Loading...
HomeMy WebLinkAbout20160674E003 Bethany Corner 2022-04-22 TESC 067.pdf      www.aesgeo.com  This document is considered DRAFT until reviewed and initialed by an AESI Project Manager  Temporary Erosion and  Sediment Control Monitoring DATE PROJECT NAME AESI PROJECT NO. TESC REPORT NO.  2022‐04‐22 Bethany Corner  20160674E003 067  LOCATION CITY MUNICIPALITY CSWGP  16451 111th Ave SE Renton Renton WAR307077  PREVIOUS SITE VISIT CLIENT/OWNER  WEATHER 24 HOUR RAINFALL PAST WEEK RAINFALL  2022‐04‐15  Mark Seek (Tiger Mountain  Homes) cloudy, 50's 0.01 1.02  AESI FIELD REP Alex Ybarra, L.G. | Staff  Geologist  AESI PROJECT MANAGER Matthew A. Miller,  P.E.               QUALITY/CONDITION (SEE SWPPP FOR BMP LOCATIONS)  CONSTRUCTION ENTRANCE SITE RESTRICTED ACCESS  Asphalt pavement silt fence  WHEEL WASH SEDIMENT TRACK OUT  N/A none  ROADWAY SURFACE CATCH BASIN  asphalt silt socks, installed along 111th Ave  LIMITS BUFFER AREA STABILIZATION  silt fence landscaping grass, bark  SILT FENCING CONCRETE WORK (Sidewalks, curbing, foundation)  installed along N, S, and E side none  COVER MEARSURES OVERALL STRAW  good, exposed soils on lots north potion of site around RVs  PLASTIC SHEETING HYDROSEED  over stock piles sidewalk planters  CONVEYENCE CHANNEL CHECK DAMS  N/A N/A  STOCKPILE COVER PIPE SLOPE DRAINS  stock piles being removed N/A  LEVEL SPREADER LANDSCAPE/MULCH  south side of the site sidewalk platers  SEDIMENT POND TRAP SEDIMENT POND INLET/OUTLET  detention pond N/A  SEDIMENT POND SIDE SLOPES SURFACE WATER OBSERVATION   (Creek, Wetland, or Lake) (Clear, Turbid, Sheen)  concrete (detention valt) clear  WATER QUALITY SAMPLE TURBIDITY (NTU) pH OVERALL  See page 2 See page 2 See  page  2  BMPs in good working condition  SAMPLE LOCATION AREAS OF CONCERN  See page 2 N/A  CORRECTIVE ACTIONS  N/A  PAST CORRECTIVE ACTIONS  N/A        www.aesgeo.com  TESC REPORT Is this site in compliance with the terms and conditions  of the SWPP and NPDES discharge Permit?  Yes          DATE CSWGP PROJECT NO. TESC REPORT NO.  2022‐04‐22 WAR307077 20160674E003 067  Sample Location Approximate Flow Turbidity NTU/Transparency pH Compliance  SE of site: 111th Ave  swale outfall  100 GPM 9.63 6.5 Yes                                                                                                                                                                                                                        ADDITIONAL COMMENTS:  All site stormwater is directed to the completed underground detention vault. Detention vault discharges to the 111th  Avenue swale. Measured turbidity and pH at swale outfall.