HomeMy WebLinkAboutCO 08C.O.# 8 SUMMARY OF PROPOSED CHANGE: ITEM Unit Qty. Unit Price Total Price D54.LS 1.00 $2,088.97 $2,088.97 D55.LS 1.00 $2,139.64 $2,139.64 D56.FA 1.00 ($2,592.39)($2,592.39) Sub Total (Schedule D - water) Sales Tax (10.1%) Total (Schedule D - water) Credit from contractor for City replacement of damaged 2" meter (2@ $819.83) 1-1/5" meter (1@ $584.31) and AMR radio (2@ $184.21) NEW ITEM: Additional cost (delta) for provision of 17x30" Armorcast meter boxes in lieu of boxes specified. Standard revised after project bid. CITY OF RENTON Additional Quantities Under This Change Order Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CONTRACTOR: Downtown Utility Improvement Project CAG-21-001 SCI Infrastructure, LLC Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: NEW ITEM: $1,636.22 $165.26 $1,801.48 Additional cost (delta) for provision of 13x24" Armorcast meter boxes in lieu of boxes specified. Standard revised after project bid. CREDIT: https://cityofrentonwa.sharepoint.com/sites/PW-DUIP/Shared Documents/General/WWP-27-03949 DUIP/10 Construction/10.04 Change Orders/Change Order 8 Meter Boxes/Backup/CO#8 - DUIP 1 of 2                  CAG-21-001, CO #8-22 APPROVAL SIGNATURES: Approved By: Date: Approved By: Date: Approved By: Date: Ronald Straka, Utility Systems Director Approved By: Date: Martin Pastucha, PW Administrator Approved By: Date: Shane Moloney, Renton City Attorney $13,662,947.13 ESTIMATED CONTRACT TOTAL AFTER CHANGE SCI Infrastructure, LLC, Title ESTIMATED NET CHANGE THIS ORDER $1,801.48 ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT $13,661,145.65 $10,555,986.64 Michael Benoit, Project Manager https://cityofrentonwa.sharepoint.com/sites/PW-DUIP/Shared Documents/General/WWP-27-03949 DUIP/10 Construction/10.04 Change Orders/Change Order 8 Meter Boxes/Backup/CO#8 - DUIP 2 of 2                                     7/19/2022Approved by Cheryl Beyer via 7/19/2022 email