Loading...
HomeMy WebLinkAboutR-419221C\I C:) qT 0 LU 1-- I Or 0 ZC zo 9 ------ Om> IL < — — — — — — 0. 0 �',— I �14- — — — — m < - - - - - - - - - - 0; P ml ED m m m WEILAND C TO REMAIN FORCE MAIN (TYR) I I ROOKERY (TYR) 14 R E 11� -;7 C NCRETE REMOVE EX GRAVEL I / ROAD L REMOVE 4" K WAT R MAI �ASSOCIATED ER CONNECTIONS AND ERE D, NO LONGER IN SERVICE X REMOVE TREES TYR MATCHLINE - SEE SHEET C13 MATCHLINE - SEE SHEET C1.5 9 0 20 0 10 20 40 Scale lw=20' oo Or LEGEND SILT FENCE I(TYP) TEMPORARY 10 SUMP AND C �17 PUMP > C� L - - - - - U, 9 � �z WHIR �9 4' MO /r-CONSTRU�TION LAYDOWN AREA -H MANAGED WIT CONSTRUCTION SEQUENCE �REMOVE EX 1932 Flmt Ave SuIte 201 Seattle, WA 98101 p. 206.725.1211 m m M f. 2G6.973,5344 engineering pl1cwww.IpdengIneerIng.om NO. REVISION B7'( DATE APPR 0 E PROTECTION (�3:) TEMP INTERCEPTOR SWALE W/ ROCK CHECK DAMS AS NECESSARY@ 50' OC (TYR) (a:) (a:) ��7 QL.�7 LIMIT OF WORK CITY OF RENTON Planning/Building/Public Works Dept. PROPERTY LINE �230� EX CONTOUR (INDEX) -231- EX CONTOUR EX BUILDING PROPOSED BUILDING OUTLINE BUILDING/STRUCTURE REMOVAL ---,,,-�SAWCUT LINE ASPHALT REMOVAL CONCRETE REMOVAL STABILIZED CONSTRUCTION ENTRANCE SILT FENCE (D EX TREE TO REMAIN xEX TREE TO BE REMOVED TREE PROTECTION FX CURB TO BE REMOVED sD— EX UTILITY TO BE REMOVED CATCH BASIN INSERT . . . . LIMITS OF WORK ,-->-- INTERCEPTOR SWALE h ROCK CHECK DAM FM S FORCE MAIN NO I ES 1) AT PROPOSED CONNECTION POINTS TO EXISTING UTILITIES, CONTRACTOR TO POTHOLE TO CONFIRM LOCATION AND ELEVATION OF UTILITIES PRIOR TO CONSTRUCTION 2) ALL TREES TO BE REMOVED THAT ARE GREATER THAN 20-INCHES IN DIAMErER SHALL BE SALVAGED AND STOCKPILED BY THE CONTRACTOR AND RELOCATED ONSITE PER THE LANDSCAPE AND WErLAND MITIGATION PLANS 3) UTILIZE EXISTING SITE FENCING AND/OR PROVIDE CONSTRUCTION FENCING AS NECESSARY TO SECURE SITE 4) PROVIDE INLEF PROTECTION 300 FEEL DOWNSTREAM OF SITE AND ALONG HAUL ROUTE 5) REFER TO SHEETS C1.1-C1.5 FOR DEMOLITION IN THE RIGHT-OF-WAY 6) THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION AND EROSION CONTROL ON THE PROPOSED SITE PER THE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (SWPPP) "now what's below. Call before you dig. Dial 811 R-419220 IN COMPLIANCE WITH CITY OF RENTON STANDARDS P� CID 0 .j r� CY) CD CD C%1j rA, rfil 0') 00 N 1�t (D R r ill po 04/13/2022 GO F- z w NEW ELEMENTARY SCHOOL #16 04 MAR 2022 0 mo� 1075 DUVALL AVE NE RENTON, WA 98059 P�l F- TESC AND DEMOLITION PLAN C1.4 W a- 21 147