HomeMy WebLinkAboutS-409104V /
r')
z
17
0
LU
-17
n
Q
r
Call 2 Working Days Before You Dig
811
Utilities Underground Location Center
(ID,MT,ND,OR,WA)
X
i
X
� �
h
X I
IX
20 00
I
20+00
0-0-L. PI EC
\O OF WAS;/
IF 7513�
23 ERE����\��
TONAL 813,21
lk
20+40
20+80
D.R. STRONG
CONSUL TING ENGINEERS
ENGINEERS PLANNERS SURVEYORS
620 - 7Ih AVENUE KIRKLAND, WA 98033
O 425.827.3063 F 425.827.2423
NE 9/4 SECTION 14,
MAPL
21+20
21+60
TOWNSHIP 23 N. RANGE 5 E, W. M.
PAUi78]
22+40
1
CITY COMMENTS 11.12.19
YLP
02.14.20
YLP
SURVEYED:
arc
2
INTAKE COMMENTS
YLP
06.16.21
YLP
DESIGNED:
YLP
3
CITY COMMENTS 07.27.21
YLP
08.13.21
YLP
DRAWN:
GLB
CHECKED:
YLP
N0.
REVISION
BY
DATE
APPR
APPROVE
22+80
SCALE:
AS NOTED
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
VERTICAL: NAVD 1988
HORIZONTAL: NAD 1983/1991
DATUM
23+20
23+60
1�
VRC TY OF
RENTON
VQW
Planning/Building/Public Works Dept.
SEWER MANHOLE NOTES:
1. SEWER MANHOLES PER COR STD PLAN 400.1
2. MANHOLE FRAME AND COVER PER COR STD PLAN 401.
UTILITY CROSSING NOTE:
O UTILITY CROSSING
SEE UTILITY CROSSING TABLE ON SHEET C41 FOR MORE DETAILS
NORTH
GRAPHIC SCALE
0 10 20 40
1 INCH = 20 FT.
HORIZONTAL
0 2.5 5 10
1 INCH = 5 FT
VERTICAL
R-409129
S-409104
M ,
�J
H
•
H
00
Q
J
IN COMPLIANCE WITH CITY OF RENTON STANDARDS C/)
0
WASTEWATER UTILITY z
Ann Fowler 09/30/2021 J
2
DEVELOPMENT ENGINEERING 0
njanders 10/01 /2021
LU
J
MAPLE HIGHLANDS DATE: 09.05.19
ROAD A SEWER PLAN AND PROFILE FIELDBOOK:
PAGE:
DRAWING
16210 SE 134TH STREET C31
RENTON, WASHINGTON 98059 SHEET 31 OF 41
DRS PROJECT NO. 17020