Loading...
HomeMy WebLinkAboutMFP22001256.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP22001256 IVR Number: 22001256 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:03/14/2022Application Date:0823059197Parcel Number: 750 HOUSER WAY N Permit Type:04/28/2022Issue Date:Franchise Permit Work Class:04/28/2023Expiration Date:Major Utility Job Number: 141005651Franchise Type:Electric Description: Puget Sound Energy Electric SLIDE EXISTING 48CT AERIAL FIBER 2 SPANS TO POLE (318379 166277) INSTALL 3" RISER TO NEW 25TA VAULT IN S/W. TRENCH IN SOFT SURFACE BEHIND SIDEWALK APPROX 370' TO NEW 25TA VAULT IN S/W. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Scott Warlick 1055 S Grady Way Renton, WA 98057 Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL PUGET SOUND ENERGY/ELEC PO BOX 97034 BELLEVUE , WA 98009 Owner PACCAR INC PO BOX 1518 BELLEVUE , WA 98009 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering 4 4 4 4 4 4 4 4 4 4 4 141005651 1801 N 8TH ST Monday Friday 8:00am 3:00pm PLEASE SEE ATTACHED POTELCO, INC 425 892 0416 Dylan Rutledge dylan.rutledge@pse.com 6905 S. 228TH ST KENT, WA 98032 MFP22001256 Scott Warlick CED 4/28/2022 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date CORRIE RYDBERG TABLE 1W20-3ROADCLOSEDAHEADRIGHT LANECLOSEDAHEADW4-2LW20-5RSIDEWALK CLOSED AHEAD R9-11SIDEWALKCLOSEDR9-9108TH AVE NE108TH AVE NENE 10TH STPRIVATE ROAD NE 8TH ST US BANK 929 108TH AVE NESIDEWALKCLOSEDAHEADR9-11SIDEWALK CLOSED R9-9 R3-2L24” x 24” R/B/WSEQUENTIALARROWBOARD W20-3 ROAD CLOSED AHEAD CENTER LANE CLOSED AHEAD W20-5C * Shawn Bowen 206-264-2954 (direct) 206-223-1122 (main) x1154 206-679-8732 (cell) 800-562-2854 TUBE ART GROUP ı SEATTLE 11715 SE 5th Street, Bellevue, WA 98005 Typical SB Right Lane / NB Center Lane and Sidewalk Closure NOTES:RIGHT LANECLOSEDAHEAD W20-5R W20-7W4-2L ROADWORKAHEAD W20-1 ROADWORKAHEAD W20-1 ROADWORKAHEAD W20-1 W4-119R ALL SIGNS AND SPACING TO CONFORM TO THE MUTCD AND THE CITY OF RENTON SPECS GENERAL NOTES 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD AND CITY OF RENTON SPECS. 2. PRIORITY PASSAGE THROUGH WORK AREA FOR EMERGENCY VEHICLES SHALL BE PROVIDED AT ALL TIMES. 3. ALERT METRO TRANSIT 5 DAYS IN ADVANCE (IF APPLICABLE). 4. PROTECTIVE VEHICLE RECOMMENDED-MAY BE A WORK VEHICLE. 5 DEVICES SHALL NOT ENCROACH INTO ADJACENT LANES. 6. ALL SIGNS 48” X 48” B/O UNLESS OTHERWISE SPECIFIED. 7. CHANNELIZATION DEVICES ARE 28” REFL. CONES. (see TABLE 1 for spacing distances). 8. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT GRADE INTERSECTIONS AND/OR DRIVEWAYS. WORK AREA TRAFFIC CONE EXISTING TRAFFIC FLOW LEGEND SIGN LOCATION Permit #__________NNOT TO SCALE TRAFFIC CONTROL PLAN RENTON, WA CHANNELIZING DEVICE SPACING (FEET) TAPER TANGENT 1510 28“ CONES FOR DELINEATION SPACED @ 15’ NATIONAL BARRICADE CO. LLCESTABLISHED IN 1951 Traffic Control SupervisorCard # 069749Traffic Plan Designer Matt Wright Evergreen Safety Council EXP Date01-22-21 SHALL MAINTAIN 11FT TRAVEL WIDTH Prepared By Project Number Phone Number (office) Project Location Supervisor DateEMAIL Turnkey Telecom Jeff Smith N 8TH ST 3-3-21 Matt Wright NATIONAL BARRICADE CO. LLCESTABLISHED IN 1951Phone Number 206.523.4045 turnkeytelecom@gmail.com TYPICAL MOBILE RIGHT LANE CLOSURE N 8TH ST HOUSER WAY NGARDEN AVE NROADWORKAHEAD ROADWORKAHEAD MFP22001256 Project Location:Page-1: T. Smith J. Smith J. Smith - 03/04/21 PACCAR.DWG 03/04/211/5PAC CAR SUBSTATION FIBER BUILD RENTONCITY OFDesigned by:Sheet:Scale:Date:Filename:Approved by-date:Checked by: Confidential and ProprietaryRevised Date:Puget Sound Energy NTS PUGET SOUND ENERGY1801 N 8th StRenton, WashingtonWO# 141005651RENTONDennis LibadiaPuget Sound EnergyTelecom Fiber Transport Engineer9515 Willows Rd NERedmond,Wa.425 867-7338 ofc425 223-2108 cellSTARTUNDERGROUNDIN ALL UNDERGROUND INSTALLATIONS, A TRACER WIREWILL BE RUN WITH THE FIBER OPTIC CABLE .PULLINGTENSION ON FIBER SHALL NOT EXCEED 600 LBSMAXIMUM.COMMUNICATION MARKERSCOMMUNICATIONS CABLE WRAP AROUND MARKERSSHALL BE INSTALLED AT EACH POLE LOCATION.FIBER HANDLINGALL FIBER CABLE ENDS WILL BE SEALED TO ENSURETHAT NO MOISTURE ENTERS.HANDLE FIBER WITH CARE. DO NOT ALLOW BEND RATIOSTO EXCEED 20 TIMES THEDIAMETER OF THE CABLE.PUGET SOUND ENERGY WILL TEST CABLE BEFORE ANDAFTER INSTALLATION TO CONFIRM THAT NO DAMAGEHAS OCCURRED WHILE IN THE CONTRACTOR'S CARE.SAFETYCONTRACTOR WILL PROVIDE ALL FLAGGING ANDWARNING SIGNS AS REQUIRED TO DO A SAFE JOB ANDMEET FEDERAL, STATE AND LOCAL REQUIREMENTS.PERMITTINGMOST CITY/STATE PERMITS REQUIRE THAT WE NOTIFYTHEM OF OUR INTENTION TO START A PROJECT 48HOURS IN ADVANCE OF CONSTRUCTION. CHECK YOURCOPIES FOR INFORMATION REGARDING NOTIFICATIONAND CALL 48 HOURS BEFORE YOUR INTENDED STARTDATE. PERMITS CAN BE VOIDED BY YOUR FAILURE TOMAKE NOTIFICATION. FOREMAN MUST HAVE COPIES OFPERMITS AT ALL TIMES WHERE REQUIRED.ADMINISTRATIONCONTRACTOR AUTHORIZED TO MAKE ON SITE CHANGESAS DEEMED NECESSARYFOREMAN IS TO SIGN AS-BUILT PRINTS AND RETURN TOPUGET SOUND ENERGY.ANY QUESTIONS ABOUT THE CONSTRUCTION OF THISJOB WILL BE ANSWERED BY:DENNIS LIBADIA - 425-867-7338FIELD NOTES:ENDMFP22001256This permit is for Major construction work in the ROW and will be billed at an additional$60/HR for inspections. After hours and weekend work will be billed at $125/HRPOTHOLE ALL EXISTING UTILITIESRESTORATION PER CITY OF RENTON STANDARDS 2134Place 1-3" PVCDuct betweennew vault &existing VaultPlace new25-TA VaultExistingPSE VaultControlHouse501'PULL NEW 48 COUNT FIBER THROUGH EXISTING 6" DUCTRailroad TracksRailroad Tracks2' Planter Strip8' SidewalkExistingPSE VaultsHouser Way NN 8th StProject Location: Page: 2 T. Smith J. Smith J. Smith - 03/04/21 PACCAR.DWG 03/04/212/5PAC CAR SUBSTATION FIBER BUILD RENTONCITY OFDesigned by:Sheet:Scale:Date:Filename:Approved by-date:Checked by: Confidential and ProprietaryRevised Date:Puget Sound Energy NTS0000NEW JOINT POLEJOINT POLEEXISTING RISERSTORAGE731FT731FT00DOUBLE DEADENDSTANGENT CLAMPSFIBER FTG. W/ STORAGEFIBER FTG. W/OUT STORAGER200'RENTONPLAN VIEWA#SYMBOL CORRESPONDS TO PHOTOLOCATIONS AND ORIENTATION. SEESHEET FOR SITE PHOTOGRAPHS.MATCH TO SHEET B Place new25-TA VaultPlace new25-TA vaultMFP22001256 5370'.Garden Ave N 48 count existing aerial fiber Open trench 1-3" Duct on BACK OF WALK TO NEW 25TA VAULT (Approx 370')Place3" riser8RetrieveStorageloopPull slack to PSE Pole UTILIZING EXISTING AERIAL FIBER.Garden Ave NN 8th StN 8th St7Place New25TA Vaultat base of poleProject Location: Page: 3 T. Smith J. Smith J. Smith - 03/04/21 PACCAR.DWG 03/04/213/5PAC CAR SUBSTATION FIBER BUILD RENTONCITY OFDesigned by:Sheet:Scale:Date:Filename:Approved by-date:Checked by: Confidential and ProprietaryRevised Date:Puget Sound Energy NTS0010NEW JOINT POLEJOINT POLEEXISTING RISERSTORAGE1051FT1051FT02DOUBLE DEADENDSTANGENT CLAMPSFIBER FTG. W/ STORAGEFIBER FTG. W/OUT STORAGER200'RENTONPLAN VIEWB#SYMBOL CORRESPONDS TO PHOTOLOCATIONS AND ORIENTATION. SEESHEET FOR SITE PHOTOGRAPHS.INSTALL DOUBLE DEADENDS WORKINGDISTANCE ABOVE TELCO. INSTALL AERIALSTORAGE (SNOWSHOES)INSTALL FIBER TANGENT CLAMPS WORKINGDISTANCE ABOVE TELCO, MINIMUM 40" BELOWNEUTRAL ON ALL POLES UNLESS OTHERWISEINDICATED. INSURE FIBER IS ON SAME SIDE OFPOLE AS TELCO.INSTALL DOUBLE DEADENDS WORKINGDISTANCE ABOVE TELCO.123MATCH TO SHEET A MFP22001256 Project Location:Page: 4 T. Smith J. Smith J. Smith - 03/04/21 PACCAR.DWG 03/04/214/5PAC CAR SUBSTATION FIBER BUILD RENTONCITY OFDesigned by:Sheet:Scale:Date:Filename:Approved by - date:Checked by: Confidential and ProprietaryRevised Date:Puget Sound Energy NTS RENTON MFP22001256All new conduit in theROW shall beschedule 80 orequivalent Project Location:Page: 5 T. Smith J. Smith J. Smith - 03/04/21 PACCAR.DWG 03/04/215/5PAC CAR SUBSTATION FIBER BUILD RENTONCITY OF Designed by:Sheet:Scale:Date:Filename:Approved by - date:Checked by: Confidential and ProprietaryRevised Date:Puget Sound Energy NTS RENTONSITE PHOTOS#SYMBOL CORRESPONDS TO PHOTO LOCATIONSAND ORIENTATION. SEE PLAN VIEW SHEET.PHOTO #1 SEE PLAN VIEW A 8RetreivestorageloopTelcoBuildingNew 25-TAVaultExisting6" DuctExistingVaultExisting6" DuctNew 25-TAVaultExistingVaultTo TelcoBuildingExistingVaultsExisting6" DuctExistingVaultsN 8th St N 8th StGar de n A v e N N 8th StN 8th StExisting6" DuctPHOTO #2 SEE PLAN VIEW A PHOTO #3 SEE PLAN VIEW A PHOTO #4 SEE PLAN VIEW A PHOTO #7 SEE PLAN VIEW B New vault to beinstalled outside ofthe drip edge of thetrees.MFP22001256