Minor Franchise Permit: MFP22002601
IVR Number: 22002601
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:05/17/2022Application Date:7612500080Parcel Number: 5025 NE 9TH PL
Permit Type:06/02/2022Issue Date:Franchise
Permit Work Class:06/02/2023Expiration Date:Minor Utility
Job Number: 186061625Franchise Type:Electric
Description: Puget Sound Energy Electric CREW TO REPLACE P01 (318459 167456) AND P02 (318442 167457). CREW TO
INSTALL 1 NEW CONCRETE HH AT HH01. 1:3'X4' AND 1:7'X6' CONCRETE CUT ANTICIPATED. RESTORATION PER
CITY OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
DANG JENNY N+WILLI VONG 5025 NE 9TH PL
RENTON , WA 98059
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
186061625
5025 NE 9TH PL
VALENSE PLUVIOSE 253-553-6176
MFP220026001
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 6/2/2022
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
5025 NE 9th Pl
Renton
WA 98059
USA
P01
HH01
P02
12121515131399 920NE 9TH PL
NE 9TH ST
NE 8TH CTHOQUIAM AVE NESTOP
FLAGGER
STOP
FLAGGER
NE 10TH ST
W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'STOP
FLAGGER
W20-7AROADWORKAHEADW20-1
W20-4ONE LANEROADAHEAD100'100'100'W20-7AROAD
WORK
AHEAD W20-1W20-4ONE LANE
ROADAHEAD100'100'100'ROADWORKAHEADW20-1RESIDENT(S) WILL BE INFORMED
OF POSSIBLE TEMPORARY
DRIVEWAY CLOSURE
W20-7AROADWORKAHEADW20-1
W20-4ONE LANEROADAHEAD100'100'100'X'X'PLACE W20-1 SIGNS ON ALL
ADJACENT STREETS WITHIN
FEET OF WORK AREA
ROAD
WORK
AHEAD W20-1ROADWORKAHEADW20-1300
PLACE SIGNS
BOTH SIDES OF
WORK AREA
FROMTOTOW AWAY AREAPHONE 888-9999
INFRASOURCE LLC
000
00000
00 NO PARKINGNO-PA
RK FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PA
R
K
THE CREW SHALL CEASE
WORK FOR A FLAGGER/SPOTTER
TO ESCORT PEDESTRIANS
AROUND THE WORK AREAHOQUIAM AVE NEHOQUIAM AVE NENE 8TH PL
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
POLE
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
TEMPORARY TRAFFIC CONTROL PLAN
0'60'30'
PRINT ON
11X17" SHEETS ONLYN
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
03/25/2022
186061625
0
5025 NE 9TH PL, RENTON, WA 98059
Yuriy Bashtovoy
(425)424-6603
Yuriy.Bashtovoy@PSE.com
1 OF 1
Puget Sound Energy
Traffic Control Supervisor:
Yuriy S. Bashtovoy
Card No. 011687
Card Exp. 06/30/2022
Yuriy.Bashtovoy@pse.com
(425)424-6603
Notes:
1. All signs and spacing to conform to the
MUTCD and City of RENTON standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
MFP220026001
"920""5025""5020""959""980""901""904"INST NEWSW# X86979HOQUIAM AVE NENE 9TH ST142ND AVE SE NE 9TH PL1 - 2" RISER1/0 UG TPX512554661186061625101147565 / 108135710PROJECT PHASEPWRNOTIF#ORDER#SuperiorSub OrderN/AN/APSENoNoNoYesYesYesNoYesDeveloper"Flagging Required""Outages Required""Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGSAP W.O. #186061625FOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.OH CIRCUIT MAP: D2305E040 SCALE 6" = 1 MILEJOB SITEARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.POWER GENERAL NOTES1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from thiswork sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy.2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three(3) working days in advance.3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing workto get the underground facilities located.4.All work is to be done in accordance with local municipal and county permit requirements as applicable.5.Inclement weather conditions may cause delays in construction times and dates.SCALE: 1:100SITE PLAN: P01 - P02DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPV. PLUVIOSE253-553-61763/1/22J. REYNA253-259-70763/1/22N/AN/AN/AA.TOLENTINON/A3/1/22N/ACITY OF RENTONENGR1 COMCAST TK# 4986199REPLACE (2) DISTRIBUTION POLES & INST 1Ø SEC HANDHOLE5025 NE 9TH PL, RENTON, WA 98059POTELCON/AN/AN/A186061625AS NOTED1/1KINGN/AN/AQCSOKET23, R05E, S10N/AN/AA2305E037D2305E040R2305E037PRE-14N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AVICINITY MAPJOB SITESITE SPECIFIC NOTESP01 (318459-167456) CONCRETE RESTORATION REQUIRED-REPLACE EXIST 40' CL4 POLE-INST NEW 45' CLH1 POLE (6010.1000 PD45H1)-CREW TO DEEP SET POLE 1' - 0"-INST 3Ø PRI NEUT SGL ARM (6033.3010 TAP312)-REMOVE 9' C/O DBL ARMS-REMOVE (3) EXIST 15kVA 277/480v XF W/ LB C/Os-REMOVE EXIST UNUSED 3" RISER APPROX. 40' (____)'-SEE HANDHOLE NOTES FOR HANDHOLE INSTALATION-TRANSFER EXIST OH TPX-TOP POLE TO COMMSP02 (318442-167457)-REPLACE EXIST 40' CL4 POLE-INST NEW 45' CLH1 POLE (6010.1000 PD45H1)-CREW TO DEEP SET POLE 1' - 0"-INST 3Ø PRI NEUT DBL DE (6033.3040 DEP312) W/ LB C/Os FUSED AT 40T (3412500) EA-INST NEW SW# X86979-TRANSFER EXIST 25kVA 120/240v W/ LB C/O FUSED AT 10T (3412200)-TRANSFER & EXTEND EXIST 2" RISER APPROX 5' (_____')-SPLICE & EXTEND EXIST 1/0 UG TPX APPROX 5' (_____')-TRANSFER EXIST OH SEC-TOP POLE TO COMMSNew pole at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER TRANSFERCompany ID#:Primary phase connected to:Tested Secondary VoltageP02318442-16745725kVA 120/240VPOLE TABLE (NEW)Site#Pole DataGrid #HeightClassYearRemarks / Location Ref.P01318459-16745645'H1P02318442-16745745'H1 POLE RETIREMENT TABLE TEMP TRANSFERSST. LIGHT TRANSFERSSITE#POLE DATAPOLETELTVFIBERTRANRMVDID NUMBERGRID #HEIGHTCLASSYEARTOPPEDRMVDP01318459-16745640'41999N/AP02318442-16745740'41997N/ARemoved at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER REMOVALCompany ID#:Primary phase connected to:Tested Secondary Voltage P01318459-16745615kVA 277/480vRemoved at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER REMOVALCompany ID#:Primary phase connected to:Tested Secondary Voltage P01318459-16745615kVA 277/480vRemoved at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER REMOVALCompany ID#:Primary phase connected to:Tested Secondary Voltage P01318459-16745615kVA 277/480vTOP VIEWSIDE VIEW3'-4"EXCAVATION: 5-1/3 CUBIC YARDS7'-0"6'-0"2"SINGLE PHASE SECONDARY CONCRETE HANDHOLENot to scale6050.2020-2Steel DoorHandhole1900 lbsTypical customer runservice conductors in ductSeal conduitwith foamInstall PVC bell endsand grout into wallConduits and conductors shall enter fromends of handhole through knockouts provided3'-8"2'-8"6" Crushed rock SCALE: 1:100ONE LINE DIAGRAM: HH01HANDHOLE NOTESHH01 (318459-167456)-INST NEW 1Ø 3030 SEC CONCRETE HH ANTI-SKID (6050.2020 HH14350AS) W/ 4" BELLEND (7624900) & 4" BEND (7645601) AT BASE OF P01-INST 4 POS FARGOS-INST NEW 2" RISER (6042.1000 RIS2CSS) ON S/O BKTS APPROX. 40' (____)' UP POLE-INST 1 - 45' (_____)' 1/0 UG TPX IN NEW RISER-INST 1 - 2" PVC CONDUIT APPROX 5' (_____)'-RE-ROUTE & RECONNECT EXIST CUSTOMER WIRERESTORATION PER CITY OF RENTON STANDARDSMFP220026001