Loading...
HomeMy WebLinkAboutC_Hazardous_Materials_Management_Statement_220303_V1.pdf1�0" 1" 0010 = BlueFern March 3, 2022 City of Renton Alex Morganroth Senior Planner 1055 South Grady Way Renton, WA 98057 RE: Hazardous Material Management Statement Dear Alex: Please find the Hazardous Material Management Plan below: Description of Refueling and materials on site: • Refueling of construction vehicles will occur onsite by a fuel truck. • Any on -site generators shall be placed in a containment device to prevent spills • A full list of hazardous materials that will be temporarily stored, dispensed, used or handled on site during the course of construction will be provided prior to construction approval. Compliance with RMC 4-4-03008 • The site does not appear to be within an aquifer protection area therefore compliance with RMC 4-4-03008 is not applicable. Should you have any questions, or require additional information, please contact me directly. Michelle Branley C00 Cc: Benjamin Paulus, Blue Fern John Graves, Blue Fern 18300 Redmond Way Suite 120, Redmond, WA 98052 1 425-629-3854