Loading...
HomeMy WebLinkAboutR-398733I L0 r z 0 F- Q F- 00 w Ir LL 3 I 0 Z m I 0 Rm L0 0 I 0 i N N I c 0 t� s c i c 0 L 3 Im V) N to U N O U J J a 0, c w 0 J w a z w ?15 1��Z 00 (CAL � N89 05 22 W 1 "IRCIN PIPE IS X 771 DHA 2596-77 ' 3-10" DEG � � '\ - -2260'�E OF PROP LINE REBAR CONTROL CAP 02- 12"TEc - - - I� �� �� END OF FENCE IS N 192409.364' I \ 3 4 'D-EC -- \ - _ _ GRASS 0 0.6'E OF PROP LINE E 1302594,966' 8" DEC\�-----_- 5--��T EL 220.73 \DEC - - - -22 X STEEL FENCE POST r -22 2.0'E OF PROP LINE s -5E - - - -2 _ PROPOSED RESERVOIR LIMITS (NOT 2'�pEc \ PART OF THIS CONTRACT) 2-12" DEC-, IN 213.50 TC 213.00 TPI / DHA 2596-76- . REBAR/ CONTROL CAP N 192252,456' E 1302633.016' \ EL 211.8�' 212.81 TC 212.31 TP CEO #334210-3248 C B 209.57 1 209.07 1 RIM 206.40 XIEBOT W 204.20 S 204.20 E 204.15 204.00 \ 209.20 TC 208.70 TP 0 z 0 0 MATCH EX 7 1� CON'C,E 850 - - -' E / '%\k\, 1207.93 TC� " - - S S - - 207.43 FL �--SS----SS--��-S�,- / 8/ OTE: 1.5% MAX CROSS -� _ \ SLOPE PER COR STD 102 `\ N.. 30TH S� -- w--r�� W---- W---- L-- 12 Y3670 ��-SD--_ 12 ADS - \ICONCRETE TALK 850*. a _ a a /lam r - ,.�-- - __---- - 1932 First Ave Suite 201 Imm Seattle, WA 98101 p. 206.725.1211 f. 206.973.5344 engineering p l l c www.Ipdengineering.com Call 3 Working Days Before You DIGl o.Q � 1-800-424-5555 -1 LL- X� PROPOSED PROPERTY PARCEL #334210-3240 SEPARATION LINE �\ \\ WORK SEPARATION N LINE A�� 1 r\211.99 FENCE IS 0.3'W OF PROP LINE UPSTREAM STRUCTURE NOT LOCATED ---MH (48"DIA) RIM 215.28 IE NE 209.28 IE S 209.18 CHANNELED BOTTOM S. END OF FENCE IS 0.4'E OF PROP LINE PARCEL #334210-3237 V211.96 211.92 BI 212.11 RIM 212.39 I IE NE 210.49 IE W 210.34 V1212.09 I E E 210.39 FUTURE BOT 209.44 CB RIGHT-OF-WAY RIM 218.02 II SETBACK IE NE 216.42 212.64 �,� IE W 215.97 v 41 ASPHALT IE E 215.97 \ 213.os DRIVE BOT 214.92 ��co z 1225 DIRT -� Ex 212.s1�� �GONCRE\TE WALK x219°12 112.9 T 1219 x212.4s ° /-- /2"GONG/ // i / 85P2 ONC916�--SD MATCH EX o 'V ry �0 / C0 N --- �ONC / ss/896.81500\LC)� / 1 V 78.83 CALC) I TX CASE 217.38 -�- W-N-- W-T-- \�--- \ T0, NUT 215.09 \ oo ,<i it - - -551 +02.39 224.04 LT 0 10 20 Scale 121=20' 548+08.08 212.34 LT 16+00 �2 CMP"B\ CMP SDCONC7VT ASPHALT \\F)Rl\/R ,o W� 40 C0P#1 2/23/2018 LEGEND - - PROPERTY LINE --2JO-- EX CONTOUR (INDEX) EX CONTOUR 230_ _ PROPOSED CONTOUR (INDEX) 231_ _ PROPOSED CONTOUR XXX SPOT ELEVATION FF 78.0 FINISHED FLOOR ELEVATION ///////////„z' PROPOSED BUILDING CONCRETE PAVEMENT HEAVY DUTY CONCRETE ASPHALT (AC) PAVEMENT PERVIOUS PAVEMENT ;. GRAVEL PATH SITE WALL VERTICAL CURB CURB AND GUTTER DRAINAGE SWALE GRAVEL DISPERSION TRENCH 1� 1� 1 BIORETENTION POND ID QUARRY SPALL DISCHARGE PAD O AREA/YARD DRAIN TRENCH/CHANNEL DRAIN 505 CATCH BASIN TYPE 1 OCATCH BASIN TYPE 2 STORM DRAINAGE PIPE FOOTING/SUBSURFACE DRAIN DETENTION SYSTEM SDC00 STORM DRAIN CLEANOUT FDCO 0 FOOTING DRAIN CLEANOUT DS• DOWNSPOUTS SIDE SEWER PIPE SEWER CLEANOUT SIDE SEWER CONNECTION BOLLARD FIRE HYDRANT WATER FITTINGS WATER SERVICE LINES WATER METER WATER SERVICE LINES FIRE SERVICE LINE o° FIRE SERVICE VAULT FIRE SERVICE CONNECTION R-398733 IN COMPLIANCE WITH CITY OF RENTON STANDARDS SURVEYED: SCALE: DATE: HORIZONTAL: ONNTA�L'.:NAD 198/11991 FIRE STATION 15 4/30/2019 DESIGNED: 1 -20 CITY OF Lip -R 1404 N 30TH STREET FIELDBOOK: DRAWN: RENTONSMN WA 98056 PAGE: • RENTON ONE INCH DATUM � DRAWING N0: CHECKED: AT FULL SCALE Planning/Building/Public Works Dept. 02,00 N0. REVISION BY DATE APPR APPROVED: SCALE NOT ONE INCH ALE ACCORDINGLY V SHEET: G OF:1 Q CJ GRADING 00 0 L0 0 0 0 a J 0 0 0 0 I T CA z Q 0 0 W Er L0 z 0 H H MW Ir LL