Loading...
HomeMy WebLinkAboutMFP22002771.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP22002771 IVR Number: 22002771 Permit Information Permit Name: Puget Sound Energy Gas Permits Address/Location:05/26/2022Application Date:3342103895Parcel Number: 3101 MOUNTAIN VIEW AVE N Permit Type:06/08/2022Issue Date:Franchise Permit Work Class:06/08/2023Expiration Date:Minor Utility Job Number: 106386857Franchise Type:Natural Gas Description: PSE Gas CREW TO TIE INTO EXISTING MAIN AND INSTALL NEW 1 18" PE GAS SERVICE, APPROX 10' IN ROW.1:3'X5' ASPHALT CUT ANTICIPATED. 1:2'X4' ASPHALT CUT ANTICIPATED. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Stuart Bennett Infrasource Services LLC 1622 Eastport Plaza Dr Collinsville, IL 62234 B: (303) 419-8755 H: (425) 677-5197 C: (713) 985-6489 Contractor Business License Number: 36742Construction Contractor: INFRASL871C2 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering INFRASOURCE, INC 6905 S 228TH ST KENT, WA 98032 PLEASE SEE ATTACHED 106386857 3101 MOUNTAIN VIEW AVE N SARA HYACINTHE 206-637-3169 MFP22002771 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 6/8/2022 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG #3101 LAKE WASHINGTON BLVD N1010 MOUNTAIN VIEW AVE NMOUNTAIN VIEW AVE N 99 99 PLACE SIGNS ALONG WORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKSTOP FLAGGER STOP FLAGGERW20-7AW20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1W20-7AW20-4ONE LANE ROAD AHEAD100'100'100'ROAD WORK AHEAD W20-1RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE CREW SHALL POTHOLE FOR WATER MAIN DEPTH PRIOR TO PROJECT START WORK PIT 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 TEMPORARY TRAFFIC CONTROL PLAN N Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 8. Work area will be 10' SCL of N 31st St & 8' WCL of Mountain View Ave N and 10' SCL of N 31st St & 9' WCL of Mountain View Ave N. Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 05/18/2022 512862235 0 3101 Mountain View Ave N, Renton Flaviana Nunes 425-424-7386 flaviana.rodriguesnunes@pse.com 1 OF 1 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 MFP22002771 Service Address: City Zip: Customer:Phone: Customer Email: Est. Start Date: Site Contact Email: & & 203.081 2 X 4 X 210'South of CL N 31ST ST 9'West of CL MOUNTAIN AVE N PM / Inspector: sebastianryan76@gmail.com 98056 Phone:(503) 957-9523 Puget Sound Energy Gas Pre-Inspect Form 5/16/22Date: 106386857Job #: RENTON, 98056 3101 MOUNTAIN VIEW AVE N JOHN SMITH 425-894-8671 sinlew@hotmail.com Phone:(206) 637-3169Sara Hyacinthe6/6/22 10'South Surface Type A A Size of Cut of CL N 31ST ST 8'West of CL MOUNTAIN AVE N 3 X 5 X 2 Work Location No Residential Conversion SVC Service Information Street Information 1-1/8" PE 9999546 Del Press:6" W.C.Traffic Signal:Bus Stop:No KNT FLT - KentBollards:2.5" #4" #ADA Ramps #:0 Route #'s: Meter Loc:Trolley Lines:No Mtr Hoods #:008 - OR A425 MDPE - 1 - 1/4" IPS - (DIA) 1"CTS PLAT Map: N EFV:1-1/8" - 2600 - 9999144 Police #:0 TCP:Yes Tie-In Fitting Meter:Speed Limit:0 No Parks #:0 Job Type Diameter:Flaggers #:0 Arterial: RENTON YesROW Permit: Jurisdiction: Project Scope: TIE-INTO 1-1/4" MPE IP MAIN (107009638-2000); INSTALL 1-1/8" PE SVC (10' SCAT STUB, 2600 EFV/ 115' PLAT EXT); SET A425 MSA O/R Est. Duration: No Job Description New Construction: Construction Method Building Foundation Type Septic System 1 Day (8 Hours) No Crawl Space Directional Bore PLANTERSSTRIPPLANTERSSTRIPPARKINGSTRIPPARKINGSTRIP1-1/4" MPE IP 9'W107009638-2000P/L P/L C/L ROW 20 FT N 31ST ST MOUNTAIN VIEW AVE NA425 MSA 1-1/8" PE 3101 SEWER TO THE EAST, OUTSIDE OF INSTALL PATH 1000 SQFT WORKZONE MFP22002771 RESTORATION PER CITY OF RENTON STANDARDS 71830047062902806706712806711810812814818815819816808820909012930290870171532123216311431107093106710703716806801300870774080581380180930118178198103117802806814919062910300491190290690180781380581881681491031009073013311531113107321731013213320930093119320530113015300730053001300329313005310371380332028259032929LAKE WASHINGTON BL A KE W A SH I N GT O N B LVD NBURNETT AVE NN 33RD STN 32ND STN 31ST STBURNETT AVE NN 30TH STM O U N T A IN V IE W MOUNTAIN VIEW AVE N9'S13'N2" MPE-9 IP 1091219822" MPE-9 IP 2-1'S 109121982-20214" MPE-9 24'E2" MPE IP 1'W 107005976-20004" MPE-9 IP 2'S 109121982-20214" MPE-9 IP 2-3'S 109121982-20214" MPE-9 2'S4" MPE-9 IP 4-2'S 109121982-20211 1 /4 " M P 1 0 7 0 0 9 62" MPE IP 22'E 107023517-20052" PE IP 14'S 802-4192" MPE IP 10'E 107040934-20102" MPE IP 10'E 107025726-20062" MPE IP ON CL 107017617-2003DEACT 2" MPE 7'S 107005976-20002 PE IP 10S 920550DEACT 2" MPE 14'N 97078842" MPE IP 16'N 107043974-20112" MPE IP 16'N 107032014-20072" PE IP 14'S 8726232" MPE IP 19'N 107004965-19992" PE IP 19'N 93037262" PE IP 14'S 9100502" MPE IP 16'W 97078842" PE IP 12'W 9200132" PE IP 14'W 9100552" PE IP 19'W 93037262" MPE IP 19'W 107006117-19992" MPE IP 16'W 97078842" PE IP 15'S 9123472" P 9202" PE-A IP 14'S 8721731 1/4" MPE IP 3'W 107008427-20001 1/4" PE IP 2'E-W 90295612" STW HP 11'E(E EDGE PA 7831651 1/4" MPE IP 10'E 107009638-20001 1/4" MPE I P 10 'E 1 0 7009638-2000 2" PE IP 10'S 9420966 2 PE IP 12S 94209661 1/8" 2014-E1 1/8" MPEI2014-E1 1/8" MPE2013-E1 1/8" MPEI2015-E1 1/8" MPE2018-E1 1/8" MPE2019-E1 1/8" MPE2012-E1 1/8" MPE2019-E1 1/8" MPEI2016-E1 1/8" MPEI2016-E1 1/8" MPE2016-E5/8"69'E1 1/8" MPEI2017-E5/8"112'W1 1/8" MPE2013-E5/8" PE19905/8" MPEI2003 5/8" MPE20055/8" MPE20005/8" MPE2007-E5/8" MPE20005/8" MPE20051 1/8" MPEI20115/8" MPE20035/8" MPE20105/8" PE19925/8" MPE20045/8" MPE19985/8" PE19875/8" MPEI20115/8" MPE19955/8" PE19895/8" MPEI20075/8" MPEI2011-E1 1/8" MPEI20045/8" PE19905/8" MPE19985/8" PE19901 1/4" MPE2006-E5/8" MPE20025/8" MPEI2007-E5/8" PE19925/8" PE19915/8" PE19935/8"92'E 5/8" PE19865/8" MPE20005/8" PE19875/8" PE19875/8" MPE20045/8" PE19925/8" PE19905/8" MPE1997-E5/8" MPE1997-E5/8" MPE1997-E5/8" MPE1997-E5/8" MPE20045/8" PE19875/8" PE19901 1/8" MPE2006-E1 1/8" MPE2010-E5/8" MPEI20081 1/8" MPEI2011-E5/8" PE19905/8" PE19925/8" MPE2003 5/8" PE1994 5/8"373'W5/8" MPE19995/81995/8" PE19900021'W,3'S10'S@PL513'S77'S-CM112'E407'E346'W390'W523'E228'W119'E157'S184'S958'S986'S69'E194'N272'E282'W297'S590'S111'N151'W74'W68'W146'W439'S203'W256'W89'S23'S521'S274'S227'E174'W42'S71'S68'E1049'S833'W57'N71'E105'S175'N65'W83'N278'W153'W230'E308'W247'W101'W1183'W394'S44'S52'E943'S883'S717'S92'E138'W101'S573'S5'S14'S,434'W270'S326'E16'N72'E38'E,13'S514'S14'S,22'ERETIRED FT #2011920311156'W250'W351'W18'S71'S11'S526'E181'NTLTL18'W11'W30'N12'E12'E11'SH428'W17'W514'S34'N28'N50E395'W197'N96'S91'S38'S89'E108'S104'S@CLT16'ST1'SECEC74'WEC380'W8252907549'W,4'SROPES460'W,2'S70349'E,1'SROPES161'E,13'S D2405E124, R2405E124, A2405E124S200080, Q203081The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“05-13-2022Scale 1:1471Lat\Long=47.5192, -122.2093MFP22002771