Loading...
HomeMy WebLinkAboutCO 30            CAG-20-126, CO #30-22 Approved by Cheryl Beyer via 5/4/2022 email Change Order No. 30 Contract Title: Lk Washington Loop Trail Contract No. CAG -20-126 Page 2 of 3 THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: Add the following lump sum item to the contract: o Lump Sum Item No. 30-1 CREDIT FOR NO REMOVAL OF SERVICE CABINET AND BASE AT STA 29+00 RT o Measurement: per Lump Sum o Payment: Lump Sum Price = -$550.00 o Location: Sta. 29+00 RT Reason for Change: The contract drawing IL8.06 construction note 10 called for the removal of the existing service cabinet and base upon transfer of the illumination system to a new service. This work is included in the lump sum item No 71 Illumination system. Upon investigation during construction, the existing service was found to also serve a pump system that is operated and maintained by the City of Renton Parks Department. The service and needs to remain in place for that pump system. Affects DBE Work: ܆܆ Yes ܈ No Materials: None. Plans: IL8.06 rev 1 dated 4/8/22. Equitable Adjustment: This Change Order does include an equitable adjustment per Section 1-09.4 of the 2021 WSDOT/APWA Standard Specifications. See attached. Extension of Time: The Time for Completion is extended 0 Working Days.          Change Order No. 30 Contract Title: Lk Washington Loop Trail Contract No. CAG -20-126 Page 3 of 3 Sections 1-04.4 and 1-04.5 of the 2021 WSDOT/APWA Standard Specifications shall govern this Change Order. The Work of the referenced Contract is modified to include the changes detailed herein. The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all other claims that may be made by the Contractor as a result of this change. To be attached to Change Order: ܈܈ Plans          New Lump Sum Item No. Description Quantity Unit Unit Price Cost CO30-1 Credit for No Removal of Service Cabinet and base at Sta 29+00 RT 1 LS -$550.00 -$550.00 -$550.00 -$550.00 Total Change Order Cost New Lump Sum Item Lump Sum Item Cost By: Date: 4/20/22 Equitable Adjustment Change Order No 30 Project Name: Lake Washington Loop Trail Contractor: Active Construction Inc. Federal Aid No: TAP-1070(008) Contract No: CAG 20-126 Construction Manager: Tani Stafford, PE          NEMANEMA CITY OF RENTONBY: DATE:APPROVED FOR CONSTRUCTIONOFTransportation Planning | Design | Traffic Impact & Operations11400 SE 8th Street, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747Transportation Engineering NorthWestProject Contact: Elyse Stemmler, P.E.Phone: 425-250-5004TENWxxxx11 FWD No 30 - Delete Removal of Service at Sta 29+00 RT TLS 4/8/22