Minor Franchise Permit: MFP22004050
IVR Number: 22004050
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:07/29/2022Application Date:3345700015Parcel Number:
Permit Type:08/04/2022Issue Date:Franchise
Permit Work Class:08/04/2023Expiration Date:Minor Utility
Job Number: 101150619Franchise Type:Electric
Description: Puget Sound Energy Electric CREW TO PARK IN ROW AND DISCONNECT EXISTING CABLE AT J01 AND P01.
RESTORATION PER CITY OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Carli Bunkelman
PSE/POTELCO - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 437-6708Contractor
Business License Number: 5109Construction Contractor: POTELI*227PL
EARLINGTON 60 INC 18300 REDMOND WY #120
REDMOND, WA 98052
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
101150619
4196 LINCOL AVE NE
RANDY BLACKIE 425-457-2614
MFP22004050
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 8/2/2022
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
4196 Lincoln Ave NE
Renton
WA 98056
USA
P01
PRIV
A
T
E
P
R
O
P
E
R
T
Y LINCOLN AVE NE4124
RESIDENT(S) WILL BE INFORMED
OF POSSIBLE TEMPORARY
DRIVEWAY CLOSURE
SHOULDER
WORK W21-5ROAD
WORK
AHEAD W20-1100'100'ROADWORKAHEADW20-1100'
R
O
ADWOR
K
AH
E
AD
W20-1
1111
LINCOLN AVE NEPLACE SIGNS ALONG
WORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PAR
K
LEGEND
28" TRAFFIC CONE
SIGN LOCATION
TRAFFIC FLOW
POLE
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
TEMPORARY TRAFFIC CONTROL PLAN
0'60'30'
PRINT ON
11X17" SHEETS ONLYN
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
07/15/2022
101150619
0
4196 LINCOLN AVE NE, Renton, WA 98056
Yuriy Bashtovoy
(425)424-6603
Yuriy.Bashtovoy@PSE.com
1 OF 2
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
Notes:
1. All signs and spacing to conform to the
MUTCD and City of RENTON standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
MFP22004050
4196 Lincoln Ave NE
Renton
WA 98056
USA
P01
PRIV
A
T
E
P
R
O
P
E
RT
Y LINCOLN AVE NE4124
RESIDENT(S) WILL BE INFORMED
OF POSSIBLE TEMPORARY
DRIVEWAY CLOSURESHOULDERWORKW21-5ROADWORKAHEADW20-1100'100'ROAD
WORK
AHEAD W20-1100'R
O
ADWORK
AH
E
AD
W20-
1
1111
LINCOLN AVE NEPLACE SIGNS ALONG
WORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKJ01
TEMPORARY TRAFFIC CONTROL PLAN
0'60'30'
PRINT ON
11X17" SHEETS ONLYN
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
07/15/2022
101150619
0
4196 LINCOLN AVE NE, Renton, WA 98056
Yuriy Bashtovoy
(425)424-6603
Yuriy.Bashtovoy@PSE.com
2 OF 2
LEGEND
28" TRAFFIC CONE
SIGN LOCATION
TRAFFIC FLOW
POLE
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
Notes:
1. All signs and spacing to conform to the
MUTCD and City of RENTON standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
MFP22004050
#2ACSRFEEDHAZ
15 CBA4124
#2ACSR
C4006 #2ACSRCN
#2ACSR
CN#2ACSR
TO BE REMOVED
TO BE REMOVED
#2ACSR
8221
8211FEEDHAZ
15
11448 11468
ΔΔ
Δ
Δ
Δ
TO BE REMOVED
TO BE REMOVED
TO BE REMOVED
LINCOLN AVE NE4130
SE 82ND ST
60'
50'
HAZ
16FEED
TO REMAIN
NEWCASTLE CREST
105096789
N
Vicinity Map
47.5298, -122.1935
Owner / Developer Contact Info
officeATTN:
CENTURY COMMUNITIES
20000 N CREEK PKWY, STE. 200
BOTHELL, WA 98011
STACIA BLOOM 949.838.6057
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
512982511 101150619
N/A 108138470
N/A 583069906
N/A 584048265
N/A 593245846
N/A 594150711
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Removal
OH Xfmr
UG Xfmr
OH Misc.
UG Misc.
Distribution
Service Stubs
HP Svc/MSA 101150619 N/A
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
R.BLACKIE 425.457.2614 .
K.COSTLEY 425.272.7075 6.8.22
K.COSTLEY 425.272.7075 6.8.22
K.COSTLEY 425.272.7075 6.8.22
REDT # ( RW-127042 )RENTON
CANOPY RELOCATE
SYSTEM MODIFICATION AND REMOVAL
P#3345700015, 4196 LINCOLN AVE NE, RENTON, WA 98056
PUGET SOUND ENERGY
N/A IP 469-45
N/A 101150619
AS SHOWN 1 OF 2
KING 24 CIKNC QCSOKE
32NE-T24N-R05E 200.080 202.083
2405E125 2405E136 2405E125 HAZ-15
COMCAST
JIM COHN
253.569.0636
LUMEN TECH
ALEX HARB
206.345.4476
RIGHT OF WAY
PEYTON TAMAYO
425.462.3055
.
.
.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:RANDY BLACKIE
425.457.2614
randy.blackie@pse.com
x
x
...
...
...
AT P01 (319611-166436) 1998 CLASS 3 - 45'
-TO REMAIN
-DISCONNECT AND REMOVE EX. OH #2ACSR TO P02
-TO BE REMOVED
AT P03 (319610-166488) UNK CLASS UNK - 40'
AT P04 (319610-166493) 1960 CLASS 5 - 45'
-TO BE REMOVED
-REMOVE EXISTING DOWN GUY AND ANCHOR
SITE SPECIFIC NOTES LABOR UNITS
-
-
AT P05 (319623-166489) 1958 CLASS UNK - 45'
-TO BE REMOVED
-
-
2-26
x
PSE GENERAL SPECIFICATIONS
GENERAL
-ALL WORK IS TO BE COMPLETED PER PSE STANDARDS & PRACTICES. COPIES OF ALL PSE
STANDARDS ARE AVAILABLE UPON REQUEST.
-WORK SITES SHALL BE KEPT CLEAR OF DEBRIS AND ALL CONSTRUCTION MATERIALS; EQUIPMENT
AND PACKING SHALL BE REMOVED DAILY.
-RETURN ALL UNUSED AND REMOVED POLES, TRANSFORMERS AND HARDWARE TO PSE,
STOREROOM. ALL COPPER SHALL BE COILED AND RETURNED THE DAY IT IS REMOVED FROM THE
POLES. REMOVE ALL UNUSED PINS AND INSULATORS.
-RETURN ALL STREETLIGHTS, AREA LIGHTS AND FLOODLIGHTS TO SUMNER YARD.
PRE-CONSTRUCTION
-NOTIFY APPROPRIATE CITY, COUNTY OR DOT AUTHORITIES 48 TO 72 HOURS, OR AS REQUIRED BY
PERMITTING AGENCY, IN ADVANCE OF STARTING WORK IN RIGHT-OF-WAY INVOLVING A PERMIT.
-ALL SYSTEM SWITCHING SHALL BE APPROVED BY SYSTEM OPERATIONS (425-882-4652) A MINIMUM OF
48 HOURS IN ADVANCE.
-NOTIFY CUSTOMERS OF ALL OUTAGES 48 HOURS IN ADVANCE.
SAFETY
-EFER TO PSE STANDARDS 6275.3000 FOR REQUIREMENTS ON SYSTEM GROUNDING
-REFER TO PSE STANDARDS 6275.9210, 6275.9230 AND 6275.9250 FOR PERSONAL PROTECTIVE
GROUNDING REQUIREMENTS.
-REFER TO PSE STANDARDS 6275.9150 FOR VEHICLE GROUNDING AND BARRICADING REQUIREMENTS.
-PROPER LINE CLEARANCES SHALL BE TAKEN AT THE BEGINNING, AND RELEASED AT THE END, OF
EACH WORKDAY, OR AS OTHERWISE INSTRUCTED BY THE SYSTEM OPERATOR.
-PROVIDE SIGNS, BARRICADES, AND TRAFFIC CONTROL IN CONFORMANCE WITH PERMIT
REGULATIONS.
-UTILIZE FLAGGING AND OTHER VEHICLE TRAFFIC CONTROL AS NECESSARY AND IN CONFORMANCE
WITH LOCAL TRAFFIC REGULATIONS.
-MAINTAIN TRAFFIC FLOW AS REQUIRED BY PERMITTING AGENCY.
JOINT FACILITIES
-COORDINATE WITH COMMUNICATION COMPANIES FOR TRANSFERS.
OVERHEAD CONSTRUCTION
POLES & STRUCTURES
-POLES ARE TO BE INSTALLED OR RELOCATED AS STAKED. UNLESS OTHERWISE NOTED, ALL POLE
LOCATION MEASUREMENTS ARE FROM THE CENTER OF THE POLE.
-ALL NEW POLES SET SHALL BE THE CLASS INDICATED ON THE SKETCH, OR BETTER. DO NOT SET A
LOWER CLASS POLE THAN SPECIFIED.
-INSTALL GROUND PLATE ASSEMBLY ON ALL NEW POLES. INSTALL SWITCH GROUND ASSEMBLY PER
STANDARD SPECIFICATION 6014.1000 AT NEW GANG OPERATED SWITCH LOCATIONS.
-INSTALL GRID NUMBERS ON ALL NEW AND EXISTING POLES AS SHOWN ON SKETCH.
-STRAIGHTEN EXISTING POLES AS INDICATED OR AS NECESSARY.
-TREAT ALL FIELD-DRILLED POLES WITH COPPER NAPHTHENATE WOOD PRESERVATIVE.
-REMOVE OLD POLES AFTER COMMUNICATION COMPANIES HAVE TRANSFERRED OFF AND RETURN TO
PSE STOREROOM. FILL AND CROWN POLE HOLES AND RESTORE THE AREA SIMILAR TO ADJACENT
LANDSCAPING.
CONDUCTORS & EQUIPMENT
-TRANSFER ALL OVERHEAD AND UNDERGROUND PRIMARY, SECONDARY AND SERVICE CONDUCTORS
AND GUYS TO NEW POLES SET, UNLESS OTHERWISE INDICATED ON THIS SKETCH.
-TRANSFER EXISTING TRANSFORMERS TO NEW POLES UNLESS OTHERWISE INDICATED ON THIS
SKETCH.
-USE STIRRUPS TO CONNECT ALL OVERHEAD AND UNDERGROUND PRIMARY TAPS, AND
TRANSFORMERS ABOVE 25 KVA. INSTALL AT ALL SITES BEING WORKED WITHIN THE SCOPE OF THE
PROJECT WHERE THEY ARE CURRENTLY MISSING.
-FOR 12VK CONSTRUCTION, INSTALL AVIAN PROTECTION WITH #4 CU-COVERED JUMPERS
(MID#9998076) AND #4 SD ALUMINUM COVERED TIE-WIRE (MID#8309760). FOR 34VK CONSTRUCTION
USE BARE WIRE PRIMARY JUMPERS WITH PRE-FORMED HELICAL-GRIP TIES AND AVIAN PROTECTION
DEVICES WHEN REQUIRED PER STD. 6015.2000. JUMPERS FOR POLES THAT ARE DOUBLE DEAD
ENDED WITH TREE WIRE CAN BE EITHER THE SAME SIZE TREE WIRE CONDUCTOR OR COVERED CU.
-APPLY GRIT INHIBITOR ON ALL AMPACT, STIRRUP, AND DEAD-END CONNECTIONS.
-CONNECT PRIMARY TAPS AND TRANSFORMERS TO SAME PHASE AS EXISTING UNLESS OTHERWISE
SHOWN ON THE DRAWING.
-ALL NEUTRAL CONNECTIONS TO BE MADE WITH SOLID COMPRESSION CONNECTORS. CONNECT ALL
POLE GROUNDS TO COMMON NEUTRAL.
-USE LOAD-INTERRUPTER CUTOUTS (WITH ARC SHIELDS) ON ALL PRIMARY OVERHEADS AND
UNDERGROUND TAPS WITH FUSED PROTECTION ABOVE 40T.
-INSTALL WILDLIFE PROTECTORS ON ALL TRANSFORMERS.
STACIA.BLOOM@CENTURYCOMMUNITIES.COM
-
-
2-26
-
-
2-26
-REMOVE EXISTING DOWN GUY AND ANCHOR
SITE
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P04
319610-166493
5kVA
RETIREMENT POLE TABLE
SITE
#
POLE DATA POLE TRANSFERS REMARKS
GRID # HEIGHT CLASS YEAR
XFMR CO.
ID#TOPPED RMVD TEL TV FIBER ST. LIGHT (ADDITIONAL INFORMATION)
P02 319609
166460 40'UNK 1960
P03 319610
166488 40' UNK UNK
P04 319610
166493 45'CL5 1960 LUMEN TECH
P05 319623
166489 45' UNK 1958
WIRE REMOVAL TABLE
Location
Pri Sec Wire Size & Type Quantity
Length
(ft per
conductor)RemarksFrom To
P01 P02 X #2ACSR OH PRI & NEUT 2 235 2-27
P02 P03 X #2ACSR OH PRI & NEUT 2 270
P03 P04 X #2ACSR OH PRI & NEUT 2 45
P03 P05 X #2ACSR OH PRI & NEUT 2 130
P05 P06 X #2ACSR OH PRI & NEUT 2 335
Total Feet (#2ACSR OH PRI) TO BE REM'D 1015
Total Feet (#2ACSR OH NEUT) TO BE REM'D 1015
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
V01
319590-166458
25kVA
CIRCUIT FT REMOVED: 1685'
CIRCUIT FT ADDED: 175'
-REMOVE EXISTING DOWN GUY AND ANCHOR -
-
AT V01 (319590-166458)-
-REMOVE EXISTING 25kVA TRANSFORMER & VAULT 2-45, 2-60
1" = 50'
SITE PLAN
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
HAZ-16
5.3.22
355 398 370
-3 -
355 401 370
SITE SPECIFIC NOTES (cont.)
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit Field Face
Quadrant
Climbing
SpaceRoad Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
NOT TO SCALE
-REMOVE ALL PSE EQUIPMENT
-REMOVE ALL PSE EQUIPMENT
-
-REMOVE ALL PSE EQUIPMENT -
AT P06 (319622-166521) 1958 CLASS UNK - 40'-
-
1-8E
2-57
LABOR UNITS
-POLE TO REMAIN
-REMOVE EXISTING DOWN GUY AND ANCHOR
-INSTALL 1Ø TERM TO EX. XFMR CUTOUT (NCTSU1F) 6043.1007
-INSTALL (1) 2" PRIMARY RISER ON NEW S/O BRACKETS (RIS2CSS) 6042.1000 2-45
-ALUM "H" CONN (2168000)-
AT P02 (319609-166460) 1960 CLASS UNK - 40'
-TO BE REMOVED
-
-
2-26
-
-REMOVE ALL PSE EQUIPMENT
-
-
-
-
-REMOVE EXISTING DOWN GUY AND ANCHOR 1-8E x2
SPAN NOTES
J01 TO V01
DEAVTIVATED IN PLACE ( ') 1/0 DB PRIMARY CABLE
DEACTIVATE ± 670' OF EX 1/0 DB PRIMARY UG CABLE AS NEEDED -
-
-
x
HAZ-15-3
MFP22004050
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
R.BLACKIE 425.457.2614 .
K.COSTLEY 425.272.7075 6.8.22
K.COSTLEY 425.272.7075 6.8.22
K.COSTLEY 425.272.7075 6.8.22
REDT # ( RW-127042 )RENTON
CANOPY RELOCATE
SYSTEM MODIFICATION AND REMOVAL
P#3345700015, 4196 LINCOLN AVE NE, RENTON, WA 98056
PUGET SOUND ENERGY
N/A IP 469-45
N/A 101150619
AS SHOWN 2 OF 2
KING 24 CIKNC QCSOKE
32NE-T24N-R05E 200.080 202.083
2405E125 2405E136 2405E125 HAZ-15
COMCAST
JIM COHN
253.569.0636
LUMEN TECH
ALEX HARB
206.345.4476
RIGHT OF WAY
PEYTON TAMAYO
425.462.3055
.
.
.
...
...
...
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
EX OVERHEAD CIRCUIT MAP 2405E136
SCALE: 6" = 1 MILE
EX UNDERGROUND CIRCUIT MAP 2405E125
NOT TO SCALE
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE
FROM TO
SIZE
(IN)QTY.
DESIGN
LENGTH
(FT)
BENDS PULL
(LBS)
PULL
REV
(LBS)
CABLE
SIZE
DESIGN
LENGTH
(FT)
PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED LUBRICANT (Gal.)
90° 45°22° 11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE EST. ACTUAL
V02 P06 CABLE ONLY 123 115 1/0 AL JKT 215 -EIV100 -2-54 1.5
1/0 AL JKT TOTAL (FT) =215 1.8
SITE
SITE
NEW 1/O AL BØEIY391
EIV100-BØ
VAULT & EQUIPMENT TABLE
SITE # GRID #
VAULT SIZE &
COVER
TYPE & SIZE
EQUIPMENT IN
VAULT
PRIMARY
BUSHINGS TRANSFORMER ID NUMBERS
(COMPANY ID)
AS-BUILT INFORMATION
LB DC FOREMAN: INCLUDE PHASE TAPPED
Existing
V02
319613
166536
54"x54"x38"
Unistrut HH
Matid: Existing
75KVA MP TRF
120/240
Matid: Existing
1 -
ELB10J 6041.1000 EX BØ (2-57)
NOT TO SCALE
NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM
MFP22004050