HomeMy WebLinkAboutCO 27            CAG-20-126, CO #27-22 Approved by Cheryl Beyer via 5/3/2022 Change Order No. 27 Contract Title: Lake Washington Loop Trail Contract No. CAG -20-126 Page 2 of 3 THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: Change to Contract Plans: As required in FWD No 31, the Contractor is directed to field cut the most southerly section of bridge railing, prior to installation, and field paint the raw edge per WSDOT Standard Specification 6-07. The railing section to be cut off shall be located at the northerly end of the southerly railing section in order to maintain the angled end section as fabricated. The approximate length of railing section to be removed is 19-inches but the exact length shall be verified in the field by the City. The removed railing section is to be hauled to waste and disposed of. Reason for Change: Contract Plans: The reason for the cut is to shift the south-most bridge railing type S-BP30 section to the north on the existing concrete barrier in order to protect the existing monument and allow it to be free and clear of the new railing. The plans did not show the existing monument. Materials: Field Paint Plans: Shop Drawing PS2 Estimated Cost: This Change Order does include an equitable adjustment per Section 1-09.4 of the 2020 WSDOT/APWA Standard Specifications. Payment for shortening the bridge railing type S-BP30 will be calculated using force account methods. There will be no deduct for the measurement and payment of BI 22 Bridge Railing Type S-BP30 due to this change, measurement for BI 22 will be based on the fabricated length of railing.        Change Order No. 27 Contract Title: Lake Washington Loop Trail Contract No. CAG -20-126 Page 3 of 3 See attached equitable adjustment determination. Extension of Time: The Contractor agrees that the time for Completion is extended 0 Working Days for the additional work. Sections 1-04.4 and 1-04.5 of the 2020 WSDOT/APWA Standard Specifications shall govern this Change Order. The Work of the referenced Contract is modified to include the changes detailed herein. The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all other claims that may be made by the Contractor as a result of this change. Attachments: Forms to be attached to Change Order ܈ Plans ܈Equitable Adjustment Determination Forms to be used during Force Account Work ց Daily Report of Force Account Labor ց Daily Report of Force Account Equipment ց Daily Report of Force Account Materials ց Force Account Summary        New Contract Item No. Description Quantity Unit Lump Sum Price Cost CO27-1 Shorten Bridge Railing Type S-BP30 1 LS $341.35 $341.35 $341.35 $341.35 Lump Sum Cost Change Order Cost Lump Sum Item By: Date: 4/4/22 Equitable Adjustment Determination CO 27 Project Name: Lake Washington Loop Trail Contractor: Active Construction Inc. Federal Aid No: TAP-1070(008) Contract No: CAG 20-126 Construction Manager: Tani Stafford, PE        Remove Approx 19 inches from south section of railing and shift section north to avoid monument