Loading...
HomeMy WebLinkAboutR-398740C0P#1 2/23/2018 0 w I - T Z 0 I- Q F♦^_ V♦ w It LL. rn 3 v I[I I m w O z 0 z 0 w z Ca 0 Z) m I rn 0 to 0 1 ro I N N I 0 cn M COVER ENTIRE ISOLATOR ROW WITH ADS GEOSYNTHETICS 601T NON -WOVEN GEOTEXTILE 8' (2.4 m) MIN WIDE STORMTECH HIGHLY RECOMMENDS FLEXSTORM PURE INSERTS IN ANY UPSTREAM STRUCTURES WITH OPEN GRATES CATCH BASIN OR MANHOLE SUMP DEPTH TBD BY SITE DESIGN ENGINEER (24" [600 mm] MIN RECOMMENDED) INSPECTION & MAINTENANCE SC-740 CHAMBER 24" (600 mm) HDPE ACCESS PIPE REQUIRED USE FACTORY PRE -FABRICATED END CAP PART #: SC740EPE24B SC-740 ISOLATOR ROW DETAIL NTS STEP 1) INSPECT ISOLATOR ROW FOR SEDIMENT A. INSPECTION PORTS (IF PRESENT) A.1. REMOVE/OPEN LID ON NYLOPLAST INLINE DRAIN A.2. REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLED A.3. USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOG A.4. LOWER A CAMERA INTO ISOLATOR ROW FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL) A.5. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. B. ALL ISOLATOR ROWS B.1. REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW B.2. USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW THROUGH OUTLET PIPE i) MIRRORS ON POLES OR CAMERAS MAYBE USED TO AVOID A CONFINED SPACE ENTRY !I) FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLE B.3. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. STEP 2) CLEAN OUT ISOLATOR ROW USING THE JETVAC PROCESS A. A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m) OR MORE IS PREFERRED B. APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEAN C. VACUUM STRUCTURE SUMP AS REQUIRED STEP 3) REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS. STEP 4) INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM. 1. INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUS OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS. 2. CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY. L.UNI.:Kt I t UULLAN PAVEMENT CONCRETE SLAB 8" (200 mm) MIN THICKNESS FLEXSTORM CATCH Il PART#6212NYFX WITH USE OF OPEN GRATE 6" (150 mm) INSERTA TEE PART# 6P26FBSTIP' INSERTA TEE TO BE CENTEREC ON CORRUGATION CREST OPTIONAL INSPECTION PORT SC-740 END CAP TWO LAYERS OF ADS GEOSYNTHETICS 315WTK WOVEN GEOTEXTILE BETWEEN FOUNDATION STONE AND CHAMBERS 5' (1.5 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS TH CONCRETE COLLAR NOT REQUIRED FOR UNPAVED APPLICATIONS 12" (300 mm) NYLOPLAST INLINE DRAIN BODY W/SOLID HINGED COVER OR GRATE PART# 2712AG61P* SOLID COVER: 1299CGC* GRATE: 1299CGS 6" (150 mm) SDR35 PIPE SC-740 CHAMBER * THE PART# 2712AG61PKIT CAN BE USED TO ORDER ALL NECESSARY COMPONENTS FOR A SOLID LID INSPECTION PORT INSTALLATION SC-740 6" INSPECTION PORT DETAIL NTS m = z y O r Lo F- z C7 w o rc W r D ¢ o L > O f n rc LU z 7 n ° Ix 0 � a N 04 co z LL z 0 3 wpj �t o L" W 2 o a rc a m zF �z zw z w� wp Wp O W U �rc � w >o yz o aED V rcED N U p a Wm�p� U_ K� 0% W� r 0 0 g V w� ' J 3 g x ma Wo • 2 y yw° W Q FU 0 10 � Gz L9N w MEa 3 ww TU � ° Ww $ ao o� o" m O ctj ow Or rcQ m M Zr ¢� 2 w 0 �z °o ¢ zr oW w O J co J wz w �= oz ao � W H z m� wao x z �z 's °d F� SHEET 4 5 OF STORMTECH DERDRAIN DETAIL NTS CHP UTLET MANIFOLD i FOUNDATION STONE BENEATH CHAMBERS ADS GEOSYNTHETICS 601 NON -WOVEN GEOTEXTIL STORMTECH END CAP FOUNDATION BENEATH CHAMBERS ADS GEOSYNTHETICS 601T NON -WOVEN GEOTEXTILE DESIGN ENGINEER 4" (100 mm) TYP FOR SC-310 & SC-160LP SYSTEMS 6" (150 mm) TYP FOR SC-740, DC-780, MC-3500 & MC-4500 SYSTEMS SECTION B-B L WALL FORATED E ERDRAIN SC-740 TECHNICAL SPECIFICATION NTS r__ 90.7" (2304 mm) ACTUAL LENGTH -I 85A" (2169 mm) INSTALLED LENGTH BUILD ROW IN THIS DIRECTION (START CNn OVERLAP NEXT CHAMBER HERE (OVER SMALL CORRUGATION) 29.3" 30 0" (744 mm) o o (762 mm) 45.9" {1166 mm] 51 A (310 m mm) �'I I` (1295 m"m) NOMINAL CHAMBER SPECIFICATIONS SIZE (W X H X INSTALLED LENGTH) 51.0" X 30.0" X 85.4" (1295 mm X 762 mm X 2169 mm) CHAMBER STORAGE 45.9 CUBIC FEET (1.30 m3) MINIMUM INSTALLED STORAGE* 74.9 CUBIC FEET (2.12 m') WEIGHT 75.0 Ibs. (33.6 k9) *ASSUMES 6" (152 mm) STONE ABOVE, BELOW, AND BETWEEN CHAMBERS IA A �I 1 94 PRE-FAB STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "W 1 PRE-FAB STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T" C 66 PRE -CORED END CAPS END WITH "PC" PART # STUB A B C SC740EPE06T / SC740EPE06TPC 6" (150 mm) 10.9" (277 mm) 18.5" (470 mm) -- SC740EPE06B / SC740EPE06BPC --- 0.5" (13 mm) SC740EPE08T /SC740EPE08TPC 8" (200 mm) 12.2" (310 mm) 16.5" (419 mm) -- SC740EPE08B / SC740EPE08BPC --- 0.6" (15 mm) SC740EPE10T / SC740EPElOTPC 10" (250 mm) 13.4" (340 mm) 14.5" (368 mm) -- SC740EPE10B / SC740EPE10BPC --- 07' (18 mm) SC740EPE12T / SC740EPE12TPC 12" (300 mm) 14.7" (373 mm) 12.5" (318 mm) SC740EPE12B / SC740EPE12BPC --- 1.2" (30 mm) SC740EPE15T / SC740EPE15TPC 15" (375 mm) 18.4" (467 mm) 9.0" (229 mm) SC740EPE15B / SC740EPE15BPC --- 1.3" (33 mm) SC740EPE18T / SC740EPE18TPC 18" (450 mm) 19.7" (500 mm) 5.0" (127 mm) SC740EPE18B / SC740EPE18BPC 1.6" (41 mm) SC740EPE24B* 24" (600 mm) 18.5" (470 mm) 0.1" (3 mm) ALL STUBS, EXCEPT FOR THE SC740EPE24B ARE PLACED AT BOTTOM OF END CAP SUCH THAT THE OUTSIDE DIAMETER OF THE STUB IS FLUSH WITH THE BOTTOM OF THE END CAP. FOR ADDITIONAL INFORMATION CONTACT STORMTECH AT 1-888-892-2694. * FOR THE SC740EPE24B THE 24" (600 mm) STUB LIES BELOW THE BOTTOM OF THE END CAP APPROXIMATELY 1.75" (44 mm). BACKFILL MATERIAL SHOULD BE REMOVED FROM BELOW THE N-12 STUB SO THAT THE FITTING SITS LEVEL. NOTE: ALL DIMENSIONS ARE NOMINAL a = z C O Ln H i Y 3 0 ° rc U r 0 L) o � n � w z 7 ° co a LL O N wZ LL z 0 3 a LU � o L H O W o a a rc W zF °z z w. o a w� 4 wOW W j o-U p o w� � �z w >o � z J F O z z w 0 wF rcI � rcw r Y w vi a ac W x C O _V w OQ rc z� Zw w� s 18w wa U p r O yw x m wa � �o H� z EL:, � wo L 9� w 0 � U ww zN R °or wa ow oC rcg mM zor z ¢= rcz w0 °o zr F� °zx w ¢ w O J w z-w, � J z f0 w V 2 oz w C7 rcm aw wo rcw E zm ! w m Z~ 1z z 00 SHEET 5 of 5 R-398740 IN COMPLIANCE WITH CITY OF RENTON STANDARDS a �� J A c 4 WAS,6, SURVEYED: SCALE: DATE: Call 3 Working Days _ TTV FIRE STATION 15 / / c 1932 First Ave w ]c ( n HORIZONTAL: r D 1983//1991 • 4 30 201 9 W Suite 201 Before You DIGS �� �� DESIGNED:Lip 1 20 CITY 1 �� FIELDBOOK: g Seattle, WA 98101 DRAWN: � RENTON 1404 N 30TH STREET PAGE: i p. 206.725.1211 0 _Q ,0 30766 SMN RENTON WA 98056 DRAWING N0: rn •08. rp �F�1sT1 Rti w ONE INCH DATUM f. 206.973.5344 �� o�m m�� ��ti CHECKED: AT FULL 03.06 � SIGNAL �� IF NOT ONE SO. CH Planning/Building/Public Works Dept. engineering pllc www.lpdengineering.com y-800-424-5555 NO. REVISION BY DATE APPR APPROVED: SCALE ACCORDINGLY STORMTECH DETAILS SHEEP: 1 3 OF. 1 Q U CJ W LO 0 0 A� 1 ` 0 T a J 0 0 0 0 A� 1 ` T I.L rV, V Z /Q I.L I.L 0 0 w or I T Z 0 H Q H w cr LL