Loading...
HomeMy WebLinkAboutMFP22002639.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP22002639 IVR Number: 22002639 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:05/18/2022Application Date:0087000091Parcel Number: 10405 SE 166TH ST Permit Type:05/23/2022Issue Date:Franchise Permit Work Class:05/23/2023Expiration Date:Major Utility Job Number: 101149164Franchise Type:Electric Description: Puget Sound Energy Electric Upgrade EXISTING OH XFMR AT P01 (316858 166190) and connect OH Service line for a fire damaged home. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Carli Bunkelman PSE/POTELCO - Billing 6905 S 228th St Kent, WA 98032 B: (253) 437-6708Contractor Business License Number: 5109Construction Contractor: POTELI*227PL PETZ KIMBER LEE 10405 SE 166TH ST RENTON , WA 98055 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 101149164 10405 SE 166TH ST MICHELE ABLEMAN 206-794-4202 Monday - Friday 8:00AM - 3:00PM MFP22002639 Scott Warlick CED 5/23/2022 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG ROW ROW ROW P01 ROAD WORK AHEAD W20-1 BE PREPARED TO STOP W20-7b W20-7A 100' 100' ROAD WORK AHEAD W20-1 BE PREPAREDTO STOP W20-7b W20-7A 100' 100' ROAD WORK AHEAD W20-1 BE PREPARED TO STOP W20-7bW20-7A 100'100' ROAD WORK AHEAD W20-1 BE PREPARED TO STOP W20-7b W20-7A 100' 100'PLEASE SCHEDULE WITH DISPATCH @ 800-343-4049 OPT.1 AND PROVIDE A COPY OF THE APPROVED TRAFFIC CONTROL PLAN Notes: 1. Maintain ped. access to and through crosswalks 2. Maintain Min. 11' lanes 3. Maintain local access 4. Notify Transit Authority at least 72 hrs. in advance of bus stop closure 5. Traffic control plan and all devices shall comply with MUTCD, PROWAG & WSDOT 6. DEVICE SPACING Flag Taper 20' Signs per WSDOT Tapers per WSDOT 7. 28" Cones 36" Barrels 48" Signs 24" Paddle 8. Adjust to field conditions K&D Services, as the preparer of this traffic control plan makes no representation as to its' general adequacy or being approved for implementation. Approval must result from the Traffic Engineer or other Public Official having statutory enforcement authority in the jurisdiction. Utilization and implementation of this plan shall be a result of that approval. Ref. MUTCD 2009 6A-01 (10) Legend Bucket Truck Cones Flagger Pole ROADWORKAHEAD W20-1 road work ahead W20-7A Flagger Ahead BE PREPAREDTO STOP W20-7b be prepared to stop Manifest 10 x Cones 4 x W20-1 road work ahead 4 x W20-7A Flagger Ahead 4 x W20-7b be prepared to stop NOT TO SCALE NOTIFY EMS, FIRE, POLICE AND LOCAL TRANSIT AUTHORITY 72 HOURS IN ADVANCE N Adjust Controls as Needed PRINT ON 11"X17"CUSTOMER: CONTACT: LOCATION: DATE:W/O # Inland Group M. Ableman 206.794.4202 10405 SE 166TH ST, RENTON, WA 04.26.2022 OFFICE: 800-343-4049 CELL: 425-765-1153 WATCP@KNDSERVICES.NET WSTCS#013076 101149164 DESIGNED BY: CHRIS SCHALEGERCedar Ave SCedar Ave SSE 166th St SE 166th St 105th Ave SEwww.invarion.com MFP22002639 10416 10404 10414 2816 2822 2907 2911 1660510419 16618 16624 16617 2915 SE 166TH ST "10405"CEDAR AVE SR/W 60'R/W 60' 316858-166190 15 kVA 120/240 (C) 25 kVA 120/240 (C) 316846-166164 75 kVA (C) 316858-166167 316858-166171 12-341 (65T) 316841-166170 25 kVA (C) UNK (100T) PRE LI MI N A R Y NOT F O R C O N S T R U C TI O N FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.101149164JOB SITE OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE ___-__ 9/2022 --- --- --- SITE SPECIFIC NOTES: P01 - EXISTING #316858-166190 -REMOVE EXISTING OH 1Ø 15 120/240 kVA XFMR & RETURN TO YARD -INSTALL OH 1Ø 25 kVA 120/240v XFMR, TAP C PHASE -INSTALL L/B C/O, FUSE @ 10T (MID:3412200) -INSTALL STIRRUP & HOT CLAMP M01 - METER BASE -INSTALL 200 AMP METER SERVICE SPAN NOTE: -SEE SITE PLAN, ONE-LINE DIAGRAMS, & TABLES FOR INSTALL DEVELOPER & CUSTOMER NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: JOB SITE READINESS -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. -IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR WSDOT, A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . CIRCUIT FEED ADDED: 0' LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 1,236 SQ. 200AMPS GAS 7.3kW 65A 2.4% 3.7% 00 1"2" 00 50'100' Installed at site: Grid Number: kVA Rating: TRANSFORMER INSTALLATION (OH) Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information 25kVA 120/240v 6211250 P01 316858-166190 Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01 316858-166190 15kVA SITE PLAN SCALE: 1" = 50' SERVICE LINE(UTILITY OWNED) 11' MIN 3-1/2' MIN 11' MIN 3'MIN DECK ROOFS WITHPERMANENT ACCESS ROOFS WITHOUTPERMANENT ACCESS ELECTRICMETER GAS METER OVERHEAD SERVICE WIRE TO STRUCTURE CLEARANCE DETAIL SCALE: NONE SERVICE LINE(UTILITY OWNED) SERVICE MAST CONNECTION POINT 26' 17-1/2' 12'13' STATE HIGHWAYS STREETS, ALLEYS, COUNTY ROADS, DRIVEWAYS, AND PARKING AREAS RESIDENTIAL PROPERTY OVERHEAD SERVICE CLEARANCE DETAIL SCALE: NONE POWER GENERAL NOTES - COMMERICAL PROJECT 1.ALL MATERIALS TO BE INSTALLED IN ACCORDANCE WITH PUGET SOUND ENERGY'S (PSE) STANDARDS. ANY DEVIATION FROM THIS WORK SKETCH MUST BE AUTHORIZED BY PSE'S PROJECT MANAGER AND NOTED ON THE FOREMANS' COPY. 2.ALL SWITCHING ARRANGEMENTS AND/OR OUTAGE ARRANGEMENTS ARE TO BE MADE WITH THE PROJECT MANAGER AT LEAST THREE (3) WORKING DAYS IN ADVANCE. 3.CONTACT THE UTILITIES UNDERGROUND LOCATION CENTER (1-800-424-5555) AT LEAST 48 HOURS PRIOR TO COMMENCING WORK TO GET THE UNDERGROUND FACILITIES LOCATED. 4.STAKING: THE CUSTOMER WILL PROVIDE ALL STAKING (TRANSFORMER, HANDHOLE, TRENCH, GRADE, LOT, POLE, SIDEWALK, ETC.). SEE SKETCH AND DETAILS FOR LOCATIONS. EQUIPMENT LOCATIONS MUST BE APPROVED BY THE PROJECT MANAGER. 5.SITE PREPARATION: THE WORK AREA WILL BE AT OR NEAR FINISHED GRADE, CLEAR OF TRENCH SPOILS OR CONSTRUCTION MATERIALS WHICH WOULD RESTRICT CONSTRUCTION AND/OR EQUIPMENT ACCESS, BEFORE WORK CAN BEGIN. 6.ROADS SHALL BE PAVED OR HAVE A COMPACTED , CRUSHED ROCK BASE IN PLACE. 7.CLEARANCES: TRANSFORMERS REQUIRE A MINIMUM OF 6 FEET FROM FIRE FIGHTING EQUIPMENT, 10 FEET FROM COMBUSTIBLE WALLS, OVERHANGS, DOORS, AND WINDOWS, AND A MINIMUM OF 5 FEET FROM THE BACK OF CURB (OR GUARD POSTS WILL BE REQUIRED PER PSE STANDARDS). ALL CONDUITS AND VAULTS ARE TO BE AT LEAST 5 FEET AWAY FROM WATER, STORM AND SEWER LINES WHEN PARALLELING THEM IN THE RIGHT OF WAY, AND AT LEAST 1 FOOT WHEN CROSSING THEM. 8.ALL WORK IS TO BE DONE IN ACCORDANCE WITH LOCAL MUNICIPAL AND COUNTY PERMIT REQUIREMENTS AS APPLICABLE. 9.CUSTOMER/DEVELOPER IS RESPONSIBLE TO PROVIDE, INSTALL AND MAINTAIN ALL SECONDARY SERVICE CABLES, CONDUITS AND CROSSINGS FROM THE INDIVIDUAL UNIT'S METER BASE TO THE DESIGNATED CONNECTION POINT. 10.INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES AND DATES. 11.EXCAVATION: THE CUSTOMER IS TO PROVIDE ALL TRENCHING, BACKFILL, VAULT EXCAVATIONS, COMPACTION AND RESTORATION PER THIS SKETCH AND PER PSE STANDARDS. A MINIMUM PROTECTIVE COVER OF 36" IS REQUIRED OVER PSE'S PRIMARY VOLTAGE EQUIPMENT AND 24" IS REQUIRED OF PSE'S SECONDARY VOLTAGE EQUIPMENT. THE CUSTOMER WILL PROVIDE ANY AND ALL SHORING OR THEY WILL SIDE SLOPE THE TRENCH TO 1:1. UNDERGROUND CIRCUIT MAP SCALE: 1" = 75' O - EXISTING KNOCKOUT X - NEW KNOCKOUT CUSTOMER APPROVAL I approve the location of the trench, including road crossings, and all electrical equipment as shown on print. ________________________ Customer's Signature ________________________ Print Name/Date JOB SITE JOB SITE N Vicinity Map N/A PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) Owner / Developer Contact Info officeATTN: Transformed Electric LLC 10303 194th Ave E Bonney Lake, Wa 98391 Ryan Fowler 253.332.8438 OH Service OH XFMR Removal Superior ORDER#NOTIF# PWR PROJECT PHASE 101149164512083001 583069545 101149165512862100 E-Mail: Cell Phone: Project Manager Contact Information: Manager: Michele.Ableman@pse.com (206) 794-4202 Michele Ableman UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP SIGNATURE M. ABLEMAN 206-794-4202 4/7/22 D. BRINKMANN 206-794-8599 4/7/22 D. BRINKMANN -4/11/22 N/A CITY OF RENTON WILSON FIRE REBUILD SFR 1Ø OH XMFR UPGRADE & OH SVC 10405 SE 166TH ST, RENTON, 98055 N/A N/A N/A 101149164 AS NOTED 1/1 KING COUNTY N/A N/A CSPSKEPM T23N.R05E.NW29 N/A N/A 2305E114 2305E136 2305E114 ROL-15 CenturyLink N/A N/A Comcast/Xfinity N/A N/A PSE - Gas N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A MAST HEIGHT BELOW 26" METER SURFACE MOUNTED, U-BOLTS SECURE MAST SERVICE BRACKET WEATHERHEAD FLASHING 18" MIN 18" MIN24" MAX *FLASHING IN COURSES OF SHINGLES MINIMUM 2" x 6" INSTALLEDSOLIDLY BETWEEN RAFTERS OR STUDS WITH HOLEBORED FOR SNUG FIT 2" x 6" INSTALLED SOLIDLY BETWEENRAFTERS AND AGAINST ROOF SHEATHING RIGID STEEL CONDUIT STRUCTURAL FRAMINGAND FINISH MATERIALS STUD GROUND * ADDITIONAL SUPPORT GUYS REQUIRED FOR ATTACHMENTS GREATER THAN 24" ABOVE ROOFLINE OR IF SERVICE LINE EXCEEDS 100' IN LENGTH MAST HEIGHT BELOW 26" METER SURFACE MOUNTED, GALVANIZED LAG BOLTS SECURE MAST SERVICE BRACKET WEATHERHEAD FLASHING FRONT VIEW GALVANIZED LAG-BOLT INTO FRAMING MEMBER HEAVY-WALLSTRUT-TYPE CHANNEL HEAVY-WALL STRUT-TYPECHANNEL 18" MIN24" MAX * SERVICE DROP DETAIL BLOCKING BETWEENMAST AND BUILDING 5/16" U-BOLTS 2" x 6" BACKING SHIM METERBASE/SOCKETAND FASTEN WITH SCREWS FLUSH METERSOCKET GROUND RIGID STEEL STRUCTURAL FRAMING ANDFINISH MATERIALS 24" MAX * SERVICE DROP SERVICE BRACKET FLASHING MAST HEIGHT BELOW 26" METER FLUSH MOUNTED SERVICE DROP WEATHERHEAD MINIMUM 2' x 6" BETWEENRAFTERS WITH HOLE BORED FOR SNUG FIT RIGID STEEL CONDUIT UN-GUYED SERVICE MAST DETAIL SCALE: NONE MFP22002639