Loading...
HomeMy WebLinkAboutMFP22002550.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP22002550 IVR Number: 22002550 Permit Information Permit Name: Puget Sound Energy Gas Permits Address/Location:05/15/2022Application Date:1437650110Parcel Number: 800 DUVALL PL NE Permit Type:05/31/2022Issue Date:Franchise Permit Work Class:05/31/2023Expiration Date:Minor Utility Job Number: 109140665Franchise Type:Natural Gas Description: PSE Gas CREW TO CUT AND CAP EXISTING 5/8" PE GAS SERVICE AT MAIN AND INSTALL NEW 1 1/8" PE GAS SERVICE AT MAIN, APPROX 7' IN ROW. 1:3'X5' ASPHALT CUT ANTICIPATED. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Stuart Bennett Infrasource Services LLC 1622 Eastport Plaza Dr Collinsville, IL 62234 B: (303) 419-8755 H: (425) 677-5197 C: (713) 985-6489 Contractor Business License Number: 36742Construction Contractor: INFRASL871C2 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering INFRASOURCE, INC 6905 S 228TH ST KENT, WA 98032 PLEASE SEE ATTACHED 109140665 800 DUVALL PL NE SARA HYACINTHE 206-637-3169 Monday - Friday 8:00AM - 3:00PM MFP22002550 Scott Warlick CED 5/31/2022 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG 800 Duvall Place Northeast Renton WA 98059 USA NE 9TH ST 139TH AVE SE1414 17171717NE 9T H S T FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PAR K RESIDENT(S) WILL BE INFORMED OF TEMPORARY DRIVEWAY CLOSURE EMERGENCY VEHICLES WILL BE ALLOWED TO PASS WORK ZONE.SHOULDERWORKW21-5100'100'ROADWORKAHEADW20-1WORK PIT LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 TEMPORARY TRAFFIC CONTROL PLAN N Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 8. Work area will be 545' SCL of NE 9th St & 8' ECL of 139th Ave SE. Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 05/04/2022 109140665 0 800 Duvall Pl NE, Renton, WA 98059 Safaa Al Neema (425) 398-6077 safaa.alneema@pse.com 1 OF 1 Puget Sound Energy Traffic Control Supervisor: Safaa Al Neema Card No. 012611 Card Exp. 10/31/2024 Safaa.alneema@pse.com (425)398-6077 MFP22002550 Est. Start Date: & & & & & MDPE - 1 - 1/4" IPS - (DIA) 1"CTS 9999546 Job #:109140665 Date:12/9/21 Address:800 DUVALL PL NE Puget Sound Energy Gas Pre-Inspect Form 5/9/22 PM / Inspector:Sara Hyacinthe 206-637-3169 Est. Duration:1 Day (8 Hours) Jurisdiction:RENTON City / Zip:RENTON, 98059 ROW Permit:Yes Customer:CARL UELAND 206-276-9280 Work Location Size of Cut Surface Type Job Description New Construction: No Construction Method 0 PLAT Map:206.086 N Project Scope: *TERRADEX CLEAR* UPGRADE HOST (DECOUPLE AND INSTALL COMPLETE SVC FOR HOST AND TWIN): HOST 800: C/C 5/8" PE SVC (1986) AT MN (ALSO CUTTING TWIN 806); INSTALL 75' OF 1-1/8" SCAT PE SVC (7' STUB, 2600 EFV/ 68' EXT); SET A425 MSA; INSTALL ADDITIONAL 65' PE SVC EXT (TWIN TO 806); REHANG MTR NOTE: HOST 800 WAS PREVIOUSLY 11848 139TH AVE SE AND TWIN 806 WAS PREVIOUSLY 11844 of CL 139TH AVE SE 3 X 5 X 2 A of CL 545'South of CL NE 9TH ST 8'East of CL Service Information Street Information Job Type of CL of CL of CL of CL Altered Residential Svc EFV:1-1/8" - 2600 - 9999144 Police #:0 TCP:No Diameter:1-1/8" PE Flaggers #:0 Arterial:No Tie-In Fitting Trolley Lines:No Mtr Hoods #:0 Meter:A425 Speed Limit: 0 Route #'s:Bollards:2.5" #4" #ADA Ramps #: Del Press:6" W.C.Traffic Signal:Bus Stop:No 0 No Parks #:0 Meter Loc:08 - OR of CL of CL KNT FLT - Kent 800 803 806809 809 812 100FT RAD 1-1/8" PE 5/8" PE 1986 1-1/8" PE NE 9TH ST CL TERRADEX CLEAR WATER AND SEWER OUTSIDE OF WORKZONE MFP22002550 POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS 766 49335005 49254917 5003 5011 5018 5019 861 753 785 5017 779 805 853 867 959 830 836 842 862 868 874 900 904 852 858 864 4822 907 930 825 819 817 851 857 863 800 806 803 815 821 861 801 807 8134826 4820 950 913 919 953 961 927 501050044920 761 769 749 4707 751 4701 855 859 848 854 863860 49114905 921 903 909 4536 4608 4602 4603752 4542 748 491449084902 4904 906 912 4609 4614 4620 4810 4816 755 5023 50065000 927 915 918 912 920 908 922 816 4548 801 4704 4710 4716 745 824 818 812 806 848 809 812 5001 901 500750135019 5002 5008 5014 5020 957 953 954 752 823 755753 874 880 800 4540 862 868 807813 4519 873 886 138TH PL SE139TH AVE SE138TH AVE SE138TH AVE SECHELAN AVE NECHELAN AVE NE CHELAN PL NEGRAHAM AVE NENE 9TH ST NE 8TH ST 140TH AVE SE140TH AVE SENE 9TH PL 800 1'W2'N 18'E12'S CM 14'N131'W25'E4" MPE-7 IP 28'E 109102802-2020 2" MPE IP 18'S 107044775-2012 JT 2" MPE IP 17'S 9718047 2" MPE IP 18'S 107045118-2012 JT 2" MPE 235'N 2" MPE IP 17'S 107056917-20181" STW I P 16'W 8577-19662" MPE IP 11'E 107051235-2016 JT2" MPE 11'N2" MPEI 20'E2" MPE IP 11'S 107051235-2016 JT2" MPE IP 19'E 107051235-20162" MPE I 107'E2" MPE IP 20'E 107051235-2016 JT2" MPEI IP 23'S 107051235-20162" MPE 23'E2" MPE 21'E2" MPE IP 14'E-21'E 107051235-2016 JT2" MPE IP 18'S 107045016-2012 2" STW IP 18'S N. ESMT LINE 7860-1966 2" MPE IP 30'S 107007987-2000 JT 2" MPE IP 23'E 107007987-2000 JT2" MPE IP 27'W 9854742 JT2" MPE 158'N2" MPE IP 29'E 98547422" MPE IP 29'E 98547422" MPE IP 18'N 107031198-2007 JT 2" MPEI 2" PE-A IP 20'E 8520352" STW IP 20'E 8577-19662" MPE IP 14'S 107029877-2007 JT 2" PE-A 25'S 2" STW IP 17'S 8577-1966 2" STW IP 16'W 8577-19662" STW IP 18'W 2097-19602 " M P E IP 5 7 'R 9 6 1 8 3 8 4 2" PE-A IP 25'S 852035 2" PE-A 48'S 1 1/4" PE-A IP 21'W 8520351 1/4" PE-A IP 20'E 8520351 1/4" PE IP 46'R 852035 4" MPE IP 35'N 9854742 2" STW IP 18'W 2097-19604" MPE IP 28'E 9854742 JT2" ST W IP 1 8'S 2 0 9 7 - 1 9 6 0 2" STW IP 17'S 8577-19661" STW IP 16'W 8577-19662" STW IP 20'E 8577-19661 1/8" MPEI2013-E1 1/8" MPEI2013-E 1 1/8" MPEI2013-E 1 1/8" MPEI2013-E1 1/8" MPEI2013-E 1 1/8" MPEI2012-E 1 1/8" MPE2012-E 1 1/8" MPE2012-E 3/4" STW-U1992 3/4"240'N 1 1/8" MPE2018-E 5/8" MPE1998 5/8" PE1992 3/4" STW-U1964 1 1/8" MPE2019-E 1 1/8" MPE2017-E 1 1/8" MPEI2019-E 1 1/8" MPEI2019-E 5/8" PE1986 5/8" MPE2001 5/8" MPE2001 5/8" MPE2001 5/8" PE1985 5/8" PE1985 5/8" PE1986 5/8" PE1986 5/8" PE1985 5/8" PE1988 1 1/8" MPE2019-E 1 1/8" MPE2018-E 1 1/8" MPEI2019-E5/8" MPEI2000 5/8" MPEI2000 5/8" MPE2000 1 1/8" MPE2019-E 1 1/8" MPE2019-E 1 1/8" MPE2018-E 1 1/8" MPEI2017-E 1 1/8" MPE2018-E 1 1/8" MPE2019-E 1 1/8" MPEI2017-E 5/8" PE1985 5/8" PE1985 5/8" MPE2000 5/8" MPEI2000 5/8" PE1985 5/8" PE1985 5/8" PE1985 5/8" PE1986 5/8" PE1985 5/8" PE1988 5/8" MPEI2009-E 5/8" MPEI2009-E 3/4" STW1966 1/2" STW-U1967 1/2" STW-U1968 5/8" MPE2000 5/8" MPE2000 5/8" MPE2006 1/2" STW-U1967 1/2" STW-U1967 1/2" STW-U1966 1/2" STW-U1968 3/4" STW1966 3/4" STW-U1966 3/4" STW-U1966 1 1/4" STW-U1966 5/8" MPEI2007-E 5/8" MPE1998 5/8" MPE2006-E 5/8" MPEI20055/8" PE1994 1/2" STW-U1970 3/4" STW1962 3/4" STW1961 5/8" PE1985 5/8" PE1986 5/8" MPEI2007-E 5/8" MPEI2007-E 5/8" PE1985 1 1/8" MPEI2007-E 5/8" MPEI2006-E 5/8" MPEI2006-E 5/8" MPEI1997 5/8" MPEI2004 5/8" MPEI1997 5/8" MPEI1997 5/8" MPEI1997 5/8" MPEI1997 5/8" MPE1997 5/8" MPEI1997 5/8" MPE1997 5/8" MPEI1999 5/8" MPEI1999 5/8" MPE1999 5/8" MPEI1998 5/8" 5/8" MPEI1997 5/8" MPE1997 5/8" MPEI1999 5/8" MPE1999 5/8" MPEI1999 5/8" MPEI1999 5/8" MPEI1999 5/8" MPEI1997 5/8" MPEI1998 5/8" MPEI2006-E 3/4" STW1961 5/8" MPEI2007-E 5/8" PE1986 5/8" PE1986 5/8" MPE1999 5/8" MPE1999 5/8" MPE1998 5/8" MPE1999 5/8" MPE1999 5/8" MPE1998 5/8" PEI1992 5/8" MPE1999 5/8" MPE1999 5/8" MPE1999 3/4" STW1961 5/8" PE1985 5/8" PE1985 3/4" STW1983 5/8" PEI1993 3/4" STW1962 5/8" 3/4" STW1962 5/8" STW2009-E 5/8" MPE2008-E 5/8" MPEI2008-E 5/8" MPEI2008-E 5/8" MPEI2008-E 1/2" STW-U1967 1/2" STW-U1967 1 1/8" MPEI2014-E 1 1/8" MPEI2013-E 5/8" MPEI2009-E 5/8" MPEI2009-E TF33'ETFTF20'ETF TF328'S 258'N 55'E277'N 33'N 16'E32'E346'N 380'N 423'N 464'N 54'S48'S 10'S 30'N 74'N 111'N 323'S 325'S 251'N 231'W134'E110'E95'E214'N 102'E110'N 400'E 279'N 455'S 115'E368'S 171'W90'N 164'S 89'S 73'W372'N 176'N 108'W480'N 130'E146'S 304'S 158'N 159'W114'S 214'S 87'E90'E218'N 175'N 182'N 266'N 201'N 166'N 155'N 99'N 252'E155'N 338'N240'E103'W626'E 372'E 45'E136'W130'W197'N 70'N 75'N 194'N 200'E223'N 511'S223'N 545'S378'S 207'S 111'S 190'S 259'S 251'S 180'E168'W135'E 238'E30 5'E 102'E243'S 106'S 65'S 111'S 239'W156'S 49'E101'W412'S 280'N @C/L150'W125'W135'W238'W331'W481'W431'W337'W230'W330'W252'W RPTD 2" PE IP 325'S 29'E276'N 56'S 68'S 255'W234'N,1 4'WTL TL TL33'ETLTLT LTH H54'S H70'S5' V.O.66'S5' V.O.58'S 11'W10'W48'S 29'E235'N,12'W136'N 480'W466'N56'S216'N214'S206'W 36'W 255'E 317'S111'W 650'S243'E NR100'N45'N21'S134'W282'N212'S T T 71'S 53'S T 235'N,13'WT T15'S 317'SP 15'S C.MS S256'N S327'S S254'WP 251'NP215'N LCLC173'N172'N171'NLC5/8" PE1986 No electric grid information availableS204086, Q206086 The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“ 05-02-2022 Scale 1:1890 Lat\Long=47.4967, -122.155 MFP22002550