
348,5641
673,2061
238,500 1
238,500
irensl_Gri SYa
0&17!!003 6:17 PM
5 -10 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Duvall Ave NE - SR-900 to North City Limits
Type: 1 - INFRASTRUCTURE
Functional Classification: Minor Arterial Fund: 317
Proj. Length: 1.67 miles Proj: 12123
RANK: 11 CONTACT: .lames Wilhoit 425.430.7319
DESCRIPTION:
Widening roadway to 5 lanes, includes: curbs, sidewalks, storm drainage, street lighting, channelization,
and bikeway from SR-900 to the North City limits. Note: Project manager says to 95th Intersection.
JUSTIFICATION:
Growing residential areas use this route which is also becoming a major through route between Renton
and Bellevue, as well as freight traffic.
STATUS:
Received a TIB grant in partnership with King County; the City of Newcastle also received
a TIB grant for their section of Coal Creek Parkway. The City of Renton's grant award is
$3,095,640. Split away Renton's project from joint management of TIB project with King
County.
CHANGES:
In the process of hiring consultant to design rather than use in-house staff. Split HES
intersection project away; TIB grant funding reflects reduced amount. Staff time to be
adjusted as necessary.
un e n un e
Project Totals
Programme re-200
Six -Year Program
ITEM
Programmed
Spent Pre-2003
2003
Total
20040
2006
2007
2008
2009
Project DeveloRment
recon ng/ min
0
0
R-O-W (includes min
48,300
448,300
30
Construction Contract ee
2,027,800
2,027,800
2,027,800
Construction ng min
214,200
214,200
214,200
Ot er
TOTAL EXPENSES
3,434,806
123,625
269,67
3,0 1, 00
0
2—, 2TT,0 00
SOURCE OF FUND-S.-
1/2 Cent Gas Tax
Business icense ee
105,625
2
0
Vehicle License Fee
100,000
100,000
100,000
Grants In -Hand (
2,744,117
40
2,528,377
, 00
78
Mitigation In -Hand
8 8
29,
53,93
402,12
8,9
3,
L.I. . s Formed
Other In -Hand
Grants Proposed
Mitigation ro ose
s Proposed
Other Propose
Undetermined
TOTAL SOURCES
3,434,8001
123,625
269,6751
3,041,500
9 , 00
2,2 2, 000
Du+ali - W12=3 6A3 Au
5-11 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
7nnd _ 7nna QIX_VFGR TID
NE Sunset By / Duvall Av NE Functional Classification: Minor Arterial Fund: 317
Proj. Length: Proj:
Type: 5 -OPERATIONS AND SAFETY RANK: 12 CONTACT: James wlhoit 425.430,7319
DESCRIPTION:
The project will realign and rechannelize lanes approaching, through and exiting the intersection, add an
eastbound left -turn lane, modify the traffic signals, and extend a drop lane. The modification of the fully
actuated traffic signal will include poles, signal and pedestrian displays, detection loops, emergency pre-
emption, and a new signal controller.
JUSTIFICATION:
The intersection experiences a high number of accidents including turning movements, rear ends, and
side swipes.
STATUS:
CHANGES:
New project. Awarded an HES grant for $396,000 in 2002. The project funding reflects
the total project cost estimate of the grant submittal and the revised consultant contract
amount. Staff time will be updated as necessary.
un e n un e
Project Totals
Programme re-200
Six -Year Program
ITEM
rogramme
spent Pre-2003
2003Total
2004
2005
2006
2007
2008
2009
EXPENSES:
Project Development
Precon ng dmin
59,000
59,000
0- (includes min
Construction Contract Fee
381,000
81,000
381,000
Construction ng min
Other
TOTAL EXPE=
0,000
9,000
381,000
38 T,0 00
SOURCE OF FUNDS-.
1 2 Cent Gas Tax
Business License Fee
14,876
, 00
216
12,376
Vehicle License Fee
Grants In -Hand S
396,000
55,50
340,500
3 0
Mitigation in -Hand
29,124
1,000
28,124
L.. . s Formed
Other In -Hand
Grants Proposed
lon r0 ose
ro ose
k
ro osermme
TOTAL SOUKL;t:bl
0,00059,66618
,000
381,000
0ry 11
06/1=03 6.13 PM
5.12 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
91711714 - ?nn9 SIX -YEAR TIP
Arterial Circulation Program
Type: 2 - MULTI -MODAL / TDM
Functional Classification: N/A
Proj. Length: N/A
RANK: 13
Fund: 317
Proj: 29
CONTACT: Keith Woolley 425.430.7318
DESCRIPTION:
This program provides for the long-range and short range planning and traffic analysis required
to evaluate and update the Transportation Plan in relation to the Comprehensive Land Use Plan,
to assess the impacts of new development proposals and to recommend local and regional
transportation system improvements for all modes of travel. Funding for hardware, software and
employee hours required to operate the computer model is also included under this program.
JUSTIFICATION:
Combined State and Federal Clean Air legislation, the Growth Management Act, passage of the
RTA plan and the increasing importance of making sure that local and regional transportation
plans are coordinated to the benefit of Renton, make on -going, multi -modal planning a high
priority need.
STATUS:
This project will fund the on -going planning work which will lead to refinement
and/or adjustment of the of improvement projects on the arterial network identified
in the Transportation Plan.
CHANGES:
un e 11,554,080 nun e
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent In 2002
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
,554,080
68,080
186,000
1,300,000
200, 00
200, 0
200,000
200,000
250,000
250,000
recon ng min
R-O- (includes dmm
Construction Contract Fee
Construction ng min
Ot er
TOTAL EXPE17SE-9
1,554,080
68,080
186,000
1,300,000
200,000
200,000
200,000
200,000
250,000
250,000
SOURCE OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
1,554,080
68,080
186,000
1,
00
0 00
0,000
0 ,000
2 000
2 0,000
Vehicle License Fee
Grants In -Hand
Mitigation In -Hand
L..D. s Formed
Other In -Hand
Grants Propose
Mitigation Proposed
L.I.D.'s Proposed
t er Proposed
IlUndetermined
1,554,0801
68,0801
186,06-01
1,300,000
1 200,0001
200,0001
200,000
200,000
250,000
250,000
Merlel_Cr< 06MM003 &13 PM
5 -13 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2nn4 - gnna SIX -YEAR TIP
Project Development & Pre -Design Program
Type: 2 - MULTI -MODAL / TDM
Functional Classification: N/A
Proj. Length: N/A
RANK: 14
Fund: 317
Prof: 12150
CONTACT: Sharon Griffin 425.430.7232
DESCRIPTION:
Perform critical activities needed for the development of future CIP projects and for grant
applications, including scoping, cost estimates, pre -design, interlocal agreements and
deficiency analysis. Also provides for the monitoring of active grant projects for compliance
with State and Federal laws, regulations and specifications.
JUSTIFICATION:
Analysis of existing and projected transportation operation problems, infrastructure maintenance
needs, local and regional mobility goals and revenues/costs is vital to the development of
transportation projects that will be buildable, financable, best serve the needs of Renton and
compete well for grants. Also to maintain eligibility for grant funding, the City must assure that
project specifications and management comply with current State and Federal standards.
STATUS:
Ongoing yearly program.
CHANGES:
$14,600 to Lake Washington Bv. Slip Plane project in 2003.
une 11,387,227 nune
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
spent In 2002
2003
Total
2004
2005
2006
2007
2008
2009
Project Devetopment
Precon ng/ min
R- - (includes min
1,052,227
335, 000
76,
115,400
,000
860,000
290.000
0, 00
4 ,000
130, 00
0
1 0,00
0,0 0
0,000
0,000
0,000
0,000
1 0,000
0,000
Construction Contract Fee
Construction ng dmin
Other
TOTAL EXPEITSE�
1,387,227
76,827
160,400
1,150,000
175,000
175,000
200,000
200,000
200,000
200,000
SOURCE OF FUNDT-7
1 2 Cent Gas Tax
Business License Fee
Vehicle License Fee
1,387,227
76,82
0, 0
1,1 0,00175,000
000,000
00,000
, 00
200, 00
Grants In -Hand
Mitigation In -Han
L..D. s Formed
Other In -Hand
Grants Proposed (L1A
Mitigation Proposed
s Proposed
Other Proposed
Undetermined
1,387,2271
76,8271
160,4001
1,150,000
175,0001
175,000
200,000
200,000
200,000
200,000
ceo
06/17l100J 6:13 PAI
5 -14 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Type: 1 -INFRASTRUCTURE
N/A
Prof. Length: N/A
RANK: 15
CONTACT:
Fund: 317
Proj: 106
Jason Fritzler 425.430.7243
DESCRIPTION:
Inspect all roadway bridges owned by the City every two years to determine bridge sufficiency
and load ratings, seismic retrofit needs, undertake minor repairs, and preventative maintenance
as needed.
JUSTIFICATION:
Inspection program must be done for safety and funding purposes and as part of WSBIS
Program to determine structural deficiencies, physical deterioration, or functional obsolescence
and to qualify for Federal bridge replacement grant funding. Repair funding is provided to
accomplish improvements, identified through the inspection program, that will increase the
safety and extend
STATUS:
Biennial bridge inspections occur in 2003, 2005, 2007 and 2009. May Creek
bridge replacement is anticipated to be 2005/2006; BRAC funding will be applied
for at the appropriate time.
CHANGES:
Bridge Inspection &Repair Program
Functional Classification:
Pri6pa InaOKt
5 -15
DRAFT
06/17R003 6', 17 PM
1
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX-YFAR TIP
Traffic Signal Loop Replacement Program
Type: 1 - INFRASTRUCTURE
Functional Classification: N/A
Proj. Length: N/A
RANK: 16
Fund: 317
Proj: 16
CONTACT: Dave Whitmarsh 425.430.7423
DESCRIPTION:
Replace failed or failing traffic signal vehicle detection loops and repair pavement as required to achieve
proper installation and assure reliability.
JUSTIFICATION:
Most of Renton's signals require extensive vehicle detection systems to provide traffic count data
needed for the intersection controllers and VMS signal coordination system to operate effectively. The
detection loops in the pavement must be properly maintained; their failure results in highly inefficient
operation. Pavement deterioriation due to heavy traffic volumes, trucks, and adverse weather have
increased the need for replacement.
Project Totals Programmed Pre-2004
STATUS:
On -going yearly program.
CHANGES:
Six -Year une628nune
Program
ITEM
Programmed
Spent In 2002
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
Precon ng Admin
R- -W (includes mm
Construction Contract Fee
Construction n min
Other ity Force)1
144,08529,800
3,900
,300
167,285
12,285
900
,300
35,000
102,05F
3,00
,0
120,000
17,000
0
0
20,000
17,000
20,000
20,000
, 0
20,000
,000
20,000
17,000
00
20,000
SOURCE OF FUNDS:
1Cent Gas Tax
Business License Fee
167,2858
35,000
120,000
20,000
20,000
20,000
-20,000
20,000
20,000
Vehicle License Fee
Grants In -Hand
Mitigation n- an
L.. . s Formed
Other In -Hand
Grants ro ose
Mitigation Proposed
L..D. s Pro ose
Other Proposed
Undetermined
TOTAL SOURZE'S
167,2851
12,285
35,0001
120,000 1
20,0001
20,000
20,000
201000
20,0001
20,000
oow
owivtooa a:u nra
5-16 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
7Md _ 7MQ gIY_YFAP TIP
Traffic Sign Replacement Program
Type: 1 - INFRASTRUCTURE
Functional Classification: N/A
Proj. Length: N/A
RANK: 17
CONTACT:
Fund: 317
Proj: 12113
Dave WhRmarsh 425.430.7423
DESCRIPTION:
This program provides for the replacement and/or relocation of signs that are obsolete, faded,
poorly located or no longer appropriate.
JUSTIFICATION:
Poor signing can create safety problems and driver confusion. Purchase of these materials
falls beyond normal maintenance budget.
STATUS:
On -going yearly program. Contract fee amount is for purchase of materials that
will be assembled and installed by City.
CHANGES:
un a 153,588 nun e
Project Totals
ITEM Programmed
Programmed Pre-2004
Spent In 2002 2003
Total
Six -Year Program
2004 2005 2006
2007
2008
2009
EXP ES:
Project Development
Precon ng/ min
-O-W (includes mm
Construction Contract Fee
35,000
5,000
30,000
0 0
0
,000
5,000
5,000
Construction ng dmin
Ot er City Forces)18,588
53,588
08
1,088
0
7,500
,0
45,000
7,500
0
7,500
7,500
00
7,500
0
7,500
2,900
7,500
SOURCE OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
53,588
1
7,500
45,000
7,00
00
7,500
7,500
7,506
Vehicle License Fee
Grants n- an
Mitigation In -Hand
L.. . s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
s ro ose
Other ProEosed
Undetermined
I
TO UAL SOURCES!
53,5881
1,0881
7,5001
45,000
7,5001
7,5001
7,500
7,500
7,500
7,50p
05/12r"3 au an
5 -17 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
7nnA nnnn c w yr Am T.r.
5 -18 DRAFT O6/17R003 6:13 p
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Transit Center Video Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12208
Type: 5 - OPERATIONS AND SAFETY RANK: 19 CONTACT: Karl Hamilton 425.430.7220
DESCRIPTION:
Provide design and installation of video surveillance equipment for the Transit Center.
JUSTIFICATION:
Required to enhance Transit Center area security and public safety.
STATUS:
Currently assessing needs and locations.
CHANGES:
To be constructed and installed in 2003.
un ed : I 60,000JUnFunded
Project Totals
ITEM Programmed
Programmed Pre-2004
Spent Pre-2003 2003
Six -Year Program
Total 2004 2005 2006 2007 2008 2009
Project Development
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
60,000
40,000
20,000
20,000
EXPENSESTOTAL
60,000
40,000
20,000
20,000
SOURCE OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
60,000
40,000
20,000
20,000
Vehicle License Fee
Grants In -Hand
Mitigation In -Hand
L.I.D.'s Formed
Other In -Hand (Storm Utility)
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Pro osed
Undetermined
O TAT SO C S
60,0001
1 40,0001
20,000
20,000
00=003 6:13 PM
T—1 C,nW
5 -19 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
7004 - 7nna SIX -YEAR TIP
1-405 HOV Direct Access
Type: 2 - MULTI -MODAL / TDM
Functional Classification: Freeway Fund: 317 T
Proj. Length: N/A Proj: 12171
RANK: PO CONTACT: Keith Woolley 425.430.7318
DESCRIPTION:
This program provides for coordination with and input into WSDOT and Sount Transit plan
for the HOV Direct Access interchange and South Renton transit improvements.
JUSTIFICATION:
Direct access to 1-405 HOV lanes is an important element in increasing transit speed and
ridership in Renton.
STATUS:
Funds are identified for coordination critical to ensuring Sound Transit (ST)
improvements are consistent with City needs and desires. ST projects should be
completed by 2006 in Renton. Coordination will continue to 2006.
CHANGES:
un ed: 157,376 n un e
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent Pre-2003
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
57,376
12,
10,005
35,000
Precon ng min
R-O-W (includes min
Construction Contract Fee
Construction n min
t er
57,376
12,376
10,000
35,000
20,000
10,000
5,000
SOURCE OF FUNDS:
1Cent Gas Tax
Business License Fee
57,376
12,376
10,000
3 0
10,000
5,000
Vehicle License Fee
Grants n- an
Mitigation In -Hand
L.I.D.'s Formed
Other In -Hand
Grants ropose
Mitigation Propose
L.. . s Proposed
Other Proposed
Undetermined
TOTAL SOURCES1
57,3761
12,376
10,0001
35,000
20,000
10,U001
5,000
,D5_ nov
06/11l1003 6'.13PM
5 - 20 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Miscellaneous Traffic Safety Program
Type: 5 - OPERATIONS AND SAFETY
Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12115
RANK: 21 CONTACT: Karl Hamilton 425.430.7220
DESCRIPTION:
This program provides for special small-scale traffic safety improvements that are identified and
require materials, labor or equipment beyond the normal scope of City operations and
maintenance crews.
JUSTIFICATION:
Historically, this level of traffic safety improvements are required on an annual basis. This
program budgets for safety projects to address these needs. Projects are typically identified
analysis of accident records or observation by City Traffic Operations
througaintenance personnh citizen concerns analysis
and M
STATUS:
Ongoing yearly program. Traffic Operations Section identify and prioritize locations.
Some funds may be used to match potential Hazard Elimination & Safety (HES) grants.
Stage 1 of the Signal Pre-empt System Upgrade Program is complete; the City's oldest
equipment at 22 intersections was upgraded.
CHANGES:
Starting Stage 2 of the successful Signal Pre-empt System Upgrade Program which will
replace the equipment at 52 intersections over the next four years. The Traffic Safety
Monitor System Upgrade Program will begin after selection of the Central System.
un ed: 1464,299 n un e
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent In 2002
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
Precon ng min
43,500
10,00U
331500
4,50000
0
4,500
-O- inc u es min
Construction Contract Fee
1 00
00
2 0,000
00
2, 0
33, 00
33, 00
Construction ng A min
29,591
,00
22,00
00
0
3,0 0
0
00
Ot er
08
, 8
00
3,60
464,299
40,199
115,000
309,100
109,100
40,000
40,000
40,000
40,000
40,000
SOURCE OF FUNDS:
1/ Cent as Tax
Business License Fee
464,299
40,199
000
09,100
, 0
4 ,0 00
40,000
40,000
40,670
Vehicle License Fee
Grants In -Hand
Mitigation In -Hand
L.. . s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
s Proposed
Other Proosed
Undetermined
464,2991
409199
11115,0001
3099100
109,100
40,000
40,000
40,000
40,000
40,000
S.Wy
ONt](1003 C13 AM
5 - 21 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Traffic Systems Efficiency Improvements Program
Type: 5 - OPERATIONS AND SAFETY
Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12162
RANK: 22 CONTACT: Karl Hamilton 425.430.7220
DESCRIPTION:
Provides for improvements to the operational efficiency of the existing roadway system,
including such items as development and implementation of signal coordination programs,
signing and channelization improvements, surveillance control and driver information system
(SC 8 DI), transit signal priority, Intelligent Vehicle Highway Systems (IVHS), signal
improvements such as protective / permissive phasing, and matching funds for possible grants
to upgrade the Central traffic control system.
JUSTIFICATION:
Improving the capacity and efficiency of the existing roadway system is a very cost effective
element of the transportation program.
STATUS:
Completed two Signal Synchronization grant projects: Grady Way (2001) and Sunset
Blvd. (2002). Will upgrade all signal controllers to new in 2004 and 2005 to be compatible
with the new Central System. $15,000 in years 2002 through 2005 for Transportation's
contribution to the City's GPS Mapping Program.
CHANGES:
Awarded a new King County Signal Synchronization Grant for the NE 3rd/4th Street
Corridor in the amount of $80,000 in 2003: $10,400 to City forces; $69,600 to King
County forces (KC portion not shown in table). Upgrading of all signal controllers to new
was rescheduled to 2004 and 2005.
un a 83 nfun e
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent In 2002
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
68,000
6,800
61,200
Precon ng mm
60700
00
58,000
, 0
,00
0
0 0
R-O- (includes A mm
Construction Contract Fee
510,000
125,700
384,300
6 ,1
0
00
1
,000
onstruction ng mm
0
4,
2,000
3, 0
,0
0
00
Other
9 ,600
17,
2,000
76,600
28,3 0
28, 0
0 0
00
0
,000
TOTAL EXPEN=
783,600
21,200
138,500
623,900
251,900
252,000
30,000
30,000
30,000
30,000
SOURCE OF FUITO'ST-
1/2 Cent Gas Tax
Business License ee
6 ,2 0
0
8, 0
62 ,900
0
,000
30,00030,000
Vehicle License Fee
_T8_,_4_0_G
Grants In -Hand
8,
10,40
Mitigation In -Hand
L.. D. s Formed
Other In -Hand
Grants Proposed
Mitigation ro ose
L..D.s Proposed
Other Proosed
n etermme
TOTAL SOURUnl-
783,6001
21,200
138,5001
623,900 1
251,9001
252,0001
30,0001
30,0001
30,0001
30,000
Eff-y O&IM003 8:13 PM
5 - 22 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
CBD Bicycle and Pedestrian Connections
Type: 4 - ECONOMIC DEVELOPMENT
Functional Classification: N/A
Proj. Length: N/A
RANK: 23
CONTACT:
Fund: 317
Proj: 12185
Dan Hasty 425.430.7246
DESCRIPTION:
This project will design and construct priority bike and pedestrian connections in the Central
Business District as determined by planning and pre -engineering studies. Connections to and
among the Lake Washington Loop Trail, the Cedar River Trail and the Transit Center are
important elements.
JUSTIFICATION:
The City has developed a number of significant non -auto transportation features in its central
area, including the Cedar River and Lake Washington Loop trails and the Transit Center.
Making good connections among these transportation elements is both a challenging and
necessary goal.
STATUS:
CHANGES:
Approximately 14 curb ramps will be constructed in 2003 in the downtown area.
un a 1509,050 nFun a 1626,500
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent In 2002
2003
Total
2004
2005
2006
2007
2008
2009
EXPENSES:
Project eve o ment
0
00
-
1, 0
0,000
0,0 0
00
000
recon n dmm
,000
00
293,500
5-OU
278,000
- - (includes mm
Construction Contract Fee
628,600
25,600
603,000
60
0 , 00
Construction n min
48,400
3,100
145,300
4,900
140,400
Ot er
TOTAL EXPE=
1,135,550
550
42,000
1,093,000
68,000
10,000
10,000
590,000
410,000
5,000
SOURCE OF FUNDST-
1 2 Cent Gas Tax
Business License Fee
359,050
0
6, 00
8,00
0
00
3, 00
000
00
Vehicle License Fee
Grants In -Hand
Mitigation In -Hand
,000
150,000
150,000
L.. . s Formed
Other In -Hand
Grants Proposed
520,000
520,000
2 ,00
,00
Mitigation Proposed
L.. . s Propose
Other Proosed
Undetermined
106, 00
0
106,500
TOTAL SOURCESI
1,135,5501
550
42,0001
1,093,000
68,000
10,0001
10,0001
590,000
410,000
5,000
O6/1 WON 6:13 PM
GDP 9ke PO
5 - 23 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Arterial Rehabilitation Program
Type: 1 - INFRASTRUCTURE
Functional Classification: various
Proj. Length: N/A
RANK: 24
Fund:
Proj:
CONTACT: .lames Wilhoit
317
12186
425.430.7319
DESCRIPTION:
As funding is available, this program will provide for the rehabilitation of arterial streets where the
restoration requirements are beyond that which can be accomplished through the annual Overlay
Program.
JUSTIFICATION:
The Overlay Program concentrates to a great degree on maintaining residential streets, where
relatively small traffic volumes and less truck and bus traffic make standard asphalt overlays a
long term means of maintenance. Arterial streets can often deteriorate rather quickly and often
require more costly rehabilitation measures and/or costly temporary repairs to avoid more
extensive deterioration. A number of arterials identified as needing major rehabilitaion are being
addressed in this program and the Overlay Program.
STATUS:
CHANGES:
Funding for a portion of the Lake Washington Boulevard Slip Plane project was moved for
2004. Funding to pave Edmonds Avenue following a major wastewater line installation
from NE 16th St to NE 27th St in 2003 was moved from 2007 to 2004.
une nune
ro ect Totals
Programmed Pre-2004Six-Year
Program
ITEM
spent In 2002
2003
Total200
00
2006
200
2008
2009
Project Development
7rogmme
Precon ng mm
46,100
46,100
,800
0
2,00
0,300
000
6,000
R-O- me u es min)
Construction Contract Fee35,500070
234,200
961,3008
,
3,
00
6 , 00
8 ,600
141, 00
Construction ng mm
1100
46,100,80
00
12,000
,300
5,0006,000
Ot er
1,527,700
240, 0
234,200
1,053,500
0
0,9
28 00
,600
3, 00
SOURCE OF FUNDZ_-.
1 Cent Gas Tax
Business License Fee
48,1 9
85,000
5b7890
0
0
10 9
Vehicle icense F ee
327,441
78,419
85,000
6 ,0
3,53,011
Grants n- an
Mitigation In -Hand
2,100
64,200
487,900
250,900
23 00
s Formed
Other In -Hand
Grants Proposed
itigation Propose
's Proposed
Other Proosed
Undetermined
TOTAL SOURrE,91
1,527,7001
00
234,2001
1,053,5001
T07,TVO
3, 00
300, 00
28 ,000
9 ,600
3,500
mu�ei aeneo
06/11l1007 B:iJ iJA
5-24 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Railroad Crossing Safety Program
Type: 5 - OPERATIONS AND SAFETY
Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12166
RANK: 25 CONTACT: Karl Hamilton 425.430.7220
DESCRIPTION:
Install railroad crossing upgrade improvements at locations determined to warrant safety
improvements. Depending on the needs of the location, work could include rubber crossing
pads, lighted or unlighted signing, motion detectors, gates and connections to traffic signals to
provide signal pre-emption.
JUSTIFICATION:
Railroad roadway crossings can present a serious safety concern that needs to be addressed
when conditions warrant improvements.
STATUS:
CHANGES:
Concrete railroad crossing upgrades completed in 2002: Bronson/Houser mainline, SW
7th Street, Lind Avenue SW spurs, and Mill Avenue. Moved the Railroad Crossing Safety
Program grant to Lake Washington Blvd. - Park Ave. N to Coulon Park project (TIP #21),
une nune
Project Totals
Programmed Pre-2004x-
ear Program
ITEM
Programmed
Spent In 2002
2003
Total
2004
20052006
2007
2008
2009
ro ect eve opment
recon ng mm
222,839
3
10,000
0
00
000
O-VV (includes min
Construction Contract Fee
Construction ng min
Other (Lake Wash.Xing)
222,839
182,839
10,000
30,000
, 00
5,000
1 ,000
10,000
SOURCE OF FUNDS:
1 2 Cent Gas Tax
Business License Fee
143,098
103,098
10,000
30,000
0,00
10,000
Vehicle License Fee
Grants In -Hand
Mitigation In -Hand
s Formed
Other In -Hand S
Grants ropose
Mitigation Proposed
s Proposed
Other Proosed
Undetermined
TOTAL SOUR-CESI
222,8391
182,8391
10,000
30,000
,000
,000
10,000
0,000
RR x Q' OMM003 6.13 M1
5 - 25 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Transportation Demand Management Program Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12135
Type: 2-MULTI-MODAL/TDM RANK: 26 CONTACT: Nate Jones 425.430.7217
DESCRIPTION:
Renton's TDM program implements the State's Commute Trip Reduction (CTR) Act by encouraging a
reduction in the use of single occupancy vehicles (SOV). Incentives are offered to employees (at
businesses with 100 or more employees) arriving to work between 6 and 9 AM. The City has two CTR
programs: 1. The Citywide and 2. the City Hall CTR program (see note below). The TIP funds the
Citywide CTR Program and offers technical assistance to Renton businesses affected by the Act.
JUSTIFICATION:
The City is required by 1991 State Legislation to develop and implement a CTR program. This law
applies to areas of the State with continuing air quality problems. TDM is an important element in
achieving desired transportation, environmental, and land use goals.
Note: Renton City Hall is an affected CTR site and must implement its own CTR program for City
employees; it is funded outside the TIP program.
STATUS:
It is expected that technical assistance to employers for the Citywide program will
continue at current levels in 2004 provided State funds in support of this program
continue to be provided.
CHANGES:
Renton has received a State grant for $42,878 (July 2002 - June 2003) to help fund the
Citywide CTR program. Additional State grant funds may be available in 2004 and
beyond, but actual amounts and details of this funding is currently unknown.
une 0803 nune
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent In 2002
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
92,824
0
2
2
20
3, 00
Precon ng dmin
R-O-W (includes min
Construction Contract Fee
Construction ng min
Ot er ech. Assist.Contract)
9
58,269
306,000
TOTAL EXPENSE`9
508,093
58,693
64,200
385,200
64,200
64,200
64,200
64,200
64,200
64,200
SOURCE OF FUNDS:
1 2 Cent Gas Tax
Business License Fee
344,400
49,200
295,200
9,
9,2 0
49, TOTO
9,2
49,200
Vehicle License Fee
Grants In -Hand
itigat on In -Hand
s Formed
Other In -Hand C a ot.
63,69
1 ,000
90,0001
0
000
000
000
1 ,000
Grants Propose
Mitigation Proposed
L.. . s Proposed
Ot er Proposed
ndetermme
I TOTAL SOURCES
508,0931
58,693
64,2001
385,200
1 64,200
6 ,2 00
64,200
64,200
64,200
64,200
TDM
Odf 7(Zppl 0:13 MI
5 - 26 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Lake Washington Blvd. - Coulon Park to NE 44th St
Type: 3 -COMMUNITY LIVABILITY / ENHANCEMENT
Functional Classification: Collector Fund: 317
Proj. Length: N/A Proj: 12205
RANK: 27 CONTACT: Dan Hasty 425.430.7246
DESCRIPTION:
To improve and enhance this important collector. Non -motorized and streetscape
improvements are the focus of this project, as well as access to the parka
JUSTIFICATION:
Ensure that improvements to the south end of Lake Washington Blvd. are consistent with potential
North Renton Boeing property development efforts and plant operations.
STATUS:
CHANGES:
Speed limit/raised pavement markings and double solid yellow lines have been added at
and between the South entrance of Coulon Park to N 44th St in response to citizens'
concerns. Additional funding ($15,275) required for traffic studies and staff review due to
impacts of potential developments at NE 44th St.
Funded : 140,275 UnFunded
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent Pre-2003
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
30,275
275
10,000
20,000
10,000
10,000
Precon En /Admin
10,000
10,000
R-O-W includes Admin
Construction Contract Fee
Construction En /Admin
Other
TOTALE PEN E
40,275
275
20,000
20,000
10,000
10,000
SOURCE OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
40,275
275
20,000
20,000
10,000
10,000
Vehicle License Fee
Grants In -Hand
Mitigation In -Hand
L.I.D.'s Formed
Other In -Hand Storm Utility)
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
5
,
Lk_WA_N 08M24M 6.13 AM
5 - 27 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Transportation Concurrency / LOS Program
Type: 4 - ECONOMIC DEVELOPMENT
Functional Classification: N/A Fund:
Proj. Length: N/A Proj:
RANK: 28 CONTACT: Keith
317
12107
Woolley 425.430,7318
DESCRIPTION:
The City has created a city-wide Transportation Benefit Zone as part of the GMA Comprehensive Plan's
Transportation Concurrency requirements to provide a source of funds for transportation improvements
necessary to support new development. This project supports the necessary planning effort to
determine appropriate fees to charge as part of the mitigation process, to adjust the fee due to
transportation plan changes and other factors affecting the fees as a funding source and to monitor the
JUSTIFICATION:
Management of the Transportation concurrency and mitigation programs are an integral part of planning
transportation improvements, ensuring that new development pays a fair share of the cost, and in
maintaining a level of service required under GMA to allow new development to be approved and to take
place.
STATUS:
On -going yearly program. For 2001, travel time studies were completed and the Level of
Service (LOS) model was recalibrated,
CHANGES:
Travel time studies will be performed again in 2004. 2003 funds are for LOS
documentation and inclusion in the Comprehensive Plan.
uned: 1128,212 JUnFunded:
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent In 2002
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
128,212
3,
5,0
120,0
0 W
U, 000
40,0 0
0, 00
I0,000
Precon ng/ dmin
R-O- (includes min
Construction Contract Fee
Construction ng min
Other
rOTAL EXPENSE-9
128,212
3,212
5,000
120,000
40,000
10,000
10,000
40,000
10,000
10,000
SOURCE OF FUNDS:
12 Cent Gas Tax
Business License Fee
28,2 2
3, Tf
5.000
,00
40, 0
0
0,0 0
40,000
0,000
0, 000
Vehicle License Fee
Grants In -Hand
Mitigation In -Hand
L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigationro ose
L.. . s Proposed
Other Proposed
Undetermined
TOTAL SOURCES
128,212
3,212
5,0001
120,000
40,000
10,000
10,000
40,000
10,000
101000
oenviooa e:,sM
5 - 28 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Missing Links Program
Type: 5 - OPERATIONS AND SAFETY
Functional Classification: N/A
Proj. Length: N/A
RANK: 29
CONTACT:
Fund: 317
Proj: 12106
Ryan Plut 425.430.7372
DESCRIPTION:
This funding provides for the completion of transportation links that do not qualify for other
sources of funding. An example would be a section of roadway between two LID's or between
two developer mitigation improvement projects.
JUSTIFICATION:
Making the necessary, and often small-scale, improvements needed to connect other projects
can achieve significant benefits.
STATUS:
With the high rate of development in the City, funding was added for potential
City/developer partnership opportunities.
CHANGES:
un e 1215,000 nun ed
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent In 2002
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
recon ng dmin
8,000
00
2 ,0 0
0 0
0
4,000
000
0
R-O- (includes min
Construction Contract Fee
68,000
,000
144,000
2 ,000
2 0
2 ,000
24,000
24,000
Construction ng dmin
14,000
2,000
12,000
2,000
2,000
,000
2,000
0
2,000
2,000
t er
5,000
5, 0
TOTAL EXPEOE�
215,000
5,000
30,000
180,000
30,000
30,000
30,000
30,000
30,000
30,000
SOURCE OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
215,000
5,000
180,0003
00
0
0, 000
0,000
30,000
30,000
Vehicle icense Fee
Grants In -Hand
itgation In -Hand
s Formed
Other n- an
Grants Proposed
itigation Proposed
L.. . s Propose
Other Proosed
Undetermined
TOTAL SOURTE'S
215,0001
5,000
30,0001
180,000
30,000
30,000
30,000
30,000
30,0001
30,000
M_lrk! OM112=03 0'.10 M1
5 - 29 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX YEAR TIP
Geographic Information System - Needs Assessment Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12206
Type: 1 - INFRASTRUCTURE RANK: 30 CONTACT: Nate Jones 425.430.7217
DESCRIPTION: STATUS:
Develop a Needs Assessment and Action Plan for implementation of Geographic Information
System (GIS) in the Transportation Systems Division.
JUSTIFICATION: CHANGES:
The Transportation Systems Division is interested in expanding the development and use of Staff are currently negotiating with a consultant to conduct the needs assessment for the
GIS technology, data, and applications to support the Division's business needs. Effective use of Transportation Systems Division. $15,000 has been added to 2003 to cover the
GIS-related resources is dependent on careful planning and execution. The Needs Assessment
allows the evaluation of Division needs and the development of an action plan for logical estimated cost of consultant contract.
development of GIS capabilitiy within the Division.
t-roiect i omis I Programmeu Pre-Z004 I Six -Year Program
ITEM Programmed I Spent Pre-2003 1 2003 1 Total 1 2004 1 2005 1 2006 1 2007 1 2009 12009
1.
elopmen
/Admin
ludes Ad
n Contra,
n Eng/Ac
,TEFlS,E
iF'FQA6
is Tax
cense Fe
inse Fee
GIs M12r2m 4:13AM
5 - 30 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
NE Sunset By / 1-405 Interchange Improvements
Type: 4 - ECONOMIC DEVELOPMENT
Functional Classification: N/A
Proj. Length: N/A
RANK: 31
Fund: 317
Proj: 12210
CONTACT: Kefth Woolley 425.430.7318
DESCRIPTION:
Conceptual planning process to evaluate performance of existing and future interchange
facilities along 1-405 from Park Avenue N to Maple Valley Highway.
JUSTIFICATION:
The intent of this planning study is to coordinate proposed improvements to 1-405 by WSDOT
with the potential of large developments in the area.
STATUS:
Programmed funds for 2003 and 2004 will be utilized for staff time and potential
consultant cost.
CHANGES:
un e 70,0001 n un e
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent Pre-2003
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
70,000
6 0
10,005
recon ng/ dmin
R-O-W (includes min
Construction Contract Fee
Construction ng mm
Ot er
TOTAL EXPENSES
70,000
60,000
10,000
10,000
SOURCE OF FUNDS:
1 Cent as Tax
Business License Fee
70,000
60,000
10,000
10,000
Vehicle License Fee
Grants In -Hand
Mitigation In -Hand
L.. . s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L..D.s Proposed
Other Proposed
Undetermined
70,0001
60,0001
10,000
1 10,000
-AA-ios vc
oaianooa e:ia AM
5-31 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Grady Way Corridor Study Functional Classification: Principal Arterial Fund: 317
Proj. Length: 0.44 miles Proj: 12127
Type: 2 - MULTI -MODAL / TDM RANK: 32 CONTACT: Nathan Jones 425.430.7217
DESCRIPTION:
In conjunction with WSDOT, Sound Transit, and property owners along the corridor, perform a
comprehensive analysis of short- and long-range multi -modal transportation improvements. The City
will conduct a pre -engineering study to evaluate short- and long-term traffic flow and safety
improvements along Grady Way including major intersections and traffic controls from Main Avenue to
the West City Limits.
JUSTIFICATION:
The two freeway interchanges and freeways and the high volume surface level regional routes of SR
515, Rainier Avenue, Lind Avenue, and Grady Way which converge in this area are of major importance
to all travel modes, including transit, freight, HOV, and general-purpose travel. Grady Way is a critical
east to west link serving the south Renton area and the downtown Central Business District; the
potential for operational problems and congestion is high if this corridor is not managed effectively.
STATUS:
WSDOT has recognized in its Highway System Plan and 1-405 Corridor Study the need to
assure that all proposed short-term and long-term improvements on these corridors be
compatible with one another and with long-range needs. The Grady Way study will be
closely coordinated with WSDOT proposed improvements for the 1-405/SR 167
interchange as well as the Rainier Avenue Corridor Study conducted by the City.
CHANGES:
Grady Way Corridor Study added to this project in mid -to -late 2003. A project proposal
for the Grady Way study is under development and internal review. Following review, a
consultant selection process will be initiated.
un a 1325,000 lUnFunded : 13,-000,000
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent Pre-2003
2003
Total
2004
2005
2006
2007
2008
2009
Project eve opment
Precon ng min
325,00G
250,005
3 ,000
29 ,000
2 0, 000
0
0,
0,000
20,000
250,000
20,000
0,00
R-O- (includes Admin)
250,000
250,00
250,000
Construction Contract Fee
2,500,005
00,000
0
Construction ng min
Ot er
TOTAL EXPEN_91�
3,325,000
30,000
3,295,000
45,000
120,000
70,000
520,000
1,270,000
1,270,000
SOURCE OF FUNDS:
12 Cent Gas Tax
Business icense Fee
325,000
30,000
295,0000
120,000
70,000
20,000
____70_,_0_0U
20,000
Vehicle License Fee
Grants In -Hand
Mitigation In -Hand
L.I.D.'s Formed
Other I n- an
Grants Proposed
Mitigation Proposed
L..D. s Proposed
Other Proosed
n etermine
,0 0,000
0 000
0, 00
,000
TOTAL SOURCE51
3,325,0001
30,0001
3,295,000 1
45,0001
120,000
70,000
520,000
1,270,000
1,270,000
Re 16I
6617!l003 6:73 PM
5 - 32 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
7nnd -Anna SIY_YFAP TIP
Bicycle Route Development Program
Functional Classification: N/A
Fund: 317
Proj. Length: N/A
Proj: 12173
Type: 3 - COMMUNITY LIVABILITY / ENHANCEMENT
RANK: 33
CONTACT: Dan Hasty 425.430.7246
DESCRIPTION:
STATUS:
Further develop the City's non -motorized facilities. Sign Bicycle Routes along preferred
The Transportation Division will apply for any
appropriate grant opportunities. Parks
corridors. Construct missing links in the bicycle route system. Construct site -specific
Dept. is updating the Trails Master Plan.
improvements. Upgrade routes as needed to safely accommodate bicycle traffic. Publicize
Renton bicycle route network. Provides funding to match grant requests for bicycle construction
improvements.
JUSTIFICATION:
CHANGES:
The City does not currently have a well -developed bicycle route system; this program will
In-house system research and inventory is underway.
complete an integrated system of bicycle routes and trails and upgrade streets to better
accommodate bicycles. Many locations along existing and potential routes have site -specific
safety problems, which would be addressed in this program. Additionally, there is a strong
demand for better -developed non -motorized facilities in Renton.
unde 1258,976
jUnFunded 190,000
Project Totals
Programmed Pre-2004
Six -Year Program
Programmed
Spent In 2002 2003
Total
2004 2005 2006
2007 2008 2009
Project Deve o ment
22,979
56,000
2,
10,005
10,005
10,000
46,0000
0
0
2, 00
10,000
1,000
1,000
Precon ng dmin
R-O- (includes min
Construction Contract Fee
246,000
246,000
00
,0
64,000
64,000
Construction ng min
24,000
24,000
2,000
2,000
10,000
, 00
,000
UtT er TOTAL EXPE17SE9
348,976
2,976
20,000
326,000
20,000
18,000
18,000
110,000
80,000
80,000
SOURCE OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
98,9 6
,000
176,000
0,
,0 0
8,000
2 ,000
,000
000
e ice icense ee
6 0
60,000
60, 0
Grants In -Hand
Mitigation In -Hand
L..D. s Formed
Other In -Hand
Grants Proposed
Mitigation ro ose
L..D. s Proposed
Other ProRosed
Undetermined
90,000190,000
0,000
348,9761
2,9761
2U,0001
326,000
1 20,0001
18,0001
18,0001
110,0001
80,0001
80,OOQ
06/12n003 6.13 PM
Pike RN.
5 - 33 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Lake Washington Blvd. - Park Ave N to Coulon Park Functional Classification: Collector Fund: 317
Proj. Length: N/A Proj: 12121
Type: 4 - ECONOMIC DEVELOPMENT RANK: 34 CONTACT: James Wilhoit 425.430.7318
DESCRIPTION:
This project includes road widening, traffic signals, railroad crossings, drainage, curb, gutter and
sidewalks.
JUSTIFICATION:
This project will serve the development and access needs to Coulon Park and to the Southport
Development.
STATUS:
Developer to design and construct. Southport's developer will get credit toward mitigation
contribution to the City, which will cover a portion of the costs, with the developer paying
the remaining project costs. The developer is proposing to complete the project in 3
phases. Project received $185,000 Railroad Crossing Safety grant.
CHANGES:
The Southport roadway and railroad crossing improvements, including the railroad grant,
have been moved from the Railroad Crossing Safety Program to this project. Estimated
conjract costs and developer reimbursement are now included. Railroad crossing
construction will be completed in Summer 2003. $15,000 in 2004 is for potential
coordination and developer plan review.
unde 1558,500 Un unded
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent Pre-2003
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
15,000
15,000
15,000
Precon En /Admin
R-O-W includes Admin
Construction Contract Fee
498,500
498,500
Construction En /Admin
15,000
15,000
Other
30,000
30,000
TOTAL EXPENTI�'g
558,500
543,500
15,000
15,000
SOURCE OF FUNU�_-.
1/2 Cent Gas Tax
Business License Fee
15,000
15,000
15,000
Vehicle License Fee
Grants In -Hand
185,000
185,000
Mitigation In -Hand
358,500
358,500
L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
U WA 0&121= 6:13 AM
5 - 34 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Interagency Signal Coordination Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12140
Type: 5 - OPERATIONS AND SAFETY RANK: 35 CONTACT: Karl Hamilton 425.430.7220
DESCRIPTION:
Provide means of signal coordination across jurisdictional boundaries of Renton, Kent, Tukwila,
King County & WSDOT. Implement signal sequences coordinated through broadcast world time
with necessary hardware to interface with Renton's master signal computer. Develop regional
traffic flow parameters & signal timings.
JUSTIFICATION:
Improve traffic flows, reduce congestion, reduce fuel consumption & air pollution. FHWA
demonstration project.
STATUS:
Tukwila is lead agency for an inter -jurisdictional ISTEA grant approved for design
of this project. Grant funds are being managed by Tukwila for the other agencies.
Project could be expanded to include Intelligent Transportation System
Improvements on Carr Rd / SW 43rd St / S 180th Street corridor if King County
obtains grant funding.
CHANGES:
May go to construction in 2004.
[Funded:[Unfunded
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent Pre-2003
2003
Total
2004
2005
2006
2007
2008
2009
Project eve opment
7,266
Precon ng dmm
, 84
7,184
- -W (includes min
Construction Contract Fee
Construction ng mm
Ot er
20,122
00
12,00000
TOTAL EXPEN=
34,572
14,572
8,000
12,000
12,000
SOURCE OF FMVDS-.'
1/2 Cent Gas Tax
Business License Fee
34,572
14,572
8,000
12,000
Vehicle icense Fee
Grants In -Hand
Mitigation In -Hand
L..D. s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.. . s Proposed
Other ProFosed
Undetermined
34,5721
14,5721
8,0001
12,000
12,000
S�Onel_Coora 06/1i 2001 6.11 PM
5 - 35 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Environmental Monitoring Program
Type: 1 - INFRASTRUCTURE
Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12187
RANK: 36 CONTACT: Jason Fritzler 425.430.7243
DESCRIPTION:
Monitoring of wetland mitigation installed as a project environmental requirement and to perform
biological assessments as required by the Endangered Species Act.
JUSTIFICATION:
Monitoring ensures that the wetland vegetation installed is properly established. Creates an account to
pay for unscheduled project environmental assessments.
STATUS:
Oakesdale Ph 1 has a 7-year monitoring period requiring maintenance three times a year.
CHANGES:
Received as-builts for Oakesdale Ph 1. Established a monthly maintenance schedule to
prevent invasive plants from emerging. With wetland construction complete, Oakesdale
Ph 2 is undergoing water quality and hydrology testing; the first year monitoring report is
near completion. Additional plants and shrubs will be planted at both locations in Spring
2003 to meet DOE requirements.
un e 1582,934 nfun e .
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent In 2002
2003
Total
2004
2005
2006
2007
2008
2009
EXPENSES:
Project Development
Precon En /Admin
R-O-W includes Admin
100,000
25,000
75,000
15,000
15,000
15,000
10,000
10,000
10,000
Construction Contract Fee
Construction En /Admin
100,000
250,000
50,000
75,000
50,000
175,000
20,000
65,000
10,000
50,000
5,000
30,000
5,000
10,000
5,000
10,000
5,000
10,000
Other
132,934
132,934
TOTAL EXPENSES
582,934
132,934
150,000
300,000
100,000
75,000
50,000
25,000
25,000
25,000
SOURCE OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
202,082
38,000
25,582
138,500
26,000
25,000
25,000
12,500
25,000
25,000
Vehicle License Fee
Grants In -Hand
Mitigation In -Hand
285,918
1241418
161,500
74,000
50,000
25,000
12,500
L.I.D.'s Formed
Other In -Hand
94,934
94,934
Grants Proposed
Miti ation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
582,9341
132,934
150,0001
300,000
100,0001
75,000
50,000
25,000
251000
25,000
E-
pBni!!Wl 6:13 PM
5 - 36 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
SW 7th St / Lind Ave SW
Type: 5 - OPERATIONS AND SAFETY
Functional Classification: Minor Arterial Fund: 317
Proj. Length: Intersection Proj: 12153
RANK: 37 CONTACT: Bob Cavanaugh 425.430.7222
DESCRIPTION:
Install new fully actuated traffic signal, including poles, signal and pedestrian displays, detection
loops, emergency pre-emption, a new signal controller, interconnect to master computer and
associated channelization.
JUSTIFICATION:
Increasing vehicular and pedestrian traffic in this area is warranting a traffic signal based on
safety and delays.
STATUS:
Project awarded a $270,000 Hazard Elimination Safety (HES) Grant.
CHANGES:
Currently at 95% design. Project temporarily delayed due to federal requirements for
construction easement process.
[Funded: 1300,000 n un e :
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent In 2002
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
Precon ng/ dmin
37,200
30,279
6,921
-W (includes mm
Construction Contract Fee
242,800
232,800
10,0000
Construction Eng/Admin
20,000
18,000
2,000
2,000
Other
TOTAL EXPE=
300,000
30,279
257,721
12,000
12,000
SOURCE OF FUNDS:
1 2 Cent Gas Tax
Business License Fee
30,000
-279Vehicle
License Fee
Grants n- an
,0
9
Mitigation In -Han
L.. . s Formed
Other n- an
Grants Proposed
Mitigation Proposed
L.. .'s Proposed
t er F5roosed
n etermine
300,0001
30,2791
257,7211
12,000
12,000
sw nn
5 - 37 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Oakesdale Ave SW Phase 2 - SW 27th St to SW 31st St
Type: 4 - ECONOMIC DEVELOPMENT
Functional Classification: Principal Arterial Fund: 317
Proj. Length: 0.25 miles Proj: 12182
RANK: 38 CONTACT: Jason Fritzler 425.430.7243
DESCRIPTION:
Construct new four -lane plus turn lanes roadway south of SW 27th Street to SW 31 st Street,
includes curbs, gutters, sidewalk, bike lanes, street lighting, drainage, and traffic signals and
requires construction of mitigation wetlands.
JUSTIFICATION:
This is the last missing link in a major regional transportation corridor serving the Green River
Valley. The project will serve economic growth, including the Boeing Longacres site which is
projected to provide 10,000 jobs at build -out, and will provide a much needed and long -planned
additional regional north -south corridor in addition to the current over capacity routes of SR 167
and SR 181.
STATUS:
CHANGES:
Project closed out with the Transportation Improvement Board (TIB) by Joe Armstrong.
The TIB completed a desk audit in April 2003 and found no exceptions to TIB guidelines.
The project will be deleted from next TIP once as-builts are received.
une 2 nune
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent Pre-2003
2003
Total
2004
2005
2006
2007
2008
2009
Pro ect Development
Precon ng/ min
4 70 66
445,066
R- - includes min
4,800
4,800
Construction Contract Fee
, 8 8
1,488, 787
98,800
Construction Eng/Admin
77,635
56,435_20Z
20,000
,000
t er Contingency
98,020
98, 20
TOTAL EXPEN'��
2,213,106
2,093,106
100,000
20,000
20,000
SOURCE OF FUNDS:
1 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants n- an
0
492,8396
6
itigation in -Hand
0,63
3
-420,666
s
Other I n- an G C & nv.
268,964
48,
200,000
20,000
000
Grants Proposed
Mitigation Proposed
L.. . s Propose
Ot er Proosed
ndetermine
2,213,1061
2,093,106
100,0001
20,000
20,000
0e t 2 0Q/1VM3 6'.13 FM
5 - 38 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Trans -Valley and Soos Creek Corridor Program
Type: 2 - MULTI -MODAL / TDM
Functional Classification: NIA Fund: 317
Proj. Length: N/A Proj: 12191
RANK: 39 CONTACT: Keith Woolley 425.430.7318
DESCRIPTION:
A joint study with King County, Kent, Tukwila and SeaTac to evaluate long-term and short-term
multi -modal transportation improvements in the Soos Creek and Valley area. This program will
fund study and pre -design work plus matching funds for grant applications.
JUSTIFICATION:
This is an area with limited transportation facilities while experiencing high growth rates.
STATUS:
The Trans -Valley Study Phase 1 started in February 2001 and was completed in March
2002, providing background documentation, research, priority corridor identification , and
potential solution sets. Funding for projects that are developed may come from the Arterial
HOV Program and the Arterial Circulation Program.
CHANGES:
Phase 2 Pre -Design work will provide pre -design level of effort that produces project lists to
a level of detail that preliminary cost estimate ranges can be produced and an
implementation plan can be developed based on timing of design development, funding,
public and political support.
Funded : 128,500 UnFun ed
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent Pre-2003
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
28,500
1,500
10,000
17,000
17,000
Precon En /Admin
R-O-W includes Admin
Construction Contract Fee
Construction En /Admin
Other
TOTALE
28,500
1,500
10,000
17,000
17,000
SOURCE OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
16,290
1,500
10,000
4,790
4,790
Vehicle License Fee
12,210
12,210
12,210
Grants In -Hand
Mitigation In -Hand
L.I.D.'s Formed
Other In -Hand
Grants Proposed
Miti ation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
10,0MI
17,000
Tnn� VN O&IZ' 03 6:13 AM
5 - 39 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Logan Avenue Bridge Seismic Retrofit Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12201
Type: 1 - INFRASTRUCTURE RANK: 40 CONTACT: Jason Fritzler 425.430.7243
DESCRIPTION:
Add lateral and longitudinal restrainers to the existing structure. Replace worn and failing
deck joints to protect new restrainers.
JUSTIFICATION:
This is a three -span pre -stressed concrete girder bridge built in 1973, The bridge carries
seven lanes of heavy arterial traffic and barrier -separated sidewalks on each side.
STATUS:
Project received BRAC grant funding in 2000 for $80,000; it was increased to $90,900
during obligation of the funds. The Biological Assessment has been accepted by WSDOT.
Construction will begin in July 2003 and be completed by August 2003.
CHANGES:
Project cost increase due to change in scope of environmental work, resulting time delays
and construction costs.
Funded : 1236,399 nFunded
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent Pre-2003
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
Precon En /Admin
38,700
33,899
4,801
R-O-W includes Admin
Construction Contract Fee
192,199
192,199
Construction En /Admin
5,500
3,000
2,500
2,500
Other
TOTALPE
236,399
33,899
200,000
2,500
2,500
SOURCE OF FUND79-.
1/2 Cent Gas Tax
Business License Fee
27,121
12,669
11,952
2,500
2,500
Vehicle License Fee
Grants In -Hand (BRAC)
130,560
21,230
109,330
Mitigation In -Hand
L.I.D.'s Formed
Other In -Hand
78,718
78&,718
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
1
, 500
Lop.M& 0WIMM 6:13 AM
5-40 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
WSDOT Coordination Program
Type: 2 - MULTI -MODAL / TDM
Functional Classification: N/A
Proj. Length: N/A
RANK: 41
CONTACT:
Fund:
Proj:
Sharon Griffin
317
12146
425.430.7232
DESCRIPTION:
Provide pre -design, design and construction coordination for WSDOT projects within or
adjacent to Renton to assure that those projects provide the maximum benefits and minimum
problems for Renton's transportation system.
JUSTIFICATION:
WSDOT projects can have signficant impacts within the City.
STATUS:
Ongoing yearly program. Staff coordinating on the 1-405 Corridor Study and other grant -
funded projects.
CHANGES:
un a 860 n un e
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent In 2002
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
77T656
0,000
60, 00
0
0,0 0
10,000
recon ng min
(includes min
Construction Contract Fee
Construction ng min
Other
TOTAL EXPERSE-9
77,860
7,860
10,000
60,000
10,000
10,000
10,000
10,000
10,000
10,000
SOURCE OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
77,86010,000
60,000
10,000
10,000
10,000
10,000,000
Vehicle License Fee
Grants In -Hand
Mitigation In -Hand
L.. . s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L..D. s Proposed
Other Pro ose
Undetermined
77,8601
7,8601
10,0001
60,000
10,0001
10,0001
10,0001
10,000
10,000
10,00
r
Odi7lI003 E:13 PM
5 -41 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
1 % for the Arts Program
Type: 3- COMMUNITY LIVABILITY/ ENHANCEMENT
Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12112
RANK: 42 CONTACT: Sharon Griffin 425.430.7232
DESCRIPTION:
Beautify entrance locations to the City. Projects to include signing and landscaping. Funding is
tied to the calculated share of eligible types of transportation projects and transportation funding
subject to the City's1 % for the Arts program. All gateway project proposals under this program
are subject to approval of the Arts Commission.
JUSTIFICATION:
Displays a sense of civic pride.
STATUS:
As projects are identified, design and construction is pursued. Transferred $13,085
to the 1 % for the Arts Program in 2001. Completing the Kennydale Slope Project
funded through the Economic Development Neighborhood Grant Program.
CHANGES:
Transfer $25,000 to Environmental Monitoring Program for 2002.
une 1294,750 1 lJn_Fu_n_ae_F_.
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent In 2002
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
Precon n min
7,438
438
1,000
6,000
00
0
0
0
R-O- (includes AdminT
Construction Contract Fee
Construction ng min
TUT 0
10,120
Other
2 7,1 2
14,192
9,0 0
214,000
0
29,000
29,000
49,000
29,000
29,000
TOTAL EXPENSES
254,750
24,750
50,000
220,000
50,000
30,000
30,000
50,000
30,000
30,000
SOURCE OF FUNDS:
1 2 Cent Gas Tax
Business License Fee
Vehicle License Fee
270,000
5uzyo
220,000,000
0,
3 0
30,0
Grants In -Hand
Mitigation In -Hand
L.I.D.'s Formed
Other In -Hand con. ev.
0
24,750
Grants Propose
Mitigation Proposed
----
L.I.D.'s Proposed
,Other Proosed
n etermine
294,7501
24,7501
50,000
220,000
50,000
30,000
30,000
50,000
30,000
30,000
G.w yf
0N11/2003 O:tO PM
5 - 42 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Arterial HOV Program Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12160
Type: 2 - MULTI -MODAL / TDM RANK: 43 CONTACT: Keith Woolley 425.430.7318
DESCRIPTION:
Perform a comprehensive analysis of short and long term HOV needs for the Renton area and
develop a prioritized list with cost estimates of recommended arterial improvements, such as
HOV lanes, HOV queue jumps, park and ride lots and other HOV facilities. Also provides
funding in future years for construction of high priority projects as they are identified.
JUSTIFICATION:
Development of arterial HOV improvements will be necessary to promote the use and efficiency
of transit and other HOV mobility options. Funding from this program will be directed to
individual projects with HOV facilities as those projects move forward.
STATUS:
HOV Arterial Study to identify specific improvements along three corridors has been
completed. Sound Transit Direct Access Program will need to do pre -design work this
year and construction in upcoming years. $10,000 in 2003 budget is provided for
potential work associated with the Sound Transit HOV program.
CHANGES:
un e 1172,354 n un e
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent Pre-2003
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
171,474
, 0
40,000
0
0
Precon ng dmin
880
880
R-O- (inclu es A min
Construction Contract Fee
Construction ng min
Other
TOTAL EXPERS7E-9
172,354
122,354
10,000
40,000
30,000
10,000
SOURCE OF FUNDS:
/2 Cent Gas Tax
Business License Fee
91,210
41,210
10,0000
0
Vehicle License Fee
Grants In -hand (ISTEA)
81,144
8 ,
Mitigation in -Hand
L.. . s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.. . s Ao ose
Other Proposed
Undetermined
, 000
M HOV 06112R603 6:13 A41
5-43 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX-YPAR TIP
Park -Sunset Corridor - Duvall Ave to Garden Ave
Type: 2 - MULTI -MODAL / TDM
Functional Classification: Principal
Proj. Length: N/A
RANK: 44
CONTACT:
Fund: 317
Proj: 12177
Keith Woolley 425.430.7318
DESCRIPTION:
Identify and construct traffic operational improvements as needed throughout the corridor.
JUSTIFICATION:
This important corridor is subject to high growth in travel demand.
STATUS:
CHANGES:
un a
1200,000 _1UnFunded
11,800,000
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent Pre-2003
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
1 ,000
5,000
5, 007
Precon ng dmin
240,000
240,0000
,00
0,000
R-O- (includes min
Construction Contract Fee
1,591,000
1, 1, 00
,000,0
,000
Construction ng min
Ot er
19970FO
159,0000
59,000
TOTAL EXPE=
2,000,000
5,000
1,995,000
5,000
50,000
100,000
1,190,000
550,000
SOURCE OF FUNDS:
2 Cent Gas Tax
Business License Fee
175,000
5,000
,0 0
30,000
___100,000
20,00020,000
Vehicle License Fee
2 ,000
2 ,00
5,0000
Grants In -Hand
Mitigation In -Hand
L.. . s Formed
Other In -Hand
-ea
Grants ropos
0 ,0 0
400,000
2, 00
180,OOU
Mitigation Proposed
L..D.'s Proposed
Other Proposed
1,400,0001
1,400,000
950,0000,00
Undetermined
TOTAL SOU=I
2,000,0001
5,0001
1.995,000
5,0001
50,0001
100,000
1,190,0001
650,000
Gark_S�na.t OW211003 6:13 PM
5 - 44 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Lind Avenue - SW 16th St to SW 43rd St
Type: 5 - OPERATIONS AND SAFETY
Functional Classification: Minor arterial Fund: 317
Proj. Length: 1.69 miles Proj: 24
RANK: 45 CONTACT: Keith Woolley 425.430.7318
DESCRIPTION:
Widen existing roadway to 5 lanes where required. Includes new roadway, curbs, sidewalks,
drainage, signals, lighting, signing and channelization.
JUSTIFICATION:
Increasing traffic demands in the Valley including the proposed development at the Boeing
Longacres site, will create the need for increasing the capacity of this major north/south arterial.
STATUS:
The needs, priorities and schedules for improvements on Lind Avenue will be
determined through Arterial Circulation studies. Construction of a signal at the
intersection of Lind Av and SW 27th St occurred in 1998 as an initial phase.
CHANGES:
une nune
Project Totals
Programmed Pre-2004Six-Year
rogram
ITEM
Programme
Spent Pre-2003
2003
Total
2004
20052006
2007
2008
2009
Project Development
,000
0
recon ng dmin
88,000
88,000
10 0
8,000
-0- includes min
Construction Contract Fee
,n8O,OOO
2,280,0001,700,000
80, 0
Construction ng A min
182,000
182,000
136,000
46,000
Other
TOTAL EXPENSES
2,S55,000
2, ,000
,0 0
0, 000
1,914,000
2 ,000
SOURCE OF FgNDS-.
1 Cent Gas Tax
Business License Fee
5,000
5,000
Vehicle License Fee
Grants n- an
Mitigation In -Han
10,000
0, 00
, 00
00
L.. . s Formed
Other In -Hand
Grants ropose
830,000
830,000
Mitigation ro ose
L.. . s Proposed
Other Proosed
Undetermined
1, 0, 00
,000
1,284,0000
oanvlooa 8, 13 wn
5 -45 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Benson Rd S / S 31st St
Type: 5 - OPERATIONS AND SAFETY
Functional Classification: Minor Arterial Fund: 317
Proj. Length: Intersection Proj: 12129
RANK: 46 CONTACT: Bob Cavanaugh 425.430.7222
DESCRIPTION:
Install a complete actuated traffic signal at Benson Rd S and S 31st St designed to provide for
possible future Benson Rd widening.
JUSTIFICATION:
Location is approaching signal warrants and traffic volume is increasing. Signal will reduce side
street delays and improve safety.
STATUS:
King County is lead agency for determining when this project will proceed.
They are currently evaluating different intersection alternatives.
CHANGES:
King County currently developing construction cost estimate. County preparing interlocal
agreement for City review.
un a 1200,000 n un e
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent Pre-2003
2003
Total
2004
2005
2006
2007
2008
2009
Project Develoment
5,0000
Precon Lng/Admin
15,000
15,000
R-O-W (includes min
Construction Contract Fee
170,000
110,000
60,000
, 0
Construction ng/ dmin
07000
8, 00
2,00
0
Ot er
200,000
138,000
62,000
62,000
SOURCE OF FUNDS:
1 2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants n- an
Mitigation In -Hand
0
, 050,300
L.. . s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L..D. s Proposed
Other Proposed
Undetermine
200,0001
133,0001
62,000 1
62,000
Pawn Ra 01112nom 6 13 PM
5 - 46 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX YEAR TIP
South Renton Burnett Park Neighborhood Street Improvements Functional Classification: N/A Fund: 317
Proj. Length: N/A Proj: 12194
Type: 1 -INFRASTRUCTURE RANK: 47 CONTACT: Kart Hamilton 425.430.7220
DESCRIPTION:
Provide improvements and asphalt overlay in the South Renton Burnett Park Neighborhood to
include the S Burnett Av/S 4th intersection. Asphalt overlay Shattuck Av S from SW 7th St to Houser
Wy S, South 6th St from Burnett Av S to Shattuck Av S, SW 7th St from Shattuck Av S to Rainier Av
S, South 5th St from Burnett Av S to Smithers Av S.
JUSTIFICATION:
Deteriorating streets.
STATUS:
Improvements are funded through the mitigation payment from Metro King County to the
City of Renton. $175,000' Metro Mitigation funding as follows:
- $75,000 for the South Renton street overlay projects;
- $40,000 for the study and design of improvements for Burnett/S 4th intersection with
- $60,000 reserved for Burnett/S 4th intersection construction with Council concur.
CHANGES:
Consultant hired to design intersection improvements in 2003. Intersection construction
anticipated in 2004 pending a design -level cost estimate, available funding and Council
approval. The overlay projects are also programmed for 2004 in coordination with the
intersection improvements, but the construction schedule is still to be determined.
unded : 1175,000 UnFunde
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent Pre-2003
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
10,000
10,000
Precon En /Admin
30,000
30,000
R-O-W includes Admin
Construction Contract Fee
125,000
125,000
125,000
Construction En /Admin
10,000
10,000
10,000
Other
TOTAL EXPENSI'9_
175,000
40,000
135,000
135,000
SOURCE OF FUND�_-
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In -Hand
Mitigation In -Hand
L.I.D.'s Formed
Other In -Hand Metro Miti
175,000
40,000
135,000
135,000
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
135,000>
SR.—P.00 OQH y1007 e:i]AM
5 - 47 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX-YFAR TIP
NE 4th Street/Hoquiam Avenue NE
Type: 5 - OPERATIONS AND SAFETY
Functional Classification: N/A
Proj. Length: N/A
RANK: 48
Fund: 317
Proj: 12209
CONTACT: Bob Cavanaugh 425.430.7222
DESCRIPTION:
Install new fully actuated traffic signal, including poles, signal and pedestrian displays, detection
loops, emergency pre-emption, a new signal controller, interconnect to master computer and
associated channelization. Right-of-way needs are unknown at this time.
JUSTIFICATION:
Increasing vehicular and pedestrian traffic in this area is warranting a traffic signal based on
safety and delays.
STATUS:
Project scheduled for design only in 2003.
CHANGES:
Funded:1
400,0001nun e
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent In 2002
2003
Total
2004
2005
2006
2007
2008
2009
Project eve opment
recon ng min
42,005
210 0
R-O- (includes min
0,000
Construction Contract Fee
280,000
280700
280,000
Construction ng min
28,000
28,000
28,000
Ot er
TOTAL EXPENSES
400,000
42,000
358,000
358,000
SOURCE OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
100.00
10,000
, 0
Vehicle License Fee
Grants In -Hand
_3U0_,_005
Mitigation In -Hand
32,000
26 ,000
0
L..D. s Formed
Other In -Hand
Grants Proposed
Mitigation Propose
L.. . s Proposed
,Other Pro ose
Un etermine
ITOTAL SOURCES
400,0001
42,0001
358,000
358,000
NE 11h 6LTbGuiem Av
06/17l1003 6:11 AA/
5 -48 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Trans -Valley ITS
Type: 5 - OPERATIONS AND SAFETY
Functional Classification: Arterial Fund: 317
Proj. Length: N/A Proj: 12211
RANK: 49 CONTACT: Karl Hamilton 425.430.7220
DESCRIPTION:
Interconnect 22 signalized intersections along the Trans -Valley Corridor creating an Intelligent
Transportation System (ITS). The project limits are Southcenter Parkway and S 180th Street to
SE Petrovisky and SE 184th Street. Project includes upgrading controllers and adding video
monitoring.
JUSTIFICATION:
Increase the efficiency of movement of persons and goods; enhance the safety and security of
travelers; enhance speed and reliability within the corridor; develop multi -agency ITS
deployments, operations and maintenance; increase public awareness of ITS benefits within
the corridor through coordinated ITS.
STATUS:
King County is the lead on this project. King County has a TIB Transportation
Partnership Program (TPP) grant of $1,875,000. The matching local funds are
$2,125,000 for a total project cost of $4,000,000.
CHANGES:
un e 50,0001 n un e
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent In 2002
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
recon ng min
R-O- (includes Admin
Construction Contract Fee
Construction ng Admin
Other
10 0
45,000
0
TOTAL EXPENSES
50,000
45,000
5,000
5,000
SOURCE OF FUNDS:
1 2 Cent Gas Tax
Business License Fee
25,000
20,000
5,000
5,000
Vehicle icense ee
Grants In -Hand
Mitigation In -Hand
2 ,000
25,000
L.I.D.'s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L..D. s Proposed
,Other Proposed
n etermine
50,0001
45,0001
5,000
1 5,000
irensVeINY ITS O&IM007 6:13
5 -49 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
South Grady Way Approach at Rainier Avenue
Type: 5 - OPERATIONS AND SAFETY
Functional Classification: N/A
Proj. Length: 0.1 mile
RANK: 50 CONTACT:
Fund: 317
Proj: 12212
Rob Lochmiller 425.430.7303
DESCRIPTION:
Construct the westbound approach of Grady Way at Rainier Avenue in concrete.
JUSTIFICATION:
The existing pavement in the project area requires yearly overlays due to the extensive bus and truck
traffic. The rutting is accelerated by the shear forces induced in the pavement as heavy vehicles stop
and start in slow moving traffic. Those actions shove the asphalt outside the wheel path. Portland
Cement Concrete pavements are significantly more resistant to the failure mechanisms currently
occuring along South Grady Way, especially the shoving failure.
STATUS:
CHANGES:
Entranco has been awarded a contract to complete the design and PSBE for the project.
Construction is planned for late September 2003.
Funded : n u n e :
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent Pre-2003
2003
Total
2004
2005
2006
2007
2008
2009
Project eve o ment
recon n min
100,605
100,005
R- - inc u es min
Construction Contract Fee
500,000
480,000
20,000
Construction n mm
000
0
t er
TOTAL EXPENSES
620,000
600,000
20,000
20,000
SOURCE OF FUNDS:
1 2 Cent Gas Tax
Business License Fee
200,000
200,000
Vehicle icense ee
Grants In -Hand
Mitigation In -Hand
420,000
0
20,000
L.. . s Formed
Other In -Hand
Grants ropose
itigation Proposed
s Proposed
Ot er ropose
Undetermined
FOTAL SOURCES--,
620,0001
600,0001
20,000 1
20,000
GaM MMoecn OQ/17l160J 6:13 MI
5-50 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Houser Way S - Main Av S to Burnett Av S
Type: 5 - OPERATIONS AND SAFETY
Functional Classification: Non -arterial
Proj. Length: 0.2 miles
RANK: 51
CONTACT:
Fund: 317
Proj: 12213
James Wilhoft 425.430.7319
DESCRIPTION:
Upgrade railroad tracks to concrete on Houser Way S between Main Avenue S and Burnette
Avenue S.
JUSTIFICATION:
This segment of roadway has a pavement management OCI rating (Year 2000) of between
0 and 12 points (out of a possible 100 points). The quality of the roadway is very poor due to
the flexing of the tracks. An overlay will only be effective if the tracks are placed in concrete.
STATUS:
Initiate discussion with Burlington Northern Santa Fe (BNSF) railroad to share
funding on this project.
CHANGES:
Funded :1 n u n et51u,UUu
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent Pre-2003
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
Precon ng/ dmm
R-O- (includes min
Construction Contract Fee
800,000
800,000
800,000
Construction ng/Admin
10,000
10,000
10,000
Ot er
TOTAL EXPENSES
810,000
810,000
$10,000
SOURCE OF FUND'9—.'
1 /2 Cent Gas Tax
Business Licenie Fee
Vehicle License Fee
Grants In -Hand
Mitigation In -Hand
L.. . s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.. . s Proposed
Ot er roposed
T8-0,-00--G
480,000
480,000
Undetermined
3 ,000
330,000
1
330,000
TOTAL SOURCES
810,0001
1
1
810,000
1
1
810,000
H"W Wey 0&12R003 0:13 M1
5 - 51 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Lake Washington Boulevard Slip Plane Functional Classification: Principal Arterial Fund: 317
Proj. Length: N/A Proj:
Type: 1 -INFRASTRUCTURE RANK: 52 CONTACT: Jason Fritzler 425.430.7243 '
DESCRIPTION:
Retain the failing slope on the west side of Lake Washington Boulevard and reconstruct both north and
southbound lanes within the slide area. This project will be coordinated with the Coal Creek Utility
District for the repair of their sewer line within the slide area. The project limits are along Lake
Washington Boulevard from NE 51st St south 0.1 mile.
JUSTIFICATION:
Since the Nisqually Earthquake in 2001, the slope along the west side of Lake Washington Boulevard
(LWB) has been moving. Consequently, this has produced a large semi -circular crack in the
southbound lane of LWB. Additionally, Coal Creek Utility staff has noticed that their sewer line has
moved with the slide. Attempts have been made to seal the cracks in the roadway and have been
unsuccessful due to the rapid movement of the slide.
STATUS:
CHANGES:
New project. A geotechnical consultant is in the process of monitoring the slope using
inclinometers and piezometers. They will develop a report stating the location and size of
the slip plane, as well as develop proposed solutions to retain the slide. Funding shown
in 2004/2005 will be used to further define the problem and respond to emergency
situations. Funding partners are anticipated to complete a permanent solution.
une 1261,600 nune
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent In 2002
2003
Total
2004
2005
2006
2007
2008
2009
Project Development
2 6,70-6
7 4,600
5,400
recon ng min
100,000
100,0000
R-O-W includes dmin
Construction Contract Fee
00,000
00, 0363,400
Construction ng min
20,000
20,000
15,000
OtTFer—
TOTAL EXPENSES
640,000
14,600
625,400
100,000
47 0000
378,400
SOURCES OF FUNDS:
12 Cent Gas Tax
Business License Fee
164,600
Vehicle License Fee
-
GrantsIn-Hancf-
Mitigation In -Hand
L..D. s Forme
Other In -Hand o be negotiated
97,000
Grants ro ose
ation ro ose
it?.I;
L. ,Proposed
Ot er Proosed
Undetermined
378,4001
378,400
378,400
1
, 400
OVFLUEI OV12=03 E:53 PM
5 - 52 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Logan Av N Concrete Panel Repair
Type: 1 -INFRASTRUCTURE
Functional Classification: Principal Arterial
Proj. Length: N/A
RANK: 53
CONTACT:
Fund: 317
Proj:
James Wilhoit 425.430.7319
DESCRIPTION:
Location: From the Logan Avenue Bridge north to N 6th St. Repair concrete panels under the asphalt to
stop the panels from moving.
JUSTIFICATION:
The panels are moving , causing the asphalt overlay to severely spall at the joints.
STATUS:
CHANGES:
New project. Currently under review.
IFunded
I JUnFunded1460,000
Project Totals
Programmed Pre-2004
Six -Year Program
ITEM
Programmed
Spent In 2002
2003
Total
2004
2005
2006
2007
2008
2009
Project Deve o ment
25,000
25,000
2 ,000
Precon Eng/Admin
25,000
2 ,000
25,000
R-O- (includes Admin
Construction Contract Fee
400,000
___40TU0_F
400,000
Construction ng dmin
10,000
10,000
10,000
Other
TOTAL EXPEUSM-9-
460,000
460,000
460,000
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants n- an
Mitigation In -Hand
L.. . s Formed
Other In -Hand
Grants Proposed
Mitigation Proposed
L.. . s Proposed
Other Proposed
Undetermined
4-67,-0-001
460,000
460,000
.VALUE
06117R003 6:13 AN
5 - 53 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
S Carr Rd / Mill Avenue S
Type: 0 -Type
Functional Classification: Principal Arterial
Proj. Length: N/A
RANK: 54
CONTACT:
Fund: 317
Proj:
Keith Woolley 425.430.7318 '
DESCRIPTION:
Install new traffic signal, including poles, signal and pedestrian displays, detection loops, emergency pre-
emption, a new signal controller, and associated channelization. Also, construct roadway widening to
accommodate turning lanes.
JUSTIFICATION:
A traffic signal is warranted based on vehicular volumes, delay, and safety. New developments north of
the intersection have been required to participate with the City. Adjacent private school desires to
participate in order to realign their access to become the fourth leg to signalized intersection. King
County Carr Rd Corridor project possibly will widen and/or realign Carr Rd through this project site. A
signal will provide a safe, pedestrian environment and crossing of Carr Rd.
STATUS:
Project currently at the planning level, being coordinated with Development Services/new
developments, the King County Carr Rd project, and New Horizons private school.
CHANGES:
New project.
un e 135,000 n un e 0 000
Project Totals
Programmed Pre-2004
Six Program
ITEM
Programmed
Spent In 2002
2003
Total
2004
—Year
2005
2006
2007
2008
2009
Project Development
15,000
00
0
Precon ng/Admin
R-O- (includes Admin)
601000
100,000
tT01000
1 0T0_00
20,000
0,000
100,000
Construction Contract Fee
Construction ng dmin
ther
300,000
300, 000
300,007
300,000
200, 0 X
300,000
100,000
TOTALEXPENSES
775,000
775,000
5,000
10,000
20,000
340,000
400,000
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
3 ,0 00
35,000
,000
10,000
20,000
Vehicle License Fee
Grants In -Hand
Mitigation In -Hand
L..D. s Formed
Other In -Hand
Grants Proposed
Mitigation Pro ose
L.. .'s ro ose
Other Proposed
Undetermined
740,0001
40,00
340,000
40 0
,�XLE
06/1](1003 E:13 PM
5 - 54 DRAFT
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2004 - 2009 SIX -YEAR TIP
Duvall Ave NE (Coal Creek Parkway) - King County Functional Classification: Minor Arterial Fund: 317
Proj. Length: Proj:
Type: 1 - INFRASTRUCTURE RANK: 55 CONTACT: James Wilhoit 425.430.7319
DESCRIPTION:
Widening roadway to 5 lanes, includes: curb, gutter, sidewalk, drainage improvements, street lighting,
channelization, signal modification and interconnection, and bikeway from Renton's north city limits to SE
95th Way (Newcastle's south city limits).
JUSTIFICATION:
Growing residential areas use this route which is also becoming a major through route between Renton
and Bellevue, as well as freight traffic. There afe currently two general-purpose lanes with little or no
pedestrian facilities, and left -turn lanes at various locations. Because there are uncompleted gaps
between the five -lane sections from unincorporated King County to Sunset Bv., the arterial exhibits
congestion and travel -time delays for all modes of traffic.
STATUS:
King County received a TIB grant award of $3,196,000.
CHANGES:
The City will manage the King County project with full reimbursement from the County. An
interlocal agreement is being developed for presentation to Council. The programmed
funding is subject to King County approval.
un e n un e
Project Totals
Programmed Pre-2004Six-Year
Program
ITEM
rogramme
Spent Pre-2003
2003
Total
200400
2006
2007
2008
200
Project DeveloRment
recon ng min
T7167
83,100
232,5000
O-W (includes min
993,600
51,199
942,402
69 ,0
Construction Contract ee
2, 2 00
,9 2,400
20
6 ,2
Construction ng Admin
438,400
38,400
219,200
219,200
Ot er
TOTAL EXPENSES
0,000
134,29
4,535,702
SOURCE OF FUNDS.-
1 Cent Gas Tax
Business icense ee
Vehicle License Fee
Grants In -Hand
Mitigation In -Hand
L.. . s Formed
Ot er n- an in ount
9
Grants ropose
lon ro ose
ro ose
V
ro oseermine
4,670,0001
134,29810
2
,
Urve�� pW12=3 6:13 MI
5-55 DRAFT
SECTION SIX
APPENDIX
9 Abbreviations & Acronyms 6-1
• TIP Adopting Resolution 6-2
• ABBREVIATIONS AND ACRONYMS
The following list defines the abbreviated words or acronyms used in the City of Renton's Six -Year
Transportation Improvement
Plan.
ACP
Asphalt Concrete Pavement
AIP
Arterial Improvement Program (administered by TIB)
BRAC
Bridge Replacement Advisory Committee
CBD
Central Business District
CIP
Capital Improvement Program
CMAQ
Congestion Mitigation and Air Quality
CTR
Commute Trip Reduction (State Act)
EB
East Bound
ER
Emergency Relief
FAS
Federal Aid Secondary Program
FAUS
Federal Aid Urban System
FHWA
Federal Highway Administration Federal Transit Administration
HCT
High Capacity Transit
HES
Federal Aid Hazard Elimination and Safety Program
HOV
High Occupancy Vehicles
I/C
Interchange
ITS
Intelligent Transportation System
ISTEA
Intermodal Surface Transportation Efficiency Act (Federal Highway Bill)
LID
Local Improvement District
METRO
Municipality of Metropolitan Seattle
MUTCD
Manual on Uniform Traffic Control Devices
NCL
North City Limits
NB
North Bound
PMS
Pavement Management System
Precon
Preconstruction Engineering/Administration (design phase of project)
PS&E
Plans, Specifications, and Estimates
ROW
Right -of -Way
SB
South Bound
SC&DI
Surveillance Control and Driver Information
SCATBd
South County Area Transportation Board
SCL
South City Limits
SMA
Structural Matrix Asphalt
SOV
Single Occupant Vehicle
STP
Surface Transportation Program
TEA-21
Transportation Efficiency Act
TDM
Transportation Demand Management Program
TIA
Transportation Improvement Account (previous TIB program)
TIB
Transportation Improvement Board
TIP
Transportation Improvement Plan
TPP
Transportation Partnership Program (administered by TIB)
UATA
Urban Arterial Trust Account (previous TIB program)
VMS
Vehicle Master System
WB
West Bound
WCL
West City Limits
WSBIS
Washington State Bridge Inventory System
WSDOT
Washington State Department of Transportation
H:\TRANSWORMS ACRONYMS.DOC
6-1
CITY OF RENTON, WASHINGTON
RESOLUTION NO.
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON,
UPDATING THE CITY'S SIX -YEAR TRANSPORTATION
IMPROVEMENT PROGRAM 2004-2009.
WHEREAS, the City of Renton has heretofore adopted a "Six -Year Transportation
Improvement Program" pursuant to Chapter 7, Extraordinary Session Laws of the State of
Washington, and Chapter 195 of the 1961 Session Laws of the State of Washington, as amended
from time to time, and the plan and program having been amended and modified from time to time
as authorized by law; and
WHEREAS, the City Council, after recommendation of its Planning/Building/Public Works
Department, held a public hearing on July 7, 2003, after notice to the public as provided by law
for the purpose of considering adoption, modification, and amendments of the plan and program;
and
WHEREAS, at such public hearing held on July 7, 2003, due consideration was given to
the proposed changes and amendments for the purpose of updating the plan and program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASHINGTON, DO RESOLVE AS FOLLOWS:
SECTION I. The City's "Six -Year Transportation Improvement Program" and
the City's "Arterial Street Plan" are hereby further amended and modified, all as more particularly
shown on the attached Exhibits "A," "B" and "C" incorporated herein as if fully set forth.
SECTION II. The plan and program, as evidenced by said Exhibits, shall be and
constitute the City's "Six -Year Transportation Improvement Program" and the City's "Arterial
1
RESOLUTION NO.
Street Plan," and shall remain in full force and effect until further revised, amended, and modified
as provided by law.
SECTION III. The Administrator of the Department of Planning/Building/Public
Works and the City Clerk are hereby authorized and directed to file this Resolution, together with
the Exhibits, with the Director of Highways for the State of Washington and as otherwise
provided by law.
PASSED BY THE CITY COUNCIL this day of .2003.
Bonnie I. Walton, City Clerk
APPROVED BY THE MAYOR this day of
Approved as to form:
Lawrence J. Warren, City Attorney
RES.985:6/2/03:ma.
Jesse Tanner, Mayor
2003.
2
CITY OF RENTON, WASHINGTON
RESOLUTION NO. �& q Z'
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON
AUTHORIZING THE MAYOR AND CITY CLERK TO ENTER INTO AN
INTERGOVERNMENTAL COOPERATIVE PURCHASING AGREE-
MENT WITH THE CITY OF EVERETT.
WHEREAS, both the City of Renton and the City of Everett periodically have the need to
obtain supplies; material, equipment or services; and
WHEREAS, both cities periodically obtain bids and contracts for such supplies, material,
equipment and services; and
WHEREAS, pursuant to state law, one city may use the bids or contracts of another
governmental entity for supplies, material, equipment and services; and
WHEREAS, the cities of Renton and Everett wish to enter into a contract covering the
use of each others bids and contracts for supplies, material, equipment and services.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASIUNGTON, DO RESOLVE AS FOLLOWS:
SECTION I. The above findings are true and correct in all respects.
SECTION H. The Mayor and City Clerk are hereby authorized to enter into an
intergovernmental cooperative purchasing agreement with the City of Everett.
I
RESOLUTION NO.
PASSED BY THE CITY COUNCIL this day of , 2003.
Bonnie I. Walton, City Clerk
APPROVED BY THE MAYOR this day of , 2003.
Approved as to form:
Lawrence J. Warren, City Attorney
RES.988:6/5/030:tmj
2
Jesse Tanner, Mayor
CITY OF RENTON, WASHINGTON
RESOLUTION NO. ? 3
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RENTON,
WASHINGTON, AUTHORIZING THE ADMINISTRATION TO
COMPLETE AND FILE AN APPLICATION WITH THE FEDERAL
AVIATION ADMINISTRATION FOR A GRANT FOR THE
RUNWAY/TAXIWAY LIGHTING, PAVING AND SIGNAGE PROJECT.
WHEREAS, the City of Renton maintains a municipal airport; and
WHEREAS, it is necessary to make certain improvements to the runways, taxiway
lighting, paving and signage; and
WHEREAS, the Federal Aviation Administration has grant funds available for such
work; and
WHEREAS, it is necessary to file a grant application with the Federal Aviation
Administration; and
WHEREAS, that grant application requires that the governing body of the City
authorized the filing of this grant;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASHINGTON, DO RESOLVE AS FOLLOWS:
SECTION I. The above findings are true and correct in all respects.
SECTION II. The Administration is hereby authorized to sign the Federal
Aviation Administration grant application for the runway/taxiway, lighting, paving and signage
project.
1
RESOLUTION NO.
PASSED BY THE CITY COUNCIL this day of , 2003.
Bonnie I. Walton, City Clerk
APPROVED BY THE MAYOR this day of , 2003.
Approved as to form:
Lawrence J. Warren, City Attorney
RES.992:6/19/03:ma
Jesse Tanner, Mayor
2
CITY OF RENTON, WASHINGTON
ORDINANCE NO. 50/ 3
AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON,
ESTABLISHING AN ASSESSMENT DISTRICT FOR SANITARY
SEWER SERVICE FOR PROPERTIES ADJACENT TO MONTEREY CT
NE, NE 16TH ST, BLAINE AVENUE NE, CAMAS AVENUE NE, DAYTON
AVENUE NE, EDMONDS AVENUE NE, AND MONTEREY AVENUE NE,
AND ESTABLISHING THE AMOUNT OF THE CHARGE UPON
CONNECTION TO THE FACILITIES.
THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO ORDAIN
AS FOLLOWS:
SECTION I. There is hereby created a Sanitary Sewer Service Special
Assessment District for the area served by the East Kennydale Sanitary Sewer Infill Phase I
project in the north quadrant of the City of Renton and within King County, which area is more
particularly described in Exhibit "A" attached hereto. A map of the service area is attached as
Exhibit `B." The recording of this document is to provide notification of potential connection
and interest charges. While this connection charge may be paid at any time, the City does not
require payment until such time as the parcel is connected to and thus benefiting from the sewer
facilities. The property may be sold or in any other way change hands without triggering the
requirement, by the City, of payment of the charges associated with this district.
SECTION H. Persons connecting to the sanitary sewer facilities in this Special
Assessment District and which properties have not been charged or assessed with all costs of the
East Kennydale Sanitary Sewer Infill Phase I, as detailed in this ordinance, shall pay, in addition
to the payment of the connection permit fee and in addition to the system development charge,
the following additional fees:
ORDINANCE NO.
Per Unit Charge. New connections of residential units shall pay a fee of $6,122.35 per
dwelling unit.
SECTION III. In addition to the aforestated charges, there shall be a charge of
4.86% per annum added to the Special Assessment District charge. The interest charge shall
accrue for no more than ten (10) years from the date this ordinance becomes effective. Interest
charges will be simple interest and not compound interest.
SECTION IV. This ordinance is effective upon its passage, approval and thirty
(30) days after publication.
PASSED BY THE CITY COUNCIL this
APPROVED BY THE MAYOR this
Approved as to form:
Lawrence J. Warren, City Attorney
Date of Publication:
ORD.1036:5/27/03:ma
day of , 2003.
Bonnie I. Walton, City Clerk
day of , 2003.
Jesse Tanner, Mayor
2
EXHIBIT A
EAST KENNYDALE SANITARY SEWER INFILL PHASE 1
SPECIAL ASSESSMENT DISTRICT
AREA "A"
LEGAL DESCRIPTION:
Lots 1, 2, and 5 through 9, inclusive, View Terrace, according to the plat thereof recorded in
Volume 72 of Plats, Page 32, Records of King County, Washington; and
The south 50 feet of the north 400 feet of the west 25 feet of the east 125 feet of Tract 250, C.D.
Hillman's Lake Washington Garden of Eden Division 4, according to the plat thereof recorded in
Volume 11 of Plats, Page 82, Records of King County, Washington; and
Those portions of Tract 250 and the east 100 feet of Tract 265 of said C.D. Hillman's Lake
Washington Garden of Eden Division 4 plat, lying southerly and westerly of said View Terrace
plat.
All situate in the southeast quarter of Section 5, Township 23 North, Range 5 East, W.M., in the
City of Renton, King County, Washington.
EXHIBIT A
EAST KENNYDALE SANITARY SEWER INFILL PHASE 1
SPECIAL ASSESSMENT DISTRICT
AREA `B"
LEGAL DESCRIPTION:
The east 150 feet of the south 175 feet of Tract 245, C.D. Hillman's Lake Washington Garden of
Eden Division 4, according to the plat thereof recorded in Volume 11 of Plats, Page 82, Records
of King County, Washington; and
The west 75 feet of the east 150 feet of the north one-half (1/2) of Tract 246 of said C.D.
Hillman's Lake Washington Garden of Eden Division 4 plat; less the south 140 feet thereof; and
Lot C of City of Renton Lot Line Adjustment No. LUA-0 1-0 14-LLA, as recorded under King
County Recording No. 20010418900004, Records of King County, Washington.
All situate in the southeast quarter of Section 5, Township 23 North, Range 5 East, W.M., in the
City of Renton, King County, Washington.
EXHIBIT A
EAST KENNYDALE SANITARY SEWER INFIILL PHASE 1
SPECIAL ASSESSMENT DISTRICT
AREA "C"
LEGAL DESCRIPTION:
Lots 1 through 9, inclusive, Woodland Terrace, according to the plat thereof recorded in Volume
71 of Plats, Page 96, Records of King County, Washington; and
That portion of the west one-half (1/2) of Tract 226, C.D. Hillman's Lake Washington Garden of
Eden Division 4, according to the plat thereof recorded in Volume 11 of Plats, Page 82, Records
of King County, Washington, lying northerly and westerly of said Woodland Terrace plat; less
the north 100 feet thereof; and
That portion of said Tract 226 lying southerly of said Woodland Terrace plat; and
That portion of the west 96 feet of Tract 233 of said C.D. Hillman's Lake Washington Garden of
Eden Division 4, lying south of the north 80 feet thereof; and
That portion of the east 96 feet of said Tract 233, lying south of the north 100 feet thereof; less
street (NE 186' Street).
All situate in the southeast quarter of Section 5, Township 23 North, Range 5 East, W.M., in the
City of Renton, King County, Washington.
EXHIBIT A
EAST KENNYDALE SANITARY SEWER INFILL PHASE I
SPECIAL ASSESSMENT DISTRICT
AREA "D"
LEGAL DESCRIPTION:
Lots 2 through 13, inclusive, J.R. Gatten Addition, according to the plat thereof recorded in
Volume 66 of Plats, Page 65, Records of King County, Washington.
All situate in the northeast quarter of Section 5, Township 23 North, Range 5 East, W.M., in the
City of Renton, King County, Washington.
EXHIBIT A
EAST KENNYDALE SANITARY SEWER INFILL PHASE 1
SPECIAL ASSESSMENT DISTRICT
AREA "E" (page 1 of 2)
LEGAL DESCRIPTION:
The east 80 feet of Tract 204, C.D. Hillman's Lake Washington Garden of Eden Division 4,
according to the plat thereof recorded in Volume 11 of Plats, Page 82, Records of King County,
Washington; and
The north 65 feet of the east 113 feet of Tract 205 of said C.D. Hillman's Lake Washington
Garden of Eden Division 4 plat; and
The north 152 feet of the south 252 feet of the east 100 feet of said Tract 205; and
That portion of the north one-half (1/2) of said Tract 205, described as follows:
Beginning at the southeast corner of said north one-half (1/2) of said Tract;
Thence northerly along the east line of said Tract, said east line also being the
westerly right of way margin of Edmonds Ave NE, a distance of 211 feet;
Thence west, parallel with the south line of the north one-half (1/2) of said Tract, a
distance of 110 feet;
Thence south, parallel with said east line of said Tract, a distance of I I I feet;
Thence east, parallel with said south line of the north one-half (1/2) of said Tract, a
distance of 10 feet;
Thence south, parallel with said east line of said Tract, a distance of 100 feet, to an
intersection with said south line of the north one-half (1/2) of said Tract;
Thence easterly along said south line, a distance of 100 feet, to the point of
beginning.
All of the above situate in the northeast quarter of Section 5, Township 23 North, Range 5 East,
W.M., in the City of Renton, King County, Washington..
TOGETHER WITH that portion of Government Lot 4 of Section 4, Township 23 North, Range 5
East, W.M., in the City of Renton, King County, Washington, described as follows:
Beginning at the intersection of the easterly right of way margin of Edmonds Ave NE
and the southerly right of way margin of NE 270' St.;
Thence southerly along said easterly right of way margin of Edmonds Ave NE, to an
intersection with the northerly right of way margin of NE 25°i St., said street
dedicated on the plat of Sandee Terrace, according to the plat thereof recorded in
Volume 67, Page 2, Records of King County, Washington;
Thence easterly along said northerly right of way margin, to the southwest corner of
Lot 15 of said plat, said southwest corner also being a point on the west line of said
plat;
Thence northerly along said west line, to the most northwesterly corner of said plat;
EXHIBIT A
AREA "B" (page 2 of 2)
Thence easterly along the north line of said plat, to an intersection with the east line
of the west 134 feet of said Government Lot 4;
Thence northerly along said east line, to an intersection with the southerly right of
way margin of NE 27"' St.;
Thence westerly along said southerly right of way margin, to said intersection with
the easterly right of way margin of Edmonds Ave NE, and the point of beginning;
and
That portion of Government Lot 4 and that portion of the southwest quarter of the northwest
quarter, both in Section 4, Township 23 North, Range 5 East, W.M., in the City of Renton, King
County, Washington, lying northerly of the plat of Aloha Ranch, according to the plat thereof
recorded in Volume 77, Page 7, Records of King County, Washington, lying westerly of the west
line of the plat of Honeycreek Heights, according to the plat thereof recorded in Volume 194,
Pages 68 and 69, Records of King County, Washington, lying southerly, westerly and southerly
of the plat of Sandee Terrace, according to the plat thereof recorded in Volume 67, Page 2,
Records of King County, Washington, and lying easterly of the easterly right of way margin of
Edmonds Ave NE.
C.
EXHIBIT A
EAST KENNYDALE SANITARY SEWER INFIIL PHASE 1
SPECIAL ASSESSMENT DISTRICT
AREA "F"
LEGAL DESCRIPTION:
Tract 261 of C.D. Hillman's Lake Washington Garden of Eden Division 4, according to the plat
thereof recorded in Volume 11 of Plats, Page 82, Records of King County, Washington; less the
street (Monterey Ave NE, I I I th Ave SE) as dedicated on the plat of Stollenmayer Addition,
according to the plat thereof recorded in Volume 88 of Plats, Page 87, Records of King County,
Washington.
All situate in the northeast quarter of Section 5, Township 23 North, Range 5 East, W.M.; in the
City of Renton, King County, Washington.
EXHIBIT B
ON ME ■
0--mmi
No ME
MONO
A
r'
EAST KENNYDALE SANITARY SEWER INFILL PHASE I
SPECIAL ASSESSMENT DISTRICT
(ENTIRE ASSESSMENT BOUNDARY)
t; �
EXHIBIT B
AREA "A" & "B"
rn
z
rn
LEGEND
3343901845 KING COUNTY TAX LOT NUMBER
1 SPECIAL ASSESSMENT DISTRICT PARCEL NUMBER
2008 HOUSE ADDRESS NUMBER
EAST KENNYDALE SANITARY SEWER INFILL PHASE I
SPECIAL ASSESSMENT DISTRICT
(MONTEREY CT. NE & NE 16TH ST.)
A
D
W
m
m
m
z
-90
z
m
EXHIBIT B
AREA "C"
U-L\-LA . �J L
NE 20TH ST
i Fr_�nin
3343901845 KING COUNTY TAX LOT NUMBER
1 SPECIAL ASSESSMENT DISTRICT PARCEL NUMBER
2008 HOUSE ADDRESS NUMBER
EAST KENNYDALE SANITARY SEWER INFILL PHASE I
SPECIAL ASSESSMENT DISTRICT
(BLAINE AVE NE & CAMAS AVE NE)
A11
N t L't 111 5 I
I
EXHIBIT B
AREA "D" & "E"
EMNM04ui
3343901845 KING COUNTY TAX LOT NUMBER
1 SPECIAL ASSESSMENT DISTRICT PARCEL NUMBER
200E HOUSE ADDRESS NUMBER
EAST KENNYDALE SANITARY SEWER INFILL PHASE I
SPECIAL ASSESSMENT DISTRICT
(EDMONDS AVE NE & DAYTON AVE NE)
Ax
EXHIBIT B
AREA "F"
D
rn
z
rn
NE 24TH ST
I G(_GAIn
3343901845 KING COUNTY TAX LOT NUMBER
SPECIAL ASSESSMENT DISTRICT PARCEL NUMBER
2008 HOUSE ADDRESS NUMBER
EAST KENNYDALE SANITARY SEWER INFILL PHASE I
SPECIAL ASSESSMENT DISTRICT
(MONTEREY AVE NE)