HomeMy WebLinkAboutAdden 1AMENDMENT NO. 1 TO CAG 22-071
THIS AMENDMENT, dated for reference purposes only as May 26, 2022, is by and between the
City of Renton (the “City”), a Washington municipal corporation, and Johnston Architects, LLC
(“Consultant”), a Washington limited liability company. The City and the Consultant are referred
to collectively in this Amendment as the “Parties.” Once fully executed by the Parties, this
Amendment is effective as of the last date signed by both parties.
Whereas, the City engaged the services of the Consultant under Agreement CAG-22-071, dated
3/16/2022, to provide necessary services for the Architectural services need for the renovation
of the 243 office building (referred to herein as the “Agreement”);
Whereas, the Parties wish to amend the Agreement to change the scope of work, and change the
compensation in order to incorporate the necessary small works furniture design into the
specification prior to bid.
NOW THEREFORE, It is mutually agreed upon that CAG-22-071 is amended as follows:
1. Scope of Work: Section 1, Scope of Work, is amended to read as follows:
Consultant agrees to provide professional services as specified in Exhibit A and Exhibit B,
which are attached and incorporated herein and may hereinafter be referred to as the
“Work.”
2. Compensation: Section 4, Compensation, is amended so that the maximum amount of
compensation payable to Consultant is increased by $11,860 from $63,540 to $75,400,
plus any applicable state and local sales taxes. The additional compensation shall be paid
based upon Work actually performed according to the rate(s) or amounts specified in
Exhibit A of the Agreement.
3.All terms of the Agreement not explicitly modified herein shall remain in full force and
effect and such terms shall apply to Work performed according to this Amendment as if
fully set forth herein.
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date
last signed by the Parties below.
CAG-22-071, Adden #1-22
PAGE 2 OF 2
CITY OF RENTON
By:_____________________________
CONSULTANT
By:____________________________
Martin Pastucha
Public Works Administrator
Jack Chaffin AIA
Partner
_____________________________
Date
_____________________________
Date
Approved as to Legal Form
By: __________________________
Alex Tuttle
Senior Assistant City Attorney
Contract Template Updated 06/17/2021
_____________________________________
Jackckckck Chaaffffin AAIAI
ϱͬϮϲͬϮϬϮϮ
Approved byAlex Tuttle via 5/26/2022 email
JOHNSTON ARCHITECTS / 100 NE NORTHLAKE WAY SUITE 200 / SEATTLE, WA 98105 / 206.523.6150
William Adams
Renton Municipal Airport/Civil Engineer III
Renton Municipal Airport
616 W Perimeter Rd W, Building 243
Renton, WA 98057
Date: May 23, 2022 Subject: Additional Service Request #1
Dear William,
We are writing to request an increase to our contract amount for the Renton Municipal Airport Office
Renovation project. The additional services not included in our original scope of work include:
Furniture Furniture Furniture Furniture Review & Review & Review & Review & ConsultingConsultingConsultingConsulting
JA will work with the furniture procurement vendor, Legacy Group. to ensure the proposed furniture [for the
Lounge, Conference Room, and offices] fits with the interior design concept developed by JA. This process
will involve email coordination and 3-4 virtual meetings. We will review the final furniture order for accuracy.
We estimate that the described scope of work will take 22228888 hourshourshourshours to complete by the following personnel:
Partner 4 hours at $215 per hour $860
Principal 8 hours at $185 per hour $1,480
Project Manager 16 hours at $130 per hour $2,080
$4,420 subtotal
Casework Addition Casework Addition Casework Addition Casework Addition
JA will provide casework details for the desk & sliding screens at the Reception area, Conference Room
kitchenette, Office credenza, and the Print Area upper storage cabinets. We will review shop drawings and
provide clarifications to the fabricator. We will also coordinate these revisions with the spec-writer to ensure
that the casework is covered in the specification manual. This additional service request covers the
additional fee from our spec-writer to incorporate the casework detailing into the manual.
We estimate that the described scope of work will take 64646464 hourshourshourshours to complete by the following personnel:
Partner 4 hours at $215 per hour $860
Principal 8 hours at $185 per hour $1,480
Project Manager 20 hours at $130 per hour $2,600
Production Assistant 20 hours at $95 per hour $1,900
Spec-Writer 12 hours at $50 per hour $600
$7,440 subtotal
Total AdTotal AdTotal AdTotal Additional Serviditional Serviditional Serviditional Services Request #1: ces Request #1: ces Request #1: ces Request #1: $11,860$11,860$11,860$11,860
If this proposed increase meets your approval, please sign and return. We would be happy to discuss the
contents of this ASR to answer any questions you may have!
Sincerely,
Dana Abdallah, Project Manager
ApprovedApprovedApprovedApproved ASR #1 $11,860ASR #1 $11,860ASR #1 $11,860ASR #1 $11,860::::
__________________________________________________________________________________________
Printed Name Signature Date
EXHIBIT B