HomeMy WebLinkAboutMFP22002590.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP22002590
IVR Number: 22002590
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:05/17/2022Application Date:0188800410Parcel Number: 3517 SE 18TH ST
Permit Type:05/26/2022Issue Date:Franchise
Permit Work Class:05/26/2023Expiration Date:Minor Utility
Job Number: 101144918Franchise Type:Electric
Description: Puget Sound Energy Electric CREW TO PARK TRUCK IN ROW AT HH01 AND ALSO AT TRANSFORMER AT GRID
317137 166953. RESTORATION PER CITY OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
HOLLENBECK ACOB WAYNE & MAC 3517 SE 18TH ST
RENTON , WA 98058
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
101144918
3517 SE 18TH ST
ANNETTE WILSON 425-766-3891
MFP22002590
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 5/26/2022
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
SE 18TH STS
E
1
9
TH
W
A
YSE 19TH WAY1
2
1
2 1212HH01IP1M01M02SHOULDERWORKW21-5100'100'ROADWORKAHEADW20-1ROADWORKAHEADW2
0
-1M6-2PLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK
FROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARK
RESIDENT(S) WILL BE INFORMED OFTEMPORARY DRIVEWAY CLOSUREEMERGENCY VEHICLES WILL BEALLOWED TO PASS WORK ZONE.TEMPORARY TRAFFIC CONTROL PLANWORK PITLEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV03/23/2022 10114491803517 SE 18th St, Renton, WA 98058 Safaa Al Neema (425) 398-6077 safaa.alneema@pse.com1 OF 4Puget Sound EnergyTraffic Control Supervisor:Safaa Al NeemaCard No. 012611Card Exp. 10/31/2024Safaa.alneema@pse.com(425)398-6077MFP22002590
3622
3619
3518
3524
3469
3475
3444
3482
3502
3517
3505
3459
3511
3451
3445
12620
3523
3536
3530
3542SE 18TH
ST
317137-166953
75 kVA (C)
317144-166930
50 kVA (C)
R/W 53'ROL16NEW 1-3"
NEW 1-3"
NEW 350MCM TPX
NEW 350MCM TPX
NEW 4/0SEC TPX
NEW 4/0SEC TPX
SPLICE IN 4/0
SEC TPX AT
METERBASE
SITE PLAN
N
Vicinity Map
47.461502, -122.170742
Owner / Developer Contact Info
officeATTN:
N/A
N/A
N/A
N/A N/A
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:Annette Wilson
253-395-6913
annette.wilson@pse.com
SCALE: 1" = 50'101144918THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
101144918
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
A. WILSON 253-395-6913 3/4/2022
A.WILSON 253-395-6913 3/4/2022
N/A N/A N/A
R.REYNOLDS 253-262-7409 3/4/2022
N/A RENTON
2305E084 ROL-16 3517 SE 18TH ST RENTON
HANDHOLE REPLACEMENT. SERVICE REPLACEMENT
3517 SE 18TH ST. RENTON, WA 98058
N/A N/A
N/A 101144918
AS NOTED 1 OF 1
KING N/A N/A CSPSKEPM
SE-21-23-5 N/A N/A
2305E084 2305E088 2305E084 ROL-16
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
11797054
SITE SPECIFIC NOTES
TENSING MAP VIEW-399180312.03125,52224693.90625,675000,0
NOTES: CORE HOURS, LOCATES, 2 FLAGGERS, RENTON PERMIT, 2 RESIDENTIAL OUTAGES.
PROBLEM: CORRECTING LOW VOLTAGE TO 3517 & 3523 (LOTS 40 & 41)
AT HH01 BETWEEN 3517 & 3523 SE 18TH ST, RENTON
*EXCAVATE,REMOVE EXISTING SECONDARY PEDESTAL HH & INSTALL NEW 1730 PE HANDHOLE PER STD
6050.2000 FIG 4.
*DISCONNECT AND ABANDON THE EXISTING TWO 1/0 SERVICES
*TRENCH AND INSTALL NEW 3" CONDUIT AND 350MCM SERVICE TO 3517 & 3523 UP TO THE 90 DEGREE BEND
AT GROUND LEVEL NEAR THE METERBASE. SPLICE AND INSTALL 4/0 FROM THERE UP INTO EACH METER
BASE.
*RESTORE LANDSCAPING TO ORIGINAL CONDITION AT 3517 & 3523 SE 18TH ST.
ROL-16 GRID 317137-166953 75KVA 120/240
SEE N#511758234
RVM RESULTS: NOT MEETING STANDARDS. SERVICEMAN STATES THAT IT IS 1/0 SERVICE FROM HH TO
HOMES BUT PER WO#105083951 WAS SUPPOSE TO BE 4/0 IN 3" CONDUIT FOR LOTS 40, 41.
UNDERGROUND AND UNIVERSAL
SCALE: 1" = 50'
Customer's
service
conductors27-1/4"
18"
Captive L-Bolt
Lock Cover, 10 lbs
40-1/2"
Conductors enter from
beneath and shall be
folded back with handhole
SIDE VIEW
2"
30"
Approx
Approx
17"
TOP VIEW
6'
5'
SINGLE PHASE SECONDARY HANDHOLE AT HH01
SCALE: NONE 6050.2000
PSE supplied and
installed DB120 conduit
for feed to HH
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS (MID 9995692).
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
SILT FENCE DETAIL
Not to Scale 0150.3200
PSE Locates Req'd Yes
Yes
YesFlagging Req'd
Outages Req'd
TRENCH DETAIL
Electric Service Cable in Conduit (NTS)
Electric Service Cable in Conduit
24" Min
24" Min
to
36" Max
Cover
Backfill for Conduit
Free of rocks
larger than 8"
in diameter)
36" MINIMUM COVER
IN RIGHT OF WAY
3" Schedule 40 Grey PVC
CONDUIT DIAGRAM
SCALE1"=50'
CABLE DIAGRAM
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
00 1"2"
00 50'100'
kWh Mtr
Elec. Mtr Base
12" Min 36" Typical
24" to 36" Max
Conduit Depth
Power Cable Conduit
Customer Provided
3" Schedule 40 Grey PVC
Regulator Vent
Utility-Provided
Gas Meter Assembly
Min
36"
Customer Provided
Conduit Stakes
48"
48"
Top View 4'
3" Conduit Service Riser
from Gas Service Lines
12" Minimum Clearance
Customer Provided
Drainage Pipe
Work Pit Dimensions
Electric & joint Utility
4'
SPLICE POINT FOR 3517 & 3523
SCALE: NONE
SPLICE IN 4/0 SEC
TPX UP TO METER
JOB SITE
JOB SITE
SCALE1"=50'
SECONDARY CABLE & CONDUIT TABLE
Work
Location
Cable
Assumed
Lot Corner
Conduit
Voltage
Drop
Voltage
Flicker
As Built Information
Size Length
Design
(ft)
Size Length
Design
(ft)
Bends Foreman - Complete
FROM TO (1/0,4/0,350)to Meter(ft)(in)90°45°22°11°(Percent)(Percent)Actual Amount Installed (Conduit & Cable)
HH01 SP1 SEC 350 UG
TPX 20'0 3"15'1 0 0 0 ----
SP1 M01 SEC 4/0 UG
TPX 10'EXISTING 3" CONDUIT
HH01 SP2 SEC 350 UG
TPX 20'0 3"15'1 0 0 0 ----
SP2 M02 SEC 4/0 UG
TPX 10'EXISTING 3" CONDUIT ----
CABLE REMOVAL SCHEDULE
CABLE
NO.
LOCATIONS CABLE
(LF) EST CABLE TYPE YEAR INST
FROM TO
N/A HH01 M01 30 1/0 SEC UG TPX
N/A HH01 M02 30 1/0 SEC UG TPX
Total 60'1/0 SEC UG TPX ACTUAL________Removed
Removal 108133528
MFP22002590