Loading...
HomeMy WebLinkAboutEx21_PSCAA_Emissions_QuestionnairePSCAA Air Permitting Applicability Questionnaire Blue Origin – Kent, WA facility Please complete this form and return it to the Environmental Health & Safety (EHS) Department. Contact any member of the EHS Department with questions about air permitting applicability. General Information: Project Contact Name: Cecil Goodson Work Group Name: Advanced Development Projects- DaVinci Lab Project Code Number: Brief Description of Project: This questionnaire evaluates the activities and processes proposed for the DaVinci lab in Renton, WA. During Research and Development activities, the team will use benchtop quantities of chemicals and inert gases in a light industrial setting under a fume hood. No major sources of emissions are proposed here. Will the equipment be venting to atmosphere? If so, please specify what is being released to atmosphere and why. Yes, a chemical fume hood will allow the team to vent chemical vapors and inert gases to atmosphere. Will any control equipment be used (e.g., baghouse, dust collector, thermal oxidizer)? Please specify what type. A fume hood. Instructions: If the proposed equipment will be used exclusively for testing or research and development, complete this page only. If the proposed equipment will be used for production, complete all four pages. Testing and Research: 1. Will the source be used exclusively for quality assurance/quality control testing? ☐ Yes This source is exempt from permitting under PSCAA Regulation I, Section 6.03(c)(132). Stop here. The project does not require air permitting. Submit this form to EHS for records. ☒ No Proceed to Question 2. 2. Will the source be used exclusively for non-production bench scale research and development, both now and in the future? If the parts produced by this process will have their own part numbers or will end up on a final product, the process does not qualify for this exemption. ☒ Yes Exempt from permitting under PSCAA Regulation I, Section 6.03(c)(132). Stop here. The project does not require air permitting. Submit this form to EHS for records. ☐ No This source is not exempt under the testing and research exemption. Proceed to the Production Air Pollution Sources section. If the source will first be used for R&D and used for production in the future, what is the timeline for converting to production? This site is being established as a research and development site only, exempt from the requirements of PSCAA. EXHIBIT 21 RECEIVED Clark Close 05/31/2022 PLANNING DIVISION DocuSign Envelope ID: 0C50F956-C05E-4AB3-B622-213397BAE02B