Loading...
HomeMy WebLinkAboutSigned_Secondary_Review_ContractScope of Work W e t l a n d R e v i e w – S o u n d e r s F a c i l i t y a t L o n g a c r e s 1 otak City of Renton Sounders Facility at Longacres – Secondary Review PRE21-000410 Otak Project No. 208796 Proposal for Professional Services May 6, 2022 The following scope of work and cost estimate was developed by Otak, Inc. (Otak) to support the City of Renton (City) with the review of the wetland delineation report (Existing Conditions Letter Report) for the Longacres property proposed for the new Seattle Sounders training facility. The property is 108 acres in size consisting of 18 property parcels located west of Oakesdale Avenue SW in Renton, WA. The City requested Otak to review the Existing Conditions Letter Report prepared by Talasaea Consultants, Inc. (TCI) dated April 29, 2022. Specifically, the City is requesting: 1) Review classification and delineation of the existing wetlands 2) Review the mitigation plan anticipated for submittal at a later date. Wetland classifications, delineations, and proposed mitigation will be reviewed for consistency with City of Renton Municipal Code (RMC) Critical Area Regulations (Title IV Chapter 3, 4-3-050) for wetlands. Our approach to this work is divided into four tasks: 1) background research and site visit; 2) report review, code review, and preparation of a findings memorandum; 3) mitigation plan review; and, 4) project coordination and management. The wetland delineation and classification review memorandum will be completed by May 27, 2022. A half-day site meeting with the applicant and City is included with this scope of work should the need arise to resolve differences in the wetland delineation or classifications. Deliverables: • Draft and Final Wetland Delineation and Classification Review Memo • Mitigation Plan Review Memo Assumptions: • A single site visit by two Otak biologists will be completed to prepare the wetland review memo. • Background review will include available published information, such as Renton CORMaps, historical imagery, and GLO maps, to evaluate whether some of the delineated wetland features meet the definition of artificial per RMC. • A half-day site meeting with the applicant and City is included with this scope of work. Scope of Work Continued W e t l a n d R e v i e w – S o u n d e r s F a c i l i t y a t L o n g a c r e s 2 otak •This scope of work includes one round of report review. Review of resubmitted revised reports will continue until the budget has been exceeded or a contract amendment has been approved by the City. Schedule and Fees Our proposed fee summary is as follows: Task 1—Background Research and Site Visit $2,750 Task 2—Report Review and Findings Memo $4,100 Task 3—Mitigation Plan Review and Findings Memo $3,900 Task 4—Project Management and Coordination $815 Direct Expenses $150 Proposed Fee Total $11,715 Otak proposes to complete the above Scope of Work for a time and materials amount of $11,715.00. In-house reimbursable expenses and any outsourced direct expenses (e.g., postage/deliveries, mileage, etc.) will be invoiced at cost plus 10% and are included in the contract amount. This is a not-to-exceed scope of work; we will not exceed this budget without prior approval from the City of Renton. Task 3 (Mitigation Plan Review and Findings Memo) will only be activated upon authorization from the City. If conditions are found to be different from those described above, Otak will notify the City of Renton immediately to discuss any impacts to the scope of work and budget We appreciate the opportunity to work with you. If you have any questions regarding this proposal or need additional information, please feel free to contact Jeff Gray at (971) 337- 3047. ____________________________________________________ ___________________ Russ Gaston, Principal Date Otak, Inc. ______________________________________________________ ____________________ Vanessa Dolbee, Planning Director Date City of Renton 05/10/2022