Loading...
HomeMy WebLinkAboutRE External Sender RE Canopy Water Extension reviewHi Holli, Yes, they did. Bill, will you please send the signed plans? Thanks, Calvin Megiveron GIS Admin | Developer Extension Coordinator Coal Creek Utility District P: 425-235-9200 From: Holli Heavrin <hhh@coredesigninc.com> Sent: Thursday, April 28, 2022 4:02 PM To: Bill Reynolds <billr@paceengrs.com>; Patrick Martin <patrick@ccud.org> Cc: Benjamin Paulus <ben@bluefern.com>; Michelle Branley <michelle@bluefern.com>; Sam Chapman <SamC@paceengrs.com>; Calvin Megiveron <calvin@ccud.org> Subject: [External Sender] RE: Canopy Water Extension review Patrick – did these get approved by the board last night? 😊 Holli Heavrin, P.E. Principal, Engr. Tech. Manager Core Design Inc. O 425.885.7877 M 206.697.9474 www.coredesigninc.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.coredesigninc.com%2F&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb% 7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=lbu8OKE9dZ%2FtGSTrB2Kt8GlSef0N%2F0w5c%2BaxmkvsaWk%3D&rese rved=0> From: Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> > Sent: Tuesday, April 26, 2022 11:20 AM To: patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@blue fern.com> >; Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> >; calvin ccud.org <calvin@ccud.org <mailto:calvin@ccud.org> > Subject: RE: Canopy Water Extension review Hi Patrick, We have reviewed the update plans provided this morning and find that all comments have been adequately addressed. The plans are acceptable for presentation for approval. Let me know if you have any questions. Bill Reynolds, PE Senior Principal Engineer 11255 Kirkland Way | Suite 300 Kirkland WA 98033 p. 425.827.2014 | c. 206.321.1109 Celebrating 30 years of providing optimal solutions to our clients in the Northwest and beyond. From: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Sent: Tuesday, April 26, 2022 10:32 AM To: Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> > Cc: patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.co m> >; Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Subject: RE: Canopy Water Extension review Bill attached is a link to our revised plans. Please let us know how the board approval goes tomorrow. And thanks again for all your (and Sam’s) hardwork getting this to the finish line. We are super grateful! 2022-04-26 CCUD Resubmittal <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcoredesigninc-my.sharepoint.com%2F%3Af%3A%2Fp%2Fhhh%2FEmI_pP0usG5Mi7WTXMKIJsEB9l991uSLWLdOhrng64U7EQ%3F e%3DEuXGLw&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1ha WwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=LBqxwfKROkdR%2F8Vm9jlAiPri%2Fqzo8XAvy%2FpxT9dqYWc%3D&reserved=0> Holli Heavrin, P.E. Principal, Engr. Tech. Manager Core Design Inc. O 425.885.7877 M 206.697.9474 www.coredesigninc.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.coredesigninc.com%2F&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb% 7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=lbu8OKE9dZ%2FtGSTrB2Kt8GlSef0N%2F0w5c%2BaxmkvsaWk%3D&rese rved=0> From: Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> > Sent: Tuesday, April 26, 2022 8:12 AM To: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Cc: patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.co m> >; Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Subject: RE: Canopy Water Extension review We would like it shown and noted for clarity. Not a big deal since it is below the IE, but any encroachment into the District easement should be identified. Bill Reynolds, PE Senior Principal Engineer 11255 Kirkland Way | Suite 300 Kirkland WA 98033 p. 425.827.2014 | c. 206.321.1109 Celebrating 30 years of providing optimal solutions to our clients in the Northwest and beyond. From: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Sent: Tuesday, April 26, 2022 7:24 AM To: Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> > Cc: patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.co m> >; Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Subject: RE: Canopy Water Extension review Thanks Bill. We will get these back to you asap. There is a comment about the vault encroaching into the sewer easement. This has been the case the entire design and I believe it was discussed early on as well. The top of the vault lid is at 75.60 and the bottom of the sewer through this area is between elevation 77-78.8. The sewer line itself is not over the vault. Are your mark-ups just noting that we call it out on the plan and profile? Snippet of your markup below Holli Heavrin, P.E. Principal, Engr. Tech. Manager Core Design Inc. O 425.885.7877 M 206.697.9474 www.coredesigninc.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.coredesigninc.com%2F&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb% 7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=lbu8OKE9dZ%2FtGSTrB2Kt8GlSef0N%2F0w5c%2BaxmkvsaWk%3D&rese rved=0> From: Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> > Sent: Monday, April 25, 2022 1:52 PM To: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Cc: patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.co m> >; Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Subject: RE: Canopy Water Extension review Hi Holli, I have added a couple of markups to the plans. See attached drawings. Sorry for the short fuse, but if you can return updated drawings by noon tomorrow, we can present to the District for approval at the meeting on Wednesday evening. Thanks! Bill Reynolds, PE Senior Principal Engineer 11255 Kirkland Way | Suite 300 Kirkland WA 98033 p. 425.827.2014 | c. 206.321.1109 Celebrating 30 years of providing optimal solutions to our clients in the Northwest and beyond. From: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Sent: Friday, April 22, 2022 2:11 PM To: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Cc: Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.com> > Subject: RE: Canopy Water Extension review Thanks Sam! How likely is it that we can still get on the April 27th board meeting? Holli Heavrin, P.E. Principal, Engr. Tech. Manager Core Design Inc. O 425.885.7877 M 206.697.9474 www.coredesigninc.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.coredesigninc.com%2F&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb% 7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=lbu8OKE9dZ%2FtGSTrB2Kt8GlSef0N%2F0w5c%2BaxmkvsaWk%3D&rese rved=0> From: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Sent: Friday, April 22, 2022 1:58 PM To: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Cc: Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.com> > Subject: RE: Canopy Water Extension review Hi Holli, I checked in with Bill this morning and he has some comments he would like to confirm with the District, he will follow up with you following confirmation. Also as a quick FYI, I will be out of office starting next week (4/25) returning (5/10). Please reach out to Bill for coordination efforts on this project during that time. Thanks, Sam Sam Chapman, PE Project Engineer 11255 Kirkland Way | Suite 300 Kirkland WA 98033 425.827.2014 Connect with us at LinkedIn <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fpace-engineers-inc.&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3% 7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=p%2B4UuOjpSD9%2BAtKlJD jj%2F4Xp2fSOujj1C7jeFNTAbl0%3D&reserved=0> | Instagram <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.instagram.com%2Fpaceengineers%2F&data=05%7C01%7C%7C88033cfbce4b4 258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=h6 B9f%2Fs9r0GLnGE9GJCeGpxr958nI77f5TCjMWWScwg%3D&reserved=0> | Facebook <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2Fpaceengrs&data=05%7C01%7C%7C88033c fbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&s data=rUFJ2PaWib%2BoTB4UoJLtayPJCjr28chQLkdgD6z2rDw%3D&reserved=0> | PACEengrs.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.paceengrs.com%2F&data=05%7C01%7C%7C880 33cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7 C&sdata=hC8E8yPrTVG1nWMTkyk7GK6sRMrJ1j9ed1AwjFUkOFk%3D&reserved=0> Voted Zweig Best Places to Work and PSBJ Top 100 Fastest Growing Firms in the Northwest From: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Sent: Friday, April 22, 2022 7:41 AM To: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Cc: Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.com> > Subject: RE: Canopy Water Extension review Hey Sam – were there any other comments? We’re eager to get on the district board for approval on April 27th Holli Heavrin, P.E. Principal, Engr. Tech. Manager Core Design Inc. O 425.885.7877 M 206.697.9474 www.coredesigninc.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.coredesigninc.com%2F&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb% 7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=lbu8OKE9dZ%2FtGSTrB2Kt8GlSef0N%2F0w5c%2BaxmkvsaWk%3D&rese rved=0> From: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Sent: Thursday, April 14, 2022 3:30 PM To: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Cc: Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.com> > Subject: RE: Canopy Water Extension review Hi Holli, I expect we will have all of our comments completed to you sometime early next week. I have completed my review but there may be additional comments that come in directly from the District. I can send you my comments now so you may get a head start on them but with the understanding this is not our completed review so please do not submit another set of plans until Patrick and Bill confirm they have no additional comments. See attached for my comments on the water plans, no additional comments for the sewer plans. Please let me know if you have questions. Also please keep in mind next opportunity for plan approval by the District is at the board meeting on April 27th. We will do our best to complete our review to allow you time to turn around comments by then (if there are additional). Thanks, Sam Sam Chapman, PE Project Engineer 11255 Kirkland Way | Suite 300 Kirkland WA 98033 425.827.2014 Connect with us at LinkedIn <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fpace-engineers-inc.&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3% 7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=p%2B4UuOjpSD9%2BAtKlJD jj%2F4Xp2fSOujj1C7jeFNTAbl0%3D&reserved=0> | Instagram <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.instagram.com%2Fpaceengineers%2F&data=05%7C01%7C%7C88033cfbce4b4 258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=h6 B9f%2Fs9r0GLnGE9GJCeGpxr958nI77f5TCjMWWScwg%3D&reserved=0> | Facebook <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2Fpaceengrs&data=05%7C01%7C%7C88033c fbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&s data=rUFJ2PaWib%2BoTB4UoJLtayPJCjr28chQLkdgD6z2rDw%3D&reserved=0> | PACEengrs.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.paceengrs.com%2F&data=05%7C01%7C%7C880 33cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7 C&sdata=hC8E8yPrTVG1nWMTkyk7GK6sRMrJ1j9ed1AwjFUkOFk%3D&reserved=0> Voted Zweig Best Places to Work and PSBJ Top 100 Fastest Growing Firms in the Northwest From: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Sent: Thursday, April 14, 2022 1:55 PM To: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Cc: Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.com> > Subject: RE: Canopy Water Extension review Hi Sam, just wanted to check in with you on the status of this final review. Can you let me know when we can expect approval? Thanks! Holli Heavrin, P.E. Principal, Engr. Tech. Manager Core Design Inc. O 425.885.7877 M 206.697.9474 www.coredesigninc.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.coredesigninc.com%2F&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb% 7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=lbu8OKE9dZ%2FtGSTrB2Kt8GlSef0N%2F0w5c%2BaxmkvsaWk%3D&rese rved=0> From: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Sent: Tuesday, March 29, 2022 2:30 PM To: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Cc: Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.com> > Subject: RE: Canopy Water Extension review Hi Holli, Received, thank you. I agree with your response that the easement should be left to 15’ for sewer with no water, I apologize for the typo. Thanks! Sam Sam Chapman, PE Project Engineer 11255 Kirkland Way | Suite 300 Kirkland WA 98033 425.827.2014 Connect with us at LinkedIn <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fpace-engineers-inc.&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3% 7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=p%2B4UuOjpSD9%2BAtKlJD jj%2F4Xp2fSOujj1C7jeFNTAbl0%3D&reserved=0> | Instagram <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.instagram.com%2Fpaceengineers%2F&data=05%7C01%7C%7C88033cfbce4b4 258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=h6 B9f%2Fs9r0GLnGE9GJCeGpxr958nI77f5TCjMWWScwg%3D&reserved=0> | Facebook <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2Fpaceengrs&data=05%7C01%7C%7C88033c fbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&s data=rUFJ2PaWib%2BoTB4UoJLtayPJCjr28chQLkdgD6z2rDw%3D&reserved=0> | PACEengrs.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.paceengrs.com%2F&data=05%7C01%7C%7C880 33cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7 C&sdata=hC8E8yPrTVG1nWMTkyk7GK6sRMrJ1j9ed1AwjFUkOFk%3D&reserved=0> Voted Zweig Best Places to Work and PSBJ Top 100 Fastest Growing Firms in the Northwest From: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Sent: Tuesday, March 29, 2022 2:17 PM To: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Cc: Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.com> > Subject: RE: Canopy Water Extension review Sam, please see our revised plans for Canopy Sewer and Water. All comments have been addressed in full with the exception of the easement within Alley 3. It was noted to make that a 25’ wide joint sewer and water easement but water does not exist within Alley 3 therefore it was left to be a 15’ wide sewer easement. Below you’ll find the link our revised plans. Should any questions arise during your final review/sign off, please let me know. 2022-03-29 CCUD resubmittal <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcoredesigninc-my.sharepoint.com%2F%3Af%3A%2Fp%2Fhhh%2FEi3obI1BIZROlJBCl3072BYB5614v19_wg1HHzubGqDNBw%3F e%3DkaGgsb&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1ha WwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=FE2Dr2dSP7cYPqhHneLnRJ2S%2FFW6nFnVtS6mK3ZO4xI%3D&reserved=0> Thanks again! Holli Heavrin, P.E. Principal, Engr. Tech. Manager Core Design Inc. O 425.885.7877 M 206.697.9474 www.coredesigninc.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.coredesigninc.com%2F&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb% 7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=lbu8OKE9dZ%2FtGSTrB2Kt8GlSef0N%2F0w5c%2BaxmkvsaWk%3D&rese rved=0> From: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Sent: Friday, March 25, 2022 7:47 AM To: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Cc: Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.com> > Subject: RE: Canopy Water Extension review Hi Holli, See attached for our comments on your recent submittal, please let me know if you have any questions. Thanks, Sam Sam Chapman, PE Project Engineer 11255 Kirkland Way | Suite 300 Kirkland WA 98033 425.827.2014 Connect with us at LinkedIn <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fpace-engineers-inc.&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3% 7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=p%2B4UuOjpSD9%2BAtKlJD jj%2F4Xp2fSOujj1C7jeFNTAbl0%3D&reserved=0> | Instagram <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.instagram.com%2Fpaceengineers%2F&data=05%7C01%7C%7C88033cfbce4b4 258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=h6 B9f%2Fs9r0GLnGE9GJCeGpxr958nI77f5TCjMWWScwg%3D&reserved=0> | Facebook <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2Fpaceengrs&data=05%7C01%7C%7C88033c fbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&s data=rUFJ2PaWib%2BoTB4UoJLtayPJCjr28chQLkdgD6z2rDw%3D&reserved=0> | PACEengrs.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.paceengrs.com%2F&data=05%7C01%7C%7C880 33cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7 C&sdata=hC8E8yPrTVG1nWMTkyk7GK6sRMrJ1j9ed1AwjFUkOFk%3D&reserved=0> Voted Zweig Best Places to Work and PSBJ Top 100 Fastest Growing Firms in the Northwest From: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Sent: Friday, March 18, 2022 7:17 AM To: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Cc: Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.com> > Subject: RE: Canopy Water Extension review Thank you, Sam, we appreciate the understanding here. Attached is a link to our revised plans for sewer and water, as well as a matrix of all previous comments and how they were addressed. Please reach out to me if there are any questions! 2022-03-18 CCUD resubmittal <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcoredesigninc-my.sharepoint.com%2F%3Af%3A%2Fp%2Fhhh%2FEu6x_2IyTeBIoWmXHQsJOy8BPyILA_yFKDLm5XkXVQobRg%3F e%3Dcr2e85&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1ha WwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=3OTULAcPaXcKYz3k5X5tI6yApllYkWIQSA6bPYMiwWE%3D&reserved=0> Holli Heavrin, P.E. Principal, Engr. Tech. Manager Core Design Inc. O 425.885.7877 M 206.697.9474 www.coredesigninc.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.coredesigninc.com%2F&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb% 7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=lbu8OKE9dZ%2FtGSTrB2Kt8GlSef0N%2F0w5c%2BaxmkvsaWk%3D&rese rved=0> From: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Sent: Wednesday, March 16, 2022 10:11 AM To: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Cc: Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.com> > Subject: RE: Canopy Water Extension review Holli, Given the property owner is not being cooperative and you cannot obtain the easement, the District understands that looping the system may not be an option for this project. With that being said, please proceed with installing the PRV at the property line within the 112th Ave ROW to the east. The design submitted shall include a plan, profile and PRV detail, which we can provide a sample if requested. Thanks, Sam Sam Chapman, PE Project Engineer 11255 Kirkland Way | Suite 300 Kirkland WA 98033 425.827.2014 Connect with us at LinkedIn <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fpace-engineers-inc.&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3% 7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=p%2B4UuOjpSD9%2BAtKlJD jj%2F4Xp2fSOujj1C7jeFNTAbl0%3D&reserved=0> | Instagram <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.instagram.com%2Fpaceengineers%2F&data=05%7C01%7C%7C88033cfbce4b4 258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=h6 B9f%2Fs9r0GLnGE9GJCeGpxr958nI77f5TCjMWWScwg%3D&reserved=0> | Facebook <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2Fpaceengrs&data=05%7C01%7C%7C88033c fbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&s data=rUFJ2PaWib%2BoTB4UoJLtayPJCjr28chQLkdgD6z2rDw%3D&reserved=0> | PACEengrs.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.paceengrs.com%2F&data=05%7C01%7C%7C880 33cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7 C&sdata=hC8E8yPrTVG1nWMTkyk7GK6sRMrJ1j9ed1AwjFUkOFk%3D&reserved=0> Voted Zweig Best Places to Work and PSBJ Top 100 Fastest Growing Firms in the Northwest From: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Sent: Friday, March 11, 2022 12:19 PM To: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Cc: Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.com> > Subject: RE: Canopy Water Extension review The property owners engineer is not being responsive. We’ve reach out several times. We can’t be held back and wait for him; we need to move this project forward. There has been preliminary discussion with Newcastle but we haven’t gotten as far as a full review. If it was infeasible for Quadrant I assume that is still the case for us. Given that, it doesn’t really make sense for us to extend water within the unopened ROW to the north as it will never go anywhere. Do you agree? We’re happy to provide the PRV on our site and a Tee/Stub to the property line to the east such that this work could be done in the future but at this point it is holding us hostage. Can we resubmit the onsite sewer and water plans to get these into final review? Holli Heavrin, P.E. Principal, Engr. Tech. Manager Core Design Inc. O 425.885.7877 M 206.697.9474 www.coredesigninc.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.coredesigninc.com%2F&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb% 7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=lbu8OKE9dZ%2FtGSTrB2Kt8GlSef0N%2F0w5c%2BaxmkvsaWk%3D&rese rved=0> From: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Sent: Friday, March 11, 2022 11:56 AM To: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Cc: Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.com> > Subject: RE: Canopy Water Extension review Hi Holli, Understanding the construction season is set to begin soon, the District attorney has been preparing an amendment to your agreement which would allow your construction to begin without the easement in hand yet. With that being said, the amendment would also require the easement acquisition and water main be constructed through the private property of parcel 3224059001. So, if it is a factor of time of why you cannot obtain the easement, the District is open to working with you. If it is not a factor of time, can you provide some more background as to why the easement is not obtainable? When we reached out to the property owner’s engineer, they were responsive. Did they provide a reason why they were not willing to work with you? We need to be absolutely certain this option is not feasible before accepting alternatives. As for the option of extending the water main to the North, this option is still not in the District’s best interest because of the 80th unimproved right of way and inability to access the water main for maintenance. Our understanding this option was not feasible before due to the critical area in that region, is that not the case anymore? Has there been discussions with the City of Newcastle? Sam Chapman, PE Project Engineer 11255 Kirkland Way | Suite 300 Kirkland WA 98033 425.827.2014 Connect with us at LinkedIn <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fpace-engineers-inc.&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3% 7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212540479%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=p%2B4UuOjpSD9%2BAtKlJD jj%2F4Xp2fSOujj1C7jeFNTAbl0%3D&reserved=0> | Instagram <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.instagram.com%2Fpaceengineers%2F&data=05%7C01%7C%7C88033cfbce4b4 258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=FV 9WINjQz%2Fin%2FACQZpXcMG1SX8nHbaX1XDkSoj2j3v0%3D&reserved=0> | Facebook <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2Fpaceengrs&data=05%7C01%7C%7C8803 3cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C &sdata=b%2FsMBWgfqq0h%2BcViv3BzMqB%2F1rUfDKtZ56SXgPhiks4%3D&reserved=0> | PACEengrs.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.paceengrs.com%2F&data=05%7C01%7C %7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7 C%7C%7C&sdata=1Vdt3DXdEubp2UtCTy%2Bc4%2FOVyPgSVAumZz9LTHAv5yY%3D&reserved=0> Voted Zweig Best Places to Work and PSBJ Top 100 Fastest Growing Firms in the Northwest From: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Sent: Wednesday, March 9, 2022 1:27 PM To: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Cc: Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.com> > Subject: RE: Canopy Water Extension review Sam/Bill, we’re unable to obtain the offsite water easement through the private property of parcel 3224059001. Given that we have 2 options. Option 1, we can extend water north through the unopened public ROW and connect to Hazelwood. This option is roughly sketched on the attached. I understand Hazelwood wasn’t required to extend due to access but if we do it, access would still not be achievable. You would have access at SE 80th and within the Canopy plat, but between those 2 points you’d have to flush the line out from either side. Alternatively, we can extend the water across our project frontage of the unopened ROW and provide the PRV as outlined in our DEA. Additionally, we can provide a tee and stub to the end of existing ROW such that when/if parcel 3224059001 develops, they could make an easy connection and close the loop at that time. We’re getting very close to our construction season for this project, and I want to get the onsite sewer and water plans back in to you for final review. Final consensus on this would be greatly appreciated. Please let us know which option above is preferred by CCUD. Holli Heavrin, P.E. Principal, Engr. Tech. Manager Core Design Inc. O 425.885.7877 M 206.697.9474 www.coredesigninc.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.coredesigninc.com%2F&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb% 7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=Ccira7dSOxdMpD21vb7CK8N5ncAS4u8T0Gyaky3hCpI%3D&reserved=0 > From: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Sent: Tuesday, March 8, 2022 1:58 PM To: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Cc: Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> > Subject: RE: Canopy Water Extension review Hi Holli, The water main that services this development extends into the Hazelwood Gardens Development from SE 80th ST then loops back into CCUD’s system on 113th Ave SE. See below for quick sketch. The watermain was not extended to the west because of the steep grade and vegetation in the SE 80th St unimproved ROW, CCUD would have no access to the water main unless access is provided. Sam Chapman, PE Project Engineer 11255 Kirkland Way | Suite 300 Kirkland WA 98033 425.827.2014 Connect with us at LinkedIn <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fpace-engineers-inc.&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3% 7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=rygYj5Co7IhtXx18GuqLJa G8LNUAgsVyY5GEC%2BSgn%2Bo%3D&reserved=0> | Instagram <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.instagram.com%2Fpaceengineers%2F&data=05%7C01%7C%7C88033cfbce4b425 8bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=FV9W INjQz%2Fin%2FACQZpXcMG1SX8nHbaX1XDkSoj2j3v0%3D&reserved=0> | Facebook <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2Fpaceengrs&data=05%7C01%7C%7C88033c fbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&s data=b%2FsMBWgfqq0h%2BcViv3BzMqB%2F1rUfDKtZ56SXgPhiks4%3D&reserved=0> | PACEengrs.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.paceengrs.com%2F&data=05%7C01%7C%7 C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C% 7C%7C&sdata=1Vdt3DXdEubp2UtCTy%2Bc4%2FOVyPgSVAumZz9LTHAv5yY%3D&reserved=0> Voted Zweig Best Places to Work and PSBJ Top 100 Fastest Growing Firms in the Northwest From: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Sent: Thursday, March 3, 2022 1:29 PM To: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Subject: RE: Canopy Water Extension review Hey Sam, we’re looking into the option of taking the waterline north through the ROW instead of the offsite easement. In talking with the city of Newcastle is appears Quadrant just finished up a project on 80th St called Hazelwood Gardens. Do you know if they extended water to their western most property line? That’s where we’d be looking to connect it to. See attached rough sketch. Holli Heavrin, P.E. Principal, Engr. Tech. Manager Core Design Inc. O 425.885.7877 M 206.697.9474 www.coredesigninc.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.coredesigninc.com%2F&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb% 7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=Ccira7dSOxdMpD21vb7CK8N5ncAS4u8T0Gyaky3hCpI%3D&reserved=0 > From: Holli Heavrin Sent: Friday, February 25, 2022 9:22 AM To: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.co m> >; Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> > Subject: RE: Canopy Water Extension review Understood, thanks for the clarification Sam. Holli Heavrin, P.E. Principal, Engr. Tech. Manager Core Design Inc. O 425.885.7877 M 206.697.9474 www.coredesigninc.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.coredesigninc.com%2F&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb% 7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=Ccira7dSOxdMpD21vb7CK8N5ncAS4u8T0Gyaky3hCpI%3D&reserved=0 > From: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Sent: Friday, February 25, 2022 9:20 AM To: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.co m> >; Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> > Subject: RE: Canopy Water Extension review Hi Holli, The plan sheet provided was only intended as a reference to a general location of where the District would like to place a hydrant. Currently there is no plan for a water main extension to service this property. The plans provided are dated back in 2020 and this is the first we have heard about them while doing investigative work on the existing easement. The District has to review developments independently and cannot rely on the hope that someday adjacent properties will develop. The current property owner has no contractual obligation or signed DE agreement with the District and therefor we have to assume they may never develop. If the water main improvements are not part of the Canopy project and the adjacent property owner never develops, then the District is left with an inadequate water system for water quality and fire flow. Sam Chapman, PE Project Engineer 11255 Kirkland Way | Suite 300 Kirkland WA 98033 425.827.2014 Connect with us at LinkedIn <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fpace-engineers-inc.&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3% 7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=rygYj5Co7IhtXx18GuqLJa G8LNUAgsVyY5GEC%2BSgn%2Bo%3D&reserved=0> | Instagram <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.instagram.com%2Fpaceengineers%2F&data=05%7C01%7C%7C88033cfbce4b425 8bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=FV9W INjQz%2Fin%2FACQZpXcMG1SX8nHbaX1XDkSoj2j3v0%3D&reserved=0> | Facebook <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2Fpaceengrs&data=05%7C01%7C%7C88033c fbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&s data=b%2FsMBWgfqq0h%2BcViv3BzMqB%2F1rUfDKtZ56SXgPhiks4%3D&reserved=0> | PACEengrs.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.paceengrs.com%2F&data=05%7C01%7C%7 C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C% 7C%7C&sdata=1Vdt3DXdEubp2UtCTy%2Bc4%2FOVyPgSVAumZz9LTHAv5yY%3D&reserved=0> Voted Zweig Best Places to Work and PSBJ Top 100 Fastest Growing Firms in the Northwest From: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Sent: Friday, February 25, 2022 8:28 AM To: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.co m> >; Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> > Subject: RE: Canopy Water Extension review Hi Sam, pardon my bluntness here but if a water extension is already planned to service this project, why are we being required to do it? That project would have full control of the easement and could easily connect to the extension we provide within the unopened ROW. There was never any mention of a proposed project on this site before so we’re a bit surprised by this. It really makes more sense that they do it with all of their improvements that way they have control with utility spacings, locations, elevations, etc. Our design would place the water line at the required depth below existing grade, but their project may need to alter those grades, requiring adjustment or replacement anyway. Wouldn’t it be in everyone’s best interest for each project to do it’s own water main extension? Holli Heavrin, P.E. Principal, Engr. Tech. Manager Core Design Inc. O 425.885.7877 M 206.697.9474 www.coredesigninc.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.coredesigninc.com%2F&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb% 7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=Ccira7dSOxdMpD21vb7CK8N5ncAS4u8T0Gyaky3hCpI%3D&reserved=0 > From: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Sent: Thursday, February 24, 2022 9:17 AM To: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.co m> >; Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> > Subject: RE: Canopy Water Extension review Hi Holli, Please see attached mark up for the off-site water main improvements plan and profile exhibit you sent over. Overall the alignment looks good, we just made some notes for your team to consider when submitting the complete drawings that meet District drafting standards. Sam Chapman, PE Project Engineer 11255 Kirkland Way | Suite 300 Kirkland WA 98033 425.827.2014 Connect with us at LinkedIn <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fpace-engineers-inc.&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3% 7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=rygYj5Co7IhtXx18GuqLJa G8LNUAgsVyY5GEC%2BSgn%2Bo%3D&reserved=0> | Instagram <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.instagram.com%2Fpaceengineers%2F&data=05%7C01%7C%7C88033cfbce4b425 8bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=FV9W INjQz%2Fin%2FACQZpXcMG1SX8nHbaX1XDkSoj2j3v0%3D&reserved=0> | Facebook <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2Fpaceengrs&data=05%7C01%7C%7C88033c fbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&s data=b%2FsMBWgfqq0h%2BcViv3BzMqB%2F1rUfDKtZ56SXgPhiks4%3D&reserved=0> | PACEengrs.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.paceengrs.com%2F&data=05%7C01%7C%7 C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C% 7C%7C&sdata=1Vdt3DXdEubp2UtCTy%2Bc4%2FOVyPgSVAumZz9LTHAv5yY%3D&reserved=0> Voted Zweig Best Places to Work and PSBJ Top 100 Fastest Growing Firms in the Northwest From: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Sent: Thursday, February 17, 2022 2:55 PM To: Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> >; Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.co m> > Subject: RE: Canopy Water Extension review Wonderful, thank you Bill! Holli Heavrin, P.E. Principal, Engr. Tech. Manager Core Design Inc. O 425.885.7877 M 206.697.9474 www.coredesigninc.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.coredesigninc.com%2F&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb% 7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=Ccira7dSOxdMpD21vb7CK8N5ncAS4u8T0Gyaky3hCpI%3D&reserved=0 > From: Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> > Sent: Thursday, February 17, 2022 2:27 PM To: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> >; Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.co m> > Subject: RE: Canopy Water Extension review Hi Holli, I spoke with George Sheng. Phone # 206-778-2431. Email hometechwa@gmail.com <mailto:hometechwa@gmail.com> I am working with the District to prepare an amendment to the DE agreement to allow for the phased construction and/or bonding of off site improvements. I hope to have something in draft form for review next week. Bill Reynolds, PE Senior Principal Engineer 11255 Kirkland Way | Suite 300 Kirkland WA 98033 p. 425.827.2014 | c. 206.321.1109 Connect with us at LinkedIn <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fpace-engineers-inc.&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3% 7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=rygYj5Co7IhtXx18GuqLJa G8LNUAgsVyY5GEC%2BSgn%2Bo%3D&reserved=0> | Instagram | Facebook <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2Fpaceengrs&data=05%7C01%7C%7C8803 3cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C &sdata=b%2FsMBWgfqq0h%2BcViv3BzMqB%2F1rUfDKtZ56SXgPhiks4%3D&reserved=0> | PACEengrs.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.paceengrs.com%2F&data=05%7C01%7C %7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7 C%7C%7C&sdata=1Vdt3DXdEubp2UtCTy%2Bc4%2FOVyPgSVAumZz9LTHAv5yY%3D&reserved=0> Voted Zweig Best Places to Work and PSBJ Top 100 Fastest Growing Firms in the Northwest From: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Sent: Wednesday, February 16, 2022 3:34 PM To: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.co m> >; Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> > Subject: RE: Canopy Water Extension review Sam attached is the plan/profile for the option across parcel 3224059001. We’ve reached out to the Mr. Sheng but haven’t heard back yet. Do you have a contact phone number for him by chance? Has there been any updates from Bill and Patrick working on bonding options? Holli Heavrin, P.E. Principal, Engr. Tech. Manager Core Design Inc. O 425.885.7877 M 206.697.9474 www.coredesigninc.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.coredesigninc.com%2F&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb% 7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=Ccira7dSOxdMpD21vb7CK8N5ncAS4u8T0Gyaky3hCpI%3D&reserved=0 > From: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Sent: Wednesday, February 9, 2022 4:03 PM To: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.co m> >; Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> > Subject: RE: Canopy Water Extension review Holli, See attached as-built with easement information. Yes, this easement is solely across the single parcel. Sam Chapman, PE Senior Engineer 11255 Kirkland Way | Suite 300 Kirkland WA 98033 425.827.2014 Connect with us at LinkedIn <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fpace-engineers-inc.&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3% 7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=rygYj5Co7IhtXx18GuqLJa G8LNUAgsVyY5GEC%2BSgn%2Bo%3D&reserved=0> | Instagram <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.instagram.com%2Fpaceengineers%2F&data=05%7C01%7C%7C88033cfbce4b425 8bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=FV9W INjQz%2Fin%2FACQZpXcMG1SX8nHbaX1XDkSoj2j3v0%3D&reserved=0> | Facebook <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2Fpaceengrs&data=05%7C01%7C%7C88033c fbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&s data=b%2FsMBWgfqq0h%2BcViv3BzMqB%2F1rUfDKtZ56SXgPhiks4%3D&reserved=0> | PACEengrs.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.paceengrs.com%2F&data=05%7C01%7C%7 C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C% 7C%7C&sdata=1Vdt3DXdEubp2UtCTy%2Bc4%2FOVyPgSVAumZz9LTHAv5yY%3D&reserved=0> Voted Zweig Best Places to Work and PSBJ Top 100 Fastest Growing Firms in the Northwest From: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Sent: Wednesday, February 9, 2022 3:46 PM To: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.co m> >; Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> > Subject: RE: Canopy Water Extension review Understood. Thanks Sam, really appreciate all the help so far. Do you happen to have an exhibit of the existing sewer easement you mention “modifying to include water” below? Is the easement solely across parcel 3224059001? Holli Heavrin, P.E. Principal, Engr. Tech. Manager Core Design Inc. O 425.885.7877 M 206.697.9474 www.coredesigninc.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.coredesigninc.com%2F&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb% 7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=Ccira7dSOxdMpD21vb7CK8N5ncAS4u8T0Gyaky3hCpI%3D&reserved=0 > From: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Sent: Wednesday, February 9, 2022 1:09 PM To: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.co m> >; Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> > Subject: RE: Canopy Water Extension review Hi Holli, Considering this is not a standard District procedure we need to consult with the Districts legal team to consider our options, and therefor unfortunately cannot commit to an ETA. That being said, we understand the time sensitivity and will be sure to update you as we learn more about our options. Thanks, Sam Sam Chapman, PE Senior Engineer 11255 Kirkland Way | Suite 300 Kirkland WA 98033 425.827.2014 Connect with us at LinkedIn <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fpace-engineers-inc.&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3% 7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=rygYj5Co7IhtXx18GuqLJa G8LNUAgsVyY5GEC%2BSgn%2Bo%3D&reserved=0> | Instagram <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.instagram.com%2Fpaceengineers%2F&data=05%7C01%7C%7C88033cfbce4b425 8bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=FV9W INjQz%2Fin%2FACQZpXcMG1SX8nHbaX1XDkSoj2j3v0%3D&reserved=0> | Facebook <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2Fpaceengrs&data=05%7C01%7C%7C88033c fbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&s data=b%2FsMBWgfqq0h%2BcViv3BzMqB%2F1rUfDKtZ56SXgPhiks4%3D&reserved=0> | PACEengrs.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.paceengrs.com%2F&data=05%7C01%7C%7 C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C% 7C%7C&sdata=1Vdt3DXdEubp2UtCTy%2Bc4%2FOVyPgSVAumZz9LTHAv5yY%3D&reserved=0> Voted Zweig Best Places to Work and PSBJ Top 100 Fastest Growing Firms in the Northwest From: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Sent: Tuesday, February 8, 2022 2:47 PM To: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.co m> >; Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> > Subject: RE: Canopy Water Extension review Thanks Sam, Happy to coordinate with Mr. Sheng on the design, I’ll be reaching out to him soon. And as for the bonding option, we look forward to hearing from Bill and Patrick. Is there any ETA on this? Holli Heavrin, P.E. Principal, Engr. Tech. Manager Core Design Inc. O 425.885.7877 M 206.697.9474 www.coredesigninc.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.coredesigninc.com%2F&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb% 7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=Ccira7dSOxdMpD21vb7CK8N5ncAS4u8T0Gyaky3hCpI%3D&reserved=0 > From: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Sent: Tuesday, February 8, 2022 2:13 PM To: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.co m> >; Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> > Subject: RE: Canopy Water Extension review Hi Holli, I wanted to touch base with you and provide some updates with regards to the off-site improvements so your team can keep action items moving. We have made contact with the Engineer for the subject property owner who’s property holds the existing sewer easement. The Engineers name is George Sheng and can be reached by his e-mail hometechwa@gmail.com <mailto:hometechwa@gmail.com> . From our initial conversations with George it sounds like the property owner is receptive to revising the easement to 25’ and include the addition of the watermain. We have notified George that you would reach out to work with them on revising the easement and go over the proposed watermain improvements with them. As for the status on the District reviewing bonding options, Bill and Patrick are currently assessing options and will reach out to you following their discussions. Please let me know if you have any questions, Thanks, Sam Sam Chapman, PE Senior Engineer 11255 Kirkland Way | Suite 300 Kirkland WA 98033 425.827.2014 Connect with us at LinkedIn <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fpace-engineers-inc.&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3% 7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=rygYj5Co7IhtXx18GuqLJa G8LNUAgsVyY5GEC%2BSgn%2Bo%3D&reserved=0> | Instagram <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.instagram.com%2Fpaceengineers%2F&data=05%7C01%7C%7C88033cfbce4b425 8bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=FV9W INjQz%2Fin%2FACQZpXcMG1SX8nHbaX1XDkSoj2j3v0%3D&reserved=0> | Facebook <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2Fpaceengrs&data=05%7C01%7C%7C88033c fbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212696726%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&s data=b%2FsMBWgfqq0h%2BcViv3BzMqB%2F1rUfDKtZ56SXgPhiks4%3D&reserved=0> | PACEengrs.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.paceengrs.com%2F&data=05%7C01%7C%7 C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C% 7C%7C&sdata=yLcxNuFHrbaBfC4mMFx%2FvRJIlTubx1nlL33iUP216sM%3D&reserved=0> Voted Zweig Best Places to Work and PSBJ Top 100 Fastest Growing Firms in the Northwest From: Sam Chapman Sent: Wednesday, January 19, 2022 9:54 AM To: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> >; Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.co m> > Subject: RE: Canopy Water Extension review Hi Holli, There is one more thing I would like to mention before you and Bill set up your chat. The District is going to require exhibits for the two design alternatives for their review. Please develop exhibits for the two alternatives we have discussed, one exhibit for construction of the water main to the North and one exhibit for construction of water main to the East. On these exhibits please identify the challenges and advantages of each alternative. These exhibits do not need to be a developed set of plans but need to include key items for discussion like the proposed water main alignment, proposed PRV’s, profile of existing grades, existing easements, wetlands, critical areas, property lines, vegetation, proposed connections to existing mains, etc. Please let me know if you would like us to assist you with the creation of these exhibits and we will do so. Thanks, Sam Sam Chapman, PE Senior Engineer 11255 Kirkland Way | Suite 300 Kirkland WA 98033 425.827.2014 Connect with us at LinkedIn <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fpace-engineers-inc.&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3% 7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=tEyxWAWZMGKFIbFnKHy%2B 8I4w2z7jaeY%2FDuGpm7YLspE%3D&reserved=0> | Instagram <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.instagram.com%2Fpaceengineers%2F&data=05%7C01%7C%7C88033cfbce4b425 8bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=J%2B kC2CPKLXsf9S35ZeX65FqPN6Ls8ZLhn5har2xGEDM%3D&reserved=0> | Facebook <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2Fpaceengrs&data=05%7C01%7C%7C88033cfb ce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sda ta=RUU1OSzuyAynBrxiTgdyawdzmhrKin5o4%2BwipmldK1k%3D&reserved=0> | PACEengrs.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.paceengrs.com%2F&data=05%7C01%7C%7C88033 cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C& sdata=yLcxNuFHrbaBfC4mMFx%2FvRJIlTubx1nlL33iUP216sM%3D&reserved=0> Voted Zweig Best Places to Work and PSBJ Top 100 Fastest Growing Firms in the Northwest From: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Sent: Wednesday, January 19, 2022 7:37 AM To: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> >; Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.co m> > Subject: RE: Canopy Water Extension review Thanks Sam. Bill, can we set up a time to chat about our options with the board. As we’ve noted we’re extremely concerned with the timing of all of this. The option to have a bond in place in the event we don’t have full approval from Newcastle will allow us to move forward with engineering approval and construction. Would love to hear any options the board would allow in this circumstance, I imagine this isn’t the first time something like this has come up. Really appreciate all the help and responsiveness! Holli Heavrin, P.E. Principal, Engr. Tech. Manager Core Design Inc. O 425.885.7877 M 206.697.9474 www.coredesigninc.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.coredesigninc.com%2F&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb% 7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=K8QpYTsmhJfC3sDHx5%2BlOUtGXyp6IuRTvZwrNpoakOs%3D&reserved =0> From: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Sent: Tuesday, January 18, 2022 9:52 AM To: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> >; Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.co m> > Subject: RE: Canopy Water Extension review Hi Holli, Sorry for the delayed response. From our initial discussion you will likely need a clearing and grading permit, a critical areas permit, and depending when you construct potentially a wet seasons permit. Although you will ultimately need to be confirm this with City when you start the permitting process. As for your options with the District and the Board, I am going to refer you to Bill for this discussion. Sam Chapman, PE Senior Engineer 11255 Kirkland Way | Suite 300 Kirkland WA 98033 425.827.2014 Connect with us at LinkedIn <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fpace-engineers-inc.&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3% 7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=tEyxWAWZMGKFIbFnKHy%2B 8I4w2z7jaeY%2FDuGpm7YLspE%3D&reserved=0> | Instagram <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.instagram.com%2Fpaceengineers%2F&data=05%7C01%7C%7C88033cfbce4b425 8bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=J%2B kC2CPKLXsf9S35ZeX65FqPN6Ls8ZLhn5har2xGEDM%3D&reserved=0> | Facebook <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2Fpaceengrs&data=05%7C01%7C%7C88033cfb ce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sda ta=RUU1OSzuyAynBrxiTgdyawdzmhrKin5o4%2BwipmldK1k%3D&reserved=0> | PACEengrs.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.paceengrs.com%2F&data=05%7C01%7C%7C88033 cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C& sdata=yLcxNuFHrbaBfC4mMFx%2FvRJIlTubx1nlL33iUP216sM%3D&reserved=0> Voted Zweig Best Places to Work and PSBJ Top 100 Fastest Growing Firms in the Northwest From: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Sent: Friday, January 14, 2022 10:56 AM To: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.com> > Subject: RE: Canopy Water Extension review In your discussion with the City of Newcastle, what type of permit is needed for this work? Is it a clear and grade permit? (understanding a separate permit may be required for wet weather work) Did they give any indication of their review times or how long it would take to get approval? If we were to request consideration from the board for bonding, what is that process like and what does it entail? Holli Heavrin, P.E. Principal, Engr. Tech. Manager Core Design Inc. O 425.885.7877 M 206.697.9474 www.coredesigninc.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.coredesigninc.com%2F&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb% 7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=K8QpYTsmhJfC3sDHx5%2BlOUtGXyp6IuRTvZwrNpoakOs%3D&reserved =0> From: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Sent: Friday, January 14, 2022 10:40 AM To: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.com> > Subject: RE: Canopy Water Extension review We will need basemap and topo to confirm the exact location of the PRV, but it can be placed int the ROW. The District has access through an existing access road/sewer easement. Bonding this work as separate projects is not District standard and would not be our decision to make, bonding in such a way would require consideration and approval by the District Board. Sam Chapman, PE Senior Engineer 11255 Kirkland Way | Suite 300 Kirkland WA 98033 425.827.2014 Connect with us at LinkedIn <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fpace-engineers-inc.&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3% 7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=tEyxWAWZMGKFIbFnKHy%2B 8I4w2z7jaeY%2FDuGpm7YLspE%3D&reserved=0> | Instagram <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.instagram.com%2Fpaceengineers%2F&data=05%7C01%7C%7C88033cfbce4b425 8bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=J%2B kC2CPKLXsf9S35ZeX65FqPN6Ls8ZLhn5har2xGEDM%3D&reserved=0> | Facebook <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2Fpaceengrs&data=05%7C01%7C%7C88033cfb ce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sda ta=RUU1OSzuyAynBrxiTgdyawdzmhrKin5o4%2BwipmldK1k%3D&reserved=0> | PACEengrs.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.paceengrs.com%2F&data=05%7C01%7C%7C88033 cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C& sdata=yLcxNuFHrbaBfC4mMFx%2FvRJIlTubx1nlL33iUP216sM%3D&reserved=0> Voted Zweig Best Places to Work and PSBJ Top 100 Fastest Growing Firms in the Northwest From: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Sent: Friday, January 14, 2022 10:24 AM To: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.com> > Subject: RE: Canopy Water Extension review Is 112th Ave SE the unopened ROW? We can place the PRV there, but it won’t have vehicular access. Considering timing and wet season work, in the event the easements and permits with Newcastle cause delays, could this connection be bonded for such that it won’t hold up approval of the sewer/water plans? Timing for site work is crucial to begin as early as possible this spring. Holli Heavrin, P.E. Principal, Engr. Tech. Manager Core Design Inc. O 425.885.7877 M 206.697.9474 www.coredesigninc.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.coredesigninc.com%2F&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb% 7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=K8QpYTsmhJfC3sDHx5%2BlOUtGXyp6IuRTvZwrNpoakOs%3D&reserved =0> From: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Sent: Friday, January 14, 2022 10:18 AM To: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.com> > Subject: RE: Canopy Water Extension review Hi Holly, We have made contact with the Owner’s Engineer for the related property. From our initial discussion they are receptive to revising the easement to include the water main and allowing the construction along the proposed route to the east of your property but they still need to confirm this with the Owner. We are currently waiting to hear back for confirmation but will follow up with them early next week if we don’t get a response today. If the Owner for the adjacent property to the east agrees to revise the easement to include the water main, then the District is still going to require the water main be looped as part of the Canopy project. As for coordination with Newcastle, please see attached e-mail for additional information as the site is in an erosion hazard area. The District would prefer to have the PRV located on Canopy’s property adjacent to 112th Ave SE. This is so the watermain in Alley 2 and respective properties remain in the same pressure zone as the rest of the site development. Thanks, Sam Sam Chapman, PE Senior Engineer 11255 Kirkland Way | Suite 300 Kirkland WA 98033 425.827.2014 Connect with us at LinkedIn <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fpace-engineers-inc.&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3% 7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=tEyxWAWZMGKFIbFnKHy%2B 8I4w2z7jaeY%2FDuGpm7YLspE%3D&reserved=0> | Instagram <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.instagram.com%2Fpaceengineers%2F&data=05%7C01%7C%7C88033cfbce4b425 8bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=J%2B kC2CPKLXsf9S35ZeX65FqPN6Ls8ZLhn5har2xGEDM%3D&reserved=0> | Facebook <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2Fpaceengrs&data=05%7C01%7C%7C88033cfb ce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sda ta=RUU1OSzuyAynBrxiTgdyawdzmhrKin5o4%2BwipmldK1k%3D&reserved=0> | PACEengrs.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.paceengrs.com%2F&data=05%7C01%7C%7C88033 cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C& sdata=yLcxNuFHrbaBfC4mMFx%2FvRJIlTubx1nlL33iUP216sM%3D&reserved=0> Voted Zweig Best Places to Work and PSBJ Top 100 Fastest Growing Firms in the Northwest From: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Sent: Thursday, January 13, 2022 7:02 AM To: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.com> > Subject: RE: Canopy Water Extension review Thanks Sam. Understood regarding the plan/profile acceptance (we appreciate the understanding here and allowance to keep the plans as is). Has there been any update/movement on getting the easement from the neighbors and coordination with Newcastle? Considering our need to get into construction as soon as the wet season ends, we’re quite leery of timing here. We understand the need for a PRV and are willing to install it. Can it be installed on the Canopy property or the unopened ROW along the east of the Canopy site? (Keep in mind for access/maintenance it would be better installed within the canopy project, possibly within Tract C near Road A. Snipped with possible location clouded below). Our though is that if we can provide the water extension through our project, the PRV, and extend the water line to our property line, then the looping through offsite easements and Newcastle could be done as a separate permit. We’re still willing to pay a proportionate share if CCUD is willing to make the connection themselves as a part of a CCUD improvement project. Does this approach work for everyone? Holli Heavrin, P.E. Principal, Engr. Tech. Manager Core Design Inc. O 425.885.7877 M 206.697.9474 www.coredesigninc.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.coredesigninc.com%2F&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb% 7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=K8QpYTsmhJfC3sDHx5%2BlOUtGXyp6IuRTvZwrNpoakOs%3D&reserved =0> From: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Sent: Wednesday, January 5, 2022 3:53 PM To: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.com> > Subject: RE: Canopy Water Extension review Hi Holly, Hope you had a good holiday as well. I will defer to Patrick if the District will allow a variance for the plan/profile. Our team went out and visited the site today and took pictures of the existing easement for the sewer main east of the canopy project (pictures attached). Given the easement is well maintained with no significant vegetation in the way of installing a water main, the District would like to continue to pursue this option as it is the most feasible for construction and looping the main. To help facilitate this option, we are going to contact the property owner to request permission to install a water main while also coordinating with the City of Newcastle to see what the permitting requirements will be for the site as it is in an erosion hazard area. As for the PRV, we will require per the water availability certificate that a PRV be constructed at the bottom of (west end) the easement. This is the best update I have for now but will keep you posted. Thanks, Sam Sam Chapman, PE Senior Engineer 11255 Kirkland Way | Suite 300 Kirkland WA 98033 425.827.2014 Connect with us at LinkedIn <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fpace-engineers-inc.&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3% 7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=tEyxWAWZMGKFIbFnKHy%2B 8I4w2z7jaeY%2FDuGpm7YLspE%3D&reserved=0> | Instagram <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.instagram.com%2Fpaceengineers%2F&data=05%7C01%7C%7C88033cfbce4b425 8bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=J%2B kC2CPKLXsf9S35ZeX65FqPN6Ls8ZLhn5har2xGEDM%3D&reserved=0> | Facebook <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2Fpaceengrs&data=05%7C01%7C%7C88033cfb ce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sda ta=RUU1OSzuyAynBrxiTgdyawdzmhrKin5o4%2BwipmldK1k%3D&reserved=0> | PACEengrs.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.paceengrs.com%2F&data=05%7C01%7C%7C88033 cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C& sdata=yLcxNuFHrbaBfC4mMFx%2FvRJIlTubx1nlL33iUP216sM%3D&reserved=0> Voted Zweig Best Places to Work and PSBJ Top 100 Fastest Growing Firms in the Northwest From: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Sent: Wednesday, January 5, 2022 8:27 AM To: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> >; Michelle Branley <michelle@bluefern.com <mailto:michelle@bluefern.com> > Subject: RE: Canopy Water Extension review Good Morning All, hope you had a wonderful holiday! I just wanted to check in and see if there was any resolution to the request below. Additionally, did the team agree that revising the plans to “plan/profile” is not required? We need this in order to move forward with our revisions, so any update is greatly appreciated! Holli Heavrin, P.E. Principal, Engr. Tech. Manager Core Design Inc. O 425.885.7877 M 206.697.9474 www.coredesigninc.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.coredesigninc.com%2F&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb% 7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=K8QpYTsmhJfC3sDHx5%2BlOUtGXyp6IuRTvZwrNpoakOs%3D&reserved =0> From: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Sent: Thursday, December 23, 2021 11:43 AM To: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> > Subject: RE: Canopy Water Extension review Hi Holli, The water availability certificate includes the construction of a PRV between pressure zones 475 and 320 which assumes the looping of the main. That being said, the District has received your request and will need some time to discuss it internally. Given the Holidays and vacation time, please expect a response following the New Year. Thank you, Sam Sam Chapman, PE Senior Engineer 11255 Kirkland Way | Suite 300 Kirkland WA 98033 425.827.2014 Connect with us at LinkedIn <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fpace-engineers-inc.&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3% 7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=tEyxWAWZMGKFIbFnKHy%2B 8I4w2z7jaeY%2FDuGpm7YLspE%3D&reserved=0> | Instagram <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.instagram.com%2Fpaceengineers%2F&data=05%7C01%7C%7C88033cfbce4b425 8bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=J%2B kC2CPKLXsf9S35ZeX65FqPN6Ls8ZLhn5har2xGEDM%3D&reserved=0> | Facebook <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2Fpaceengrs&data=05%7C01%7C%7C88033cfb ce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sda ta=RUU1OSzuyAynBrxiTgdyawdzmhrKin5o4%2BwipmldK1k%3D&reserved=0> | PACEengrs.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.paceengrs.com%2F&data=05%7C01%7C%7C88033 cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C& sdata=yLcxNuFHrbaBfC4mMFx%2FvRJIlTubx1nlL33iUP216sM%3D&reserved=0> Voted Zweig Best Places to Work and PSBJ Top 100 Fastest Growing Firms in the Northwest From: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Sent: Tuesday, December 21, 2021 10:05 AM To: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> > Subject: RE: Canopy Water Extension review Sam – we’ve been looking into this further and we still feel this ask of CCUD is well beyond the scope of our project. We understand the districts want for a looped main but per our water availability cert as well as the districts standards, extension to the property line is required and that is what we are providing. Understanding that the district would like this extension in the future we are willing to discuss the idea of the Canopy project paying a proportionate share into a fund held by CCUD for a future capital improvement project completed by CCUD. Adjoining properties of this extension could pay their fair share, or latecomer, at the time they develop. Given the timing of the offsite permits and easements that would be needed for this, we’re asking the district to consider our proposal. This will allow for the Canopy project to maintain its construction schedule without delay. Please let us know if this is an acceptable compromise. Holli Heavrin, P.E. Principal, Engr. Tech. Manager Core Design Inc. O 425.885.7877 M 206.697.9474 www.coredesigninc.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.coredesigninc.com%2F&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb% 7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=K8QpYTsmhJfC3sDHx5%2BlOUtGXyp6IuRTvZwrNpoakOs%3D&reserved =0> From: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Sent: Monday, December 6, 2021 3:02 PM To: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> >; Bill Reynolds <billr@paceengrs.com <mailto:billr@paceengrs.com> >; patrick ccud.org <patrick@ccud.org <mailto:patrick@ccud.org> > Subject: RE: Canopy Water Extension review Hi Holli, I understand this is a difficult scenario but I have to disagree that this work would not be feasible. Work for public and private utilities can still be performed in Landslide Hazard slopes per the City of Newcastle Municipal Code 18.24.270.B. Unfortunately in my experience this would require a critical areas permit. I believe the City would accept this work especially given the circumstance that our proposed alignment for the water main would be constructed under an existing developed gravel access roadway. Furthermore per the code, our work would not increase risk of landslide or erosion and vegetation removal would be limited. I do agree that we would need to obtain private easements or amend the existing easement to 25’ and to include both the new water and existing sewer. Thanks, Sam Sam Chapman, PE Senior Engineer 11255 Kirkland Way | Suite 300 Kirkland WA 98033 425.827.2014 Connect with us at LinkedIn <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fpace-engineers-inc.&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3% 7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=tEyxWAWZMGKFIbFnKHy%2B 8I4w2z7jaeY%2FDuGpm7YLspE%3D&reserved=0> | Instagram <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.instagram.com%2Fpaceengineers%2F&data=05%7C01%7C%7C88033cfbce4b425 8bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=J%2B kC2CPKLXsf9S35ZeX65FqPN6Ls8ZLhn5har2xGEDM%3D&reserved=0> | Facebook <https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2Fpaceengrs&data=05%7C01%7C%7C88033cfb ce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sda ta=RUU1OSzuyAynBrxiTgdyawdzmhrKin5o4%2BwipmldK1k%3D&reserved=0> | PACEengrs.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.paceengrs.com%2F&data=05%7C01%7C%7C88033 cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb%7C1%7C0%7C637868370212852931%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C& sdata=yLcxNuFHrbaBfC4mMFx%2FvRJIlTubx1nlL33iUP216sM%3D&reserved=0> Voted Zweig Best Places to Work and PSBJ Top 100 Fastest Growing Firms in the Northwest From: Holli Heavrin <hhh@coredesigninc.com <mailto:hhh@coredesigninc.com> > Sent: Saturday, December 4, 2021 12:20 PM To: Sam Chapman <SamC@paceengrs.com <mailto:SamC@paceengrs.com> > Cc: Benjamin Paulus <ben@bluefern.com <mailto:ben@bluefern.com> > Subject: Canopy Water Extension review Hi Sam, hope all is well. Hope you were able to enjoy a little time off over the recent holiday. As previously discussed, we reviewed the options of extending the water main to create a loop for canopy and unfortunately it doesn’t appear to be feasible. The attached shows the 2 options but both go through critical areas with Landslide hazard slopes (which are protected). As well, option 1 required offsite private easements which we don’t have. I do wish there was a better solution here but at this time I feel the best case is to extend the water main to our project limits, as shown in the second attachment, and when further development occurs in the future, looping would be done at that time. Holli Heavrin, P.E. Principal, Engr. Tech. Manager Core Design Inc. O 425.885.7877 M 206.697.9474 www.coredesigninc.com <https://nam02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.coredesigninc.com%2F&data=05%7C01%7C%7C88033cfbce4b4258bef408da29e720e3%7C650f09c59a914797a5a7c00023eb3cfb% 7C1%7C0%7C637868370213009155%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=GxibkQXLeAVPK6AKOa39JiWf%2BVo4GQRjB8xd848unNY%3D&reserved =0>