Loading...
HomeMy WebLinkAboutMFP22002804.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP22002804 IVR Number: 22002804 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:05/31/2022Application Date:0188800380Parcel Number: 3536 SE 18TH ST Permit Type:06/08/2022Issue Date:Franchise Permit Work Class:06/08/2023Expiration Date:Minor Utility Job Number: 101147952Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO PARK IN ROW. NO HS CUTS. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL LEE EDWARD & TINA 3536 SE 18TH ST RENTON , WA 98058 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 101147952 3536 SE 18TH ST ANNETTE WILSON 425-766-3891 Scott Warlick CED 6/8/2022 Monday - Friday8:00AM - 3:00PM MFP22002804 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG 3542 SE 18th St Renton WA 98058 USA1212121 2 SE 1 9 TH WAYSE 18TH STH9ASP2SP1RESIDENT(S)/CLIENT(S) WILL BE INFORMEDOF TEMPORARY DRIVEWAY CLOSUREFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK UTILITYWORKAHEADW21-7100'100'SHOULDERWORKW21-5TEMPORARY TRAFFIC CONTROL PLANSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV05/03/2022 10114795203542 SE 18th St, Renton, WAGregory Harwood(425) 445-9028gregory.harwood@pse.com1 OF 1Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.MFP22002804 3619 3518 3524 3475 3502 3517 3505 3459 3511 3523 12644 1263612628 3536 3530 3542 12652SE 18TH ST 317144-166930 50 kVA (C) R/W 53'ROL16 SPLICE IN 4/0 SEC TPX AT METERBASE SPLICE IN 4/0 SEC TPX AT METERBASE 317137-166953 75 kVA (C) NEW 1-3" NEW 1-3" NEW 4/0SEC TPX SPLICE IN 4/0 SEC TPX AT METERBASE NEW 350MCM TPX NEW 350MCM TPX SPLICE IN 4/0 SEC TPX AT METERBASE NEW 4/0SEC TPX SITE PLAN N Vicinity Map 47.461502, -122.170742 Owner / Developer Contact Info officeATTN: N/A N/A N/A N/A N/A Superior ORDER#NOTIF# PWR PROJECT PHASE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. E-Mail: Cell Phone: Project Manager Contact Information: Manager:Annette Wilson 253-395-6913 annette.wilson@pse.com SCALE: 1" = 50'101147952THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 101147952 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP A. WILSON 253-395-6913 4/12/2022 A.WILSON 253-395-6913 4/12/2022 N/A N/A N/A R.REYNOLDS 253-262-7409 4/12/2022 N/A RENTON 3536 & 3542 SE 18TH ST, RENTON HANDHOLE REPLACEMENT. SERVICE REPLACEMENT 3536 SE 18TH ST. RENTON, WA 98058 N/A N/A N/A 101147952 AS NOTED 1 OF 1 KING N/A N/A CSPSKEPM SE-21-23-5 N/A N/A 2305E084 2305E088 2305E084 ROL-16 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 11833638 PROBLEM: CORRECTING LOW VOLTAGE TO 3536 & 3542 (LOTS 38 & 39) NOTES: CORE HOURS, LOCATES, 2 FLAGGERS, RENTON PERMIT, RESIDENTIAL OUTAGES. Will need 1 day Trench Crew and vactor truck per Randy Chapple, Potelco. AT HH H9A 3536 SE 18TH ST, RENTON * EXCAVATE,REMOVE EXISTING SECONDARY PEDESTAL HH & INSTALL NEW 1730 PE HANDHOLE PER STD 6050.2000 FIG 4. * DISCONNECT AND ABANDON THE EXISTING 1/0 SERVICES *TRENCH AND INSTALL NEW 3" CONDUIT AND 350MCM SERVICE TO 3536 & 3542 UP TO THE 90 DEGREE BEND AT GROUND LEVEL NEAR THE METERBASE. SPLICE AND INSTALL 4/0 FROM THERE UP INTO EACH METER BASE. * RESTORE LANDSCAPING TO ORIGINAL CONDITION AT 3536 & 3542 SE 18TH ST. * RESTORE SYSTEM TO NORMAL WITH SYSTEM OPERATOR. UNDERGROUND AND UNIVERSAL SCALE: 1" = 50' PSE Locates Req'd Yes Yes YesFlagging Req'd Outages Req'd CONDUIT DIAGRAM SCALE1"=50' CABLE DIAGRAM OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE 00 1"2" 00 50'100' JOB SITE JOB SITE SCALE1"=50' SECONDARY CABLE & CONDUIT TABLE Work Location Cable Assumed Lot Corner Conduit Voltage Drop Voltage Flicker As Built Information Size Length Design (ft) Size Length Design (ft) Bends Foreman - Complete FROM TO (1/0,4/0,350)to Meter(ft)(in)90°45°22°11°(Percent)(Percent)Actual Amount Installed (Conduit & Cable) H9A SP1 SEC 350 UG TPX 20'0 3"15'1 0 0 0 ---- SP1 M01 SEC 4/0 UG TPX 10'EXISTING 3" CONDUIT H9A SP2 SEC 350 UG TPX 60'0 3"70'1 0 0 0 ---- SP2 M02 SEC 4/0 UG TPX 10'EXISTING 3" CONDUIT ---- CABLE REMOVAL SCHEDULE CABLE NO. LOCATIONS CABLE (LF) EST CABLE TYPE YEAR INST FROM TO N/A H9A M01 30 1/0 SEC UG TPX N/A H9A M02 70 1/0 SEC UG TPX Total 60'1/0 SEC UG TPX ACTUAL________Removed HH Removal 108136490 108136142 3542 SIDE YARDH9A CONNECTIONSEXISTING HANDHOLE 3536 SIDE YARD LOT LAYOUT FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 kWh Mtr Elec. Mtr Base 12" Min 36" Typical 24" to 36" Max Conduit Depth Power Cable Conduit Customer Provided 3" Schedule 40 Grey PVC Regulator Vent Utility-Provided Gas Meter Assembly Min 36" Customer Provided Conduit Stakes 48" 48" Top View 4' 3" Conduit Service Riser from Gas Service Lines 12" Minimum Clearance Customer Provided Drainage Pipe Work Pit Dimensions Electric & joint Utility 4' SPLICE POINT FOR 3536 & 3542 SCALE: NONE SPLICE IN 4/0 SEC TPX UP TO METER Customer's service conductors27-1/4" 18" Captive L-Bolt Lock Cover, 10 lbs 40-1/2" Conductors enter from beneath and shall be folded back with handhole SIDE VIEW 2" 30" Approx Approx 17" TOP VIEW 6' 5' SINGLE PHASE SECONDARY HANDHOLE AT H9A SCALE: NONE 6050.2000 PSE supplied and installed DB120 conduit for feed to HH TRENCH DETAIL Electric Service Cable in Conduit (NTS) Electric Service Cable in Conduit 24" Min 24" Min to 36" Max Cover Backfill for Conduit Free of rocks larger than 8" in diameter) 36" MINIMUM COVER IN RIGHT OF WAY 3" Schedule 40 Grey PVC Misc UG/Splicing 594149217 3536 SVC Removal 11861995 101149210 1011484033542 SVC Removal 11861996 108136489 MFP22002804 RESTORATION PER CITY OF RENTON STANDARDS