Major Franchise Permit: MFP22002639
IVR Number: 22002639
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:05/18/2022Application Date:0087000091Parcel Number: 10405 SE 166TH ST
Permit Type:05/23/2022Issue Date:Franchise
Permit Work Class:05/23/2023Expiration Date:Major Utility
Job Number: 101149164Franchise Type:Electric
Description: Puget Sound Energy Electric Upgrade EXISTING OH XFMR AT P01 (316858 166190) and connect OH Service line
for a fire damaged home.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Carli Bunkelman
PSE/POTELCO - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 437-6708Contractor
Business License Number: 5109Construction Contractor: POTELI*227PL
PETZ KIMBER LEE 10405 SE 166TH ST
RENTON , WA 98055
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
101149164
10405 SE 166TH ST
MICHELE ABLEMAN 206-794-4202
Monday - Friday 8:00AM - 3:00PM
MFP22002639
Scott Warlick CED 5/23/2022
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
ROW ROW ROW
P01
ROAD
WORK
AHEAD
W20-1
BE PREPARED
TO STOP
W20-7b
W20-7A
100'
100'
ROAD
WORK
AHEAD
W20-1
BE
PREPAREDTO STOP
W20-7b
W20-7A
100'
100'
ROAD
WORK
AHEAD
W20-1
BE
PREPARED
TO STOP
W20-7bW20-7A
100'100'
ROAD
WORK
AHEAD
W20-1
BE
PREPARED
TO STOP
W20-7b
W20-7A
100'
100'PLEASE SCHEDULE
WITH DISPATCH
@ 800-343-4049 OPT.1
AND PROVIDE A
COPY OF THE APPROVED
TRAFFIC CONTROL PLAN
Notes:
1. Maintain ped. access to
and through crosswalks
2. Maintain Min. 11' lanes
3. Maintain local access
4. Notify Transit Authority
at least 72 hrs. in advance
of bus stop closure
5. Traffic control plan and all
devices shall comply with
MUTCD, PROWAG & WSDOT
6. DEVICE SPACING
Flag Taper 20'
Signs per WSDOT
Tapers per WSDOT
7. 28" Cones
36" Barrels
48" Signs
24" Paddle
8. Adjust to field conditions
K&D Services, as the preparer of this traffic
control plan makes no representation as to its'
general adequacy or being approved for implementation.
Approval must result from the Traffic Engineer or
other Public Official having statutory enforcement authority
in the jurisdiction. Utilization and implementation of this
plan shall be a result of that approval.
Ref. MUTCD 2009 6A-01 (10)
Legend
Bucket Truck
Cones
Flagger
Pole
ROADWORKAHEAD W20-1 road work ahead
W20-7A Flagger Ahead
BE PREPAREDTO STOP W20-7b be prepared to stop
Manifest
10 x Cones
4 x W20-1 road work ahead
4 x W20-7A Flagger Ahead
4 x W20-7b be prepared to stop NOT TO SCALE
NOTIFY EMS, FIRE,
POLICE AND LOCAL
TRANSIT AUTHORITY
72 HOURS IN ADVANCE
N
Adjust Controls as Needed
PRINT ON 11"X17"CUSTOMER:
CONTACT:
LOCATION:
DATE:W/O #
Inland Group
M. Ableman
206.794.4202
10405 SE 166TH ST,
RENTON, WA
04.26.2022
OFFICE: 800-343-4049
CELL: 425-765-1153
WATCP@KNDSERVICES.NET WSTCS#013076
101149164
DESIGNED BY: CHRIS SCHALEGERCedar Ave SCedar Ave SSE 166th St
SE 166th St
105th Ave SEwww.invarion.com
MFP22002639
10416
10404
10414
2816
2822
2907
2911
1660510419
16618
16624
16617
2915
SE 166TH ST
"10405"CEDAR AVE SR/W 60'R/W 60'
316858-166190
15 kVA 120/240 (C)
25 kVA 120/240 (C)
316846-166164
75 kVA (C)
316858-166167
316858-166171
12-341 (65T)
316841-166170
25 kVA (C)
UNK (100T)
PRE
LI
MI
N
A
R
Y
NOT
F
O
R
C
O
N
S
T
R
U
C
TI
O
N
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.101149164JOB SITE
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
___-__
9/2022
---
---
---
SITE SPECIFIC NOTES:
P01 - EXISTING #316858-166190
-REMOVE EXISTING OH 1Ø 15 120/240 kVA XFMR & RETURN TO YARD
-INSTALL OH 1Ø 25 kVA 120/240v XFMR, TAP C PHASE
-INSTALL L/B C/O, FUSE @ 10T (MID:3412200)
-INSTALL STIRRUP & HOT CLAMP
M01 - METER BASE
-INSTALL 200 AMP METER SERVICE
SPAN NOTE:
-SEE SITE PLAN, ONE-LINE DIAGRAMS, & TABLES FOR INSTALL
DEVELOPER & CUSTOMER NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET
SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
JOB SITE READINESS
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5
BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT
ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING.
-IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR WSDOT, A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
CIRCUIT FEED ADDED: 0'
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
1,236 SQ.
200AMPS
GAS
7.3kW
65A
2.4%
3.7%
00 1"2"
00 50'100'
Installed at site:
Grid Number:
kVA Rating:
TRANSFORMER INSTALLATION (OH)
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
Foreman to redline the following information
25kVA 120/240v
6211250
P01
316858-166190
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
316858-166190
15kVA
SITE PLAN
SCALE: 1" = 50'
SERVICE LINE(UTILITY OWNED)
11' MIN
3-1/2' MIN
11' MIN
3'MIN
DECK
ROOFS WITHPERMANENT ACCESS ROOFS WITHOUTPERMANENT ACCESS
ELECTRICMETER
GAS
METER
OVERHEAD SERVICE WIRE TO STRUCTURE CLEARANCE DETAIL
SCALE: NONE
SERVICE LINE(UTILITY OWNED)
SERVICE MAST
CONNECTION POINT
26'
17-1/2'
12'13'
STATE HIGHWAYS STREETS, ALLEYS, COUNTY ROADS,
DRIVEWAYS, AND PARKING AREAS
RESIDENTIAL PROPERTY
OVERHEAD SERVICE CLEARANCE DETAIL
SCALE: NONE
POWER GENERAL NOTES - COMMERICAL PROJECT
1.ALL MATERIALS TO BE INSTALLED IN ACCORDANCE WITH PUGET SOUND ENERGY'S (PSE) STANDARDS. ANY
DEVIATION FROM THIS WORK SKETCH MUST BE AUTHORIZED BY PSE'S PROJECT MANAGER AND NOTED ON
THE FOREMANS' COPY.
2.ALL SWITCHING ARRANGEMENTS AND/OR OUTAGE ARRANGEMENTS ARE TO BE MADE WITH THE PROJECT
MANAGER AT LEAST THREE (3) WORKING DAYS IN ADVANCE.
3.CONTACT THE UTILITIES UNDERGROUND LOCATION CENTER (1-800-424-5555) AT LEAST 48 HOURS PRIOR TO
COMMENCING WORK TO GET THE UNDERGROUND FACILITIES LOCATED.
4.STAKING: THE CUSTOMER WILL PROVIDE ALL STAKING (TRANSFORMER, HANDHOLE, TRENCH, GRADE, LOT,
POLE, SIDEWALK, ETC.). SEE SKETCH AND DETAILS FOR LOCATIONS. EQUIPMENT LOCATIONS MUST BE
APPROVED BY THE PROJECT MANAGER.
5.SITE PREPARATION: THE WORK AREA WILL BE AT OR NEAR FINISHED GRADE, CLEAR OF TRENCH SPOILS OR
CONSTRUCTION MATERIALS WHICH WOULD RESTRICT CONSTRUCTION AND/OR EQUIPMENT ACCESS,
BEFORE WORK CAN BEGIN.
6.ROADS SHALL BE PAVED OR HAVE A COMPACTED , CRUSHED ROCK BASE IN PLACE.
7.CLEARANCES: TRANSFORMERS REQUIRE A MINIMUM OF 6 FEET FROM FIRE FIGHTING EQUIPMENT, 10 FEET
FROM COMBUSTIBLE WALLS, OVERHANGS, DOORS, AND WINDOWS, AND A MINIMUM OF 5 FEET FROM THE
BACK OF CURB (OR GUARD POSTS WILL BE REQUIRED PER PSE STANDARDS). ALL CONDUITS AND VAULTS
ARE TO BE AT LEAST 5 FEET AWAY FROM WATER, STORM AND SEWER LINES WHEN PARALLELING THEM IN
THE RIGHT OF WAY, AND AT LEAST 1 FOOT WHEN CROSSING THEM.
8.ALL WORK IS TO BE DONE IN ACCORDANCE WITH LOCAL MUNICIPAL AND COUNTY PERMIT REQUIREMENTS
AS APPLICABLE.
9.CUSTOMER/DEVELOPER IS RESPONSIBLE TO PROVIDE, INSTALL AND MAINTAIN ALL SECONDARY SERVICE
CABLES, CONDUITS AND CROSSINGS FROM THE INDIVIDUAL UNIT'S METER BASE TO THE DESIGNATED
CONNECTION POINT.
10.INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES AND DATES.
11.EXCAVATION: THE CUSTOMER IS TO PROVIDE ALL TRENCHING, BACKFILL, VAULT EXCAVATIONS,
COMPACTION AND RESTORATION PER THIS SKETCH AND PER PSE STANDARDS. A MINIMUM PROTECTIVE
COVER OF 36" IS REQUIRED OVER PSE'S PRIMARY VOLTAGE EQUIPMENT AND 24" IS REQUIRED OF PSE'S
SECONDARY VOLTAGE EQUIPMENT. THE CUSTOMER WILL PROVIDE ANY AND ALL SHORING OR THEY WILL
SIDE SLOPE THE TRENCH TO 1:1.
UNDERGROUND CIRCUIT MAP
SCALE: 1" = 75'
O - EXISTING KNOCKOUT
X - NEW KNOCKOUT
CUSTOMER APPROVAL
I approve the location of the trench, including road crossings,
and all electrical equipment as shown on print.
________________________
Customer's Signature
________________________
Print Name/Date
JOB SITE
JOB SITE
N
Vicinity Map
N/A
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
Owner / Developer Contact Info
officeATTN:
Transformed Electric LLC
10303 194th Ave E
Bonney Lake, Wa 98391
Ryan Fowler 253.332.8438
OH Service
OH XFMR Removal
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
101149164512083001
583069545
101149165512862100
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:
Michele.Ableman@pse.com
(206) 794-4202
Michele Ableman
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
SIGNATURE
M. ABLEMAN 206-794-4202 4/7/22
D. BRINKMANN 206-794-8599 4/7/22
D. BRINKMANN -4/11/22
N/A CITY OF RENTON
WILSON FIRE REBUILD SFR
1Ø OH XMFR UPGRADE & OH SVC
10405 SE 166TH ST, RENTON, 98055
N/A N/A
N/A 101149164
AS NOTED 1/1
KING COUNTY N/A N/A CSPSKEPM
T23N.R05E.NW29 N/A N/A
2305E114 2305E136 2305E114 ROL-15
CenturyLink
N/A
N/A
Comcast/Xfinity
N/A
N/A
PSE - Gas
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
MAST HEIGHT BELOW 26"
METER SURFACE MOUNTED, U-BOLTS SECURE MAST
SERVICE BRACKET
WEATHERHEAD
FLASHING
18" MIN
18" MIN24" MAX *FLASHING IN COURSES
OF SHINGLES
MINIMUM 2" x 6" INSTALLEDSOLIDLY BETWEEN RAFTERS
OR STUDS WITH HOLEBORED FOR SNUG FIT
2" x 6" INSTALLED
SOLIDLY BETWEENRAFTERS AND AGAINST
ROOF SHEATHING
RIGID STEEL
CONDUIT
STRUCTURAL
FRAMINGAND FINISH
MATERIALS
STUD GROUND
* ADDITIONAL SUPPORT GUYS REQUIRED FOR ATTACHMENTS GREATER
THAN 24" ABOVE ROOFLINE OR IF SERVICE LINE EXCEEDS 100' IN LENGTH
MAST HEIGHT BELOW 26"
METER SURFACE MOUNTED, GALVANIZED LAG BOLTS SECURE MAST
SERVICE BRACKET
WEATHERHEAD
FLASHING
FRONT VIEW
GALVANIZED LAG-BOLT
INTO FRAMING MEMBER
HEAVY-WALLSTRUT-TYPE
CHANNEL HEAVY-WALL
STRUT-TYPECHANNEL
18" MIN24" MAX *
SERVICE DROP
DETAIL
BLOCKING BETWEENMAST AND BUILDING
5/16" U-BOLTS
2" x 6" BACKING
SHIM METERBASE/SOCKETAND FASTEN WITH
SCREWS
FLUSH
METERSOCKET
GROUND
RIGID STEEL
STRUCTURAL
FRAMING ANDFINISH MATERIALS
24" MAX *
SERVICE DROP
SERVICE BRACKET
FLASHING
MAST HEIGHT BELOW 26"
METER FLUSH MOUNTED
SERVICE DROP WEATHERHEAD
MINIMUM 2' x 6" BETWEENRAFTERS WITH HOLE
BORED FOR SNUG FIT
RIGID STEEL CONDUIT
UN-GUYED SERVICE MAST DETAIL
SCALE: NONE
MFP22002639