Loading...
HomeMy WebLinkAbout20180398E003_Renton_ES_16_2022-05-18_FR_008 Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 2 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 05/18/2022 Renton Elementary School 16 20180398E003 008 Location Municipality AESI Project Manager AESI Field Rep 1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Kelsey McCrady Permit No. Client/Owner Attn Requested By Renton School District No. 403 Ed Thomson Client Engineer/Architect General Contractor Grading Contractor Weather LPD / Hutteball + Oremus Cornerstone Continental Dirt Contractors/ Jerry Jr. Partly cloudy, 50’s THE FOLLOWING WAS NOTED: Associated Earth Sciences Inc. (AESI) was on site, as requested, to observe building subgrade preparation. Upon arrival, we met with representatives from Cornerstone and Continental Dirt Contractors (CDC). Building Foundation Subgrade Preparation: Upon arrival, CDC was continuing preparation of the future building pad subgrade south/southwest of Wetland B. In the area work was performed today, soil and current ground surface elevation consisted of a very moist to wet, dark brown, silty fine sand with occasional organics. Using a ½ diameter steel soils T-probe, this material probed between 1 and 2 feet. While onsite, AESI observed as the contractor removed the soft soils in an area approximately 60-feet wide by 70-feet long by approximately 1- to 3-feet deep. The contractor excavated in the area until hard native till was exposed. AESI probed the moist, gray, sand with silt native till to less than 2 inches and noted the material appeared firm and unyielding underfoot. The contractor then backfilled the area using 2.5-inch minus crushed rock material in 1-foot thick lifts. Each lift was compacted using a vibratory roller. Wile onsite today, AESI observed the contractor remove approximately 430 cubic yards of soft soils (bank yardage). See Figure 1 below for location. AESI will return tomorrow to continue observation of building pad subgrade preparation. Figure 1: Approximate location of subgrade over excavation outlined in blue. Date Project Name Project No. Report No. 05/18/2022 Renton ES 16 20180398E003 008 Page 2 of 2 FIELD REPORT Photo 1: Overexcavation observed today. Photo faces northeast.