Loading...
HomeMy WebLinkAboutMFP22001700.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP22001700 IVR Number: 22001700 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:04/04/2022Application Date:1723059136Parcel Number: 615 WILLIAMS AVE S Permit Type:04/27/2022Issue Date:Franchise Permit Work Class:04/27/2023Expiration Date:Major Utility Job Number: 101145506Franchise Type:Electric Description: REVISION: ADD POLE P07 BETWEEN P05 AND P06. SEE SITE PLANS FOR DETAILS. Puget Sound Energy Electric CREW TO REMOVE POLES AT P02 (317593 166039), P04 (317591 166054), P05 (317601 166053), AND P08 (317623 166053). POLE INSTALL AT P03 (317589 166044) & P09 (317625 166064). IN SIDEWALK, TRENCH 80' NE FROM P03 TO J04 (317593 166051 THEN 160' NE FROM J04 TO GRADY/WILLIAMS INTERSECTION. IN SIDEWALK, TRENCH 180' N ALONG WILLIAMS TO J03 (317621 166063), THEN FROM J03 P09 40' N. BORE 100' UNDER WILLIAMS, THEN TRENCH 110' NE TO P06. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL GMD RENTON LLLP 520 PIKE ST # 1010 SEATTLE , WA 98101 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering 4 4 4 4 4 4 4 4 4 4 4 101145506 615 WILLIAMS AVE S Monday Friday 8:00am 3:00pm PLEASE SEE ATTACHED POTELCO, INC 425 892 0416 DAN.FOGEL@PSE.COM 6905 S. 228TH ST KENT, WA 98032 MFP22001700 Scott Warlick CED 4/26/2022 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date CORRIE RYDBERG P02 P04 P05 P08 P03 P09 J04 J03 P06 WELLS AVE S22 BUSSTOPWILLIAMS AVE S1515 1213 12 12 12 12 1 1 1 1 1 2 1 1 1 1 1 1 11 1 2 11 1 1 1 1 1 1 1 1 1 1 WILLIAMS AVE SS GR A D Y W A Y S GRA D Y W A Y c-curbc-curbBUS STOP ARRW-BRDM6-2W20-5RW4-2LRIGHT LANECLOSEDAHEADW20-5RW4-2LROADWORKAHEADW20-1100'100'100'ROAD WORK AHEA D W20-1X'X'PLACE W20-1 SIGNS ON ALL ADJACENT STREETS WITHIN FEET OF WORK AREA ROAD WORKAHEAD W20-1ROADWORKAHEADW20-11050 S/WCLOSEDR9-9S/WCLOS ED R9-9 C/WCLOSEDR9-3DETOURM4-9bCROSS HERESIDEWALK CLOSEDAHEADCRO S S HE R E SI D EWA LK C L O S E D A H E A D BUSINESS(ES)/RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE FLAGGERS SHALL STOP TRAFFIC IN ALL DIRECTIONS (SHORT DURATION: APPROX 10 MINUTES) FOR LINE DROP. MOVE BUS STOP 275' WEST. KING COUNTY METRO WILL BE CONTACTED AT 206-477-1150 FIVE DAYS IN ADVANCE OF SCHEDULED DATE. NEAREST ADJACENT ST CROSSABLE CORNER OR CROSSWALK NEAREST ADJACENT ST CROSSABLE CORNER OR CROSSWALK BUSINESS DRIVEWAY CLOSED.ENTER/EXIT FROM DRIVEWAY FURTHER WEST ON S GRADY WAY. PLACE SIGNS BOTH SIDES OF WORK AREA FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 00 0 00 0000 0 NO PARKINGNO-PAR K FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKTEMPORARY TRAFFIC CONTROL PLAN N Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 03/15/2022 101145506 0 615 Williams Ave S # HSE, Renton Flaviana Nunes 425-424-7386 flaviana.rodriguesnunes@pse.com 1 OF 4 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 28" TRAFFIC CONE TRAFFIC FLOW SIGN LOCATION LEGEND POLE CHEVRONARROW BOARD WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY VAULTVault TRENCH SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 65 - - 780 70 - - 840 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m.MA T C H L I N E S H E E T 2 S H E E T 1 MFP22001700 P02 P04 P05 P08 P09 J04 J03 P06 WELLS AVE S22 BUS STOPWILLIAMS AVE S1515 1213 12 12 12 12 11 1 1 12 11 11 1 1 1 1 1 2 1 1 1 1 11 11 11 11 1 1 1 1 1 1 1 1 WILLIAMS AVE SS GR A D Y W A Y S GRA D Y W A Y S GRA D Y W A Yc-curbc-curbc-curbBUS STOP ARRW-BRDM6-2RIGHT LANECLOSEDAHEADW20-5RW4-2LROADWORKAHEADW20-1350'350'350'RIGHT LANECLOSEDAHEADW20-5RW4-2LROADWORKAHEADW20-1100'100'100'ROAD WORK AHEA D W20-1X'X'PLACE W20-1 SIGNS ON ALL ADJACENT STREETS WITHIN FEET OF WORK AREA ROAD WORKAHEAD W20-1ROADWORKAHEADW20-11050 S/WCLOSEDR9-9C/WCLOSEDR9-3DETOURM4-9bCROSS HERESIDEWALK CLOSEDAHEADBUSINESS(ES)/RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE FLAGGERS SHALL STOP TRAFFIC IN ALL DIRECTIONS (SHORT DURATION: APPROX 10 MINUTES) FOR LINE DROP. NEAREST ADJACENT ST CROSSABLE CORNER OR CROSSWALK TEMPORARY TRAFFIC CONTROL PLAN N Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 03/15/2022 101145506 0 615 Williams Ave S # HSE, Renton Flaviana Nunes 425-424-7386 flaviana.rodriguesnunes@pse.com 2 OF 4 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 28" TRAFFIC CONE TRAFFIC FLOW SIGN LOCATION LEGEND POLE CHEVRONARROW BOARD WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY VAULTVault TRENCH SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 65 - - 780 70 - - 840 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m.MA T C H L I N E S H E E T 2 S H E E T 1 MFP22001700 W20-7AP02 P04 P05 P08 P09 J04 J03 P06 WELLS AVE S22WELLS AVE S22 BUS STOPWILLIAMS AVE SWILLIAMS AVE S1515 1515 1213 12 12 12 12 11 1 1 12 1 1 11 1 1 11 1 2 1 1 1 1 1 1 1 1 11 11 1 1 1 1 1 1 1 1 WILLIAMS AVE SS GRA D Y W A Y S GRA D Y W A Y S GRA D Y W A Yc-curbc-curbc-curbBUS STOP ARRW-BRDM6-2RIGHT LANECLOSEDAHEADW20-5RW4-2LROADWORKAHEADW20-1350'350'LEFT LANECLOSEDAHEADW20-5LROADWORKAHEADW20-1X'X'PLACE W20-1 SIGNS ON ALL ADJACENT STREETS WITHIN FEET OF WORK AREA ROAD WORKAHEAD W20-1ROADWORKAHEADW20-11750 S/WCLOSEDR9-9S/WCLOSEDR9-9C/WC L O S E D R9-3 D E T O U R M4-9bCROSS HERESIDEWALK CLOSEDAHEADNEAREST ADJACENT ST CROSSABLE CORNER OR CROSSWALK PLACE SIGNS BOTH SIDES OF WORK AREA FROMTOTOW AWAY AREAPHONE 888 -9999INFRASOURCE L LC 000 0 0000 00 NO PARKINGNO-PARK FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK C/W CLOSE D R9-3DETO U R M4-9b100'100'100'W4-2RPOLICEUPO W20-7ABEPREPAREDTOSTOPW3-4350'350'350'W20-7A100'100'100'W4-2RLEFT LANECLOSEDAHEADW20-5LROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'W20-7ABEPREPAREDTOSTOPW3-4100'100'W20-7 A R O A D W O R K A H E A D W20-1 B E P R E P A R E D T OS T O P W3-4350'350'350'CROSS HERESIDEWALK CLOSEDAHEADNEAREST ADJACENT ST CROSSABLE CORNER OR CROSSWALK DOJO 3 DRIVEWAY CLOSED. ENTER/EXIT FROM DRIVEWAY FURTHER EAST ON S GRADY WAY. BUSINESS(ES)/RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE SET SIGNAL TO FLASH TEMPORARY TRAFFIC CONTROL PLAN N Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 03/15/2022 101145506 0 615 Williams Ave S # HSE, Renton Flaviana Nunes 425-424-7386 flaviana.rodriguesnunes@pse.com 3 OF 4 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 28" TRAFFIC CONE TRAFFIC FLOW SIGN LOCATION LEGEND POLE CHEVRONARROW BOARD WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY VAULTVault TRENCH SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 65 - - 780 70 - - 840 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. UNIFORMED POLICE OFFICERPOLICE MFP22001700 P02 P04 P05 P08 P03 P09 J04 J03 P06 BUS STOP BUS STOPWILLIAMS AVE S1515 1213 12 12 12 12 1 1 11 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 9 1 1 1 2 1 1 1 1 1 2 WILLIAMS AVE SS GR A D Y W A Y S GR A D Y W A Y S GRA D Y W A Y c-curbc-curbc-curb BUS STOP ARRW-BRD ROADWORKAHEADW20-1350'ROAD WORK AHEA D W20-1X'X'PLACE W20-1 SIGNS ON ALL ADJACENT STREETS WITHIN FEET OF WORK AREA ROAD WORK AHEAD W20-1ROADWORKAHEADW20-11050 C/WCLOSEDR9-3DETOURM4-9bC RO S S H E R E SI D EW A L K C LO S E D AH E A D FLAGGERS SHALL STOP TRAFFIC IN ALL DIRECTIONS (SHORT DURATION: APPROX 10 MINUTES) FOR LINE DROP. NEAREST ADJACENT ST CROSSABLE CORNER OR CROSSWALK RI G H T L A N E C LO S E D A H E A D W20-5 R W4-2 L RO A DWOR K A H E AD W20- 1350'350'350'S /W C LO S E D R9-9 ROAD WOR K AHEA D W20-1ROADWORKAHEADW20-1100'OTHER SIDES/W CLOSE D TEMPORARY TRAFFIC CONTROL PLAN N Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 03/15/2022 101145506 0 615 Williams Ave S # HSE, Renton Flaviana Nunes 425-424-7386 flaviana.rodriguesnunes@pse.com 4 OF 4 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 28" TRAFFIC CONE TRAFFIC FLOW SIGN LOCATION LEGEND POLE CHEVRONARROW BOARD WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY VAULTVault SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 65 - - 780 70 - - 840 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. MFP22001700 N Vicinity Map Thomas Guide Page XX 101145506ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. LEGEND EXISTING PROPERTY LINE EXISTING UG RISER NEW UG RISER SVC STUB J-BOXJ NEW TRENCH LINE EXIST. 3Ø WIRE EXISTING CENTER LINE EXISTING CONDUCTOR TO BE REMOVED DISCONNECT - FUSED EXIST. 1Ø WIRE EXISTING RIGHT OF WAY PROPOSED PULL VAULTP EXISTING POLE DOWN GUY EXISTING SECONDARY SERVICE LINE DISCONNECT - UNFUSED EXISTING STREETLIGHT NEW POLE PROPOSED PADMOUNT TRANSFORMER EXISTING PADMOUNT TRANSFORMER PROPOSED TOTAL UNDERGROUND TRANSFORMER EXISTING TOTAL UNDERGROUND TRANSFORMER HANDHOLE PRIMARY METERING POINT WATERSHED RENTON SCHEDULE 73 OH TO UG CONVERSION Owner / Developer Contact Info officeATTN: GMD Renton LLLP 520 Pike St. Suite 1010 Seattle WA 98101 Kory Knudson 206-579-6634PHONE CABLE TV 511716414 101145506 108133995 593241992 108133996 PROJECT PHASE PWR NOTIF#ORDER# Superior Pole Relocate Pole Removal UG Misc&Exp 594147892 101145507 OH Misc&Exp PRI Wire Removal THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) NOTE: DEVELOPER TO PROVIDE ALL CIVIL WORK: TO AND INCLUDING EXCAVATION, BACKFILL, SHORING, TRENCH MAINTENANCE, SANDING FOR DUCT, SELECT 5/8" CRUSH FOR UNDER VAULTS, COMPACTION, ALL HARDSURACE RESTORATION AND RELATED LANDSCAPING RESTORATION. DEVELOPER TO PROVIDE TEMPORARY EXCAVATION PLATING (IF REQUIRED). GENERAL 1. Pre-construction Notify appropriate City or County 48 to 72 hours or as required by permitting agency before starting work on any right-of-way involving a permit. Follow all requirements as outlined by the permitting agency. Locate and mark all underground utilities prior to start of construction. If there is a conflict with the intended trench route as shown on the site plan and existing utilities or obstructions, trench route may need to be moved to opposite side of street. Cooperation with Quality Inspector, Puget Sound Energy Contractor, City or County authorities during Pre-construction meeting will determine the final trench route. 2. Existing Utilities Hand excavate (pothole) all marked utility crossings to verify exact location and depth at point of crossing. Protect underground utilities during excavation. Use hand excavation methods if necessary to avoid damage. Fabricate and install adequate temporary structures to support and protect underground utilities while exposed during construction. Maintain 6" minimum clearance at crossings between existing utilities and new duct installations. Transition trench or tunnel profile gradually as required at crossings. Maintain 24" minimum separation between new trench or tunnel and parallel existing utilities or as required by the permit agency. In the event of damage to an underground utility, notify Puget Sound Energy at once. Contractor agrees to make work force and resources available at once to Puget Sound Energy or municipal authorities to repair damage at no cost. 3. Work Drawings Maintain on site, in good condition, a complete file of all work drawings. These drawings shall be available at all times to a Puget Sound Energy representative. Corrections and changes made during the job shall be recorded continuously on these drawings. All underground electrical facilities shall have a minimum of 36 inches of cover. Any change must be approved by the PSE engineer or project manager. Furnish Puget Sound Energy a complete set of as built prints (foreman's copies) at the end of the job. 4. Safety Provide signs, barricades, and traffic control in conformance with local jurisdictions and regulations. Provide flagging and or other vehicle traffic control as needed in conformance with local regulations. (see SPM # 100.4000) Provide adequate signage and protection to traffic during non-working hours. Maintain traffic flow as required by permitting agency. Provide signs and barricades to warn pedestrians, motorcycles and bicycles. Install warning barricades at least every 50 feet along the trench route from the time the trench is opened until the trenching is complete. 5. Existing Systems Maintain existing electrical system in service until new system is complete, tested, and ready for service. Disable existing system only to make cutovers and connections as directed by Puget Sound Energy's representative. Provide temporary wiring and connections to maintain existing systems in service during construction; if a scheduled outage is not possible. When work must be performed on energized equipment or circuits, use qualified personnel for such operations. EARTHWORK See Puget Sound Energy SPM 6800.4050 1. Back hoe, Hand Dug Excavations Paved Surfaces Cut the edges of the trench prior to digging. Use the narrowest bucket practical or plow off the edge of paved surface far enough to minimize asphalt disturbance. Repair any blow out areas (where edge has been broken) by sawing. The depth of the trench shall be enough to allow 36" of cover . Backfill material shall be Controlled Density Fill (CDF) cover or select fill (5/8" minus) to meet permit requirements. Unpaved Surfaces Conduit/cable trenches are to be excavated just off the existing road edge or in the shoulder of the road behind the existing ditch line. Contractor shall use a back hoe with the narrowest width bucket practical or plow. Trench shall be deep enough to allow a minimum of 36" of cover over the top most cable. All ditch crossings shall have a minimum of 36" cover from the lowest point within the existing ditch line. Culverts; when installing facilities under a culvert, excavation must be filled with packed crush rock. If any culvert is damaged it will be repaired or replaced in accordance with permitting agency and contractors responsibility. Spoils shall be removed quickly to minimize blocking of traffic. All spoils and wastes become the property of the contractor immediately upon removal. Remove spoils and wastes promptly to an approved disposal site. Remove spoils containing asphalt or concrete to a disposal site specifically approved for such materials. Provide Puget Sound Energy with a disposal receipt for all spoils. 2. Backfill Unpaved Road Surfaces Backfill for unpaved road crossings shall consist of 1-1/2" to 2-1/2" material compacted to 95% density. Backfill for unpaved road sections shall consist of native material compacted to 95% density. At the end of each workday, backfill or plate all trench, remove all spoils and clean roadway surface of large hazardous debris. 3. Surface Restoration Unpaved Surfaces Restore ground surface to original contour. Restore to original condition or better. 4. Landscaping Arrange and perform work to minimize impact to existing landscaping. Restore landscaping that has been disturbed during the course of work, including seeding of banks and fills. Vaults set in bank areas may require re-sloping the surrounding land to avoid sloughing. Leave area in its original state or better at the end of construction. Hand dig if required to prevent damage to tree roots. ELECTRICAL 1. Conduit Conduit for installation in unpaved areas shall be 2", 3", 4", or 6" PVC DB120 or 2", 3", 4", or 6" DB120 for direct burial. Maintain 36" minimum cover above top conduit at all times or as required by the permitting agency. Where conduit is routed from road edge to vault location, maintain 36" minimum cover above top conduit at all times or as required by the permitting agency. Bends shall be made with as long a radius as possible (48" minimum). Avoid making sharp bends or kinks in conduit during installation. Obtain exact location of conduit entrance into vault from Puget Sound Energy before penetrating vault. Penetrate the vault using existing knockout or use core drilled holes. Stub the 4" or 6" PVC 2"-3" into vault interior and grout between the conduit and vault wall. Leave a 10' minimum of extra pull rope in each end of installed conduit where 4" or 6" PVC is installed and cap conduit to prevent the entry of dirt and moisture. Arrange work so conduit plays directly off reel into trench. Place the conduit in the trench as straight as possible. Avoid vertical and horizontal "snaking" of the conduit. Multiple conduit runs may be stacked vertically. Where conduit must be pulled through a trench to allow a crossing under an existing utility, cap conduit end before pulling to avoid contamination. If a kink occurs, cut the conduit ahead of kink and splice to new conduit to continue run. 2. Underground Primary Cable Primary cable shall be 1/O Alum Sol Jacketed Cable rated for 15 KV service with a polyethylene jacket. Primary cable shall be 61 strand 750 MCM aluminum conductor rated for 15 KV service with a copper tape neutral conductor and polyethylene jacket. A 4/0 copper neutral shall be run with each 3 phase circuit of 750 MCM. Install cable into existing or new conduit systems using approved installation equipment. Approved equipment includes either cable pullers and/or cable pushers. Pulling socks shall be non-conductive or similar material. Steel pulling socks are prohibited. Bare steel cable shall not be used to pull cable. Cable pulling equipment (winches, hoist, driven reels, etc.) shall be equipped with instrumentation to continually monitor and record peak tension encountered during a pull. Before installing cable, obtain rated pulling tension for cable from Puget Sound Energy. Do not exceed rating at any time during installation. Notify Puget Sound Energy immediately if pulling tension equals or exceeds rating (828/1657lbs for 1/0 or 5000lbs for 750 .) Do not exceed minimum bend radius of cable or impose kinks or sharp bends on cable during pulling operations. Install cable directly off reel without dragging it on the ground. Apply Puget Sound Energy approved lubricant to cable continually during pulling to reduce pulling tension and to permit future removal. Install adequate amounts of 3/4 " plywood on existing sidewalk areas to support pulling equipment and prevent un-necessary damage to sidewalks. Train and coil cables in vaults as required to form a smooth transition from conduit to termination. if terminations are to be performed by others, coil 15' of cable in vault and cap end. 3. Terminations and Splices Install approved terminations on cables in accordance with Puget Sound Energy SPM 2247.5115- 5119. Unless otherwise directed, approved terminations will be load break elbows in vaults and cold shrink pin terminals on pole risers per Puget Sound Energy SPM 2247.9317. Splice cable with approved splice kits in vaults, hand holes or similar enclosures. Do not splice cables in runs between vaults. See Puget Sound Energy SPM 2233.2075-2076. 4. Concrete Vaults Excavate, install base material, and compact base material in accordance with Puget Sound Energy SPM 6775.0040. Install and seal precast sections in accordance with Puget Sound Energy SPM 6775.0040. Use precast neck and shaft sections to bring manhole entrance to proper elevation. Install manholes plumb. Set the top of each manhole to finished elevation or no higher than 6" above existing road elevation. Install hillholders as required on sketch or by construction notes. 5. Grounding Install ground rod per Puget Sound Energy SPM 6275.6100 at each vault in which primary cable is terminated. Locate rod in trench excavation wherever possible to obtain maximum driven depth in undisturbed soil. Connect each ground individually to ground loop inside vault with bare no. 2 copper jumper or to Concentric neutral at each splice vault location. Minimum grounding requirement is 4 grounds per mile. 6. Existing Underground Primary Cable (if applicable) Abandon existing primary cable in place. Cut off old cable ends inside vault flush with wall. Before cutting, pigtail concentric neutral strands and connect to ground loop inside vault. Return scrap cable and existing cable tags to Puget Sound Energy. Remove or fill existing vaults as required by permitting agency. 7. Traffic Control All traffic control to comply with current specifications in M.U.T.C.D. PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP DAN FOGEL 360-722-2783 10/9/22 STEPHAN SHAW 253-234-6405 1/17/22 N/A N/A N/A STEPHAN SHAW 253-234-6405 1/17/22 RW-125285 RENTON WATERSHED RENTON 3Ø FDR & PRI OH-UG CONV 615 WILLIAMS AVE S RENTON 98057 N/A N/A N/A 101145506 AS SHOWN 1 OF 5 KING N/A N/A CSPSKEPM SE 18-23N-05E N/A N/A 2305E072 2305E076 R2305E072SE GRA-17 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 5/1/22 S.SHAW ADD'L POLE INSTALL N/A N/A N/A N/A N/A N/A E-Mail: Cell Phone: Project Manager Contact Information: Manager:DAN FOGEL 360-722-2783 DAN.FOGEL@PSE.COM 593241993Oh Misc&Exp POWER GENERAL NOTES - COMMERCIAL PROJECT 8. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. 1. 2. 3. 4. 5. 6. 7. 9. 11. 10. Will maintain 36" Min. depth while directional drilling 36" Min Depth Final Grade TYPICAL BORE COVER BORE NOTE CALL (800) 424-5555 UTILITY NOTIFICATION CENTER A MINIMUM OF 2 BUSINESS DAYS BEFORE BEGINNING ANY EXCAVATION TO PREVENT DAMAGE TO UNDERGROUND FACILITIES & AVOID BODILY INJURY. PSE/POTELCO REPRESENTIVE MUST BE ONSITE FOR DURATION OF BORE POTHOLING IS REQUIRED PRIOR TO BORE. ALL OTHER UTILITIES SHALL HAVE THEIR ALIGNMENTS AND PROFILES MAPPED. BORING CONTRACTOR SHALL PREPARE A PROPOSED BORING ALIGNMENT AND PROFILE ON SITE AND PROVIDE IT TO THE PSE/POTELCO REPRESENTATIVE FOR APPROVAL BEFORE COMMENCING ANY WORK BORING CONTRACTOR SHALL USE CONDUIT AND MATERIALS PROVIDED ONLY BY PSE/POTELCO WHEN OPERATING IN PUBLIC RIGHT OF WAY NEW CONDUIT SHALL BE INSTALLED PER PSE STANDARDS AND ADHERE TO ALL JURISCITION REQUIREMENTS. NEW CONDUIT SHALL BE INSTALLED AT 36" MINIMUM COVERAGE. LOCAL JURISIDICTIONS MAY HAVE DIFFERENT REQUIREMENTS FOR MINIMUM COVERAGE IN PUBLIC RIGHT OF WAY. NEW CONDUIT SHALL MAINTAIN MINIMUM 1-FOOT VERTICAL CLEARANCE BETWEEN OUTER SURFACES OF EXISTING UTILITIES AND STRUCTRES. IT SHALL ALSO MAINTAIN A MINIMUM 5-FOOT HORIZONTAL SEPARATION OF WATER MAIN, STORM DRAIN AND 5-FOOT OF SEWER STRUCTURE. LOCAL JURSIDICTION MAY REQUIRE A DIFFERENT MINIUM SEPARATION. This permit is for Major construction work in the ROW and will be billed at an additional $150/HR for inspections. After hours and weekend work will be billed at $175/HR All conduit in the ROW shall be schedule 80 or equivalent. POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS Pre-Construction meeting required MFP22001700 PSE PROVIDED & INSTALLED 3Ø 750 KCMIL UG FEEDER CABLE IN CUSTOMER INSTALLED CONDUIT PSE PROVIDED & INSTALLED 3Ø 1/0 AL UG CABLES IN CUSTOMER INSTALLED CONDUIT PSE PROVIDED & INSTALLED 3Ø 1/0 AL UG CABLES IN CUSTOMER INSTALLED CONDUIT PSE PROVIDED & INSTALLED 3Ø 1/0 AL UG CABLES IN CUSTOMER INSTALLED CONDUIT PSE PROVIDED & INSTALLED 3Ø 1/0 AL UG CABLES IN CUSTOMER INSTALLED CONDUIT PSE PROVIDED & INSTALLED 3Ø 1/0 AL UG CABLES IN CUSTOMER INSTALLED CONDUIT PSE PROVIDED & INSTALLED 3Ø 1/0 AL UG CABLES IN CUSTOMER INSTALLED CONDUIT 317621-166052 45° R=48" TYP. 90° R=48" 45° R=48" TYP. 90° R=48" 160' 180' 40' 10' 30' 30'60' 80' 370' PSE PROVIDED & CUSTOMER INSTALLED 6" SCH 80 PVC CONDUIT PSE PROVIDED & CUSTOMER INSTALLED SPARE 6" SCH 80 PVC CONDUIT PSE PROVIDED & CUSTOMER INSTALLED 4" SCH 80 PVC CONDUIT PSE PROVIDED & CUSTOMER INSTALLED 4" SCH 80 PVC CONDUIT PSE PROVIDED & CUSTOMER INSTALLED 4" SCH 80 PVC CONDUIT PSE PROVIDED & CUSTOMER INSTALLED 4" SCH 80 PVC CONDUIT CUSTOMER PROVIDED 4'x4' WORK PIT CUSTOMER PROVIDED 4'x4' WORK PIT CUSTOMER PROVIDED 9'x11' WORK PIT w/ 6" BED OF 5/8" MINUS CRUSH ROCK CUSTOMER PROVIDED 4'x4' WORK PIT CUSTOMER PROVIDED 4'x4' WORK PIT CUSTOMER PROVIDED 9'x11' WORK PIT w/ 6" BED OF 5/8" MINUS CRUSH ROCK PSE PROVIDED & CUSTOMER INSTALLED 4" SCH 80 PVC CONDUIT 370' CUSTOMER PROVIDED 4'x4' WORK PIT SCALE: 1" = 50' UNDERGROUND CIRCUIT MAP (R2305E072SE) OVERHEAD CIRCUIT MAP (2305E076) SCALE: 6" = 1 MILE UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP DAN FOGEL 360-722-2783 10/9/22 STEPHAN SHAW 253-234-6405 1/17/22 N/A N/A N/A STEPHAN SHAW 253-234-6405 1/17/22 RW-125285 RENTON WATERSHED RENTON 3Ø FDR & PRI OH-UG CONV 615 WILLIAMS AVE S RENTON 98057 N/A N/A N/A 101145506 AS SHOWN 2 OF 5 KING N/A N/A CSPSKEPM SE 18-23N-05E N/A N/A 2305E072 2305E076 R2305E072SE GRA-17 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 5/1/22 S.SHAW ADD'L POLE INSTALL N/A N/A N/A N/A N/A N/A CABLE DETAIL NOT TO SCALE CONDUIT DETAIL NOT TO SCALE JOB SITE JOB SITE 101145506MFP22001700 620 536 541 900 538 540 602 539 601 605 615 607 WILLIAMS AVE SS GRA DY WAY S G R A D Y W A Y GRA 17 617 DW TRIM OVERHEAD SPANS TO NEW POLE REFERENCED ON INSTALL PAGE TRIM OVERHEAD SPANS TO NEW POLE REFERENCED ON INSTALL PAGE 317601-166053 SK00595 (100T) 317591-166054 317593-166039 X12254 (100T) 317623-166053 X12255 (40T) 317591-166039 317592-165032 300 kVA 208V (ABC) 317621-166052 150 kVA 208V (ABC) 317614-166057 30 kVA 208V (ABC) 317576-166023 317640-166058 317574-166020 X7072 X7072 317586-166015 112.5 kVA 208V (ABC) 317590-166024 317609-166022 25 kVA (A) 317640-166033 75 kVA (A) 317639-166053 50 kVA (C) SLAG6831 317621-166052 58' ROW 80' ROW 336.4 MCM A C S R A B C 336.4 M C M A C S R A BC ABC #2CU317637-166077 TRIM OVERHEAD SPANS TO NEW POLE REFERENCED ON INSTALL PAGE SITE PLAN SCALE: 1" = 50' SITE SPECIFIC NOTES AT P01: 317576-166023 -EXISTING 55' CL-2 1998 DISTRIBUTION POLE TO REMAIN AT P02: 317593-166039 -REMOVE EXISTING FRAMING, OH-UG TERMINATION, & RISER -REMOVE EXISTING 40' CL-3 1969 DISTRIBUTION POLE -DISCONNECT UPSTREAM OVERHEAD FEEDER, CUT AND REPOSITION TO P03 AT J01 : 317591-166039: EXISTING 3PH PRI JUNCTION VAULT -REMOVE (3) EXISTING J-BUSES -DISCONNECT (3) EXISTING PRIMARY CABLES AS LABELED IN THE TABLES BELOW -PSE TO REMOVE CONCRETE VAULT AT V01 : 317592-165032: EXISTING 3PH PM TRF -EXISTING PADMOUNT VAULT TO REMAIN -EXISTING 3PH PM TRF TO REMAIN -DISCONNECT CABLES TO J01 -CONNECT NEW CABLES FROM J04 AT P04: 317591-166054 -REMOVE EXISTING 30'' CL4 1990 GUY POLE -REMOVE GUY & ANCHOR AT P05: 317601-166053 -REMOVE EXISTING FRAMING, OH-UG TERMINATION, & RISER -REMOVE EXISTING AMR DEVICE & RETURN TO LANDIS+GYR -REMOVE EXISTING 60' CL1 1990 DISTRIBUTION POLE AT P06: 317614-166057 -EXISTING 40' CL3 1969 DISTRIBUTION POLE TO REMAIN -EXISTING 3Ø 120/208v OVERHEAD TRANSFORMER TO REMAIN AT J02 : 317621-166052: EXISTING 3PH PRI JUNCTION VAULT -REMOVE (3) EXISTING J-BUSES -DISCONNECT (3) EXISTING PRIMARY CABLES AS LABELED IN THE TABLES BELOW -PSE TO REMOVE CONCRETE VAULT AT P08: 317623-166053 -REMOVE EXISTING FRAMING, OH-UG TERMINATION, & RISER -REMOVE EXISTING 40' CL-3 1969 DISTRIBUTION POLE SPAN SPECIFIC NOTES SEE TABLES FOR REMOVALS AND INSTALLS OF CONDUIT, CABLE, & WIRE ABANDONED / REMOVE / REPLACED CABLE SCHEDULE CABLE NO. SAP EQUIP LOCATIONS CABLE (LF) EST EXISTING CABLE MFG. NAME EXISTING CABLE MFG. DATE CABLE REPLACED?FROM TO AGK110 13965098 P02 J01 120' AGK111 13965099 P02 J01 120' AGK112 13965100 P02 J01 120' AGK113 13965101 J01 V01 50' AGK114 13965102 J01 V01 50' AGK115 13965103 J01 V01 50' AGK116 13965104 P08 J02 50' AGK117 13965105 P08 J02 50' AGK118 13965106 P08 J02 50' 25964 10700724 J02 V02 20' 25965 UNK J02 V02 20' 25966 UNK J02 V02 20' TOTAL 720' UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP DAN FOGEL 360-722-2783 10/9/22 STEPHAN SHAW 253-234-6405 1/17/22 N/A N/A N/A STEPHAN SHAW 253-234-6405 1/17/22 RW-125285 RENTON WATERSHED RENTON 3Ø FDR & PRI OH-UG CONV 615 WILLIAMS AVE S RENTON 98057 N/A N/A N/A 101145506 AS SHOWN 3 OF 5 KING N/A N/A CSPSKEPM SE 18-23N-05E N/A N/A 2305E072 2305E076 R2305E072SE GRA-17 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 5/1/22 S.SHAW ADD'L POLE INSTALL N/A N/A N/A N/A N/A N/A POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS Wk Loc Pole Data Pole TEL TV FIBER TRAN RMVD ID NUMBER Grid #Length Class Year TOPPED RMVD P02 317593-166039 40'3 1969 P04 317591-166054 30'4 1990 P05 317601-166053 65 1 1990 P07 317623-166053 40'3 1969 WIRE REMOVAL TABLE Work Location Wire Size & Type Quantity Length (per conductor) Remarks From To P03 P02 PRI 336 ACSR 3 90' P03 P02 LEGACY - #4 ACSR 1 90' P02 P05 PRI 336 ACSR 3 159' P02 P05 LEGACY - #4 ACSR 1 159' P05 P04 GUY WIRE 1 80' P05 P08 LEGACY - #2 CU 3 225' P05 P08 UNK NEUTRAL 1 225' P08 P09 PRI 336 ACSR 3 30' P08 P09 LEGACY - #4 ACSR 1 30' P05 P07 PRI 336 ACSR 3 110' P05 P07 LEGACY - #4 ACSR 1 110'101145506recommend installing pole P07 outside of the restoration area of the watershed project. RESTORATION PER CITY OF RENTON STANDARDS MFP22001700 620 536 541 900 538 540 602 539 601 605 615 607 WILLIAMS AVE SS GRA DY WAY S G R A D Y W A Y GRA 17 617 DW 317625-166064 T87292 (SOLI) 317589-166044 T87289 (100T) T87290 (SOLI) 317593-166051 317621-166063 317592-165032 300 kVA 208V (ABC) 317621-166052 150 kVA 208V (ABC) 317614-166057 30 kVA 208V (ABC) 317576-166023 317640-166058 317574-166020 X7072 X7072 317586-166015 112.5 kVA 208V (ABC) 317590-166024 317609-166022 25 kVA (A) 317640-166033 75 kVA (A) 317639-166053 50 kVA (C) SLAG6831 58' ROW 80' ROW 336.4 MCM A C S R A B C 336.4 M C M A C S R ABC ABC #2CU317637-166077 317610-166072 T87291 (SOLI) CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: CROSSING/BORING. -BORING FOR CROSSINGS ARE REQUIRED PER LOCAL MUNICIPALITY PERMIT REQUIREMENTS. -CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO CONSTRUCTION. -PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION WORK IN RIGHT OF WAY. -EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY. VAULTS & WORK PITS. -REQUIRED TO PROVIDE 9' X 11' WORK PIT & 6" WORTH OF 5/8" MINUS CRUSHED ROCK AT J03 & J04 -REQUIRED TO PROVIDE 4’ X 4’ RECEIVING PIT & 4’ X 8’ BORE PIT @ 'WILLIAMS AVE S' CROSSING -REQUIRED TO PROVIDE 4’ X 4’ WORK PIT AT P03, P06, P09, V01, & V02 TRENCHING & CONDUIT. -SEE TABLES FOR INSTALLS OF CONDUIT -REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL CONDUITS. JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. -IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS. CIRCUIT LOADING TABLE (FUTURE MF SCOPE) AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP DAN FOGEL 360-722-2783 10/9/22 STEPHAN SHAW 253-234-6405 1/17/22 N/A N/A N/A STEPHAN SHAW 253-234-6405 1/17/22 RW-125285 RENTON WATERSHED RENTON 3Ø FDR & PRI OH-UG CONV 615 WILLIAMS AVE S RENTON 98057 N/A N/A N/A 101145506 AS SHOWN 4 OF 5 KING N/A N/A CSPSKEPM SE 18-23N-05E N/A N/A 2305E072 2305E076 R2305E072SE GRA-17 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 5/1/22 S.SHAW ADD'L POLE INSTALL N/A N/A N/A N/A N/A N/A POLE TABLE (NEW) Work Location Pole Data Grid #Height Class Year Remarks / Location Ref. P03 317589-166044 50 CL-3 P07 317610-166072 45 CL-3 P09 317625-166064 45 CL-3 Primary Cable & Conduit Table (Foreman to Complete) LOCATION CONDUIT PRIMARY CABLE QTY OF LUBE (gal.)AS BUILT INFORMATION From To Size (in) Qty Design Length (ft) Actual Length (ft) TYPE BENDS PULL (lbs) PULL Rev (lbs) Cable Size Design Length (ft) Actual Length (ft) CABLE NUMBERS MANUFACTURING INFORMATION FOR FEEDER CABLE ONLY Check applicable box DB120 HDPE SCH 80 90°45°22°11°A B C Manufacturer Compound Year Tape CN #4/0 NEU Design As Built Actual Amount Installed (Conduit & Cable) P03 P06 6"1 370'X 1 902.54 902.54 FEEDER 750 UG 430'EIQ276 EIQ277 EIQ278 P03 P06 6"1 370'X 1 SPARE CONDUIT P03 J04 4"1 80'X 2 173 181.4 3Ø PRI 12KV 1/0 UG 140'EIQ279 EIQ280 EIQ281 J04 J03 4"1 340'X 2 1 393.9 358.1 3Ø PRI 12KV 1/0 UG 380'EIQ282 EIQ283 EIQ284 J04 V01 4"1 90'X 1 499.8 484.7 3Ø PRI 12KV 1/0 UG 110'EIQ285 EIQ286 EIQ287 J03 V02 4"1 40'X 1 51.8 50.8 3Ø PRI 12KV 1/0 UG 60'EIQ288 EIQ289 EIQ290 J03 P08 4"1 40'X 1 152.2 148.6 3Ø PRI 12KV 1/0 UG 90'EIQ291 EIQ292 EIQ293 SITE SPECIFIC NOTES AT P01: 317576-166023 -EXISTING 55' CL-2 1998 DISTRIBUTION POLE TO REMAIN AT P03: 317589-166044 -INSTALL 50' CL-3 DISTRIBUTION POLE PER STD 6010.1000 (PD502) -INSTALL 9' 8 POSITION DOUBLE ARM (ARD2H09) -INSTALL 3Ø TANGENT DEADEND FRAMING PER STD 6033.1042 (DE3310) -INSTALL 3Ø 12kV TAN POLE TOP PINS, 397 AAC PER STD 6033.1012 (TAN313) -RECONNECT UPSTREAM OVERHEAD FEEDER FROM P02 -INSTALL 9' 8 POSTION SINGLE CUTOUT ARM (ARD19C) -INSTALL (1) 200A & 600A DBL OH/UG TERM PER STD 6043.1022 (TSU6D31) -INSTALL FEEDER TERM SWITCH # T87289 (100T) -INSTALL 1/0 TERM SWITCH # T87290 (SOLI) -INSTALL (1) 7/16" PRI & NEUT GUY w/ AUTO GRIP PER STD 6013.0100 (GYD7SA & GYD7SAN) -INSTALL (1) 10" SNGL HELIX ANCHOR, 25' LEAD PER STD 6012.1000 (ANDH1) -INSTALL (1) 6" PRI RISER ON NEW S/O BRKTS PER STD 6042.1000 (RIS6CSS) -INSTALL (1) 4" PRI RISER ON S/O BRKTS PER STD 6042.1000 (RIS4CSS) -INSTALL GRID # AT J04 : 317593-166051 : NEW 3Ø PRIMARY JUNCTION VAULT -INSTALL (1) 575 3Ø JUNCTION VAULT PER STD 6055.1030 (JBOX3AS) -INSTALL (1) JBOX ANTI-SKID COVER (MID: 9996162) -INSTALL (3) 4 POS JBOX 200A 15KV (MID: 7625900) -INSTALL (9) 12KV ELBOW KIT PER STD 6041.1000 (ELB10J) -INSTALL (3) 12KV DUST CAPS (MID: 7630600) -INSTALL GRID# AT J03 : 317621-166063 : NEW 3Ø PRIMARY JUNCTION VAULT -INSTALL (1) 575 3Ø JUNCTION VAULT PER STD 6055.1030 (JBOX3AS) -INSTALL (1) JBOX ANTI-SKID COVER (MID: 9996162) -INSTALL (3) 4 POS JBOX 200A 15KV (MID: 7625900) -INSTALL (9) 12KV ELBOW KIT PER STD 6041.1000 (ELB10J) -INSTALL (3) 12KV DUST CAPS (MID: 7630600) -INSTALL GRID# AT V01 : 317592-165032 : EXISTING 3Ø PM TRANSFORMER -EXISTING PM VAULT TO REMAIN -EXISTING 3PH PM TRF TO REMAIN -DISCONNECT CABLES TO J01 -CONNECT NEW PRIMARY CABLES FROM J04 AT V02 : 317621-166052 : EXISTING 3Ø PM TRANSFORMER -EXISTING PM VAULT TO REMAIN -EXISTING 3PH PM TRF TO REMAIN -DISCONNECT CABLES TO P08 -CONNECT NEW PRIMARY CABLES FROM J03 AT P06: 317614-166057 -EXISTING 40' CL3 1969 DISTRIBUTION POLE TO REMAIN -EXISTING 3Ø 120/208v OVERHEAD TRANSFORMER TO REMAIN AT P07: 317610-166072 -INSTALL 45' CL-2 DISTRIBUTION POLE PER STD 6010.1000 (PD452) -INSTALL 9' 8 POSITION DOUBLE ARM (ARD2H09) -INSTALL 3Ø TANGENT DEADEND FRAMING PER STD 6033.1042 (DE3310) -INSTALL 3Ø 12kV TAN POLE TOP PINS, 397 AAC PER STD 6033.1012 (TAN313) -RECONNECT UPSTREAM OVERHEAD FEEDER FROM P06 -INSTALL 3Ø 12kV DEADEND FEEDER L/I SOLID BLADE AS UG/OH TERM PER STD 6043.1020 (TSU3DF1) -INSTALL (1) 7/16" PRI & NEUT GUY w/ AUTO GRIP PER STD 6013.0100 (GYD7SA & GYD7SAN) -INSTALL (1) 10" SNGL HELIX ANCHOR, 25' LEAD PER STD 6012.1000 (ANDH1) -INSTALL (1) 6" PRI RISER ON NEW S/O BRKTS PER STD 6042.1000 (RIS6CSS) AT P09: 317625-166064 -INSTALL 45' CL3 DISTRIBUTION POLE PER STD 6010.1000 (PD453) -INSTALL 3Ø TANGENT DEADEND FRAMING PER STD 6033.1040 (DE2315) -INSTALL 3Ø 12kV TAN POLE TOP PINS, #2 ACSR PER STD 6033.1010 (TAN312) -RECONNECT UPSTREAM OVERHEAD PRIMARY FROM P02 -INSTALL (1) 3Ø PRIMARY L/I SOLID BLADE UG/OH TERMINATION PER STD 6043.1001 (UTSU3L1) -INSTALL PRIMARY TERM SWITCH # -INSTALL (1) 4" PRI RISER ON S/O BRKTS PER STD 6042.1000 (RIS4CSS) -INSTALL (1) 3/8" SIDEWALK GUY PER STD 6013.0180 (GYD3PB) -INSTALL (1) 10" SNGL HELIX ANCHOR, 5' LEAD PER STD 6012.1000 (ANDH1) -INSTALL GRID # SPAN SPECIFIC NOTES SEE TABLES FOR REMOVALS & INSTALLS OF CABLE, & WIRE TWO 1' SQ PAVEMENT CUTS FOR BORE GRA-17 6/2020 167 179 184 28 28 28 195 207 212 101145506SITE PLAN SCALE: 1" = 50' 6" PVC (FT) & BENDS 740'_____'X FDR 750 UG TOTAL (FT)1,290'_____'2 4" PVC (FT) & BENDS 590'_____'X 3Ø PRI UG TOTAL (FT)2,340'_____'5 3 MFP22001700 UTILITY POLE EROSION CONTROL DETAIL TOP VIEW FLOWING DITCH or BODY OF WATER SLOPE Secure bottom of fence with gravel bags Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Adjacent to flowing ditches or bodies of water Install silt fence around pole excavation Field Face Quadrant Road Face Quadrant Climbing Space 5" Min CL Direction of Vehicular TrafficCL TOP VIEW CONDUIT RISER PLACEMENT DETAIL SCALE: NONE FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 Cables should enter the vault so that all of the cables will lay in the same direction. TOP VIEW J- BOX CABLE ENTRY DETAIL Not to scale 6" to 12" Under Normal Conditions 40" Min for Single Helix 65" Min for Triple Helix Not To Scale ANCHOR DETAIL - SINGLE HELIX Excavated Dirt Pile Final Grade 24" Min Backfill for Schedule 40 Conduit (NO Rocks over 10" Diameter or foreign objects)Separation 12" Min 18" Min JOINT TRENCH DETAIL Primary-Schedule 40 (NTS) 48" Max 36" Min Cover Phone & TV Primary Power Cable in Customer Provided Schedule 80 Conduit ROADSIDE To Excavated Dirt Pile UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP DAN FOGEL 360-722-2783 10/9/22 STEPHAN SHAW 253-234-6405 1/17/22 N/A N/A N/A STEPHAN SHAW 253-234-6405 1/17/22 RW-125285 RENTON WATERSHED RENTON 3Ø FDR & PRI OH-UG CONV 615 WILLIAMS AVE S RENTON 98057 N/A N/A N/A 101145506 AS SHOWN 5 OF 5 KING N/A N/A CSPSKEPM SE 18-23N-05E N/A N/A 2305E072 2305E076 R2305E072SE GRA-17 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 5/1/22 S.SHAW ADD'L POLE INSTALL N/A N/A N/A N/A N/A N/A Field Face Quadrant Road Face Quadrant Climbing Space 5" Min CLDirection of Vehicular TrafficCL TOP VIEW CONDUIT RISER PLACEMENT DETAIL SCALE: NONE 2" Excavation - 19-1/2 cubic yards SIDE VIEW 5'-4"Crushed 6" Rock TOP VIEW 9' 11' 7'-0" 4'-0" 1' 4'-8" 4,750 lbs 2,490 lbs VAULT & EXCAVATION DETAIL Not to scale 6051.1500 10' Minimum Sidewalk or Pathway 4 5 6 7 2 9 2 12 7 11 10 8 3 (L) 6 Y - CONNECTION & SIDEWALK GUY DETAIL Not to scale DBL Termination DE Pole SCALE: 1" = 20' POSSIBLE CUSTOMER ENTRY LOCATION POSSIBLE CUSTOMER PSE ENTRY LOCATION ENTRY LOCATION POSSIBLE CUSTOMER CABLE INSTALLATION DIAGRAM R Not to scale 2" Excavation - 19-1/2 cubic yards SIDE VIEW 5'-4"Crushed 6" Rock TOP VIEW 9' 11' 7'-0" 4'-0" 1' 4'-8" 4,750 lbs 2,490 lbs VAULT & EXCAVATION DETAIL Not to scale 6051.1500 N N 101145506SW NEW 4" SCH80 CONDUIT IN NEW 4" SCH80 CONDUIT OUT NOT TO SCALE BUTTERFLY VAULT CONDUIT ENTRY DIAGRAM LOOKING SOUTH N NEW 4" SCH80 CONDUIT NEW 4" SCH80 CONDUIT IN NOT TO SCALE BUTTERFLY VAULT CONDUIT ENTRY DIAGRAM LOOKING SOUTH NEW 4" SCH80 CONDUIT OUT NEW 4" SCH80 CONDUIT OUT MFP22001700