Loading...
HomeMy WebLinkAboutContract CAG-17-074 Local Agency A&E Professional Services Negotiated Hourly Rate Consultant Agreement Agreement Number: CAG-17-074 Firm/Organization Legal Name (do not use dba's): BergerABAM Inc. Address Federal Aid Number 33301 Ninth Ave S Ste 300, Federal Way WA 98003 BROS-1070(009) UBI Number Federal TIN or SSN Number 601-110-595 91-1422812 Executio Date Completion Date �� �� December 31, 2018 1099 For Required Federal Participation Q Yes Q No ❑�/ Yes ❑ No Project Title NE 31 st Street Bridge Replacement Description of Work The City of Renton is planning to replace the NE 31st St Bridge (Renton-23)with a new bridge. The existing bridge is structurally deficient with a sufficiency rating of 27. The bridge crosses over May Creek. The City has secured FHWA funding for design, environmental permitting, right-of-way acquisition and construction. The work to be performed by the consultant in this contract includes construction management and inspection services and engineering support during construction. ❑ Yes �❑ No DBE Participation Maximum Amount Payable: $322,364 ❑ Yes Q No MBE Participation ❑ Yes � No WBE Participation ❑ Yes ❑✓ No SBE Participation Index of Exhibits Exhibit A Scope of Work Exhibit B DBE Participation Exhibit C Preparation and Delivery of Electronic Engineering and Other Data Exhibit D Prime Consultant Cost Computations Exhibit E Sub-consultant Cost Computations Exhibit F Title VI Assurances Exhibit G Certification Documents Exhibit H Liability Insurance Increase Exhibit I Alleged Consultant Design Error Procedures Exhibit J Consultant Claim Procedures AgreementNumber: CAG-17-074 Local Agency A8E Professional Services Negotiafed Hourly Rate Consultant Agreement Page 1 of 14 Revised 4/10/2015 THIS AGREEMENT, made and entered into as shown in the "Execution Date"box on page one(1) of this AGREEMENT, between the City of Renton , hereinafter called the "AGENCY," and the "Firm /Organization Name" referenced on page one (1) of this AGREEMENT, hereinafter called the "CONSULTANT." WHEREAS, the AGENCY desires to accomplish the work referenced in "Description of Work" on page one (1) of this AGREEMENT and hereafter called the "SERVICES;" and does not have sufficient staff to meet the required commitment and therefore deems it advisable and desirable to engage the assistance of a CONSULTANT to provide the necessary SERVICES; and WHEREAS, the CONSULTANT represents that they comply with the Washington State Statutes relating to professional registration, if applicable, and has signified a willingness to furnish consulting services to the AGENCY. NOW, THEREFORE, in consideration ofthe terms, conditions, covenants, and performance contained herein, or attached and incorporated and made a part hereof, the parties hereto agree as follows: I. General Description of Work The work under this AGREEMENT shall consist of the above-described SERVICES as herein defined, and necessary to accomplish the completed work for this project. The CONSULTANT shall furnish all services, labor, and related equipment and, if applicable, sub-consultants and subcontractors necessary to conduet and complete the SERVICES as designated elsewhere in this AGREEMENT. II. General Scope of Work The Scope of Work and projected level of effort required for these SERVICES is described in Exhibit"A" attached hereto and by this reference made a part of this AGREEMENT. The General Scope of Work was developed utilizing performance based contracting methodologies. III. General Requirements All aspects of coordination of the work of this AGREEMENT with outside agencies, groups, or individuals shall receive advance approval by the AGENCY. Necessary contacts and meetings with agencies, groups, and/or individuals shall be coordinated through the AGENCY. The CONSULTANT shall attend coordination, progress, and presentation meetings with the AGENCY and/or such State, Federal, Community, City, or County officials, groups or individuals as may be requested by the AGENCY. The AGENCY will provide the CONSULTANT sufficient notice prior to meetings requiring CONSULTANT participation. The minimum required hours or days' notice shall be agreed to between the AGENCY and the CONSULTANT and shown in Exhibit"A." The CONSULTANT shall prepare a monthly progress report, in a form approved by the AGENCY, which will outline in written and graphical form the various phases and the order of performance of the SERVICES in sufficient detail so that the progress of the SERVICES can easily be evaluated. The CONSULTANT, any sub-consultants, and the AGENCY shall comply with all Federal, State, and local laws, rules, codes, regulations, and all AGENCY policies and directives, applicable to the work to be performed under this AGREEMENT. This AGREEMENT shall be interpreted and construed in accordance with the laws of the State of Washington. Agreement Number: CAG-17-074 Local Agency A&E Professional Services Negotiated Hourly Rate Consultant Agreement Page 2 of 14 Revised 4/10/2015 Participation for Disadvantaged Business Enterprises (DBE) or Small Business Enterprises (SBE), if required, per 49 CFR Part 26, shall be shown on the heading of this AGREEMENT. If DBE firms are utilized at the commencement of this AGREEMENT, the amounts authorized to each firm and their certification number will be shown on Exhibit`B" attached hereto and by this reference made part of this AGREEMENT. If the Prime CONSULTANT is a DBE certified firm they must comply with the Commercial Useful Function (CUF) regulation outlined in the AGENCY's "DBE Program Participation Plan" and perform a minimum of 30%of the total amount of this AGREEMENT. It is recommended, but not required,that non-DBE Prime CONSULTANTS perform a minimum of 30°/a of the total amount of this AGREEMENT. The CONSULTANT, on a monthly basis, is required to submit DBE Participation of the amounts paid to all DBE firms invoiced for this AGREEMENT. All Reports, PS&E materials, and other data furnished to the CONSULTANT by the AGENCY shall be returned. All electronic files,prepared by the CONSULTANT, must meet the requirements as outlined in Exhibit"C— Preparation and Delivery of Electronic Engineering and other Data." All designs, drawings, specifications, documents, and other work products, including all electronic files, prepared by the CONSULTANT prior to completion or termination of this AGREEMENT are instruments of service for these SERVICES, and are the property of the AGENCY. Reuse by the AGENCY or by others, acting through or on behalf of the AGENCY of any such instruments of service, not occurring as a part of this SERVICE, shall be without liability or legal exposure to the CONSULTANT. Any and all notices or requests required under this AGREEMENT shall be made in writing and sent to the other party by (i) certified mail, return receipt requested, or(ii) by email or facsimile, to the address set forth below: If to AGENCY: If to CONSULTANT: Name: Derek Akesson Name: Robert Fernandes Agency: City of Renton Agency: BergerABAM Inc. Address: City Hall - Sth Floor, 1055 S Grady Way Address: 33301 Ninth Avenue S., Suite 300 City: Renton State: WA Zip: 98057 City: Federal Way State: WA Zip: 98003 Email: dakesson@rentonwa.gov Email: bob.fernandes@abam.com Phone: 425-430-7337 Phone: 206-431-2333 Facsimile: 425-430-7376 Facsimile: 206-431-2250 IV. Time for Beginning and Completion The CONSULTANT shall not begin any work under the terms of this AGREEMENT until authorized in writing by the AGENCY. All work under this AGREEMENT shall conform to the criteria agreed upon detailed in the AGREEMENT documents. These SERVICES must be completed by the date shown in the heading of this AGREEMENT titled "Completion Date." The established completion time shall not be extended because of any delays attributable to the CONSULTANT, but may be extended by the AGENCY in the event of a delay attributable to the AGENCY, or because of unavoidable delays caused by an act of GOD, governmental actions, or other conditions beyond the control of the CONSULTANT. A prior supplemental AGREEMENT issued by the AGENCY is required to extend the established completion time. AgreementNumber: CAG-17-074 LocalAgencyA&E Professiona/Services Negotiated Hourly Rate ConsulfantAgreement Page 3 of 14 Revised 4/10/2015 V. Payment Provisions The CONSULTANT shall be paid by the AGENCY for completed SERVICES rendered under this AGREEMENT as provided hereinafter. Such payment shall be full compensation for SERVICES performed or SERVICES rendered and for all labor, materials, supplies, equipment, and incidentals necessary to complete SERVICES. The CONSULTANT shall conform to all applicable portions of 48 CFR Part 31 (www.ecfr.gov). A. Hourly Rates: Hourly rates are comprised of the following elements - Direct(Raw) Labor, Indirect Cost Rate, and Fixed Fee (Profit). The CONSULTANT shall be paid by the AGENCY for work done, based upon the negotiated hourly rates shown in Exhibits "D" and "E" attached hereto and by reference made part of this AGREEMENT. These negotiated hourly rates will be accepted based on a review of the CONSULTANT's direct labor rates and indirect cost rate computations and agreed upon fixed fee. The accepted negotiated rates shall be memorialized in a final written acknowledgement between the parties. Such final written acknowledgement shall be incorporated into, and become a part of, this AGREEMENT. The initially accepted negotiated rates shall be applicable from the approval date, as memorialized in a final written acknowledgement, to 180 days following the CONSULTANT's fiscal year end (FYE) date. The direct(raw) labor rates and classifications, as shown on Exhibits "D" and "E" shall be subject to renegotiations for each subsequent twelve (12) month period (180 days following FYE date to 180 days following FYE date) upon written request of the CONSULTANT or the AGENCY. The written request must be made to the other parry within ninety(90) days following the CONSULTANT's FYE date. If no such written request is made, the current direct(raw) labor rates and classifications as shown on Exhibits"D" and"E", will remain in effect for the twelve (12) month period. Conversely, if a timely request is made in the manner set forth above, the parties will commence negotiations to determine the new direct(raw) labor rates and classifications that will be applicable for the twelve (12) month period. Any agreed to renegotiated rates shall be memorialized in a final written acknowledgement between the parties. Such final written acknowledgement shall be incorporated into, and become a part of, this AGREEMENT. If requested,the CONSULTANT shall provide current payroll register and classifications to aid in negotiations. If the parties cannot reach an agreement on the direct (raw) labor rates and classifications, the AGENCY shall perform an audit of the CONSULTANT's books and records to determine the CONSULTANT's actual costs. The audit findings will establish the direct (raw) labor rates and classifications that will be applicable for the twelve (12) month period. The fixed fee as identified in Exhibits "D" and "E" shall represent a value to be applied throughout the life of the AGREEMENT. The CONSULTf1NT shall submit annually to the AGENCY an updated indirect cost rate within 180 days of the close of its fiscal year. An approved updated indirect cost rate shall be included in the current fiscal year rates under this AGREEMENT, even if/when other components of the hourly rate are not renegotiated. These rates will be applicable for the twelve (12) month period. At the AGENCY's option, a provisional and/or conditional indirect cost rate may be negotiated. This provisional or conditional indirect rate shall remain in effect until the updated indirect cost rate is completed and approved. Indirect cost rate costs incurred during the provisional or conditional period will not be adjusted. The CONSULTANT may request an extension of the last approved indirect cost rate for the twelve (12) month period. These requests for provisional indirect cost rate and/or extension will be considered on a case-by-case basis, and if granted, will be memorialized in a final written acknowledgement. The CONSULTANT shall maintain and have accessible support data for verification of the components of the hourly rates, i.e., direct (raw) labor, indirect cost rate, and fixed fee (profit)percentage. The CONSULTANT shall bill each employee's actual classification, and actual salary plus indirect cost rate plus fixed fee. AgreementNumber. CAG-17-074 Loca/AgencyA&E Professional Services Negotiated Hourly Rate ConsultantAgreement Page 4 of 14 Revised 4/10/2015 B. Direct Non-Salary Costs: Direct Non-Salary Costs will be reimbursed at the actual cost to the CONSULTANT. � These charges may include, but are not limited to, the following items: travel, printing, long distance telephone, supplies, computer charges and fees of sub-consultants. Air or train travel will be reimbursed only to lowest price available, unless otherwise approved by the AGENCY. The CONSULTANT shall comply with the rules and regulations regarding travel costs (excluding air, train, and rental car costs) in accordance with the WSDOT's Accounting Manual M 13-82, Chapter 10—Travel Rules and Procedures, and all revisions thereto. Air, train and rental card costs shall be reimbursed in accordance with 48 Code of Federal Regulations (CFR) Part 31.205-46 "Travel Costs."The billing for Direct Non-salary Costs shall include an itemized listing of the charges directly identifiable with these SERVICES. The CONSULTANT shall maintain the original supporting documents in their office. Copies of the original supporting documents shall be supplied to the STATE upon request. All above charges must be necessary for the SERVICES provided under this AGREEMENT. C. Maximum Amount Payable: The Maximum Amount Payable by the AGENCY to the CONSULTANT under this AGREEMENT shall not exceed the amount shown in the heading of this AGREEMENT on page one (1.) The Maximum Amount Payable does not include payment for extra work as stipulated in section XIII, "Extra Work."No minimum amount payable is guaranteed under this AGREEMENT. D. Monthly Progress Payments: Progress payments may be claimed on a monthly basis for all costs authorized in A and B above. The monthly billings shall be supported by detailed statements for hours expended at the rates established in Exhibit"D," including names and classifications of all employees, and billings for all direct non- salary expenses. To provide a means of verifying the billed salary costs for the CONSULTANT's employees, the AGENCY may conduct employee interviews. These interviews may consist of recording the names, titles, salary rates, and present duties of those employees performing work on the SERVICES at the time of the interview. E. Final Payment: Final Payment of any balance due the CONSULTANT of the gross amount earned will be made promptly upon its verification by the AGENCY after the coinpletion of the SERVICES under this AGREEMENT, contingent upon receipt of all PS&E, plans, maps, notes, reports, electronic data, and other related documents which are required to be furnished under this AGREEMENT. Acceptance of such Final Payment by the CONSULTANT shall constitute a release of all claims for payment, which the CONSULTANT may have against the AGENCY unless such claims are specifically reserved in writing and transmitted to the AGENCY by the CONSULTANT prior to its acceptance. Said Final Payment shall not, however, be a bar to any claims that the AGENCY may have against the CONSULTANT or to any remedies the AGENCY may pursue with respect to such claims. The payment of any billing will not constitute agreement as to the appropriateness of any item and at the time of final audit all required adjustments will be made and reflected in a final payment. In the event that such final audit reveals an overpayment to the CONSULTANT, the CONSULTANT will refund such overpayment to the AGENCY within thirty (30) calendar days of notice of the overpayment. Such refund shall not constitute a waiver by the CONSULTANT for any claims relating to the validity of a finding by the AGENCY of overpayment. Per WSDOT's "Audit Guide for Consultants," Chapter 23 "Resolution Procedures,"the CONSULTANT has twenty (20)working days after receipt of the final Post Audit to begin the appeal process to the AGENCY for audit findings. F. Inspection of Cost Records: The CONSULTANT and their sub-consultants shall keep available for inspection by representatives of the AGENCY and the United States, for a period of six (6) years after receipt of final payment, the cost records and accounts pertaining to this AGREEMENT and all items related to or bearing upon these records with the following exception: if any litigation, claim or audit arising out of, in connection with, or related to this AGREEMENT is initiated before the expiration of the six(6) year period, the cost records and accounts shall be retained until such litigation, claim, or audit involving the records is completed. An interim or post audit may be performed on this AGREEMENT. The audit, if any, will be performed by the State Auditor, WSDOT's Internal Audit Office and/or at the request of the AGENCY's Project Manager. AgreementNumber: CAG-17-074 Local Agency A&E Professional Services Negotiated Hourly Rate Consu/tant Agreement Page 5 of 14 Revised 4/10/2015 VI. Sub-Contracting The AGENCY permits subcontracts for those items of SERVICES as shown in Exhibit "A" attached hereto and by this reference made part of this AGREEMENT. The CONSULTANT shall not subcontract for the performance of any SERVICE under this AGREEMENT without prior written permission of the AGENCY. No permission for subcontracting shall create, between the AGENCY and sub-consultant, any contract or any other relationship. Compensation for this sub-consultant SERVICES shall be based on the cost factors shown on Exhibit"E" attached hereto and by this reference made part of this AGREEMENT. The SERV'ICES of the sub-consultant shall not exceed its maximum amount payable identified in each sub- consultant cost estimate unless a prior written approval has been issued by the AGENCY. All reimbursable direct labor, indirect cost rate, direct non-salary costs and fixed fee costs for the sub-consultant shall be negotiated and substantiated in accordance with section V"Payment Provisions" herein and shall be memorialized in a final written acknowledgement between the parties. All subcontracts shall contain all applicable provisions of this AGREEMENT, and the CONSULTANT shall require each sub-consultant or subcontractor, of any tier, to abide by the terms and conditions of this AGREEMENT. With respect to sub-consultant payment, the CONSULTANT shall comply with all applicable sections of the STATE's Prompt Payment laws as set forth in RCW 39.04.250 and RCW 39.76.01 l. The CONSULTANT, sub-recipient, or sub-consultant shall not discriminate on the basis of race,color, national origin, or sex in the performance of this AGREEMENT. The CONSULTANT shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT assisted contracts. Failure by the CONSULTANT to carry out these requirements is a material breach of this AGREEMENT, which may result in the termination of this AGREEMENT or such other remedy as the recipient deems appropriate. VII. Employment and Organizational Conflict of Interest The CONSULTANT warrants that they have not employed or retained any campany or person, other than a bona fide employee working solely for the CONSULTANT,to solicit or secure this contract, and that it has not paid or agreed to pay any company or person, other than a bona fide employee working solely for the CONSULTANT, any fee, commission,percentage, brokerage fee, gift, or any other consideration, contingent upon or resulting from the award or making of this contract. For breach or violation of this warrant,the AGENCY shall have the right to annul this AGREEMENT without liability or, in its discretion, to deduct from this AGREEMENT price or consideration or otherwise recover the full amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee. Any and all employees of the CONSULTANT or other persons while engaged in the performance of any work or services required of the CONSULTANT under this AGREEMENT, shall be considered employees of the CONSULTANT only and not of the AGENCY, and any and all claims that may arise under any Workmen's Compensation Act on behalf of said employees or other persons while so engaged, and any and all claims made by a third party as a consequence of any act or omission on the part of the CONSULTANT's employees or other persons while so engaged on any of the work or services provided to be rendered herein, shall be the sole obligation and responsibility of the CONSULTANT. The CONSULTANT shall not engage, on a full- or part-time basis, or other basis, during the period of this AGREEMENT, any professional or technical personnel who are, or have been, at any time during the period of this AGREEMENT, in the employ of the United States Department of Transportation or the AGENCY, except regularly retired employees, without written consent of the public employer of such person if he/she will be working on this AGREEMENT for the CONSULTANT. Agreement Number: CAG-17-074 LocalAgencyA&E Professional Services Negotiated Hourly Rate ConsultantAgreemenf Page 6 of 14 Revised 4/10/2015 VIII. Nondiscrimination During the performance of this AGREEMENT, the CONSULTANT, for itself, its assignees, sub-consultants, subcontractors and successors in interest, agrees to comply with the following laws and regulations: • Title VI of the Civil Rights Act of 1964 • Civil Rights Restoration Act of 1987 (42 U.S.C. Chapter 21 Subchapter V § 2000d (Public Law 100-259) through 2000d-4a) • American with Disabilities Act of 1990 • Federal-aid Highway Act of 1973 (42 U.S.C. Chapter l26 § 12101 et. seq.) (23 U.S.C. Chapter 3 § 324) • 23 CFR Part 200 • Rehabilitation Act of 1973 • 49 CFR Part 21 (29 U.S.C. Chapter 16 Subchapter V § 794) • 49 CFR Part 26 • Age Discrimination Act of 1975 • RCW 49.60.180 (42 U.S.C. Chapter 76 § 6101 et. seq.) In relation to Title VI of the Civil Rights Act of 1964, the CONSULTANT is bound by the provisions of Exhibit"F" attached hereto and by this reference made part of this AGREEMENT, and shall include the attached Exhibit"F" in every sub-contract, including procurement of materials and leases of equipment, unless exempt by the Regulations or directives issued pursuant thereto. IX. Termination of Agreement The right is reserved by the AGENCY to terminate this AGREEMENT at any time with or without cause upon ten (10) days written notice to the CONSULTANT. In the event this AGREEMENT is terminated by the AGENCY, other than for default on the part of the CONSULTANT, a final payment shall be made to the CONSULTANT for actual hours charged at the time of termination of this AGREEMENT, plus any direct non-salary costs incurred up to the time of termination of this AGREEMENT. No payment shall be made for any SERVICES completed after ten (10) days following receipt by the CONSULTANT of the notice to terminate. If the accumulated payment made to the CONSULTEINT prior to Notice of Termination exceeds the total amount that would be due when computed as set forth in paragraph two (2) of this section, then no final payment shall be due and the CONSULTANT shall immediately reimburse the AGENCY for any excess paid. If the services of the CONSULTANT are terminated by the AGENCY for default on the part of the CONSULTANT, the above formula for payment shall not apply. In the event of a termination for default,the amount to be paid to the CONSULTANT shall be determined by the AGENCY with consideration given to the actual costs incurred by the CONSULTANT in performing SERVICES to the date of termination, the amount of SERVICES originally required which was satisfactorily completed to date of termination, whether that SERVICE is in a form or a type which is usable to the AGENCY at the time of termination, the cost to the AGENCY of employing another firm to complete the SERVICES required and the time which may be required to do so, and other factors which affect the value to the AGENCY of the SERVICES performed at the time of termination. Under no circumstances shall payment made under this subsection exceed the amount, which would have been made using the formula set forth in paragraph two (2) of this section. If it is determined for any reason that the CONSULTANT was not in default or that the CONSULT�INT's failure to perform is without the CONSULTANT's or its employee's fault or negligence,the termination shall be deemed to be a termination for the convenience of the AGENCY. In such an event, the CONSULTANT would be reimbursed for actual costs in accordance with the termination for other than default clauses listed previously. Agreement Number: CAG-17-074 Local Agency A&E Professional Services Negotiated Hourly Rate Consultant Agreement Page 7 of 14 Revised 4/10/2015 The CONSULTANT shall, within 15 days, notify the AGENCY in writing, in the event of the death of any member, partner, or officer of the CONSULTANT or the death or change of any of the CONSULTANT's supervisory and/or other key personnel assigned to the project or disaffiliation of any principally involved CONSULTANT employee. The CONSULTANT shall also notify the AGENCY, in writing, in the event of the sale or transfer of 50%or more of the beneficial ownership of the CONSULTANT within 15 days of such sale or transfer occurring. The CONSULTANT shall continue to be obligated to complete the SERVICES under the terms of this AGREEMENT unless the AGENCY chooses to terminate this AGREEMENT for convenience or chooses to renegotiate any term(s) of this AGREEMENT. If termination for convenience occurs, final payment will be made to the CONSULTANT as set forth in the second and third paragraphs of this section. Payment for any part of the SERVICES by the AGENCY shall not constitute a waiver by the AGENCY of any remedies of any type it may have against the CONSULTANT for any breach of this AGREEMENT by the CONSULTANT, or for failure of the CONSULTANT to perform SERVICES required of it by the AGENCY. Forbearance of any rights under the AGREEMENT will not constitute waiver of entitlement to exercise those rights with respect to any future act or omission by the CONSULTANT. X. Changes of Work The CONSULTANT shall make such changes and revisions in the completed work of this AGREEMENT as necessary to correct errors appearing therein, without additional compensation thereo£ Should the AGENCY find it desirable for its own purposes to have previously satisfactorily completed SERVICES or parts thereof changed or revised, the CONSULTANT shall make such revisions as directed by the AGENCY. This work shall be considered as Extra Work and will be paid for as herein provided under section XIII "Extra Work." XI. Disputes Any disputed issue not resolved pursuant to the terms of this AGREEMENT shall be submitted in writing within 10 days to the Director of Public Works or AGENCY Engineer, whose decision in the matter shall be final and binding on the parties of this AGREEMENT; provided however,that if an action is brought challenging the Director of Public Works or AGENCY Engineer's decision, that decision shall be subject to judicial review. If the parties to this AGREEMENT mutually agree, disputes concerning alleged design errors will be conducted under the procedures found in Exhibit"J". In the event that either party deem it necessary to institute legal action or proceeding to enforce any right or obligation under this AGREEMENT, this action shall be initiated in the Superior Court of the State of Washington, situated in the county in which the AGENCY is located. The parties hereto agree that all questions shall be resolved by application of Washington law and that the parties have the right of appeal from such decisions of the Superior Court in accordance with the laws of the State of Washington. The CONSULTANT hereby consents to the personal jurisdiction of the Superior Court of the State of Washington, situated in the county in which the AGENCY is located. XII. Legal Relations The CONSULT�INT, any sub-consultants, and the AGENCY shall comply with all Federal, State, and local laws, rules, codes, regulations and all AGENCY policies and directives, applicable to the work to be performed under this AGREEMENT. This AGREEMENT shall be interpreted and construed in accordance with the laws of the State of Washington. The CONSULTANT shall defend, indemnify, and hold the State of Washington (STATE) and the AGENCY and their officers and employees harmless from all claims, demands, or suits at law or equity arising in whole or in part from the negligence of, or the breach of any obligation under this AGREEMENT by, the CONSULTANT or the CONSULTANT's agents, employees, sub consultants, subcontractors or vendors, of any tier, or any other persons for whom the CONSULTANT may be legally liable; provided that nothing herein shall require a CONSULTANT Agreement Number: CAG-17-074 Local Agency A&E Professional Services Negotiated Hourly Rate Consultant Agreement Page 8 of 14 Revised 4/10/2015 to defend or indemnify the STATE and the AGENCY and their officers and employees against and hold harmless the STATE and the AGENCY and their officers and employees from claims, demands or suits based solely upon the negligence of, or breach of any obligation under this AGREEMENT by the STATE and the AGENCY, their agents, officers, employees, sub-consultants, subcontractors or vendors, of any tier, or any other persons for whom the STATE and/or the AGENCY may be legally liable; and provided further that if the claims or suits are caused by or result from the concurrent negligence of(a)the CONSULTANT or the CONSULTANT's agents, employees, sub-consultants, subcontractors or vendors, of any tier, or any other persons for whom the CONSULTANT is legally liable, and (b)the STATE and/or AGENCY,their agents, officers, employees, sub-consultants, subcontractors and or vendors, of any tier, or any other persons for whom the STATE and/or AGENCY may be legally liable, the defense and indemnity obligation shall be valid and enforceable only to the extent of the CONSULTANT's negligence or the negligence of the CONSULTANT's agents, employees, sub-consultants, subcontractors or vendors, of any tier, or any other persons for whom the CONSULTANT may be legally liable. This provision shall be included in any AGREEMENT between CONSULTANT and any sub-consultant, subcontractor and vendor, of any tier. The CONSULTANT shall also defend, indemnify, and hold the STATE and the AGENCY and their officers and employees harmless from all claims, demands, or suits at law or equity arising in whole or in part from the alleged patent or copyright infringement or other allegedly improper appropriation or use of trade secrets, patents, proprietary information, know-how, copyright rights or inventions by the CONSULTANT or the CONSULTANT's agents, employees, sub-consultants, subcontractors or vendors, of any tier, or any other persons for whom the CONSULTANT may be legally liable, in performance of the Work under this AGREEMENT or arising out of any use in connection with the AGREEMENT of inethods, processes, designs, information or other items furnished or communicated to STATE and/or the AGENCY, their agents, officers and employees pursuant to the AGREEMENT; provided that this indemnity shall not apply to any alleged patent or copyright infringement or other allegedly improper appropriation or use of trade secrets, patents, proprietary information, know-how, copyright rights or inventions resulting from STATE and/or AGENCY's,their agents', officers' and employees' failure to comply with specific written instructions regarding use provided to STATE and/or AGENCY, their agents, officers and employees by the CONSULTANT, its agents, employees, sub-consultants, subcontractors or vendors, of any tier, or any other persons for whom the CONSULTANT may be legally liable. The CONSULTANT's relation to the AGENCY shall be at all times as an independent contractor. Notwithstanding any determination by the Executive Ethics Board or other tribunal, the AGENCY may, in its sole discretion, by written notice to the CONSULTANT terminate this AGREEMENT if it is found after due notice and examination by the AGENCY that there is a violation of the Ethics in Public Service Act, Chapter 42.52 RCW; or any similar statute involving the CONSULTANT in the procurement of, or performance under, this AGREEMENT. The CONSULTANT specifically assumes potential liability for actions brought by the CONSULTANT's own employees or its agents against the STATE and/or the AGENCY and, solely for the purpose of this indemnification and defense, the CONSULTANT specifically waives any immunity under the state industrial insurance law, Title 51 RCW. This waiver has been mutually negotiated by the Parties. Unless otherwise specified in this AGREEMENT,the AGENCY shall be responsible for administration of construction contracts, if any, on the project. Subject to the processing of a new sole source, or an acceptable supplemental AGREEMENT, the CONSULTANT shall provide On-Call assistance to the AGENCY during contract administration. By providing such assistance,the CONSULTANT shall assume no responsibility for: proper construction techniques,job site safety, or any construction contractor's failure to perform its work in accordance with the contract documents. The CONSULTANT shall obtain and keep in force during the terms of this AGREEMENT, or as otherwise required, the following insurance with companies or through sources approved by the State Insurance Commissioner pursuant to Title 48 RCW. AgreementNumber: CAG-17-074 LocalAgencyA&E Professiona/Services Negotiated Hourly Rate Consu/tantAgreement Page 9 of 14 Revised 4/10/2015 Insurance Coverage A. Worker's compensation and employer's liability insurance as required by the STATE. B. Commercial general liability insurance written under ISO Form CG 00 O1 12 04 or its equivalent with minimum limits of one million dollars ($1,000,000.00) per occurrence and two million dollars ($2,000,000.00) in the aggregate for each policy period. C. Business auto liability insurance written under ISO Form CG 00 O1 10 O1 or equivalent providing coverage for any "Auto" (Symbol 1) used in an amount not less than a one million dollar($1,000,000.00) combined single limit for each occurrence. Excepting the Worker's Compensation Insurance and any Professional Liability Insurance, the STATE and AGENCY, their officers, employees, and agents will be named on all policies of CONSULTANT and any sub- consultant and/or subcontractor as an additional insured (the "AIs"), with no restrictions or limitations concerning products and completed operations coverage. This coverage shall be primary coverage and non-contributory and any coverage maintained by the AIs shall be excess over, and shall not contribute with,the additional insured coverage required hereunder. The CONSULTANT's and the sub-consultant's and/or subcontractor's insurer shall waive any and all rights of subrogation against the AIs. The CONSULTANT shall furnish the AGENCY with verification of insurance and endorsements required by this AGREEMENT. The AGENCY reserves the right to require complete, certified copies of all required insurance policies at any time. All insurance shall be obtained from an insurance company authorized to do business in the State of Washington. The CONSULTANT shall submit a verification of insurance as outlined above within fourteen (14) days of the execution of this AGREEMENT to: Name: Derek Akesson Agency: City of Renton Address: City Hall- Sth Floor, 1055 S Grady Way City: Renton State: WA Zip: 98057 EmaiL• dakesson@rentonwa.gov Phone: 425-430-7337 Facsimile: 425-430-7376 No cancellation of the foregoing policies shall be effective without thirty (30) days prior notice to the AGENCY. The CONSULTANT's professional liability to the AGENCY, including that which may arise in reference to section IX "Termination of Agreement" of this AGREEMENT, shall be limited to the accumulative amount of the authorized AGREEMENT or one million dollars ($1,000,000.00), whichever is greater, unless the limit of liability is increased by the AGENCY pursuant to Exhibit H. In no case shall the CONSULTANT's professional liability to third parties be limited in any way. The parties enter into this AGREEMENT for the sole benefit of the parties, and to the exclusion of any third party, and no third party beneficiary is intended or created by the execution of this AGREEMENT. The AGENCY will pay no progress payments under section V"Payment Provisions" until the CONSULTANT has fully complied with this section. This remedy is not exclusive; and the AGENCY may take such other action as is available to it under other provisions of this AGREEMENT, or otherwise in law. Agreement Number: CAG-17-074 Local Agency A&E Professional Services Negotiated Hourly Rate Consultant Agreement Page 10 of 14 Revised 4/10/2015 XIII. Extra Work A. The AGENCY may at any time, by written order, make changes within the general scope of this AGREEMENT in the SERVICES to be performed. B. If any such change causes an increase or decrease in the estimated cost of, or the time required for, performance of any part of the SERVICES under this AGREEMENT, whether or not changed by the order, or otherwise affects any other terms and conditions of this AGREEMENT, the AGENCY shall make an equitable adjustment in the: (1) maximum amount payable; (2) delivery or completion schedule, or both; and (3) other affected terms and shall modify this AGREEMENT accordingly. C. The CONSULTANT must submit any "request for equitable adjustment," hereafter referred to as "CLAIM," under this clause within thirty (30) days from the date of receipt of the written order. However, if the AGENCY decides that the facts justify it, the AGENCY may receive and act upon a CLAIM submitted before final payment of this AGREEMENT. D. Failure to agree to any adjustment shall be a dispute under the section XI "Disputes" clause. However, nothing in this clause shall excuse the CONSULTANT from proceeding with the AGREEMENT as changed. E. Notwithstanding the terms and conditions of paragraphs (A.) and (B.) above, the maximum amount payable for this AGREEMENT, shall not be increased or considered to be increased except by specific written supplement to this AGREEMENT. XIV. Endorsement of Plans If applicable, the CONSULTANT shall place their endorsement on all plans, estimates, or any other engineering data furnished by them. XV. Federal Review The Federal Highway Administration shall have the right to participate in the review or examination of the SERVICES in progress. XVI. Certification of the Consultant and the Agency Attached hereto as Exhibit"G-1(a and b)" are the Certifications of the CONSULTANT and the AGENCY, Exhibit "G-2" Certification Regarding Debarment, Suspension and Other Responsibility Matters - Primary Covered Transactions, Exhibit"G-3" Certification Regarding the Restrictions of the Use of Federal Funds for Lobbying and Exhibit"G-4" Certificate of Current Cost or Pricing Data. EXhibit"G-3" is required only in AGREEMENT's over one hundred thousand dollars ($100,000.00) and Exhibit"G-4" is required only in AGREEMENT's over five hundred thousand dollars ($500,000.00.)These Exhibits must be executed by the CONSULTANT, and submitted with the master AGREEMENT, and returned to the AGENCY at the address listed in section III "General Requirements" prior to its performance of any SERVICES under this AGREEMENT. XVII. Complete Agreement This document and referenced attachments contain all covenants, stipulations, and provisions agreed upon by the parties. No agent, or representative of either party has authority to make, and the parties shall not be bound by or be liable for, any statement, representation, promise or agreement not set forth herein. No changes, amendments, or modifications of the terms hereof shall be valid unless reduced to writing and signed by the parties as a supplement to this AGREEMENT. Agreement Number: CAG-17-074 Local Agency A8E Professional Services Negotiated Hourly Rate Consultant Agreement Page 11 of 14 Revised 4/10/2015 XVIII. Execution and Acceptance This AGREEMENT may be simultaneously executed in several counterparts, each of which shall be deemed to be an original having identical legal effect. The CONSULTANT does hereby ratify and adopt all statements, representations, warranties, covenants, and AGREEMENT's contained in the proposal, and the supporting material submitted by the CONSULTANT, and does hereby accept this AGREEMENT and agrees to all of the terms and conditions thereof. XIX. Protection of Confidential Information The CONSULTANT acknowledges that some of the material and information that may come into its possession or knowledge in connection with this AGREEMENT or its performance may consist of information that is exempt from disclosure to the public or other unauthorized persons under either chapter 42.56 RCW or other local, state or federal statutes ("State's Confidential Information"). The "State's Confidential Information" includes, but is not limited to, names, addresses, Social Security numbers, e-mail addresses, telephone numbers,financial profiles, credit card information, driver's license numbers, medical data, law enforcement records (or any other information identifiable to an individual), STATE and AGENCY source code or object code, STATE and AGENCY security data, non-public Specifications, STATE and AGENCY non-publicly available data, proprietary software, STATE and AGENCY security data, or information which may jeopardize any part of the project that relates to any of these types of information. The CONSULTANT agrees to hold the State's Confidential Information in strictest confidence and not to make use of the State's Confidential Information for any purpose other than the performance of this AGREEMENT,to release it only to authorized employees, sub-consultants or subcontractors requiring such information for the purposes of carrying out this AGREEMENT, and not to release, divulge, publish, transfer, sell, disclose, or otherwise make it known to any other party without the AGENCY's express written consent or as provided by law. The CONSULTANT agrees to release such information or material only to employees, sub-consultants or subcontractors who have signed a nondisclosure AGREEMENT, the terms of which have been previously approved by the AGENCY. The CONSULTANT agrees to implement physical, electronic, and managerial safeguards to prevent unauthorized access to the State's Confidential Information. Immediately upon expiration or termination of this AGREEMENT, the CONSULTANT shall, at the AGENCY's option: (i) certify to the AGENCY that the CONSULTANT has destroyed all of the State's Confidential Information; or(ii)returned all of the State's Confidential Information to the AGENCY; or(iii)take whatever other steps the AGENCY requires of the CONSULTANT to protect the State's Confidential Information. As required under Executive Order 00-03, the CONSULTANT shall maintain a log documenting the following: the State's Confidential Information received in the performance of this AGREEMENT; the purpose(s) for which the State's Confidential Information was received; who received, maintained and used the State's Confidential Information; and the final disposition of the State's Confidential Information. The CONSULTANT's records shall be subject to inspection, review, or audit upon reasonable notice from the AGENCY. The AGENCY reserves the right to monitor, audit, or investigate the use of the State's Confidential Information collected, used, or acyuired by the CONSULTANT through this AGREEMENT. The monitoring, auditing, or investigating may include, but is not limited to, salting databases. Violation of this section by the CONSULTANT or its sub-consultants or subcontractors may result in termination of this AGREEMENT and demand for return of all State's Confidential Information, monetary damages, or penalties. It is understood and acknowledged that the CONSULTANT may provide the AGENCY with information which is proprietary and/or confidential during the term of this AGREEMENT. The parties agree to maintain the confidentiality of such information during the term of this AGREEMENT and afterwards. All materials containing such proprietary and/or confidential information shall be clearly identified and marked as "Confidential" and shall be returned to the disclosing party at the conclusion of the SERVICES under this AGREEMENT. Agreement Number: CAG-17-074 Loca/Agency A&E Professional Services Negotiafed Hourly Rate Consultant Agreement Page 12 of 14 Revised 4/10/2015 The CONSULT�INT shall provide the AGENCY with a list of all information and materials it considers confidential and/or proprietary in nature: (a) at the commencement of the term of this AGREEMENT; or(b) as soon as such confidential or proprietary material is developed. "Proprietary and/or confidential information" is not meant to include any information which, at the time of its disclosure: (i) is already known to the other party; (ii) is rightfully disclosed to one of the parties by a third party that is not acting as an agent or representative for the other party; (iii) is independently developed by or for the other party; (iv) is publicly known; or(v) is generally utilized by unaffiliated third parties engaged in the same business or businesses as the CONSULTANT. The parties also acknowledge that the AGENCY is subject to Washington State and federal public disclosure laws. As such, the AGENCY shall maintain the confidentiality of all such information marked proprietary and/ or confidential or otherwise exempt, unless such disclosure is required under applicable state or federal law. If a public disclosure request is made to view materials identified as "Proprietary and/or confidential information" or otherwise exempt information,the AGENCY will notify the CONSULTANT of the request and of the date that such records will be released to the requester unless the CONSULTANT obtains a court order from a court of competent jurisdiction enjoining that disclosure. If the CONSULTANT fails to obtain the court order enjoining disclosure,the AGENCY will release the requested information on the date specified. The CONSULTANT agrees to notify the sub-consultant of any AGENCY communication regarding disclosure that may include a sub-consultant's proprietary and/or confidential information. The CONSULTANT notification to the sub-consultant will include the date that such records will be released by the AGENCY to the requester and state that unless the sub-consultant obtains a court order from a court of competent jurisdiction enjoining that disclosure the AGENCY will release the requested information. If the CONSULTANT and/or sub-consultant fail to obtain a court order or other judicial relief enjoining the AGENCY by the release date, the CONSULTANT shall waive and release and shall hold harmless and indemnify the AGENCY from all claims of actual or alleged damages, liabilities, or costs associated with the AGENCY's said disclosure of sub-consultants' information. XX. Records Maintenance During the progress of the Work and SERVICES provided hereunder and for a period of not less than six (6) years from the date of final payment to the CONSULTANT, the CONSULTANT shall keep, retain and maintain all "documents" pertaining to the SERVICES provided pursuant to this AGREEMENT. Copies of all "documents" pertaining to the SERVICES provided hereunder shall be made available for review at the CONSULTANT's place of business during normal working hours. If any litigation, claim or audit is commenced, the CONSULTANT shall cooperate with AGENCY and assist in the production of all such documents. "Documents" shall be retained until all litigation, claims or audit findings have been resolved even though such litigation, claim or audit continues past the six (6) year retention period. For purposes of this AGREEMENT, "documents" means every writing or record of every type and description, including electronically stored information ("ESI"), that is in the possession, control, or custody of the CONSULTANT, including, without limitation, any and all correspondences, contracts,AGREEMENTs, appraisals, plans, designs, data, surveys, maps, spreadsheets, memoranda, stenographic or handwritten notes, reports, records, telegrams, schedules, diaries, notebooks, logbooks, invoices, accounting records, work sheets, charts, notes, drafts, scribblings, recordings, visual displays,photographs, minutes of ineetings, tabulations, computations, summaries, inventories, and writings regarding conferences, conversations or telephone conversations, and any and all other taped, recorded, written, printed or typed matters of any kind or description; every copy of the foregoing whether or not the original is in the possession, custody, or control of the CONSULTANT, and every copy of any of the foregoing, whether or not such copy is a copy identical to an original, or whether or not such copy contains any commentary or notation whatsoever that does not appear on the original. AgreementNumber: CAG-17-074 Local Agency A&E Professional Services Negotiated Hourly Rate Consultant Agreement Page 13 of 14 Revised 4/10/2015 For purposes of this AGREEMENT, "ESI" means any and all computer data or electronic recorded media of any kind, including"Native Files", that are stored in any medium from which it can be retrieved and examined, either directly or after translation into a reasonably useable form. ESI may include information and/or documentation stored in various software programs such as: Email, Outlook, Word, Excel,Access, Publisher, PowerPoint,Adobe Acrobat, SQL databases, or any other software or electronic communication programs or databases that the CONSULTANT may use in the performance of its operations. ESI may be located on network servers, backup tapes, smart phones, thumb drives, CDs, DVDs, floppy disks, work computers, cell phones, laptops or any other electronic device that CONSULTANT uses in the performance of its Work or SERVICES hereunder, including any personal devices used by the CONSULTANT or any sub-consultant at home. "Native files" are a subset of ESI and refer to the electronic format of the application in which such ESI is normally created, viewed, and /or modified. The CONSULTANT shall include this section XX "Records Maintenance" in every subcontract it enters into in relation to this AGREEMENT and bind the sub-consultant to its terms, unless expressly agreed to otherwise in writing by the AGENCY prior to the execution of such subcontract. In witness whereof,the parties hereto have executed this AGREEMENT as of the day and year shown in the "Execution Date" box on page one (1) of this AGREEMENT. ������( L�"''^ 16 Ma 2017 Y Signature �,������+uniq�te .��''��`�°�''R'E'N'r�'����"'�-, , _ ,� . , � _. -.� . -� �: � . zz ; - S�,[��t��� . , Signature Denis Law, Mayor at�* "%, � � �= ason th, City Clerk ., .' ''''���'�c�Rp�RATEO g����```: �����i i i u��►��������� Any mod�cation, change, or reformation of this AGREEMENT shall require approval as to form by the O,ffice of the Attorney General. AgreementNumber: CAG-17-0�5 Local Agency A&E Professional Services Negotiated Houily Rate Consultant Agreement Page 14 of 14 Revised M10/2015 Exhibit A Scope of Work Project No. TED4003843 See Exhibit A-1, attached. AgreementNumber: CAG-17-074 WSDOT Form 140-089 EF Exhibit A Page 1 of 1 Revised 10/30/2014 EXHIBIT A-1-SCOPE OF WORK CONSTRUCTION ADMINISTRATION AND INSPECTION SERVICES, PLUS ENGINEERING SUPPORT SERVICES CITY OF RENTON - NORTHEAST 31ST STREET BRIDGE REPLACEMENT PROJECT DESCRIPTION Northeast 31st Street is a low-volume local access road that serves as the only public access to several homes. The Northeast 31st Street Bridge(Structure ID: 08557300) spans over May Creek.The bridge,built in 1950 by King County, is structurally deficient and has a sufficiency rating of 27. It is a two-span bridge with precast channel girders supported on timber pile caps. Each timber pile cap is supported on five timber piles.The center pier has two piles (middle and adjacent) that have severe rot, diminishing their ability to carry vertical loads. In 2014, temporary vertical supports were installed at the center pier to increase the load carrying capacity. These temporary vertical supports are not resistant to scour resulting from high flows in May Creek. This project will replace the existing bridge with a new bridge. The design of this project is complete.The new bridge consists of a single span,precast concrete structure with voided slab girders founded on steel round piles filled with concrete and rebar. For scour protection, sheet piling is to be installed around the abutments. PURPOSE The City of Renton(AGENCY) is requesting A&E Professional Services from BergerABAM Inc. (CONSULTANT)to perform Construction Management, Inspection, and Engineering Support Services during construction of the Northeast 31st Street Bridge Replacement Project. This contract provides for two types of services during construction of this project. • Construction Administration and Inspection(CA&I) Services • Design Construction Support Services(DCSS) GENERAL ASSUMPTIONS The following scope and associated costs are based on the assumptions outlined below. • Federal Highway Administration(FHWA) funds are being utilized for construction management,inspection, and engineering support services included in this contract. Therefore, this contract is subject to all rules and regulations associated with this funding source. • Any task or deliverable requested by the AGENCY that is not specifically defined in this scope of work will not be performed by the CONSULTANT unless one of the following occur. - The CONSULTANT provides a written request to the AGENCY to use Management Reserve Funds, if available.This request shall summarize the scope of additional work City of Renton,Construction Support,Admin,and Inspection Services BergerABAM,A17.0023.00 Northeast 31st Street Bridge Replacement Project May 2017 Renton,Washington Exhibit A-1 Page l broken into tasks. For each task, the request shall list the job classifications of those individuals proposed to perform the work and associated rates of pay, along with the estimated hours.Once received, the AGENCY will evaluate the request. If approved, the AGENCY will issue a notice to proceed(NTP) in writing. Once received, the CONSULTANT may proceed with the additional work. — The CONSULTANT provides a draft supplemental agreement to the AGENCY for review and negotiation.The supplemental agreement shall be complete. It shall include the scope of additional work broken into tasks.For each task,the request shall list the job classifications of those individuals proposed to perform the work and associated rates of pay, along with the estimated hours.The AGENCY will review the supplemental agreement. Once complete, further negotiations may occur between the parties.Once a scope of work and budget is agreed to, one signed original supplemental agreement, in Adobe Acrobat.pdf format, will be delivered to the AGENCY,by the CONSULTANT, for execution by the AGENCY. Once executed, the AGENCY will issue a NTP in writing.Once received, the CONSUTLANT may proceed with the additional work. • The AGENCY is responsible for the following, as necessary. — Reserve and arrange conference room(s)as necessary, for meetings held at Renton City Hall. — Prepare and mail project notices, as required. — Prepare and publish all public notices, newsletters, and press releases for this project. — Host and update a project website. — All coordination with franchise and public utilities, as necessary. — Provide environmental support services during construction with a consultant, under a separate contract with the AGENCY. • The AGENCY and CONSULTANT recognize that the budget for these services needs to fit within the overall budget for the project,but that the level of services also needs to be sufficient to administer and inspect the project and to provide adequate records to meet the Washington State Department of Transportation(WSDOT) standards to pass WSDOT/FHWA audits. • The AGENCY and CONSULTANT recognize that efforts to provide services under this agreement can vary considerably from estimates utilized to develop the maximum amount payable for this agreement. Some tasks may cost more and other tasks may cost less. Budgets for tasks assigned to CONSULTANT may be adjusted between CONSULTANT assigned tasks as long as the maximum amount payable for this agreement is not exceeded. City of Renton,Construction Support,Admin,and Inspection Services BergerABAM,A17.0023.00 Northeast 31st Street Bridge Replacement Project May 2017 Renton,Washington Exhibit A-1 Page 2 However, budgets assigned to subconsultants may not be exceeded or used for other tasks without a supplement to this agreement. • Other task-specific assumptions are provided with each task. TASK 1.0 CONSTRUCTION ADMINSTRATION AND INSPECTION(CA&1)SERVICES The following items are to be performed by the CONSULTANT, under this task. Assumptions for Task 1 • Budget: The budget for this task is based on a construction contract with 80 working days, plus project start up and close out. Refer to Exhibit D for an estimate of staffing level requirements. The AGENCY and CONSULTANT recognize that the staffing level requirements will be adjusted to the contractor's schedule. The budget also assumes that the work will be conducted in 2017. • Field Office: The construction contract includes the provision of an office facility for the construction administration team with power,heat, air conditioning, suitable furniture(file cabinets, desks, and chairs) for four staff; a conference table and chairs;security alarm system; communications, including high-speed internet; and copier and fax. Therefore,no costs are included in the fee estimate for these items. • Field Office Equi�ment and Sup�lies: The CONSULTANT will provide computers, laptops, tablets,cell phones, and other office supplies required for the CONSULTANT staff to perform work on this project. • Vehicles and Milea�e: CONSULTANT field staff shall be compensated for mileage to and from the permanent duty station(Federal Way Office)to the site or from home, whichever is less. CONSULTANT field staff shall be compensated for mileage traveled at the site as long as the travel is for project-related work activities. • No efforts and/or costs are included in this proposal to accommodate discovery, testing, and/or disposal of hazardous materials from the site. Under CA&I, two basic subtasks will be provided as follows. Task 1.1 Project Start Up The CONSULTANT shall provide start-up services for the construction administration team to review contract plans and specifications for inspection requirements; develop preliminary inspection assignments;establish a project file system;attend meetings with the AGENCY, utility companies, and others;and establish form/systems for tracking required items. The purpose of these start-up services is to have the construction administration team ready to respond to contract requirements immediately after issuing NTT'for the construction contract. Contract administration duties will be provided up to the contract completion date to facilitate close out of the project. City of Renton,Construction Support,Admin,and Inspection Services BergerABAM,A17.0023.00 Northeast 31st Street Bridge Replacement Project May 2017 Renton,Washington Exhibit A-1 Page 3 The CONSULTANT, if requested,will conduct a prebid meeting in conjunction with the AGENCY. The CONSULTANT,if requested,will facilitate a bid review meeting with the AGENCY and apparent low bidder and forward documentation of the meeting and recommendations to the AGENCY. The CONSULTANT,if requested,will conduct a precon meeting in conjunction with the AGENCY. Deliverable(s) • Prebid meeting agenda and PowerPoint presentation . Bid review meeting agenda, documentation and recommendations • Precon meeting agenda and PowerPoint presentation • Meeting notes for above referenced meetings Task 1.2 Construction Administration and Inspection The CONSULTANT will assist the AGENCY in preparing contract documentation, data, and reports required by WSDOT for receiving FHWA funding. CONSULTANT will monitor total costs expended under this agreement and will notify AGENCY when costs have reached 25,50, and 75 percent of the maximum amount payable authorized under this agreement. At each cost milestone,CONSULTANT will meet with the AGENCY and will jointly develop an estimated amount to complete the work. If CONSULTANT costs for the remaining work under this agreement are estimated to be higher than the original amount in this agreement, the remaining work above the amount authorized will not be performed without prior written authorization from the AGENCY. CA&I Staffing Under these services, the CONSULTANT will provide staff for the following positions at the construction site. More detailed descriptions of the duties of these staff are described in the following section. • Project Manager-The Project Manager,who will be part time,will oversee all construction management operations for the project.This includes overseeing mock audits of the construction documentation files, assisting the Resident Engineer and AGENCY in resolving Contract issues and assisting the Resident Engineer with technical expertise for miscellaneous construction elements. The Project Manager will monitor the construction administration, and inspection scope, schedule, and budget, and produce monthly invoices and projects reports for work performed under this Contract. • Resident Engineer-The Resident Engineer will be part time and will be experienced in construction administration and inspection procedures on large federally funded road and bridge projects to oversee all activities on the project site. City of Renton,Construction Support,Admin,and Inspection Services BergerABAM,A17.0023.00 Northeast 31st Street Bridge Replacement Project May 2017 Renton,Washington Exhibit A-1 Page 4 • Project Inspector-The Project Inspector will be experienced in all aspects of road and bridge construction on large federally funded projects.He will monitor and track all daily activities on the project. He will coordinate with the Resident Engineer in scheduling subconsultant inspections of the work. • Document Control Specialist-The Document Control Specialist will be experienced in federally funded projects to organize and maintain all project records and materials documentation in accordance with FHWA/WSDOT requirements. This position will also assist with any supplemental inspection needs and facilitate audits with WSDOT, FHWA, and others. Job Descriptions for, Duties of,and Prospective CA&I Staff More detailed job descriptions, duties, and prospective personnel for each of the key positions are described below. Project Manager-Bob Lee(BergerABAM) Position reports to AGENCY(Derek Akesson) and BergerABAM(Bob Fernandes). Job Description The Project Manager will monitor the construction, administration, and inspection scope, schedule, and budget, and produce monthly invoices and project reports for work performed under this Contract. He will also assist the team by overseeing mock audits of the construction documentation files, assisting the Resident Engineer and AGENCY in resolving Contract issues, and assist the Resident Engineer with technical expertise for construction of the project. Duties include • It will be the responsibility of this position to ensure that project staff is trained and aware of elements of construction inspection, project documentation, and materials testing in accordance with the WSDOT Construction Manual, WSDOT Standard Specifications, and Local Agency Guidelines. • The Project Manager will produce monthly invoices and project reports for all work performed under this agreement. Resident Engineer-Ed Cline,PE(BergerABAM) Position reports to AGENCY (Derek Akesson) and BergerABAM(Bob Lee). Job Description The Resident Engineer supervises the inspection team and Document Control Specialist. The Resident Engineer is responsible for the daily operations and functions of the field and office staff for the Project. The Resident Engineer will work closely with AGENCY to keep the AGENCY informed of the progress of the project in regards to scope,schedule, and budget. T'he Resident Engineer will be the main contact for AGENCY. Duties include • Conduct an initial safety analysis, including potential job site safety hazards for all CONSULTANT site personnel. Review the Contractor's Health and Safety Plan and ensure City of Renton,Construction Support,Admin,and Inspection Services BergerABAM,A17.0023.00 Northeast 31st Street Bridge Replacement Project May 2017 Renton,Washington Exhibit A-1 Page 5 CONSULTANT and subconsultants are aware and understand the elements of the plan. Conduct and document monthly safety meetings for CONSULTANT staff. • Review and evaluate construction documents. • Establish construction administration tasks. • Oversee construction contract administration and field inspections. • Oversee the materials documentation filing system in conjunction with the Document Control Specialist. This will include overseeing project staff in updating the Record of Materials(ROMs), at a minimum, on a weekly basis;processing/distributing and filing QPLs,ensuring that approval codes are acted upon;using the WSDOT on-line aggregate source approval database;processing RAMs for signature and distribution; and final processing and filing of certs, CMOs, materials inspection reports, field density reports, concrete test reports,HMA gradation test reports,HMA density reports, approved for shipment documentation, and all other information regarding materials. • Supervise field staff in practices and procedures of codes, regulations, federal,state, and local contract requirements;oversee contract compliance. • Facilitate weekly construction meetings. • Supervise construction project inspection. • Oversee or prepare correspondence, records, and change orders during construction of the project. • Supervise staff to ensure adequacy of field project notes and monthly estimates for progress payments. • Act as a resource and lead with federal and state auditors ensuring appropriate contract compliance. • Ensure personal protective equipment is available in the job site office. • Draft or delegate drafting of serial letters to the contractor. • If the contractor requests additional compensation for any item, the Resident Engineer will determine entitlement. If entitlement is warranted, then the Resident Engineer will evaluate any cost and/or schedule impacts, and review response with AGENCY staff. • Draft change orders. City of Renton,Construction Support,Admin,and Inspection Services BergerABAM,A17.0023.00 Northeast 31st Street Bridge Repiacement Project May 2017 Renton,Washington Exhibit A-1 Page 6 • Facilitate and/or lead change order negotiations with the contractor. The negotiations will be done in conjunction with the AGENCY representative or other AGENCY officials with signatory authority. • Supervise and guide office staff in initial setup of project files, documentation flow, and computer systems. • Ensure that design team support staff is notified promptly of potential field design revisions and/or changes. Supervise and oversee office staff personnel in routing RFIs, shop drawings, and other information to design team support staff. • Provide coordination for material testing in accordance with WSDOT and FHWA requirements. This will also include coordination with items inspected by WSDOT fabrication inspectors. • Coordinate with the project design team for reviews and/or special inspections. • Maintain a record drawing set,following the procedures listed in Special Provision 1-05.18. • Review contractor maintained record drawing set, following the procedures listed in Special Provision 1-05.18. Lead Project Inspector- Michael Niehl or TBD(BergerABAM) Position reports to Resident Engineer(Ed Cline). Job Description T'his position will assume the day-to-day inspection activities for civil and structural elements on the Project. The Lead Project Inspector will work with the Resident Engineer in coordinating all subconsultant inspections assigned to the project. Duties include • Complete Inspectors Daily Reports recording all site activities, contractor and subcontractor warkforce, materials delivered,bid items worked on, conversations with the contractor, and record of daily traffic control operations. • Complete and/or review field note records for payment. Ensure items for payment have complete documentation prior to payment. This includes materials documentation, such as RAMs, certs, samples, and approved for tags or other. For QPL items, ensure that approval code action is completed. • Take preconstruction photographs, periodic photo records during construction, and post- construction project photos. • Provide inspection records, including a record of field changes for use in preparing record drawings. City of Renton,Construction Support,Admin,and Inspection Services BergerABAM,A17.0023.00 Northeast 31st Street Bridge Replacement Project May 2017 Renton,Washington Exhibit A-1 Page 7 • Coordinate scheduling of materials testing lab personnel with the Resident Engineer. • Coordinate scheduling of geotechnical inspector, as needed, with the Resident Engineer to document activities, including pile driving, wall construction, and subgrade investigations or inspections, and other elements of work as needed. • Conduct weekly environmental walk-through inspections with the contractor and AGENCY's environmental consultant. • Be first level to resolve field disputes with contractors. • Evaluate issues of concern and develop corrective actions based on the Contract. Document Control Specialist-Dana Salyer or TBD(BergerABAM) Position reports to Resident Engineer(Ed Cline). Job Description The Document Control Specialist will work under the direction of the Resident Engineer at a construction site field office in the collection, logging, distribution, and processing of all incoming and outgoing office correspondence. This position will assist the Resident Engineer in updating and keeping current the project filing system, including materials documentation system.The Document Control Specialist will use Newforma to track all incoming and outgoing correspondence and the AGENCY will have access to the system. The position will compute and/or check field note records for payment and enter into the project ledger. The Document Control Specialist will assist the Resident Engineer to ensure that all applicable materials documentation for each bid item within a progress payment is received prior to payment for the individual bid items. All EEO documentation, including required forms to be submitted by the contractor,will be processed and tracked by this position;this will also include checking payrolls for compliance to Contract requirements.The Document Control Specialist will track and report status of COA DBE subcontractors and project training. Duties include • Assist the Resident Engineer with elements of the materials documentation system. This includes processing QPLs and RAMs, updating the project ROM, and coordinating with the Project Inspector to ensure all materials delivered to site are approved for incorporation and all documentation is in hand. • Assist the Resident Engineer in computing and/or checking field note records, collecting/computing and/or checking totals of item quantity tickets,entering pay information into the project ledger or checking information entered into project ledger, and running monthly pay estimates. Check progress estimates for accuracy,completeness, and then submit to the Resident Engineer for review with the contractor. After review, make any revisions and submit to the Resident Engineer for final reviews and processing. • Assist the Resident Engineer in filing all field note records submitted for monthly progress payments into the office field note record books. File and reference all item quantity tickets City of Renton,Construction Support,Admin,and Inspection Services BergerABAM,A17.0023.00 Northeast 31st Street Bridge Replacement Project May 2017 Renton,Washington Exhibit A-1 Page 8 and any backup tickets far neat line items in the office file cabinet or storage boxes. Check to ensure that all items paid by neat line that require cross section and end area information and calculations are submitted with such. File and reference all backup information in the project files or backup boxes. • Assist the Resident Engineer in the processing of force account bid items. This includes contractor and subcontractor personnel weighted wage rates, contractor and subcontractor equipment rates, and all backup information to determine the rates. Complete the calculation portion of the Inspector's Daily Report of force account. This will include entering the weighted wage rates and equipment rates, then totaling and applying applicable markups to determine total compensation in accordance with WSDOT Standard Specification 1-09.6. Maintain all backup information for payment of force account items. • Assist the Resident Engineer in collecting,compiling, packaging, distributing, and filing all change order backup information,including,but not limited to, serial letters, e-mails, verbal and/or written approvals to proceed,independent estimates, and any other backup to be included in each change order file. • Attend meetings as requested by the Resident Engineer. • Assist the Resident Engineer to ensure that all required contract forms and/or reports are received from the contractor in a timely manner, processed, and filed. These include,but are not limited to, Apprentice Utilization Plan,Statement of Apprentice Journeyman Participation,Quarterly Report of Amounts Paid to DBE,Annual EEO Report, monthly Utilization Report, Request to Sublet, and Notice of Intent to Pay Prevailing Wage. • Process training plan, trainee requests, and payment of training for the project. • Check weekly payrolls for prime contractor and all subcontractors to ensure applicable contract prevailing wage rates and benefits are paid. Compare to employee interview reports to ensure contractor field staff is being paid in accordance with the contract. • Update and keep the project files, as new correspondence is received, current on a daily basis. • Update and keep ROMs current on a weekly basis. • Assist the Resident Engineer in the processing of incoming and outgoing correspondence, such as serial letters, transmittals, submittals, materials information, shop drawings, catalogue cuts, and miscellaneous documentation. This will include date stamping, logging information into an Excel spreadsheet for tracking, distributing copies for routing, and ensuring copies are placed in the project files. • Attend preconstruction and weekly construction meetings to record and transcribe meeting minutes and distribute to attendees for comment. City of Renton,Construction Support,Admin,and Inspection Services BergerABAM,A17.0023.00 Northeast 31st Street Bridge Replacement Project May 2017 Renton,Washington Exhibit A-1 Page 9 • Assist field inspectors in conducting or conduct Employee Wage Rate interviews and DBE on-site reviews. • Distribute office mail, draft and prepare written correspondence, and review routine invoices for payment. • Make copies of project documentation and/or scan information for distribution and electronic filing. Deliverable(s) • Monthly invoices and project reports for work performed under this agreement . Meeting notes • Inspectors Daily Reports • Monthly pay estimates, including all backup information to support payment • Project photos • Change orders, including all backup information and independent estimate • Log of all project correspondence • Project files in hard copy and electronic version TASK 2.0 DESIGN CONSTRUCTION SUPPORT SERVICES(DCSS) DCSS provides continuity of the design team through the construction process. Services to be provided by the CONSULTANT design team during construction will include shop drawing review, submittal review, and responses to contractor RFIs. Services may also include adjustments to the project design to work around unforeseen site conditions. Services will include site visits, attendance at project meetings, design-team inspections, and preparation of record drawings. Services of subconsultants may be utilized under the task indicated below. Assumptions for Task 2 • The subconsultant(s) will provide computers, cell phones, and other office supplies required for the subconsultant staff. • Vehicles and Milea�e: Travel expenses for special inspections and project meetings attended by CONSULTANT design staff and/or subconsultants shall be invoiced on the basis of mileage. • No efforts and/or costs are included in this task to accommodate discovery, testing, and/or disposal of hazardous materials from the site. Under DCSS, five basic tasks will be provided as follows. Task 2.1 Project Administration, Permitting Support,and Meetings The CONSULTANT will attend project site meetings as necessary. It is assumed the CONSULTANT will attend the preconstruction meeting and up to three weekly meetings. City of Renton,Construction Support,Admin,and Inspection Services BergerABAM,A17.0023.00 Northeast 31st Street Bridge Replacement Project May 2017 Renton,Washington Exhibit A-1 Page 10 This task also includes coordination of design services for both CONSULTANT, subconsultants, and the CA&I staff. Task 2.2 Requests for Information and Submittal Review The CONSULTANT will respond to questions and IZFIs by the contractor and shall review contractor submittals as assigned by the CONSULTANT CA&I staff. It is assumed that up to 15 RFIs may be submitted. Submittal reviews are included in the accompanying fee estimate. Deliverable(s) • Responses to CONSULTANT CA&I staff to support RFIs and submittal review, as required Task 2.3 Change Orders The CONSULTANT shall provide revised plans and specifications as required to execute change orders. Deliverable(s) • Revised plans and specifications will be provided, as required . Independent estimates for proposed change orders (task under CA&I Services) • Change order form to be in a format approved by the AGENCY(task under CA&I Services) Task 2.4 Special Field Inspections CONSULTANT design staff, geotechnical engineer, and hydrologist will provide part-time or special inspections as shown below or as requested by the AGENCY. Services to be provided by subconsultant,PanGEO • Geotechnical observation for the installation of round piles and sheet piling • Geotechnical observation of subgrade construction Services to be provided by subconsultant,Beyler Consulting • Review of contractor supplied survey calculations and staking data • Verification of contractor survey stakes for round piling, sheet piling, abutments,bearing pads, roadway alignment, along with any other spot checks requested by the AGENCY Potential services to be provided by subconsultant,Watershed Science&Engineering • Special inspections by the hydrologist as needed or as requested by AGENCY Potential services to be provided by subconsultant, Universal Field Services • Assistance with easements, as requested by the AGENCY Deliverable(s) • CONSLTLTANT design staff and/or subconsultants will provide written inspection reports whenever on site to conduct these inspections.T'hese reports will summarize the date of the inspection, time of arrival and departure from site, purpose for the site visit and the observation(s)made as they relate to that purpose • Pile driving logs for round piles City of Renton,Construction Support,Admin,and Inspection Services BergerABAM,A17.0023.00 Northeast 31st Street Bridge Replacement Project May 2017 Renton,Washington Exhibit A-1 Page 11 • Pile driving logs for sheet piling Task 2.5 Record Drawings and Load Rating The CONSULTANT shall prepare a record set of drawings for the AGENCY that reflect field changes (additions, modifications,or deletions) to the bid drawing set during construction. The record drawing set shall include any drawings revised or reissued during construction as a result of change orders and shall include changes resulting from RFI responses. T'he basis for the record drawings shall be a set of bid drawings redlined with changes by the AGENCY/CONSULTANT field staff and supplied to the CONSULTANT design staff. These drawings shall be noted as "record drawings" in the drawing revision block, and shall be stamped and sealed by registered professionals.The intent of the record drawing set is to provide the best information available to capture significant field changes,but not necessarily, every minor change that may occur. The CONSULTANT shall load rate the bridge in conformance with the WSDOT Bridge Design Manual LRFD, Chapter 13,June 2016 edition. Deliverable(s) • One full-size plan set and one half-size plan set(11x17) in PDF format plus CAD files on one compact disc • One hardcopy of load rating calculations and associated load rating summary sheet, stamped and signed by the Engineer of Record, along with one compact disc with electronic pdf copies of these materials TASK 3.0 MATERIALS TESTING SERVICES The subconsultant, Mayes Testing Engineers, Inc., a Terracon Company, shall provide materials testing services on materials incorporated into the project. Field testers and laboratories shall be certified to perform materials testing in accordance with the WSDOT Local Agency Guidelines, WSDOT Construction Manual, and WSDOT Materials Manual.The sampling methods, testing procedures, evaluation of testing data and documentation of testing results shall be in accordance with the WSDOT manuals listed above and the construction contract provisions for this project. Deliverable(s) • Material test reports summarizing testing results and other associated documentation, as applicable City of Renton,Construction Support,Admin,and Inspection Services BergerABAM,A17.0023.00 Northeast 31st Street Bridge Replacement Project May 2017 Renton,Washington Exhibit A-1 Page 12 Exhibit B DBE Participation Not applicable. Agreement Number: CAG-17-074 WSDOT Form 140-089 EF Exhibit B Page 1 of 1 Revised 10/30/2014 Exhibit C Preparation and Delivery of Electronic Engineering and Other Data In this Exhibit the agency, as applicable, is to provide a description of the format and standards the consultant is to use in preparing electronic files for transmission to the agency. The format and standards to be provided may include, but are not limited to,the following: I. Surveying, Roadway Design& Plans Preparation Section A. Survey Data Standard: City of Renton Survey Control Netwark and Standards, 2000 Format: Autodesk, AutoCAD Civi13D,Note: Consultant's version shall be compatible with City of Renton's version, at the time of submission of deliverables. For 2015, City of Renton version is AutoCAD Civi13D 2015. Transmission: Compact Disk, DVD and/or Flash Drive B. Roadway Design Files Standard: Washington State Department of Transportation, Local Agency Guidelines, December 2015 Format: Autodesk, AutoCAD Civi13D, Note: Consultant's version shall be compatible with City of Renton's version, at time of submission of deliverables. For 2015, City of Renton version is AutoCAD Civi13D 2015. Adobe pdf for plan sheets and/or roll plots. Transmission: Compact Disk, DVD and/or Flash Drive C. Computer Aided Drafting Files Standard: City of Renton Drafting Standards far Road, Bridge and Municipal Construction, 2004 Format: Autodesk, AutoCAD Civi13D, Note: Consultant's version shall be compatible with City of Renton's version, at the time of submission of deliverables. For 2015, City of Renton version is AutoCAD Civil 3D 2015. Use sheet border and title block as provided by the City of Renton. Transmission: Compact Disk, DVD and/or Flash Drive Agreement Number: CAG-17-074 WSDOT Form 140-089 EF Exhibit C Page 1 of 4 Revised 10/30/2014 D. Specify the Agency's Right to Review Product with the Consultant Agency retains the right to review all deliverables listed in the Scope of Work as shown in Exhibit A. E. Specify the Electronic Deliverables to Be Provided to the Agency See Exhibit A. F. Specify What Agency Furnished Services and Information Is to Be Provided See Exhibit A. Agreement Number: CAG-17-074 WSDOT Form 140-089 EF Exhibit C Page 2 of 4 Revised 10/30/2014 II. Any Other Electronic Files to Be Provided See Exhibit A. IIL Methods to Electronically Exchange Data E-mail, Compact Disk, DVD and/or Flash Drive. WSDOT Form 140-089 EF Exhibit C Page 3 of 4 Revised 10/30/2014 A. Agency Software Suite Compatible with Microsoft Windows 7, Microsoft Office 2010 B. Electronic Messaging System Compatible with Microsoft Office Outlook 2010 C. File Transfers Format Compatible with Adobe pdf, ZIP files, Microsoft Office: Word(2010), Excel(2010),Project (2010), PowerPoint(2010), Publisher(2010) WSDOT Form 140-089 EF Exhibif C Page 4 of 4 Revised 10/30/2014 Exhibit D Prime Consultant Cost Computations See Exhibit D-1, attached. Agreement Number: CAG-17-074 WSDOT Form 140-089 EF Exhibit D Page 1 of 1 Revised 10/30/2014 EXHIBIT D-1 -CONSULTANT FEE DETERMINATION CA plus DCSs Costs NE 31ST ST BRIDGE REPLACEMENT 5/1s/2o1� PAGE 1 OF 8 Construction Administration and Inspection(CA&I) Task 1.1, Task 1.2 and Task 3.0 DIRECT SALARY COSTS(DSCI for BeraerABAM Personnel Hours Rate Cost 1 Project Manager 4 X $59.95 = $ 240 FY 2018 40 $61.15 $ 2,446 FY 2019 $62.37 $ - 2 Resident Engineer 40 X $56.63 = $ 2,265 FY 2018 298 $57.76 $ 17,212 FY 2019 $58.92 $ - 3 Projectlnspector 80 X $36.20 = $ 2,896 FY 2018 752 $36.92 $ 27,764 FY 2019 $37.66 $ - 4 Document Control 64 X $33.65 = $ 2,154 FY2018 321 $34.32 $ 11,017 FY 2019 $35.01 $ - BERGER/ABAM Hours,TOTAL 1,599 Subtotal Direct Salary Costs(DSC)_ $ 65,994 Salary Escalation-Estimated Salary Escalation Costs are included in above rates S - Overhead(OH) 174.19% of(DSC+SE)= E 114,954 Fixed Fee(FF) 30.00% of(DSC+SE)= 79,798 TOTAL SALARY COSTS(DSC+SE+OH t FF)_ $ 200,746 SUBCONSULTANTS Mayes Testing Engineers Inc.,a Terracon Company(Task 3.0) $ 14,123 TOTAL SUBCONSULTANTS-CA&1= $ 14,123 DIRECT NONSALARY COSTS(DNSCI Printer(by contractor) $ _ Copier(by contractor) g _ Cell Phones(3) Included in Overhead RT/Mo Months RT Miles Mileage Rate PM Mileage 2 5 52 $ 0.535 $ 278 RE Mileage 8 6 52 $ 0.535 $ 1,335 PI Mileage 21 6 52 $ 0.535 $ 3,505 DC Mileage 8 6 52 $ 0.535 $ 1,335 TOTAL REIMBURSABLE EXPENSES(DNSC)_ $ 6,454 TOTAL CAB�I FEE (DSC+SE+OH+FF+DNSC)_ $ 221,323 DESIGN CONSTRUCTION SUPPORT SERVICES(DCSS)COSTS Task 2.1 thru 2.5 BergerABAM $ 39,725 SUBCONSULTANTS PanGeo $ 16,870 Beyler g g,388 Watershed $ 3,002 UFS $ 2,750 TOTAL ESTIMATED DESIGN CONSTRUCTION SUPPORT FEES= $ 71,735 TOTAL ESTIMATED FEE FOR CA81+DCSS SERVICES = $ 293,058 MANAGEMENT RESERVE @ 10%_ $ 29,306 TOTAL CONTRACT AMOUNT= $ 322,364 EXHIBIT D-1 - CONSULTANT FEE DETERMINATION BergerABAM CA Rates NE 31ST ST BRIDGE REPLACEMENT PROJECT 5/19/2017 PAGE20F8 Rate(July 1, 'Average Hourly 2016 to June 30, Percent(%) Hourly Wage Rate Including Classification Name 2017) Participation Rate Escalation Project Manager Bob Lee $59.95 PT $59.95 FY 2018 $61.15 FY 2019 $62.37 FY 2020 $63.62 $61.77 Resident Engineer Ed Cline $56.63 FT $56.63 FY 2018 $57.76 FY 2019 $58.92 FY 2020 $60.10 $58.35 Project Inspector Michael Niehl $36.20 FT $36.20 FY 2018 $36.92 FY 2019 $37.66 FY 2020 $38.42 $37.30 Document Control TBD $33.65 PT $33.65 FY 2018 $34.32 FY 2019 $35.01 FY 2020 $35.71 $34.67 $0.00 Exhibit E-1-CONSULTANT FEE DETERMINATION BergerABAM and City CAField Staff Hours NE 31 ST BRIDGE REPLACEMENT 5/19/2017 PAGE 1 OF 8 CA&I STAFFING CALENDAR NE 31st Brid e Re lacement Renton Brid es-Construction Total Workin Da s 171 TASK 1.1 Consultant Calendar ear 2017 2017 2p�g Month JAN FEB MAR APR MAY JUN FY 2017 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN FY 2018 Pro'ect Workin Da s er Month 23 20 22 22 TOTAL 20 23 20 21 20 20 21 19 22 21 22 21 TOTAL Total Pro'ect Mana er Bob Lee BA 4 4 8 8 8 8 8 40 44 Resident En ineer Ed Cline BA 40 40 48 55 48 50 48 48 298 338 __ — _ - -- -_ .__ __ - -_ _ Ins ection Michael Niehl BA 80 80 160 184 160 168 80 752 832 Document Control Dana Sal er BA 64 64 40 46 40 67 64 64 321 385 0 p O o 0 p 0 p __ _ — —_ _ _ _ _ - _ __ — __ _ _—__ _— p � - 1598.8 0 0 0 0 0 188 188 256 293 256 294 200 112 0 0 0 0 0 0 1411 1599 D X G� 2 mW w � Op � � � � EXHIBIT D-1 - CONSULTANT FEE DETERMINATION BergerABAM DCSS Costs NE31ST STREET BRIDGE REPLACEMENT PROJECT 5/19/2017 PAGE40F8 DIRECT SALARY COSTS(DSC) Personnel Hours Rate Cost 1 Project Manager CS 13 X $77.84 = $ 1,012 2 Project Engineer ST 15 X $65.29 = $ 979 3 Civil EngineerJD 56 X $33.65 = $ 1,884 4 Structural Engineer GB 96 X $58.32 = $ 5,599 5 Designer-CADD LC 60 X $41.20 = $ 2,472 6 X = $ - 7 Admin, Clerical KR 10 X $34.23 = $ 342 Total Hours 250 Subtotal Direct Salary Costs(DSC)_ $ 12,289 Salary Escalation(SE)= 5°/a of DSC= $ 614 Subtotai(DSC+SE)_ $ 12,903 Overhead(OH) 174.19% of(DSC+SE)_ $ 22,476 Fixed Fee(FF) 30.00% of(DSC +SE)_ $ 3,871 TOTAL SALARY COSTS(DSC+SE+OH+ FF)_ $ 39,250 DIRECT NONSALARY COSTS(DNSC) Mileage 416 miles @ $ 0.540 $ 225 Inspection EquipmentEquipment Copies $ 250 TOTAL REIMBURSABLE EXPENSES (DNSC)_ $ 475 TOTAL AUTHORIZED AMOUNT = $ 39,725 PAYMENT Services will be paid on a DSC multiplier equal to 3.042 EXHIBIT D-1-CONSULTANT FEE DETERMINATION BergerABAM DCSS Hours NE31ST STREET BRIDGE REPLACEMENT PROJECT 5/19/2017 PAGE 5 OF 8 BergerABAM DCSS Staff BergerABAM Task Project Project Civil Structural Designer- Admin, TASK DESCRIPTION N0. Manager Engineer Engineer Engineer CADD Clerical Totals DESIGN CONSTRUCTION SUPPORT SERVICES TASK 2.1-Project Admin&Meetings 2.1 6 - 38 38 20 - 8 110 Project Preconstruction Meeting 4 4 4 - �2 Attendance at Weekly Site Meetings(5 Mtgs) 15 15 - 30 Site Visits(3 site visits-2 persons each) 2 9 9 - 20 Quantity assistance - 10 10 20 40 Monthly Invoices and Progress Reports _ _ g g TASK 22-RFI's&Submittal Review 22 4 12 4 40 - - - 60 Construction Access Plan By CA&I Staff _ SWPPP By CA81 Staff _ Construction Stormwater _ Dewatering Plan _ Drain Pipe and Structures By CA&I Staff _ Gravel By CA&I Staff _ CSBC&CSTC By CA&I Staff _ HMA By CA&I Staff _ Traffic Control Plan By CA&I Staff _ Sheet Pile Submittal � 7 g �p Sheet Pile Wall Cap Rebar Submittal 1 4 5 Pipe Pile Submittal 1 4 5 Abutment Rebar Shop Drawings 1 4 5 Girder Shop Drawings 1 1 4 6 Girder Erection Plan 2 2 q Miscellaneous Strudural Submittals 2 2 q g RFI's(Assume 15) 3 4 10 17 TASK 2.3-Change Orders 2.3 3 3 10 10 10 36 TASK 2.4-Inspections 2.4 - - - - - _ _ _ Included in CA&I Services and Task 1 _ TASK 2.5-Record Drewings 2.5 - 4 8 30 - 2 44 TOTAL ESTIMATED HOURS FOR DCSS 13 15 56 96 60 - 10 250 EXHIBIT D-1 ��� PAGE60F8 Wa�hing#o!'��`►#i�'�e t"rans}�ortation Sua,ding �� t)e rtme�nt af't'ran�s rt�kion ��o r�������aw���s.�. P'� t� r��.���a��o o����.w��sc��-7�r� ssa-�e�s-�000 TTY:t-800-833-6388 wvv+,v.wsdcst,wa.gnv Nov�srat�er 29, �O l G BergerABAM, inc. 3330i Ninth Avenue Sauth, Suite 300 Federai Way, WA 98003-2600 Subject: Acceptance FYE 241 C ICR —�1.udit Dffice Review Dear Ms. Megan Isaacks: Transmitted herewith is the WSD4T Audit Oftice's memo af"Acceptance" of yanr firtn's FYE 2016 Indirect Cost Rate(ICR) af 174,I9%. This rate will be applicable fc�r WSDOT A�reements a�r�i Lc�cal Agency Contracis in Washingtc�n only. This rate may be subject to additional review if considered necessary by WSD4T. `y'our iCR must be updated on an annual basis. Cc�sts billed to agreernentslcontracts will still be subject to audit af actual cc�sts, based c�n the terms and canditians c�f the respective agreement/contract, This was nc�t a ca�nizant review. Any other entity �contracting with S�our firm is responsit�le for determining the acceptability+�f the IGR. If you have any questions, feel free to contact aur of�ce at{360) 705-7019 r�r via email cc�nsultantrates cc�w�sdat.wa.�a��. ' Regards; �j'►s:' � IK K. JON N � Manager, Cansultant Services Office EKJ:kms Accrptanc:e K:K Auclit O�ce Revaew EXHIBIT D-1 PAGE70F8 BergerABAM,inc. I�ndireet Cust Rate Schectule For the Year Ended hlay 3l,2016 General Firm Accepted Cfassificatioa Ledger Adjast. ttef. Amouat �fo Direet La6ar Bsse t 1.391.3�8 H i 1,394,3(��t ind'erect Sa{ariee±z Proposa[Admi�e Sataries 662,699 662,b99 5.82°�„ Propos�f?IVegotiation Salaries 3,225,714 (56,445) n_n� 3,IbY�,769 37.l3!°�6 AdnTinistratit>e Salarics� 2,597�(utl {38,?92T n ?,SS$,$d9 22.4�i% Payrt�IlVarianct; (IR.(b0) -18.16fl -0.16°l4 Office 5uppon SaEaries {t 0 O.OQ°�o Accaunting Salaries 4t36.{�1 486.{!41 4.27% }Inusekeeping�'Sthy.Sala�rieti U Q 0.0(3"�0 Professional A�tivitses Saiarics b4,6Rb 64,6�6 0.57°rn [:ducats�n&Trai�ing rialaries 257,6�{2 257,6a2 2.2h°.�o Reuurch�nd Uevetnpment I b,3 i 4 1(,,314 ().t A°%u Carnputer Salary 395,U20 395;020 3.47°re ToEallndirectSaturics 7,C�8T,597 (gy,?37} 7,591,860 b�i.63°l0 Fringe Bemefits/Salary Uverhead Incentive Com�ensatian A09.330 409,33ll 3.S�via Vac�tion 1.4t�£t,2U3 1,A08,263 12.36°�b Ftoliday 625,49A b2�,'394 5.4�7°�a Sick Leave 4A7.026 447,0?6 3.92°io C7thcr t'aid l.eave 19,y3 i 19,931 C1.17°ib FICA 1,4fi1.004 1,4fi1,(1(kl 12.t�2°�o Federat Elttem�i�>ymcnt 13,6R.5 13,b85 0.12°!u Statc LtRc-m�toyment I 19,b55 !tN,OSS 1.OQ°/4 Industrial[nsur�ace 6 (a U.00°i� USL&f�#WurkComp 143,318 I43.3t$ 126°�c Gr�up Insurance 1.9ti7,344 I,y67,364 17.27"fo Retirement Expc��se A3$,12�i f824} 437.302 3.£34°l0 Henefit Recavrry Q 0.40°r„ Friagc F3en�tit Adjustment (6,B$2} �t -(a.88: -(1.06%� Total Fringe Benefits/Sal.Ovhd. 7.U53,if1? {7,7(1b) U 7,q�5;39b 61.�3°-0 Administrative E:xpenses 7'ravei�ic 5ubsisEencc 202,?3fi (21,733) n,r.r.� 18fi,50S I SR°�n 2ecruiting Pees&Expi:nsc�a 59,41� G�,417 D.Gt% Contractl'crsonncl 49,938 C2R,B63) 21,�75 U.18°iu Advertising 2.3QQ {2.3Of)} �.<' q p.0�°,'a Entertainment Expense: 0 OAO°o Charitablc C'�ntritwtic�ns i 3,523 (13,5.3) g.� d 0.40°/u Empinyr.�Welfarr. lQ2,28Q (3t,714) s.[:.t 7U.S65 O.Ci2°•o E:mpluyee Meals 97,21 y (54,191} a.E,F.�: 43,028 Q3$°ro C.ibrary 21,1flk3 (1�36) 2�,912 0.18°l0 Prc�fassi+�na1 Activities 14,2(i9 (2.376) d 11.833 0.10°Io Gducatioa& training Fc�es IOC�,884 (4�)) s I06.835 Q.9�°ru Rcsearch&Drvetop Eacpense 0 n o.�0% Genernl Admin I0�,99t (7,?(33} ts 95,7F2f3 U.f3�°/a rlssc�iatinn Dues 87,27� (22,174} u 65,0�75 0.574�b C3eneral L.iahility[nsur�nsc 88,UOS (138) �,� $7,2G7 4.77% Ltg�1E''ee5 174,693 (32.173} b t42,520 1_2S"lo Accc�unting�ees 233,223 (47,908} �; 13S,31S 1.19"!0 Proposat Adminisrration t444,ROb? {99,St1�) a,t�.� -544,306 -�.78°,�4 Prcrposal&Negnuation 0 O.UQ°ro (3!'fice and Work 5pace 1,6�?3,4G4 n 1,692,464 I4.85% C?perating L:xpe.�nse 75,975 s 73,R75 q.ti7°.o f'a��1 EXHIBIT D-1 PAGE80F8 BergerABAM,lnc. [ndirect Cast Rate Schedule For the Year Encfed i41sy 31,3016 Geeeral Firm Accepted Clsssificakion Ledger Adjust. ReL Amount % Fumiture&Small Equipmcnt 8.45R 8,558 pA8°b � Furn&Sei�ail qt�icc Dtpr. ?73.297 273.297 2.40°� {)ITce��ipnicni 4 0 0,(�i"/o O�ceSuppl'te5 62,126 s 62,126 pS$°!o 1-`ieid f:yuipment tA,195 14,195 O.12°o Field Equip llepreciation 67.010 67,014 Q.59% Auto t�uel&Maintcnance 47,SS1 4�,551 0,4a% Au1a InSuranc�c&Lic+.�nsr 26,t32 s 26,132 �23°.0 Auto b"c'1'ruck Ileprecivtimi 45,805 45,8QS �.�0°�� HieidEquipRecovery {113,9Q2) -El3,902 -1.00"�'0 "Celcphonc 217,879 217.K79 I.9 t°�o Postage&Freight 19,35 t 19,351 0.17"�0 Rc�rc7ductinn i h?,680 [62,684 1,43°,6 FcnunalPrY+pertyTax 2�1,30? 2�,1b7 0.2i'S'o Fidelity insuranc:e 31,324 3I,3:4 �J.27°4, Business&I'rof t_iccnsc 42,tkll 4'?,041 0.37°ro I�Eerest�xpensc 3,072 (�,i172) a 0 U.4U"%o Errcar&()nsissic�ns tnsurcnce 60()<04i t,i (iQq,(141 S27°yo F3&OTaxes 536,753 S3b,753 4.75°Fa C�iry,Sta��and Fecl��ral T�rxes $39,386 (523,?46y �. 16.1af1 0.14°!4 Computer E:xpense 540.bti8 590,688 5.I8°f� Computer qeprw�c:iativn 244,73p 249,73�J 2.l4°io Mi,r-c[ncome mi Q pAl?°lo GaivarLoss5alcc�fAss�t (1S,39g} -35,395 -0.1�% Tatsl Adm�nistrativc Expenscx h.t�l.Sb4 (940,)hi5) 0 S.t$Q,549 �5.47�0 Totall�direekCastsandOverhead 2Q,it62,263 (i,q=i=t,4t7t�) U 19,8t7,f355 173.92°10 tndirect Cast Kate I.83 t.7A E�acilities C'ost of'C'a{�atal _ 31,053 0.27°,'0 �2Q862.263 I�C.6)�14.40�3) 14,8d8,908 174.19% References Ren�oved by Brr�erAL3A�9 A tJ�nlli�w�able Propc�sal Negatiation Satanes($S6.S�45.3h}and Administra�iv�sal¢ries t�3R."I`)?.0�). I3 tJnrllowable administrativic expenses. I�irm tracks unatic�wahle ex�ases 4�n ttac gentral ledger. C Advcrtising unallowablc per 48 CFR 31.20S-t(�. D Cantributions unallawable�rcr 4R f'FK 31.205-£3. E Itemoved bu SergerlABAM in campEiance k•ith varictus FAIiS re�ulutians. F 'Cravel arad subsis�ence that are over th�daiky T�A�alln�vable ratrs per43 C1=R 31.2{15-4� C� lnterest and other ti�ancial costs nnt allow�(rle p�r 4k�C'FR 3 t.20�-2Q li Fringe 13enr:fit acljustment;direcdy�ssoc'ratcd cost Ea unatlowabfe aclvcrtifiing,public re^latinns and direct selling latwr unallawable p�r 4R GFR 31.2C?I-6(a) I t7etermie�ing apuwahillity-tcrsts praperty suppone�i wiih atteyuate d�cumn��ntfcrn ar�allcz�rakxle Ci=R 91.2pi-2(d) J CF R31<U I-3(b)(1)Detenn9ning reasona6lene�sx-C�7sts generally not recvni�ed as ordinary�and necessary for the conctuct of t�u�eness nre unallowable K Taxes-Ta�ces from wtricl�exempuons are avaitablc to the�rontractor dir�ctly am unalCawaFate when the t�c�rden incidant ro tibtaini�g the e�remption outwei�hs the corresponding benefits acaving to the G�vernment.CfFt 3 L2Q�-d I(E3)(3) L '1'axws-Fadernl inctrme and eYcess profits taxes arc unatlowablc 3vt pzsipt�buld loss acijustments N UnAtloN�abl�adjvstmcnts mud4 I'rom cunduciing F:�'yuant Auttit-1 I i339,2?from trav�;l,i�7N.12 form meals and�123�.21 remo4-e.^r]fcuna pr�posal F'a�e 2 Exhibit E Sub-consultant Cost Computations There isn't any sub-consultant participation at this time. The CONSULTANT shall not sub-contract for the performance of any work under this AGREEMENT without prior written permission of the AGENCY. Refer to section VI "Sub-Contracting" of this AGREEMENT. See Exhibits E-1, E-2, E-3, E-4 and E-5 attached. AgreementNumber: CAG-17-074 WSDOT Form 140-089 EF Exhibit E Page 1 of 1 Revised 10/30/2014 EXHIBIT E-1 -SUBCONSULTANT FEE DETERMINATION PanGeo Costs NE 31ST STREET BRIDGE RPLACEMENT PROJECT 5/18/2017 PAGE 1 OF 4 DIRECT SALARY COSTS(DSC) Personnel Hours Rate Cost 1 Principal 0 X $75.96 = $ - 2 Geotechnical Project Manager 35 X $64.90 = $ 2,272 3 Senior Geotechnical Engineer 23 X $52.88 = $ 1,216 4 Senior Geologist 0 X $42.37 = $ - 5 Project Engineer/Geologist 65 X $33.94 = $ 2,206 6 Technician,Admin,Clerical 12 X $30.29 = $ 363 7 X = $ - Total Hours 135 Subtotal Direct Salary Costs(DSC)_ $ 6,057 Salary Escalation(SE)= 5% of DSC= $ 303 Subtotal(DSC+SE)_ $ 6,360 Overhead(OH) 128.58% of(DSC+SE)_ $ 8,178 Fixed Fee(FF) 30.00% of(DSC+SE)_ $ 1,908 TOTAL SALARY COSTS(DSC+SE+OH+FF)_ $ 16,446 DIRECT NONSALARY COSTS(DNSC) Mileage 600 miles @ 0.540 $ 324 Inspection EquipmentEquipment Copies $ 100 TOTAL REIMBURSABLE EXPENSES(DNSC)_ $ 424 TOTAL AUTHORIZED AMOUNT = $ 16,870 PAYMENT Services will be paid on a DSC multiplier equal to 2.586 EXHIBIT E-1-SUBCONSULTANT FEE DETERMINATION PanGeo Hours NE 31ST STREET BRIDGE REPLACEMENT PROJECT 5/18/2017 PAGE 2 OF 4 Principle Geotechnical Senior Geo Senior Project Project PanGeo Task Project Engineer Geologist Engineer Coordinator TASK DESCRIPTION NO. Manager Geo�og�st ndmin Totals TASK 2.1-Project Admin&Meetings 2.1 - 13 6 - - 12 31 Precon Meeting - Project Meetings(Up to 2 total) 6 6 Site Visits(Up to 3 total for PM only) 9 9 Processing Monthly Construction Billings(up to 6 months) 4 12 16 TASK 2.2-RFI's&Submittal Review 2.2 - 12 13 - 9 - 34 Test Pile Program 6 4 10 Pipe Pile submittai 2 4 6 Sheet Pile Submittal 2 4 6 RFI's(Assume up to 5) 2 5 5 12 TASK 2.3-Change Orders 2.3 - TASK 2.4-Inspections 2.4 - 10 4 - 56 - 70 Monitor Test Pile Installation and Review Results 6 4 10 Pipe Pile Installation-2 Days 2 32 34 Sheet Pile Installation-3 Days 2 24 26 TASK 2.5-Record Drawings 2.5 - TOTAL ESTIMATED HOURS - 35 23 - 65 12 135 EXHIBIT E-1 � PAGE30F4 � Washin+g#on State Tra»sporta2ion Buitding � D+� rtmen't of Trans r��rtiOrt s1a���p�A����s.�. #� P�► �;o.g�x a�s�o Qjv��,w�s�sr,a-��� ' Lynn Pe#erson 360-?05-zoCo 5ecr�taryr of Transportatian T1Y: t-SQO-833-6388 suvuw.wsdot.wa.gov June 14,2016 ' PanGEO, Inc. 3213 Eastlake Avenue E, Suite B Seattle,WA 98102 Subject: Acceptance FYE 2015 ICR—Risk Assessment Review Dear Ms. Kristin Kimmerling: Based on Washington State Department of Transporta#ion's (WSDOT) Risk Assessrnent review of your Indirect Cost Rate (ICR), we have accepted your proposed FYE 2015 ICR of 122.58%. This ICR acceptance is in accordance with 23 CFR 172.7 and must be updated on an annual basis. This rate may be subject to additional review if considered necessary by WSDOT and will be applicable fc�r: ❑ WSDOT Agreements � I,ocal Agency Contracts in Washington State anly Costs billed to agreements/contracts will still be subject to audit of actual costs, based on the terms and conditions of the respective agt-eementicontract. This was not a cognizant, review. Any other entity contracting with the firm is responsible for determining the acceptability of the ICR. If you have any questions, feel free to contact our office at {360) 705-7104 ar via email consuttantrates("cr�wsdot.vva.gov. Regards; .`...---•., . SO Manager, Consultant Services Office EKJ:kms AccepEance IGR Risk Assessment Review EXHIBIT E-1 PAGE40F4 PanGEO,Inc. Overhead Schedule 2015 Proposed Adjusted Description Amount Adj. Ref. Amount % Direct Labor Costs $1,074,073 -$53,020 G $1,021,052 General Overhead Expenses DirectNonsalaryCosts $724,000 -$724,000 A SO 0.00% Indirect OFficers Salaries* 79,340 -976 B 78,363 7.67% Indirect TecUnical/Admin Salazies 183,213 -420 B 182,792 17.90% Bonuses 67,97i 0 C 67,971 6.66% SEP-[RA Conhibution 362,703 362,703 35.52% MedicaVDentallnsurance 196,617 196,617 19.26°/ Payroll Taxes 108,386 -107 B I08,279 10.60% Advertising 745 -745 D 0 0.00°/ Amortization Expense 0 0 0.00% Bank Service Charges 49 -49- F 0 0.00% Computers 15,155 15,155 1.48% Contributions 0 0 E 0 0.00°/ Depreciation Expense 0 0 0 0.00% Dues 8c Subscriptions 2,419 2,419 0.24% Employee Morale 2,333 2,333 0.23% Employee Recruitment 70 70 0.01% Field Supplies 6,925 6,925 0.68% Fumiture and Fixtures<$1000 0 0 0.00% Promotion 0 0 B 0 0.00%a GeneralLiabilityInsurance 1,612 1,612 0.16% ProfessionalLiabilitylnsurance 76,728 76,728 7.51% Interest Expense 0 0 0.00% Licenses and Permits 3,272 3>272 032% Office Supplies/Moving expense 1,538 1,538 0.15% Postage and Delivery 595 595 0.06% Printing and Reproduction 139 l39 0.01°/ ProfessionalDevelopment 3,188 3,168 031°/ Professional Fees 14,421 14,421 1.41% Reference(Books/Maps/etc.) 811 8l 1 0.08% Reut 46,054 46,054 4.51% , Repairs 917 917 0.09% Section 179 Depreciation Expenses 8,525 -8,525 0 0.00% Small Claim Settlement 1,000 -1,000 0 0.00% B&O Taxes 60,392 60,392 5.91% PropertyTaxes 322 322 0.03% Telephone 1Q546 1Q546 1.03% Entertainment 7,500 -7,500 B 0 0.00% Meals/Travel 6,080 -409 B 5,671 0.56%a Utilities 1,756 1,756 0.17% Total General Overhead Expenses $1,995,318 -$743,731 $1,251,587 122.58% Overhead Rate 185J7% 122.58% References A Per 48 CFR 31.202(a) B 46 CFR 31205-1(d)and 48CFR 3 L205-14 C Per 48 CFR 31-205-6(a)(6)(ii)(B) D Pe�48 CFR 3 L205-1(d) E Per 48 CFR 3 L205-8 F Per 48 CFR 3 L205-20 G Per48CFR37.]15,DCAAS-91Q5-910.2&6-410 � `Indirect Officers salary amount includes adjustment for payroll variance(=amount on P&L) EXHIBIT E-2 - SUBCONSULTANT FEE DETERMINATION Beyler Cost NE 31ST STREET BRIDGE REPLACEMENT PROJECT 5/18/2017 PAGE 1 OF 4 DIRECT SALARY COSTS(DSC) Personnel Hours Rate Cost 1 Survey Director 16 X $55.96 = $ 895 2 Survey Technician 24 X $35.00 = $ 840 3 Crew Chief 16 X $36.00 = $ 576 4 Chain Person 16 X $21.00 = $ 336 5 Crew Supervisor 14 X $42.00 = $ 588 6 0 X = $ - 7 Project Coord./Admin 16 X $18.00 = $ 288 Total Hours 102 Subtotal Direct Salary Costs (DSC)_ $ 3,523 Salary Escalation (SE)= 5% of DSC = $ 176 Subtotal (DSC+ SE) _ $ 3,700 Overhead (OH) 110.00°/a of(DSC+SE) _ $ 4,069 Fixed Fee(FF) 30.00% of(DSC+SE) _ $ 1,110 TOTAL SALARY COSTS (DSC +SE+OH + FF)_ $ 8,879 DIRECT NONSALARY COSTS(DNSC) Mileage 480 miles @ 0.540 $ 259 Inspection EquipmentEquipment $ 250 Copies TOTAL REIMBURSABLE EXPENSES (DNSC) _ $ 509 TOTAL AUTHORIZED AMOUNT = $ 9,388 PAYMENT Services will be paid on a DSC multiplier equal to 2.400 EXHIBIT E-2-SUBCONSULTANT FEE DETERMINATION Beyler Hours NE 31ST STREET BRIDGE REPLACEMENT PROJECT 5/18/2017 Beyler ', Task Survey Survey Chain Crew Technician, I� Crew Chief Admin, � TASK DESCRIPTION NO. Director Technician Person Supervisior Clerical Tot81s CONSTRUCTION CONTRACT TASK 2.1 -Project Admin & Meetings 2.1 8 8 - - 6 - 16 38 Project Preconstruction Meeting _ Project Control Setup/Verification 8 8 6 22 Monthly Invoices and Progress Reports(6 months) 16 16 TASK 2.2-RFI's& Submittal Review 2.2 4 8 - - - - - 12 -p m Submittals (Assume 4) 4 8 6 � _ mW N � _ O � m TASK 2.3-Change Orders 2.3 - � N TASK 2.4-Inspections 2.4 4 8 16 16 8 - - 52 Verification Surveys CL Bearing Pier 1 and 2 2 4 8 8 4 26 Verification Surveys Pipe and Sheet Pile Locations 2 4 8 8 4 26 Verification Survey Bottom of Pier Caps _ Verification Survey-Spot Check Rdwy Elev _ TASK 2.5-Record Drawings 2.5 - - - - - - - - TOTAL HOURS 16 24 16 16 14 - 16 102 EXHIBIT E-2 PAGE30F4 � Washingtan Sta#e Transpartatlon Building �� Dep�r#ment of'Tti^ansportation 310 Mapie Park Avenue S.E. PO.Box 47300 Olympia,WA 98504-7300 360-705-70Q0 1'fY: 1-800-833-6388 www.wsdot.wa.gav Octaber 17,2016 Landon Beyler,Owner Beyler ConsuIting,LLC 7602 Bridgeport Way West#D3 Lakewood,WA 98499-2415 Re: Beyler Consulting,LLC Safe Hazbor Indirect Cost Rate Dear Mr. Beyler: Waslungton State has received approval from our local Federal Highway Administration(FHWA) Divisian to continue administering the"safe harbor"indirect cost rate program on engineering end design related service contracts,as well as for Local Public Agency projects. We have completed our risk assessment far Beyler Consulting,LLC. Our assessment was conducted based on the documentation provided by the fum. The reviewed data included,but was not Iiinited ta,a description of the company,basis of accounting,accaunting system and the Uasis of indirect costs. Based on our review,your firm is eIigible to use tlie Safe Harbor rate. You have opted to use tlie Safe Harbor rate,rather than provide a FAR-compliant rate at this time. We are issuing the Safe Hazbor Indirect Cost Rate af 110%of direct labor with a field rate,where agpiicable,of SO%of direct labor for Beyler Consulting. The Safe Harbor rate is effective on October 17,2016. Beyler Consulting has agreed ta improve Internal Cantrols and timekeeping processes in order to be able to develop an Indirect Cost Rate Schedule in the future in accordance with the Federal Acquisition Regulations(FAR), Subpart 31. The WSDQT Internal Audit Office has provided guidance and information related to FARs and the AASHTO Audit Guide. The Safe Harbor Rate of 110%,or 80%for field office situations,can be used for agreements entered into prior to December 31,2018. For agreements entered into after this date,please contact the WSDOT Consultant Services Office(CSO)or aur affice for guidance. The Safe Harbor Rate will not be subject to audit. Please coordinate with CSO or your Local Programs � contact if you have questions about when to apply the Safe Harbor rate to your agreement. If you have any questions,please contact me,Jeri Sivertson,or Steve McKerney at{360)705-7003. Sincerely, .__ � � Schatzie Harvey ( Agreement Complia�e dit Manager ec: Steve McKerney,Director of Intemal Audit Jeri Sivertson,Assistant Director of Internal Audit � Larry SchofieId,MS 47323 � File � EXHIBIT E-2 PAGE40F4 CERTIFICATIQN OF F1t�fAL INDiRECT COSTS—FOR A SAFE HARBQR INDIRECT COST RATE Firm Name: Beyler Cc�nsuifin�LLC 1. the turrlet•sibnred, certif}�lhat Iltm�e reviei��ed the pr•oposal to c�stab/ish�l�e Sp�e Hnrbar rale. The frr•m is electir�g ro use the SAFE H�i1�QR INDIRECT COST RflTE of 11 Uro nf direc�labar u�il{r a .freld��a�e, �t�llen rrJ�plicnble, of 80%r�f c�ir�ccr labor•. Ta tlte best of my M�a►+�ledge and belie.f aJ 7`Ire fir��t l7us rtnt hud a FfiR conrpliar7t itrdn�ect cast rarcy pr�viously crccepted 6��a�ry otlrer slntr age�rcy. h) Tlte frr•�r1���ill J�r�OVlC�c�reparls as required by tlre S,4FE K4RBOR Rtl TE pr'Og7't1J)1 0I?IJJC'TI• prot,n•ess rau�ar�l cornplic�rrce ti+�ith�he cost principles of the Federal Acc�uisitio�r Re�;rtlu�ions (FAR)of title=18, Code of Federal Regulatiarrs(CFR),pprr 31. ,411 kr�otii�rr i�rc�terial lra»sartio�ls vr ei�e�its tfrnl hcn7e occurred u,ff'eclirtg the ftr�rr's oi�^nerslrip, organizntivn nrtd prior ct�curre�lt ii�rlirect cast rates•ha�ye bPer�drselased. The�rarr a�•ees�to fo!/o�s��he 'f a!h ta Coilrpliayrce". Steps noled belo»�: Tlr�PatJr�t�a}j nius�inclirde• • A Cimekeepin�s}�slenl ti►�/�ich inc/udes lhe lnterna!Co�7frols described in chupter 6 o}'AASNTCJ • A,7 c�ccounri�Tg sy�stem tivhich sc�arales indirect costs arrd direct cosis • An accarrnling syslc�n which separales a!lau�able a�zd unalJv�rable cost • A caruplia»r jab cosr systeni ir{tic/r is genera!ledget�dri��en • Traiirir�g for accou�rting personne!aeid ke��nranagemcirl on Part 31 of�{re Federa!Ac�ye�rsitio�i Re�,�rrlatians. Contract Cvst Arinciples and Procedau�es • �1 strang�+rrit�e�r iruernul conn•a!palrc}�ivith a potrcy and procedures mnnual *Signature: ,C, *Name of Certifj�in�Officiai (Print): L clon Beyler *Title: O►4�ner Date of Certification (mm/ddlyy}y): 10/a/20I6 � *Alote: This fonn is to be completed by an individuat e�ecutive or financiai afficer of il�e cansultat�t at a level no lower than a Vice President ar Cl�ief Financial Officer,al•equivalent,�r�llo has ihe ainhorit3-to re��resent the financial informaiion utilized to esta6lisli the ir�direct cost rate proposal subrnitted i�� cor�junetion with th�a�reement. �i_ ?' �' �' EXHIBIT E-3 - SUBCONSULTANT FEE DETERMINATION Watershed Costs NE31ST STREET BRIDGE REPLACEMENT PROJECT 5/18/2017 PAGE 1 OF 7 DIRECT SALARY COSTS(DSC) Personnel Hours Rate Cost 1 Principle 2 X $ 67.31 = $ 135 2 Project Engineer 2 X $ 57.69 = $ 115 3 Senior Engineer 1 12 X $ 42.79 = $ 513 4 Senior Engineer 2 0 X $ 36.06 = $ - 5 Junior Engineer 0 X $ 30.77 = $ - 6 GIS Specialist 0 X $ 35.00 = $ - 7 Project Coord/Admin 6 X $ 30.00 = $ 180 Total Hours 22 Subtotal Direct Salary Costs(DSC)_ $ 943 Salary Escalation(SE)= 5% of DSC= $ 47 Subtotal(DSC+SE)_ $ 991 Overhead(OH) 167.60% of(DSC+SE)_ $ 1,660 Fixed Fee(FF) 30.00% of(DSC+SE)_ $ 297 TOTAL SALARY COSTS(DSC+SE+OH+FF)_ $ 2,948 DIRECT NONSALARY COSTS(DNSCI Mileage 100 miles @ $ 0.540 $ 54 Miscellaneous Expendables(photographs,equip rental,etc) TOTAL REIMBURSABLE EXPENSES(DNSC)_ $ 54 TOTAL AUTHORIZED AMOUNT = $ 3,002 PAYMENT Services will be paid on a DSC multiplier equal to 2.976 EXHIBIT E-3-SUBCONSULTANT FEE DETERMINATION Watershed Hours NE 31ST STREET BRIDGE REPLACEMENT PROJECT 5/�g/Zp�7 PAGE20F7 Principle Prqect Senior Senior Junior GIS Project Watershed Task Engineer Engineerl Engineer2 Engineer Specialisl Coordinator TASK DESCRIPTION No. pdmin Totals TASK 2.1-Project Admin 8 Meetings 2.1 - 2 - _ _ g g Site Visits N/A _ Processing Monthly Construction Billings(up to 3 months) 2 6 8 TASK 2.2-RFI's&Submittal Review 2.2 2 - 4 - - - - 6 RFI's(Assume up to 2) 2 4 6 TASK 2.3-Change Orders(assumed extra work) 2.3 - TASK 2.4-Inspections 2.4 - - 8 - - - - g Channel Inspections 8 g TASK 2.5-Record Drewings 2.5 - TOTAL ESTIMATED HOURS 2 2 12 6 22 EXHIBIT E-3 PAGE30F7 .�r �i�S�'i1i1�011���@ Transpartation 8uitding �� �'�l"'�#71Qlt� ti'�7`!`x1/1Sji�D1"���IOt� 310 Msple Park Avenue S.E. P.O.Box 47300 t7lytnpia,WA 98504-73QQ Lynn Peterson 360-7o5-7s� Secr�tary af Transportation T7Y:1-SQO-833-6388 wovw.vvsda#.wa.gav Apri126, 2016 Watershed Science& Engineering , 110 Prefontaine Place S, Suite 508 Seattle, WA 98104 Subject: Acceptance FYE 2015 ICR—Audit Offi�e Review Dear Mr. Larry Karpack: Tra.nsmitted herewith is the WSDOT Audit Office's memo of"Acceptance" of your firmAs FYE 2015 Indirect Cost Rate (ICR} of 167.60%. Your ICR acceptance is in accardance with 23 CFR 172.7 and must be updated an an annual basis. This rate will be applicable for: � WSDOT Agreements � Local Agency Contracts in Washington State only Costs billed to agreements/eontracts will s�ill be subject to audit af actual costs, based ' on the tenns and conditians of the respective agreemendcontract. This was not a cognizant review. Any other entity contracting with your firm is responsible for determining the acceptability of the ICR. If you have any questions, feel free to contaet our office at {360) 705-7104 or via etnail consultantrates�wsdot.wa. ov. Regards; � � IK K. JONS�N Manager, Consultant Services Office EKJ:ktns Acceptance ICR Audit Oftice Review EXHIBIT E-3 PAGE40F7 �► � Washington State ,.,I DepartmentafTran�portatian MeI�T1OraI�UUl�l�l � a Apri125,2016 TO: Erik Jonson, Contracting Services Manager FROM: Schatzie Harvey,Agreement Compliance Audit Manager'�y � SUBJECT: Watershed Seience&Engineeriiig, Inc. Indirect Cost Rate for Fiscal Year Ended December 31,20I S We have completed our review of tlie Watershed Science&Engineering,Inc. Indirect Cost Rate for the above referenced fiscal year. We reviewed tlie docurnentation supporting the rate for compliance with criteria contained in the Federal Acquisition Regulations (FAR), Subpart 31. � Based on our review we are issuing this memo establisliing the Watershed Science& Engineering Indirect Cost Rate for fiscal year ending December 31, 2015, at 167.60% of direct labor. Watershed Science&.Engineering provided a FHWA Certificate of Finai � Indirect Costs indicating all costs incIuded in the indirect cost rate scliedule comply with FARs. � _ Costs billed to agreeinents will still be subject to audit of actual costs,based on tl�e tenns and conditions of the respective agreement. Tliis was not a cognizant review. Any otlier entity contracting with the firrn is responsible for detarmining tt�e acceptability of the Indirect Cost Rate. , If you have any questions,feel free to call me at(360) 705-7006,or via email at � har��eys a.�vsdat.wa.�,ov, i Cc: Steve McKerney ; File � I i I; �� j. l, �' i DOT Fatm 70D•DOB EF Rovisad 518� ' EXHIBIT E-3 PAGE50F7 . Cerfification afi Final Indirecf Costs � Fifm Name;Watershed Scien�e&Engfneering,Inc Indirect Cost Rate Proposal: 1s7,so°,G Date of Proposai Preparation{mm/ddtyyyy):gn2�zais Fiscal Period Covered(mmldd/yyyy to mm/dd/yyyy}: i�u2ot5-ttisv2ot5 l, the undersigned, certify that 1 have revlewed fhe proposa!to establish fina!rndirect cost rafes far 1he fiscal period�s speclfied above ar�d to the best of my knowledge and belief.• - 1.)A!!cosls inciuded in this proposaf to estabfisl�fJn�a!lnclirect cast rates ore�ilowable in accordance with fl�e cost princi�les of the Fedoral Acquisltion Regulafions(FAR)of tltle 48, Code of Federa!Regt►latlons(CFR),part 31. 2.) This�ronosa!does not include any cosfs which are expressly una!latvable under the cos! . principles of the FAR of 48 CFR 31. Al!known material transactrons or events tl�at liave occurred aflecting fhe firm's ow�iership, orgar�izafion artd indlrect cast rafes h�ve been disclosed. Signature; �� � Name of CertiFying Official"`(Pfllll): Larry Kerpack TItIB: Vice Prasidenl Date of Certification(mm/dd/yyyy);4r2ei2ois i � � `The"Certifying Official"must be an Individual executive or financial officer of the firm at a tevel ' no lower than a Vice President or ChieF Financial OFficer,or equivalent,who has the authority to represent the financial information utilized to establish the indirect cost rate for use under Agency ; co ntracts. 4 Ref.FMWA Directive 4470.�A available on line at; ,� � http�//www fhwa doi qov/legsregs/directives/ordersJ44701a htm �. . �. ! O/f-t Cerlification;Not�2U10 EXHIBIT E-3 PAGE60F7 Watershed Science and Engineering,Inc. Indirect Cost Rate Schedule ' For the Year Ended December 31,2015 Financial Statement Accepted Description Amount W5E Adj. WSDOT Adj. gef, Amount % Direct Labor(billable and non-billuble} $458,845 $458,845 100.00% Indirect Costs: Fringe Bene�ts - Paid Time Off $96,148 $96,148 20.95% Payroll Taxes 62,070 ($2,313) L 59,757 13.02% Health Insurance 75,780 75,780 16,52% 4�1-k Plan Match 27,602 27,602 6.02% Total Fringe Benefits $261,600 $0 {$2,313) $259,287 56,51% General0verhead Indirect Labor $218,434 ($192) A $218,242 47.56% Labor Variance(and Uncompensated OT) (4,480) (70) K (4,550) -0.99% Incentive Bonus 149,331 (25,050) B 124,281 27.09% Rent 52,023 52,023 1134% Maintenance&Repairs - - 0.00% Commuting and Parking 6,645 6,645 1.45% Travel 2,691 2,691 0.59% Travel-Meals 1,495 1,445 033% Insurance 10,361 10,361 2.26% Telephone 7,356 7,356 1.60% Utilities 2,200 2,200 0.48% Licenses 1,611 1,611 035% Depreciation&Amortization 4,631 4,631 1.01% Dues&Registrations 5,751 (48) C 5,704 1.24% Employee Train/Recruit/Moving 3,757 3,757 0.82% Advertising 84 (84) D - 0.00% Accounting,Payroll&401K Services 4,587 4,587 1.00% Legal Services - 7,250 7,250 1.58% Computer 10,686 10,686 2.33°/a Supplies&Miscellaneous 815 815 0.18% Equipment - - 0.00% Employee Food and Water 1,991 1,991 0.43% Employee Entertainment 5,784 (5,784) E - 0.00% Gi$s GS (65) P - 0.00% Printing and Reproduction 3,331 3,331 0.73% Books and Periodicals - - 0.00% Bank Charges(not interest) 250 250 0.05% Interest and Late Charges 644 (644) G - 0.00% Postage,Shipping,Delivery 188 188 0.04°/a B&0 Tax 41,815 41,815 9,11% Income Tax (4,839) 4,839 H - 0.00% Property Tax 1,096 1.,096 0.24% Page 1 of 2 EXHIBIT E-3 PAGE 7 0F 7 Watershed Science and Engineering,Inc. Indirect Cost Rate Schedule For the Year Ended December 31,2015 Financixl Statement Accepted Description Amount WSE Adj. WSDOT Adj. ge{', Amount % Penalties&Fines 4 (4) I - 0.00% Business Development � 1,260 1,260 0.27°/a Charitable Donations 22,987 (22,987) J - 0.00% Total Ceneral Overhead $559,805 ($50,088) $0 $509,717 111.09% Total Indirect Costs&Overhead $821,405 ($50,088) ($2,313) $�69,004 167.6U% Indirect Cost Rate 179.02% 168.10% 167.60% Watershed Science an�l Engineering,Inc.-Reviewed&flccepted-4/20/2016 DJA "Indirect Cost Rate still subject to WSDOT Audit" References WSE Adjustments: A Unallowable advertising labor costs removed,including salary overhead per 48 CFR 31.205-1 B Excess Compensation unallowable per 48 CFR 31.205-6(p)(3)(ii) C Unallowable lobbying costs removed per 48 CFR 31.205-22 D Public relations and advertising unallowable per 48 CFR 31.205-1. � E Entertaimnent unallowable per 48 CFR 31.205-14. F Gifts unallowable per 48 CFR 31.205-13(b) G Interest unallowable per 48 CFR 31.205-20. H Income taxes unallowable per 48 CFR 31.201-4 I Penalties and fines unallowable per 48 CFR 31.205-15(a) J Charitable contributions unallowablc per 48 CFR 31.205-8. K Firm reconciling labor adjustment per 48 CFR 31.201-4. WSDOT Adjustments: L Directly assceiated payroll costs related to unallowable advertising and excess compensation _$2,313 unallowable per 48 CFR 31.201-6(a) Page 2 of 2 EXHIBIT E-4-SUBCONSULTANT FEE DETERMINATION UFS Costs NE 31ST STREET BRIDGE REPLACEMENT PROJECT 5/18/2017 PAGE 1 OF 3 DIRECT SALARY COSTS(DSC) Personnel Hours Rate Cost 1 QualityAssurance 22 X $56.97 = $ 1,253 2 Project Manager 0 X $45.00 = $ - 3 Acquisition Specialist 0 X $39.00 = $ - 4 Relocation Specialist 0 X = $ - 5 Sr Administrative Specialist 4 X $30.00 = $ 120 Total Hours 4 Subtotal Direct Salary Costs(DSC)_ $ 1,373 Salary Escalation(SE)= 5°/a of DSC= $ 69 Subtotal(DSC+SE)_ $ 1,442 Overhead(OH) 52.31% of(DSC+SE)_ $ 754 Fixed Fee(FF) 30.00% of(DSC+SE)_ $ 433 TOTAL SALARY COSTS(DSC+SE+OH+FF)_ $ 2,629 DIRECT NONSALARY COSTS(DNSC) Mileage 225 miles @ $ 0.540 $ 122 Miscellaneous Expendables(photographs,equip rental,etc) TOTAL REIMBURSABLE EXPENSES(DNSC)_ $ 122 TOTAL AUTHORIZED AMOUNT = $ 2,750 PAYMENT Services will be paid on a DSC multiplier equal to 1.823 EXHIBIT E-4-SUBCONSULTANT FEE DETERMINATION UFS Hours NE 31ST STREET BRIDGE REPLACEMENT PROJECT 5/18/2017 PAGE 2 OF 3 Senior UFS Task QA-QC Project Acquistion Relocation Administration TASK DESCRIPTION No. Manager Specialist Specialist Specialist Totals TASK 2.1-Project Admin&Meetings 2.1 10 - - - 4 14 Precon Meeting - Project Meetings - Site Visits(2 each) 8 8 Progress Billings(Assume 2) 2 4 6 TASK 2.2-RFI's&Submittal Review 2.2 8 - - - - 8 Assume 3 8 8 TASK 2.3-Change Orders 2.3 - TASK 2.4-Inspections 2.4 4 - - - 4 1 Each 4 4 TASK 2.5-Record Drawings 2.5 - TOTAL ESTIMATED HOURS 22 - - - 4 26 EXHIBIT E-4 PAGE30F3 � Washing#on State Transporta#ion Building � � artme�rt of Trans rtation 310 Maple Park Avenue S.E. P Po Po.Box a7�oo Oiympia,WA 98504-7300 98�-705-7004 TTY: i-800-833-6388 www.wsdat.wa.gov February 27, 2016 Universal Field Services 6737 S. 85�h East Avenue Tulsa, OK 74133 Subject: Acceptance FYE 2016 ICR—Cognizant Review Dear Mr. Mitch Legel: We have accepted your firms FYE 2016 Indirect Cost Rate (ICR) of 52.31°Io based on the "Cognizant Review" from Stanfield & O'Dell. This rate will be applicable for WSDOT Agreements and Local Agency Contracts in Washington only. This rate may be subject to additional review if considered necessary by WSDOT. Your ICR must be updated on an annual basis. Costs billed to agreements/contracts will still be subject to audit of actual costs, based on the terms and conditions of the respective agreement/contract. Any other entity contracting with your firm is responsible for determining the acceptability of the ICR. If you have any questions, feel free to contact our office at (360) 705-7019 or via email consultantrates @ wsdot.wa.�. Regards; ERIK K. JONSON Manager, Consultant Services Office EKJ:kms Acceptance ICR Cognizant Review EXHIBIT E-5-SUBCONSULTANT FEE DETERMINATION MAYES TESTING ENGINEERS, INC. NE 31ST STREET BRIDGE REPLACEMENT PROJECT A TERRACON COMPANY PAGE 1 OF 7 5/18/2017 DIRECT SALARY COSTS(DSC) Task 1.2 Personnel Hours Rate Cost 1 Project Manager 12 X $54.60 = $ 655 2 Soil Density Testing 30 X $28.50 = $ 855 3 Concrete Inspection 35 X $28.50 = $ 998 3 HMA Density Testing 12 X $28.50 = $ 342 4 Steel Inspection X $36.50 = $ - Total Hours 89 Subtotal Direct Salary Costs(DSC)_ $ 2,850 Salary Escalation(SE)= 5% of DSC= $ 142 Subtotal(DSC+SE)_ $ 2,992 Overhead(OH) 191.26% of(DSC+SE)_ $ 5,723 Fixed Fee(FF) 30.00°/a of(DSC+SE)_ $ 898 TOTAL SALARY COSTS(DSC+SE+OH+ FF)_ $ 9,613 DIRECT NONSALARY COSTS(DNSC) Soii Moisture Density 4 $225 $900 Concrete Compressive Test 35 $25 $875 WSDOT T606 Test 1 $550 $550 Seive Analysis 5 $225 $1,125 Sand Equivalent 4 $60 $240 Fractured Face Count 1 $75 $75 HMA Rice Density 2 $100 $200 HMA Ignition Gradation 2 $250 $500 Uncompacted Void Count 1 $45 $45 HMA Core Density $35 $0 HMA Core Bit Charge $4 $0 TOTAL REIMBURSABLE EXPENSES(DNSC)_ $ 4,510 TOTAL AUTHORIZED AMOUNT = $ 14,123 PAYMENT Services will be paid on a DSC multiplier equal to 3.213 EXHIBIT E-5 PAGE20F7 �► ��5�'1��'1�0�'1 '�r�il�@ 7ransportation Bu€Id�ng � �1e rtrnent of"�rans r#�r#ion sa��a�ie R�r�ave+,ue s.�. � � � Rc7.8ox�i300 Olympda,WA 98SQ4-73Q0 36C1-7Q5-7000 TTY:1-S00-833-6388 www.�.�rsd�t.wa.gov f�U�,TL1St Ib, Z�L� Terracon Consultants, Inc. 18001 �V. 106`i' Street, Suite 300 Olathe, KS 66061 Subject: Acceptance FYE 2015 ICR—CPA I�eport Dear Pvls. Monica Curls: ViJe have accepted your firms FYE 2015 Indirect Cost Rate (ICR) of 191.26% based on the"IndependenY CPA Report,"prepared in accordance with Part 3 I of the FAR,by BKD CPAs & Advisors. Your ICR acceptance is in accardance with 23 CFR 172.7 and must be updated on an annual basis. This rate may be subject to additional review if considered necessary by WSDOT and will be applicable for: � WSDOT Agreements � Local Agency Contracts in Washington State only Costs billed to agreements/contracts will still be subject to audit af actual costs, based on the terms and conditions of the respective agreement{cantract. This was not a cognizant review. Any other entity contracting with the firm is responsible far determining the acceptability of the ICR. If you have any guestions, feel free ta contact aur office at (360) 705-7104 or via email consultantrates a,wsdot.wa.gov. . Regards; R . JONSt� Manager, Consultant Services Office EKJ:kms Acce}�tance IGR CPA Report EXHIBIT E-5 PAGE30F7 .�► � Washington State Oepartment of Transportation M emaran d u m August I1,ZOIG T4: Erik Jonsc�n,Cantracting Services Manager FROM: Scl�atzie Harvey,Agreement Compliance Audit 1Vlanage� SUB.TECT: Terracon Cansulfants,Inc. Indirect Cost Rate far ' Fiscal Year Ended Decernber 31,2C115 We accept the audit 4vark performed by BIC:Q CPAs&Advisors related to ttle Terracan ConsuItants Indireot Cost Rate far the abave referenced fiseal year. BKD audiked the Terracon Consuttants indirect costs for compliartce with Federal Acquisition Regulations (FAR), Subpart 31. Our office did nat review their audit work. Based on our accep#ance of the CPA's audit,we arre issuing this memo establishing the Temacon Consultants Indireet Cost Rate for fiscai year ending December 31,2015 at 191.26%of direct Iabor{rate inetudes 0.5?°!o FCCI1�1). Costs bitled to agreements will still be sub,�ect tc�audii of actual costs,based on the terms and conditions of the respective agreement. This was na#a cognizant review. Any ather entity contracting with the firni is responsible for determining Ehe acceptability of the Inciirect Cost Rate. If you have any questions,feel free ta ca11 me at(360)705-7006,or via email at harveys(�a,wsdot.wa.�ov. Attachment - cc: Steve MeKerney Fite � 4J UOi Fmcn TOO�oOd EF 1 Revi�5�9 � EXHIBIT E-5 PAGE40F7 � Terracon Consultants, Inc. Statement of Direct Labor, Fringe Benefits and General Overhead Year Ended December 31, 2015 Nonallowable Allowable %ofDirect Total Costs Costs Labor Direct Labor Terracon $ 125,408,107 $ 125,408,107 100.00% Overhead on Direct Labor , Vacation,sick,holidny leuve $ 20,079,221 $ 20,079,221 Payroll tuxes 18,340,560 18,340,560 Group insurance 24,659,365 , 24,659,365 Workers'compensation insiirance 2,878,396 2,878,396 Profit sharing/401(k) 7,4G3,678 7,463,678 73,421,220 � 73,421,220 58.55% General and Adminlstrative Overhead Costs Indirecdadministrative]abor 95,236,?58 $ (9,613,318)(i� 85,623,440 Travel expense 7,952,953 ((,979,886)(2J 5,973,067 Depreciation expense 3,455,896 - 3,455,896 Amorcization expense 6,977,738 (6,977,738)(3) - Gain—saleofassets {95,557) - (95,557) Rent—office 15,601,110 - 15,60 t,l 10 . Insurance—general 2,839,641 - 2,839,641 � [nsurance—professionalliability 7,208,260 - 7,208,260 Telephone 6,138,7G1 - 6,138,761 Lab expense andsupplies 2,195,000 - 2,195,000 Snpplies 3,989,264 - 3,989,264 Fqnipment repairs and maintenance 1,314,721 - 1,314,721 Fleet expense 2,850,721 - 2,850,721 Maintenanceconh�acts 34,155 - 34,155 Licenses and taxes 784,467 - 784,467 Equipment rental 167,700 - 167,700 PropeiYy tax 257,733 - 257,733 Office expense 1,489,435 - 1,489,435 Printing expense 349,130 (71,511)(d) 277,619 Photocopyexpense 1,376,129 - 1,376,129 Data processing 5,940,281 - 5,940,281 Utilities 2,333,761 - 2,333,761 Buildinb reptir and maintenance 3,340,269 - 3,34Q269 Provision for doubtful accoimts 422,806 (422,806)(5� - Dues and snbscriptions ],931,253 (58,062)(G) ],873,191 Client development 2,495,729 (1,465,ll0)(7) 1,030,619 Temporary office help 2,619,178 - 2,619,l78 FreighUpostage expense 774,009 - 774,009 Professional fees 1,767,701 (418,078)(8) 1,349,623 Donations 330,500 (330,500)(vJ - Employee expense 2,423,700 (1,691,063)(lUJ 732,637 Health and safety 380,444 (25,300)(l6) 355,144 Employee relocation 442,865 (52,172)(11J 39Q693 Employee education and training 2,455,621 - 2,455,621 Interest expense 213,875 (213,875)(/2) - Recniiting fees and expense 602,035 - 602,035 Interest income {97,679) 97,679 (/3) - Otherincome 78,071 (411,696)(Id) (333,625) Other expenses 835,686 420 (IS) 836,106 189,414,120 (23,633,016) 165,781,104 132,19% TotalOverhead $ 262,835,340 $ (23,633,016) $ 239,202,324 190.74% See Nofes to Statement of Direct Labor, Fringe Banefits and General Overhead 3 EXHIBIT E-5 PAGE50F7 Terracon Consultants, inc. Statement af Direct Labor, Fringe Benefits and General Overhead (Continued) Year Ended December 31, 2015 FAR References and Notes: (1) 31.205-1(t}(1-3) Marketing,lobbying and any labor associated with unallowable activities are unallowable. 31.205-27 Labor related to acquisitions is unallowable. 31.205-3 Labor related to Bad Debt Collection is unallowable. 31-205-6(b) Stock Options/Stock Bonuses are unallowable. 31-205-6(b) Certain payments to employees/officers made unallowable due to reasonableness. 31.205-6(g) Payments made for severance not plusuant to a formal policy are unallowable. (2) 31.205-i Travel related to unallowable public relations and advertising costs. 31.205-1(�(7) Costs of inemberships in civic organizations are unallowable. 31.205-14 Entertainrnent costs are unallowable. 31.205�}6 Lodging,Meals,Per Diem in excess of GSA JTR Rates are unallowab(e. 31.205-46 Auto Allowance is an unallowable expense. , 31.205-51 Costs of alcoholic beverages are unallowable. (3) 31.205-49 Costs for amortization of intangible assets and goodwill are unallowable. (4) 31.205-1 Cost for marketing materials-brochures and direct mail publications are unallowable. (5) 3l 205-3 F.stimated losses arising from uncollectible accounts receivable are tmallowable. • (6) 31.205-22 Lobbying costs,paid as a percentage of professional dues,are unallowable. (7) 31.205-1 Costs for promotional activities and trade shows are unallowable. 31.205-14 Entertainment costs are unallowable. (8) 31.205-27 Professional costs paid related to acquisitions and reorganization are unallowable. 31.205-41 Costs inciured related to Federal income taxes are unallowable. (9) 31.205-8 Contributions and gifts are lmallowable. (10) 31.205-13 Costs for tickets shows/sporting events,picnics,parties are imallowable. (11) 31.205-35 Lump sum payments in excess of$5,000 are iulallowable. (12) 31.205-20 Interest expense is unallowable. (13) 31205-20 Interest income is unallowable. • (14) 31.201-5 Credits related to allowable costs have been allowed. (15) 31.205-15 Costs of fines and penalties related to traffic violations are unallowable. 31.205-19(2)(vi) Key man insurance is unallowable. (16) 31.205-13 Costs of undistributed spot bom►ses are unallowable. See Notes to Statement of Direct Labor, Fringe Benefits and General Overhead 4 EXHIBIT E-5 PAGE60F7 � Terracon Consultanfis, Inc. Notes to Statement of Direct Labor, Fringe Benefits and General Overhead December 31, 2015 Note 8: Facilities Capitai Cost-of-Money Factor The cost-of money rate has been calculated in accordance with FAR§31.205-10 using average net book values of equipment and facilities multiplied by the average treasury rate for the year ended December 31,2015. Equipment and facilities include furniture and fixtures,computer equipment, software and leasehold improvements. The calculation is as follows: Average Book Value for 2015 $ 29,105,421 Average treasury rate 2.25°/o Cost of facilities capital $ 654 872 � Direct labor base $125,408,107 Cost of facilities capital percentage p.52��a Note 9: Direct Cost Accounts . The Statement of Direct Labor,Fringe Benefits and General Overhead schedule provides a detail listing of the direct cost accounts not included on the overhead pool. This list includes costs for subcontract labor, drilling equipment and supplies, depreciation,equipment rental,travel and environmental/well supplies. Note 10: Subsequent Events Subsequent events have been evaluated through the date of the Independent Auditor's Report, which is the date thc financial statement was available to be issued. 90 EXHIBIT E-5 PAGE 7 0F 7 �"�1�7'�'I�.t�.�:''F�3I`_2 CI��IZT'I:I��CA.'��'l:Q i� �}� I{I l�'A I.� I I�TU��:�.T�C;'l"'�:C_}�'l.' I=iri» Name: T�1'i•acon Coi�sulta��ts Ii�c l�idircct C'os� I;ate: ^ 1.9Q.74p/ I'acilities C'�pi1a1 C��st of I�aney; a.52U/� Daie�3�Preparaiion: I�IaV 23R 2016 Fiscal �'ear Co��ei-ect: _ 01�OZ/2015 to 12,�31/209.5� . . � � l, �Irc��rrrde�141aNCd, eertiii�ihat I hri���������te�i+c•d tlte injornrcrriort r.rsc�d lu e;�ferblisl�firra!irtdi�•c�el cost rntes,f'o�•�hc_/ise.a/pc�riod as rrrrlrcatetl rra�l�is ar+di.l. a►td ro Ihe besl of'rrta•l t�a�ti•l�dgc3 airrl beJie% i 1) �11 cc�s�usc�d tu r�stablislr,Ji�tnl hr�lirecl c�vsts]Yric�S�arc aj101t�aGlr�in acrr�rc%ncc� irith N�c ct�l�lierrbl���os!p�-irtciple.�• q/`lhr�F�dc�i-a1.�lcyr�rsr�iu►r Regr�lntio»s(F.�fi)oJ�7rth�4�4, Coc% o,f'Fc��e�nl Rc;gul[�lrp�ts(CFRJ, f'a,v 3J. _') T/iis,sub�itirtcd crrirlif f;�iclrrsirc�qJ�i��dirccl cosls)docs�rvi it�cludc�ar�i�c�asls irltieh arc _ c��r�cssh��urallo�+•a�lc turdc�r the cvst pr•rnciple..r o�rhe F.f11?aj'4rs'C'FR 31. A(IC�lIlO11QIIi'. 1 cc��7i/j�that nll Jato��i�1r nlaie��ia1 trans�rc��or�s a��es�enls�hn�hcrv�or.crn•ri�d n(/c�clii7g i 111P.,1i'!1].1'O11'1JC'l:�'�71f7, nl'�{p111�Q/lU17. C111(f 7I1LI71'CC/CO.CjS'I7C11'E' �)NL'!1 C�ISL'�I7.Si't� ! _ ``` �� � � '•� S1Li]flfUCC: � �--_,'`'--✓ �<:�" --�, � Name af Ccrtifyin�O1'ticial: � DpU� D. 0\r�1']C� e Ti�le: Controller /Vice Pr�sidenl �ate�f Certircation: �_____jul�e_30, Z 016 , I ; j. --. —._ ..______. � ' j Exhibit F Title V/Assurances During the performance of this AGREEMENT, the CONSULTANT, for itself, its assignees, and successors in interest agrees as follows: 1. Compliance with Regulations: The CONSULTANT shall comply with the Regulations relative to non- discrimination in federally assisted programs of the AGENCY, Title 49, Code of Federal Regulations, Part 21, as they may be amended from time to time (hereinafter referred to as the "REGULATIONS"), which are herein incorporated by reference and made a part of this AGREEMENT. 2. Non-discrimination: The CONSULTANT, with regard to the work performed during this AGREEMENT, shall not discriminate on the grounds of race, color, sex, or national origin in the selection and retention of sub-consultants, including procurement of materials and leases of equipment. The CONSULTANT shall not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the REGULATIONS, including employment practices when this AGREEMENT covers a program set forth in Appendix B of the REGULATIONS. 3. Solicitations for Sub-consultants, Including Procurement of Materials and Equipment: In all solicitations either by competitive bidding or negotiations made by the CONSULTANT for work to be performed under a sub-contract, including procurement of materials or leases of equipment, each potential sub- consultant or supplier shall be notified by the CONSULTANT of the CONSULTANT's obligations under this AGREEMENT and the REGULATIONS relative to non-discrimination on the grounds of race, color, sex, or national origin. 4. Information and Reports: The CONSULTANT shall provide all information and reports required by the REGULATIONS or directives issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the AGENCY, the STATE, or the Federal Highway Administration (FHWA)to be pertinent to ascertain compliance with such REGULATIONS, orders and instructions. Where any information required of a CONSULTANT is in the exclusive possession of another who fails or refuses to furnish this information, the CONSULTANT shall so certify to the AGENCY, the STATE, or the FH WA as appropriate, and shall set forth what efforts it has made to obtain the information. 5. Sanctions for Non-compliance: In the event of the CONSULTANT's non-compliance with the non- discrimination provisions of this AGREEMENT, the AGENCY shall impose such AGREEMENT sanctions as it, the STt�TE, or the FHWA may determine to be appropriate, including, but not limited to: • Withholding of payments to the CONSULTANT under this AGREEMENT until the CONSULTANT complies, and/or; • Cancellation, termination, or suspension of this AGREEMENT, in whole or in part. 6. Incorporation of Provisions: The CONSULTANT shall include the provisions of paragraphs (1)through (5) in every subcontract, including procurement of materials and leases of equipment, unless exempt by the REGULATIONS, or directives issued pursuant thereto. The CONSULTANT shall take such action with respect to any sub-consultant or procurement as the STATE,the AGENCY, or FHWA may direct as a means of enforcing such provisions including sanctions for non-compliance. Provided, however,that in the event a CONSULTANT becomes involved in, or is threatened with, litigation with a sub-consultant or supplier as a result of such direction, the CONSULTANT may request the AGENCY enter into such litigation to protect the interests of the STATE and/or the AGENCY and, in addition, the CONSULTANT may request the United States enter into such litigation to protect the interests of the United States. Agreement Number: CAG-17-074 WSDOT Form 140-089 EF Exhibit F Page 1 of 1 Revised 10/30/2014 Exhibit G Certification Documents Exhibit G-1(a) Certification of Consultant Exhibit G-1(b) Certification of City of Renton Exhibit G-2 Certification Regarding Debarment, Suspension and Other Responsibility Matters - Primary Covered Transactions Exhibit G-3 Certification Regarding the Restrictions of the Use of Federal Funds for Lobbying Exhibit G-4 Certificate of Current Cost or Pricing Data Agreement Number: CAG-17-074 WSDOT Form 140-089 EF Exhibit G Page 1 of 1 Revised 10/30/2014 Exhibit G-1(a) Certification of Consultant I hereby certify that I am the and duly authorized representative of the firm of BergerABAM Inc. whose address is 33301 Ninth Avenue S., Suite 300, Federal Way, WA 98003 and that neither the above firm nor I have: a) Employed or retained for a commission, percentage, brokerage, contingent fee, or other consideration, any firm or person (other than a bona fide employee working solely for me or the above CONSULTANT) to solicit or secure this AGREEMENT; b) Agreed, as an express or implied condition for obtaining this contract, to employ or retain the services of any firm or person in connection with carrying out this AGREEMENT; or c) Paid, or agreed to pay,to any firm, organization or person (other than a bona fide employee working solely for me or the above CONSULTANT) any fee, contribution, donation, or consideration of any kind for, or in connection with, procuring or carrying out this AGREEMENT; except as hereby expressly stated (if any); I acknowledge that this certificate is to be furnished to the City of Renton and the Federal Highway Administration, U.S. Department of Transportation in connection with this AGREEMENT involving participation of Federal-aid highway funds, and is subject to applicable State and Federal laws, both criminal and civil. BergerABAM Inc. Consultant(Firm Na e) '��������`~ 16 May 2017 Signature(Authorized Official of Consultant) Date Agreement Number: CAG-17-075 WSDOT Form 140-089 EF Exhibit G Page 1 of 1 Revised 10/30/2014 Exhibit G-1(b) Certification of CityofRenton I hereby certify that I am the: Q Certified Authority(CA) ❑ Other of the City of Renton , and BergerABAM, Inc. or its representative has not been required, directly or indirectly as an express or implied condition in connection with obtaining or carrying out this AGREEMENT to: a) Employ or retain, or agree to employ to retain, any firm or person; or b) Pay, or agree to pay, to any firm, person, or organization, any fee, contribution, donation, or consideration of any kind; except as hereby expressly stated (if any): 1 acknowledge that this certificate is to be furnished to the City of Renton and the Federal Highway Administration, U.S. Department of Transportation, in connection with this AGREEMENT involving participation of Federal-aid highway funds, and is subject to applicable State and Federal laws, both criminal and civil. r�/lc��Za��' ' nature Date AgreementNumber: CAG-17-074 WSDOT Form 140-089 EF Exhibif G Page 1 of 1 Revised 10/30/2014 Exhibit G-2 Certification Regarding Debarment, Suspension and Other Responsibility Matters - Primary Covered Transactions L The prospective primary participant certifies to the best of its knowledge and belief, that it and its principals: A. Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency; B. Have not within a three (3)year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State, or local)transaction or contract under a public transaction; violation of Federal or State anti-trust statues or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property; C. Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State, or local)with commission of any of the offenses enumerated in paragraph (1)(b) of this certification; and D. Have not within a three (3)year period preceding this application/proposal had one or more public transactions (Federal, State and local)terminated for cause or default. IL Where the prospective primary participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal. BergerABAM Inc. Consultant(Firm Name) �� 16 May 2017 Signature(Authorized Official of Consultant) Date Agreement Number: CAG-17-075 WSDOT Form 140-089 EF Exhibit G Page 1 of 1 Revised 10/30/2014 Exhibit G-3 Certification Regarding the Restrictions of the Use of Federal Funds for Lobbying The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that: 1. No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or any employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative AGREEMENT, and the extension, continuation, renewal, amendment, or modification of Federal contract, grant, loan or cooperative AGREEMENT. 2. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan or cooperative AGREEMENT,the undersigned shall complete and submit Standard Form - LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000.00, and not more than $100,000.00, for each such failure. The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier sub-contracts, which exceed $100,000, and that all such sub-recipients shall certify and disclose accordingly. BergerABAM Inc. Consultant(Firm Na ) ���������"'`'- 16 May 2017 Signature(Authorized Official of Consultant) Date AgreementNumber: CAG-17-075 WSDOT Form 140-089 EF Exhibit G Page 1 of 1 Revised 10/30/2014 Exhibit G-4 Certificate of Current Cost or Pricing Data This is to certify that, to the best of my knowledge and belief, the cost or pricing data (as defined in section 2.101 of the Federal Acquisition Regulation (FAR) and required under FAR subsection 15.403-4) submitted, either actually or by specific identification in writing,to the Contracting Officer or to the Contracting Officer's representative in support of N 27th Place Bridge Scour Repair * are accurate, complete, and current as of April 1, 2017 **. This certification includes the cost or pricing data supporting any advance AGREEMENT's and forward pricing rate AGREEMENT's between the offer or and the Government that are part of the proposal. Firm: Berger AM Inc. ���!������ Vice President Signature Title Date of Execution***: 16 May 2017 *Identify the proposal,quotation,request for pricing adjustment,or other submission involved,giving the appropriate identifying number(e.g.project title.) **Insert the day,month,and year,when price negotiations were concluded and price AGREEMENT was reached. ***Insert the day,month,and year,of signing,which should be as close as practicable to the date when the price negotiations were concluded and the contract price was agreed to. AgreementNumber: CAG-17-075 WSDOT Form 140-089 EF Exhibit G Page 1 of 1 Revised 10/30/2014 Exhibit H Liability Insurance /ncrease To Be Used Only If Insurance Requirements Are Increased The professional liability limit of the CONSULTANT to the AGENCY identified in Section XII, Legal Relations and Insurance of this Agreement is amended to $No change , The CONSULTANT shall provide Professional Liability insurance with minimum per occurrence limits in the amount of$No change . Such insurance coverage shall be evidenced by one of the following methods: • Certificate of Insurance. • Self-insurance through an irrevocable Letter of Credit from a qualified financial institution. Self-insurance through documentation of a separate fund established exclusively for the payment of professional liability claims, including claim amounts already reserved against the fund, safeguards established for payment from the fund, a copy of the latest annual financial statements, and disclosure of the investment portfolio for those funds. Should the minimum Professional Liability insurance limit required by the AGENCY as specified above exceed $1 million per occurrence or the value of the contract, whichever is greater, then justification shall be submitted to the Federal Highway Administration (FHWA) for approval to increase the minimum insurance limit. If FHWA approval is obtained,the AGENCY may, at its own cost, reimburse the CONSULTANT for the additional professional liability insurance required. Notes: Cost of added insurance requirements: $Not applicable . • Include all costs, fee increase, premiums. • This cost shall not be billed against an FHWA funded project. • For final contracts, include this exhibit. AgreementNumber: CAG-17-074 WSDOT Form 140-089 EF Exhibit H Page 1 of 1 Revised 10/30/2014 Exhibit l Alleged Consultant Design Error Procedures The purpose of this exhibit is to establish a procedure to determine if a consultant's alleged design error is of a nature that exceeds the accepted standard of care. In addition, it will establish a uniform method for the resolution and/or cost recovery procedures in those instances where the agency believes it has suffered some material damage due to the alleged error by the consultant. Step 1 Potential Consultant Design Error(s) is Identified by Agency's Project Manager At the first indication of potential consultant design error(s), the first step in the process is for the Agency's project manager to notify the Director of Public Works or Agency Engirieer regarding the potential design error(s). For federally funded projects, the Region Local Programs Engineer should be informed and involved in these procedures. (Note: The Director of Public Works or Agency Engineer may appoint an agency staff person other than the project manager, who has not been as directly involved in the project, to be responsible for the remaining steps in these procedures.) Step 2 Project Manager pocuments the Alleged Consultant Design Error(s) After discussion of the alleged design error(s) and the magnitude of the alleged error(s), and with the Director of Public Works or Agency Engineer's concurrence, the project manager obtains more detailed documentation than is normally required on the project. Examples include: all decisions and descriptions of work; photographs, records of labor, materials and equipment. Step 3 Contact the Consultant Regarding the A1leged Design Error(s) If it is determined that there is a need to proceed further,the next step in the process is for the project manager to contact the consultant regarding the alleged design error(s) and the magnitude of the alleged error(s). The project manager and other appropriate agency staff should represent the agency and the consultant should be represented by their project manager and any personnel (including sub-consultants) deemed appropriate for the alleged design error(s) issue. Step 4 Attempt to Resolve Alleged Design Error with Consultant After the meeting(s)with the consultant have been completed regarding the consultant's alleged design error(s), there are three possible scenarios: • It is determined via mutual agreement that there is not a consultant design error(s). If this is the case, then the process will not proceed beyond this point. • It is determined via mutual agreement that a consultant design error(s) occurred. If this is the case, then the Director of Public Works or Agency Engineer, or their representatives, negotiate a settlement with the consultant. The settlement would be paid to the agency or the amount would be reduced from the consultant's agreement with the agency for the services on the project in which the design error took place. The agency is to provide LP, through the Region Local Programs Engineer, a summary of the settlement for review and to make adjustments, if any, as to how the settlement affects federal reimbursements. No further action is required. • There is not a mutual agreement regarding the alleged consultant design error(s). The consultant may request that the alleged design error(s) issue be forwarded to the Director of Public Works or Agency Engineer for review. If the Director of Public Works or Agency Engineer, after review with their legal counsel, is not able to reach mutual agreement with the consultant, proceed to Step 5. AgreementNumber: CAG-17-074 WSDOT Form 140-089 EF Exhibit I Page 1 of 2 Revised 10/30/2014 Step 5 Forward Documents to Local Programs For federally funded projects all available information, including costs, should be forwarded through the Region Local Programs Engineer to LP for their review and consultation with the FHWA. LP will meet with representatives of the agency and the consultant to review the alleged design error(s), and attempt to find a resolution to the issue. If necessary, LP will request assistance from the Attorney General's Office for legal interpretation. LP will also identify how the alleged error(s) affects eligibility of project costs for federal reimbursement. • If mutual agreement is reached, the agency and consultant adjust the scope of work and costs to reflect the agreed upon resolution. LP, in consultation with FHWA, will identify the amount of federal participation in the agreed upon resolution of the issue. • If mutual agreement is not reached, the agency and consultant may seek settlement by arbitration or by litigation. AgreementNumber: CAG-17-074 WSDOT Form 140-089 EF Exhibit I Page 2 of 2 Revised 10/30/2014 Exhibit J Consultant Claim Procedures The purpose of this exhibit is to describe a procedure regarding claim(s) on a consultant agreement. The following procedures should only be utilized on consultant claims greater than $1,000. If the consultant's claim(s) are a total of$1,000 or less, it would not be cost effective to proceed through the outlined steps. It is suggested that the Director of Public Works or Agency Engineer negotiate a fair and reasonable price for the consultant's claim(s) that total $1,000 or less. This exhibit will outline the procedures to be followed by the consultant and the agency to consider a potential claim by the consultant. Step 1 Consultant Files a Claim with the Agency Project Manager If the consultant determines that they were requested to perform additional services that were outside of the agreement's scope of work, they may be entitled to a claim. The first step that must be completed is the request for consideration of the claim to the Agency's project manager. The consultant's claim must outline the following: • Summation of hours by classification for each firm that is included in the claim; • Any correspondence that directed the consultant to perform the additional work; • Timeframe of the additional work that was outside of the project scope; • Summary of direct labor dollars, overhead costs, profit and reimbursable costs associated with the additional work; and • Explanation as to why the consultant believes the additional work was outside of the agreement scope of work. Step 2 Review by Agency Personnel Regarding the Consultant's Claim for Additional Compensation After the consultant has completed step 1,the next step in the process is to forward the request to the Agency's project manager. The project manager will review the consultant's claim and will met with the Director of Public Works or Agency Engineer to determine if the Agency agrees with the claim. If the FHWA is participating in the project's funding, forward a copy of the consultant's claim and the Agency's recommendation for federal participation in the claim to the WSDOT Local Programs through the Region Local Programs Engineer. If the claim is not eligible for federal participation, payment will need to be from agency funds. If the Agency project manager, Director of Public Works or Agency Engineer, WSDOT Local Programs (if applicable), and FHWA(if applicable) agree with the consultant's claim, send a request memo, including backup documentation to the consultant to either supplement the agreement, or create a new agreement for the claim.After the request has been approved, the Agency shall write the supplement and/or new agreement and pay the consultant the amount of the claim. Inform the consultant that the final payment for the agreement is subject to audit.No further action in needed regarding the claim procedures. If the Agency does not agree with the consultant's claim,proceed to step 3 of the procedures. Agreement Number: CAG-17-074 WSDOT Form 140-089 EF Exhibit J Page 1 of 2 Revised 10/30/2014 Step 3 Preparation of Support Documentation Regarding Consultant's Claim(s) If the Agency does not agree with the consultant's claim, the project manager shall prepare a summary for the Director of Public Works or Agency Engineer that included the following: • Copy of information supplied by the consultant regarding the claim; • Agency's summation of hours by classification for each firm that should be included in the claim; • Any correspondence that directed the consultant to perform the additional work; • Agency's summary of direct labor dollars, overhead costs, profit and reimbursable costs associated with the additional work; • Explanation regarding those areas in which the Agency does/does not agree with the consultant's claim(s); • Explanation to describe what has been instituted to preclude future consultant claim(s); and • Recommendations to resolve the claim. Step 4 Director of Public Works or Agency Engineer Reviews Consultant Claim and Agency Documentation The Director of Public Works or Agency Engineer shall review and administratively approve or disapprove the claim, or portions thereof, which may include getting Agency Council or Commission approval (as appropriate to agency dispute resolution procedures). If the project involves federal participation, obtain concurrence from WSDOT Local Programs and FHWA regarding final settlement of the claim. If the claim is not eligible for federal participation, payment will need to be from agency funds. Step 5 Informing Consultant of Decision Regarding the Claim The Director of Public Works or Agency Engineer shall notify (in writing) the consultant of their final decision regarding the consultant's claim(s). Include the final dollar amount of the accepted claim(s) and rationale utilized for the decision. Step 6 Preparation of Supplement or New Agreement for the Consultant's Claim(s) The agency shall write the supplement and/or new agreement and pay the consultant the amount of the claim. Inform the consultant that the final payment for the agreement is subject to audit. AgreementNumber: CAG-17-074 WSDOT Form 140-089 EF Exhibit J Page 2 of 2 Revised 10/30/2014