HomeMy WebLinkAboutR-405213EX CB
RIM 261.23
INV-260.13 (8" CONC-E)
INV=259.73 (12" CONC-W)
I
W
Z
W
z
Q
®
EX CB
RIM 263.83
U
INV=262.53 (12" CONC-E)
INV=259.23 (12" CONC-W)
\ SD 1 S�1 SD I SD- SD S,
3 I
6+1p0 I \
ISTA: 6+58.55
I
SILT FENCE
(SEE DETAIL SHEET 6)-
TAX PARCEL
334390-2565 /
i
EXISTING RESI>%
TO BERENIOVE
I
I
LIMITS OF\PISTURBANCI
1 \
1 \
1 \
I \�
EXISTING SHED \
TO BE REMOVED \
l
I
0
N
0
N i
� O X
s
CO N O
p N
0
�o
Qz
w
�X
co
SW 1/4 OF SE 1/4 OF SEC. 5, TWP. 23 N., RNG. 5 E., W.M.
CITY OF RENTON, STATE OF WASHINGTON
W W W W -
\ 3 \
\7+00
A \I
N99"43"4W W 51.92I
\ SLOT 5
TAX PARCEL
559205-2568
LINCOLN PLACE SHORT PLAT
REC. NO. 2016020900007
SAZEI DESIGN GROUP, LLC
6608 110TH AVE. N.E.
KIRKLAND, WA. 98033
TEL. (425) 212-2280
FAX. (425) 889-6887
LOT 6
TAX PARCEL \ \
559205-2563
14TH STREET \\
s� -S S S\
(SEE DETAIL SHEET 6)
W
0
F30' INGRESS & UTILITY
EASEMENT RC NO MONTEREY HEIGHTS
5380145 VOL. 194, PGS. 50-52
\SILT FENCE
(SEE DETAIL SHEET 6)
LOT 9
TAX PARCEL
559205-0090
LIMITS OF DISTURBANCE
LOT 8
�\\ TAX PARCEL
kwAijim
REVISED PER CITY REVIEW
RECORD DRAWINGS
12-3-20 N0. I REVISION
I \
S ¢ S �S
LEGEND
CA5ED MONUMENT (OCCUPIED 10/16)
•
EXISTING GORNER AS DESCRIBED
6WOOD FENCE (UNLESS OTHERWISE NOTED)
SPOT ELEVATION
PP
POWER POLE
H YD6_
HYDRANT
WV
WATER VALVE
W ®
WATER METER
PM
POWER METER
®
CATGH BASIN
SSMH
O
SANITARY SEWER MANHOLE
TREES: CALIPER IN INCHE5 TYPE:
C-CEDAR, P-PINE, FR-FRUIT
12F 12FR
F-FIR, UD-UNKNOWN DEGIDUOU5
P
OVERHEAD POWER LINE
GRAPHIC SCALE
20 0 10 20 40
w
z
J
r
w
D-
0
O-
D-
EXISTING GROUND
GRADING SLOPE SET BACK (TYP)
N TS
CALL 2 BUSINESS DAYS
BEFORE YOU DIG
1-811-424-555
RAD
4-2-11
RAD
SURVEYED:
RAD
4-8-1V
RAD
DESIGNED:
R. DECCIO
RAD
12/3/20
DRAWN:
LR
CHECKED:
R. DECCIO
BY
DATE
APPR
APPROVED: R. DECCIO
CONSTRUCTION SEQUENCE
EROSION AND SEDIMENT CONTROL RECOMMENDED CONSTRUCTION SEQUENCE
1. PRE -CONSTRUCTION MEETING.
2. POST SIGN WITH NAME AND PHONE NUMBER OF ESC SUPERVISOR (MAY BE
CONSOLIDATED WITH THE REQUIRED NOTICE OF CONSTRUCTION SIGN).
3. FLAG OR FENCE CLEARING LIMITS.
4. INSTALL CATCH BASIN PROTECTION IF REQUIRED.
5. GRADE AND INSTALL CONSTRUCTION ENTRANCE(S).
6. INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.).
7. CONSTRUCT SEDIMENT PONDS AND TRAPS.
8. GRADE AND STABILIZE CONSTRUCTION ROADS.
9. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS,
ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT.
10. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH APPENDIX D OF THE
SURFACE WATER DESIGN MANUAL AND MANUFACTURER'S RECOMMENDATIONS.
11. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS
SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN
ACCORDANCE WITH THE CITY'S EROSION AND SEDIMENT CONTROL STANDARDS.
12. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING
THE DRY SEASON OR TWO DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER
MULCH, COMPOST, PLASTIC SHEETING OR EQUIVALENT.
13. STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS.
14. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS.
15. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED AND
BMPS REMOVED IF APPROPRIATE.
THE 13 ELEMENTS OF A CONSTRUCTION SWPPP
1. Preserve Vegetation/Mark Clearing Limits: The clearing limits are indicated on the plan sheet.
Furthermore, clearing and grading will be limited to only areas that need to be disturbed for
grading/construction of the site and frontage improvements. Construction will require regarding the
entire site. Field marking the clearing limits shall be completed prior to clearing and grading
activities.
BMP's: Preserve Natural Vegetation (VEG)
2. Establish Construction Access: Access to the construction site shall be limited to the rock
construction entrance. The rock construction entrance shall be installed off of the Street to provide
access to the construction vehicle/equipment staging and employee parking areas.
BMP's: Rock construction entrance (CE) See detail sheet C9
3. Control of Flow Rates: Storm water detention: No detention is proposed for the site since the work
should be completed in a short period of time.
BMP's None Proposed
4. Installation of Sediment Controls: Sediment control will be provided through a combination of
filtration through the surround on -site vegetation, or filter fence if required. ,
BMP's: Silt Fence (SF) Sediment Trap (ST) I
5. Soils Stabilization: Temporary and permanent soil stabilization will be provided. Temporary
stabilization will be provided through the application of straw and/or plastic sheeting to exposed,
worked earth. From October 1 until April 30, no exposed soil may remain exposed and unworked for
more than two days; after May 1, no exposed soil may remain exposed and unworked for more than
seven days.
BMP's: Straw Covering, Plastic Sheeting, Final Landscaping(as required)
6. Slope Protection: Stock piles shall be protected from erosion through cover and prevention of
concentrated surface runoff flows on steep slopes as required.
BMP's: Plastic Sheeting, (AS REQUIRED)
7. Protection of Permanent Drain Inlets: Inlet protection will be provided for all catch basins.
BMP's: Inlet Protection (IP) See detail sheet (AS REQUIRED)
8. Stabilization of Channels and Outlets: All channel slopes shall be constructed and protected
against erosion in accordance with County code.
(None Required)
9. Pollutant Control: Pollutants shall be controlled through the on -site BMP's proposed above.
10. Dewatering Control: De -watering: Interception of the water table is expected to occur. (NOT
REQUIRED)
11. BMP Maintenance: All BMP's and SWPPP elements shall be inspected daily and maintained
as required.
12. Project Management: The project shall be managed in a cooperative effort by the project
manager, contractor, engineer, and the county inspector. During the construction process, if
unforeseen issues arise that cannot be resolved on site, construction activity (other than SWPPP
maintenance) shall be halted and the owner's representative and the project engineer are to be
contacted and informed of the situation. TBD
13. Protect on -site stormwater management bmps for runoff from roofs and other hard surface
on -site stormwater management bmps used for runoff from roofs and other hard surfaces
include: full dispersion, roof downspout full infiltration or dispersion systems, perforated
stubout connections, rain gardens, bioretention systems, permeable pavement, sheetflow
dispersion, and concentrated flow dispersion. the areas on the site to be used for these bmps
shall be protected from siltation and compaction during construction by sequencing the
construction in a fashion to install these bmps at the latterpart of the construction grading Q
operations, by excluding equipment from the mps and the associated areas, and by using the J
erosion and sedimentation control bmps listed below. relevant bmp's bmp c 102: buffer zone
NOTE: H
CLEARING LIMITS AND SILT FENCE TO BE SET JUST INSIDE OF THE PROPERTY
LINES. O
TOPSOIL:
STOCKPILE EXISTING TOPSOIL DURNING GRADING AND REPLACE IT PRIOR TO
PLANTING PER BMP 15.13 OPTION 3.
TOPSOIL REQUIRED 500 CYDS
RECORD DRAWINGS
12-3-20
SCALE:
VERTICAL: NAVD 1988
•
HORIZONTAL: NAD 1983/1991
1 "=20'
DATUM
PRI
Nkslv
ONE INCH
AT FULL SCALE
Planning/
IF NOT ONE INCH
SCALE ACCORDINGLY
CITY OF
RENTON
uilding/Public Works Dept.
H
R-405213 °
IN COMPLIANCE WITH CITY OF RENTON STANDARDS CV
H
Z
W
O
J
W
W
AVON DEVELOPMENT 2 LOT DATE: 4-8-19 Q
SHORT PLAT PAGE: OOK:
PAGE:
DRAWING NO: Z
R-405203 >
S W W P PLAN SHEET: 3 OF: 9
U