HomeMy WebLinkAboutCO 2Public Works Facilities Division CONTRACT NO:CAGͲ21Ͳ180 CO NO. 2 CONTRACT CHANGE ORDER (CO)PROJECT TITLE:FAMILY FIRST COMMUNITY CENTER TO: COMER GC, Inc. (CONTRACTOR) Description Amount CCD 05ͲRevise Fire HydrantͲAHJ Fire Marshal Rqmts 5,914.00$ CCD 09ͲAdd PIV Per Fire Marshal 9,468.00$ CCD 13ͲUG Service Revisions HealthPoint Request 7,042.00$ CCD 20ͲStorm Drain Revisons Required By AHJ 3,234.00$ CCD 28ͲRoof Edge DetailsͲAdd Blocking 2,639.00$ Ͳ$ Ͳ$ Ͳ$ Subtotal 28,297.00$ WSST 2,858.00$ TOTAL THIS CHANGE ORDER 31,155.00$ CONTRACT SUM: 31,155.00$ (WASHINGTON STATE SALES TAX INCLUDED) CONTRACT TIME: 0 CALENDAR DAYS CONTRACT SUMMARY (Internal Use Only) ORIGINAL CONTRACT SUM w/ WSST 12,474,330.00$ PREVIOUS ADDITIONS/DELETIONS 17,924.28$ PREVIOUS TOTAL 12,492,254.28$ CHANGE AMOUNT THIS CHANGE ORDER 31,155.00$ REVISED CONTRACT TOTAL 12,523,409.28$ PERCENT TOTAL CHANGE FROM ORIGINAL 0.39% NOTICE TO PROCEED DATE February 25, 2022 PREVIOUS CONTRACT CALENDAR DAYS 0 PREVIOUS SUBSTANTIAL COMPLETION DATE February 25, 2023 REVISED CONTRACT CALENDAR DAYS THIS CHANGE ORDER 0 CURRENT SUBSTANTIAL COMPLETION DATE February 25, 2023 Architect AcknowledgementDate Contractor AcknowledgementDate AUTHORIZING SIGNATURE DATE The following mutually agreed to and Owner approved Contract Change Directive(s) are hereby incorporated by reference into the contract. The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full force and effect. The City of Renton hereby accepts the foregoing changes. This formal acceptance constitutes a Change to the contract only when authorizing signature is affixed. Invoices incorporating this Change Order constitute acceptance by the Contractor as total reimbursement due in connection with this Change Order. Thirty Two Thousand and Thirty Eight Dollars OF: CONTRACT Description CCD 05 ͲRevi CCD 09 ͲAdd CCD 13 ͲUG S CCD 20 ͲStor CCD 28 ͲRoof The following CONTRAC TO: m NO CHANGE INCREASE DECREASE NO CHANGE INCREASE DECREASE 7/19/2022 7/19/22              CAG-21-180, CO #2-22 PUBLIC WORKS Facilities Division Project No:CCD # 5 CONSTRUCTION CHANGE DIRECTIVE Project Name: (CCD) (CONTRACTOR) You are directed to prepare a cost proposal for the work described below and/or detailed on the attachment referred to: SOURCE OF CHANGE: DATE PROPOSAL REQUIRED:3/30/22 CHANGE ORIGINATED BY: AHJ (14 days from Request Date, unless other date agreed to) PROPOSAL REQUESTED BY: Contractor ARCHITECTCOR PM WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR: CONTRACT SUM: (WASHINGTON STATE SALES TAX EXCLUDED) In accordance with the general condition, Cost Estimate Detail Sheet(s) are attached hereto. CONTRACT TIME: OF 0 CALENDAR DAYS BY: CONTRACTOR SIGNATURE DATE We have carefully examined this proposal and find the cost to be reasonable.Therefore, we recommend acceptance. ARCHITECT DATE HEALTHPOINT DATE City of Renton Authorized Signature To be utilized for changes requested by HealthPoint CITY OF RENTON DATE CAG 21Ͳ180 Family First Community Center TO: Comer GC, Inc. The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full force and effect. We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until incorporation of this COP into a Change Order by the City of Renton. Fire Marshal required hydrant install prior to the start of comustible construction.Hydrant required hot tap and excavation not previously planned. 03/30/22Proposal Request Date: EXPLANATION: Existing survey elevation discrepancy TO: Meredith Everist TO:Russ Woodruff Of Five Thousand Nine Hundred and Fourteen Dollars 5,914.00$ WE AGREE CONTRAC TO:Mered DATE PROP (14 days from You are direct SOURCE OF Fire Marsh tap and ex EXPLANATI CONSTRU TO:Come NO CHANGE INCREASE DECREASE NO CHANGE INCREASE DECREASE Design Contractor Owner Code/AHJUnknown Conditions HealthPoint Other 7/19/2022 7/19/2022COMER GC, Inc.                                                  50441REGISTEREDP RP ORR FOO ESSIONOOANNLAAENGNNINENNEEEREEAARORNJ.JJFJELSTS A D RPRPPPRPPRPPRPRPRPPRPPRP AAAPP AAAPP APPPPPPPPP RPPRPRPR AAAP APPP APP AAAPPPPPP RPPRPRRPPPP AFFFFFFFFFFFFFFFFFFFFFFFFFOOFOOFOOFOOFOOFFOOOFOOFOOFOOOFOOOOOOOFOOOOOOOOOOOFOOFOOOORRORORRRRORRRORRRRRRRRRRRRRRRRRRRRRRRRRRRRRRPRRPRPPPPRPPPPPPPPPPPPPPPPPPPPPPPPRRRRRRRPPPPPPPPRPPPPPPPPRPPRPPP AAAAAAAAAAAAAFFFFFFFFFFFFFFOOFOOFOOFOOFOOFOOFOOFOOFOOOFOOFOFOOFOOOOOOOOOOOOOOOOFOFOOOORORORRRRRORRRRORRRRRRRRRRRPPPPPPPPPPPPRPPRRRRRPPPPPPPPPPPP AAAAAAAAAAFFFFFFFFFFFFFFFFOOOOORRRRRORRRRRRRRRRRRRRRRRRRRRRRPRPRRPPRPPPPPPPPPPPPPPPPPPRPPPPPPPP AAAAAATTTTTTTTTTTTTTTTTTTTTTT AATATATATTATTATTTATATATAATAATTTATTTTTTTTTTATATATATATATTATTATATAT AAAAAANANAANAANANANANANASSSSSSSSSSSSSSSSSSSSSSSSSS0000000000000AAAAANANANANANANANANANANANANAAAAASSANSNSSSNSSSSSANSSSSSSSSSSSSSSSSSSSSSSSSS0000S0000000000AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAASSAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAASS4SSSSSSSS444S4SS44044044404ASS0AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAASSSAAAAAAAAAAAAAAAAASSS4SSSSS4444S4SSS404AAAAAAAAAAAASS0AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAASSSS4044404S4S00AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAOUOUNRGDTHEELERINNCLP801 SECOND AVENUE, SUITE 900 (206) 343-0460 SEATTLE, WA 98104 www.cplinc.com 0102040SCALE 1"=20'NW-28-23-5OUOUNRGDTHEELERINNCLP801 SECOND AVENUE, SUITE 900(206) 343-0460SEATTLE, WA 98104www.cplinc.comCall Before You Dig. 8-1-1 or 1-800-424-5555 Underground Service (USA)PROJECT NUMBER:PROJECT MANAGER:DRAWN BY:NO.DESCRIPTION DATETED-40-4110PROPOSALREQUEST #0101/27/20221 ADDENDUM 1 11/10/2139871REGISTEREDP RPP ORR FOO ESSIOINANNLAAENGNIGGNENNEEEREEREGURK .NHTIEKPPPPPPPPPPP RPRRRRRRPRPRPPRRPRPPRRPRPRPRPPRPRPRPPRPRPRRPPRRRPPRPRRPRRRRRRRRRRPRPPRRPPPRPRPRPRPRPRPPRRPRRRRPPRPPRPRUUUUUUUUUUUUUUUUUUUUUUUUUUGGGGGGGEGEGEEGEEEGEEGEGEGEGEGGEGGEEEEGEEEGEEEEGEEEGEEEEEEEEEEEEEEEEEEEEEEEEGEEEEEEGEEGEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEREEEREEEEEEEEEEEEEEEEEEEEEEEEEEREEEEEEEEEEE CONFORMED SET03/09/2022Existing Hydrantallowed to be utilizedtowards verticalconstruction need perFire MarshalExisting Hydrantallowed to be utilizedtowards verticalconstruction need perFire MarshalHotTap fire hydrantfor immediate installand operation perFire Marshal         1 Russ Woodruff Subject:FW: FFCC - CI-005 - Fire Marshal Requirements - Vertical Construction Attachments:CCD 28 - Roof Edge Details - Add Blocking.pdf   Russ Woodruff | Capital Project Coordinator City of Renton – Public Works 1055 S. Grady Way – 5th Floor - Renton WA. 98057 Working remotely and can be reached via: 206-556-5026 rwoodruff@rentonwa.gov  From:MeredithEverist<everistm@baylisarchitects.com> Sent:Friday,July15,20223:19PM To:RussWoodruff<RWoodruff@Rentonwa.gov>;luke@comergc.com Cc:16Ͳ0996FamilyFirstCommunityCenter<16Ͳ0996@baylisarchitects.com> Subject:RE:FFCCͲCIͲ005ͲFireMarshalRequirementsͲVerticalConstruction  HIRuss,IthinkCCD#5looksgood.  Thanks,Meredith  Meredith Everist | AIA | NOMA | LEED AP BD+C Principal Pronouns: she | her 10801 Main Street, # 110 | Bellevue, WA 98004 O: 425.454.0566 D: 425.679.5205 F: 425.453.8013 everistm@baylisarchitects.com | BaylisArchitects.com Facebook | LinkedIn | Houzz  From:RussWoodruff<RWoodruff@Rentonwa.gov> Sent:Friday,July15,20229:44AM To:MeredithEverist<everistm@baylisarchitects.com>;luke@comergc.com Subject:FW:FFCCͲCIͲ005ͲFireMarshalRequirementsͲVerticalConstruction  HiMeredith,  CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.          PUBLIC WORKS Facilities Division Project No:CCD # 9 CONSTRUCTION CHANGE DIRECTIVE Project Name: (CCD) (CONTRACTOR) You are directed to prepare a cost proposal for the work described below and/or detailed on the attachment referred to: SOURCE OF CHANGE: DATE PROPOSAL REQUIRED:7/6/22 CHANGE ORIGINATED BY: AHJ (14 days from Request Date, unless other date agreed to) PROPOSAL REQUESTED BY: Contractor ARCHITECTCOR PM WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR: CONTRACT SUM: (WASHINGTON STATE SALES TAX EXCLUDED) In accordance with the general condition, Cost Estimate Detail Sheet(s) are attached hereto. CONTRACT TIME: OF 0 CALENDAR DAYS BY: CONTRACTOR SIGNATURE DATE We have carefully examined this proposal and find the cost to be reasonable.Therefore, we recommend acceptance. ARCHITECT DATE HEALTHPOINT DATE City of Renton Authorized Signature To be utilized for changes requested by HealthPoint CITY OF RENTON DATE 9,468.00$ CAG 21Ͳ180 Family First Community Center TO: Comer GC, Inc. The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full force and effect. We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until incorporation of this COP into a Change Order by the City of Renton. Add PIV per Fire Marshal requirementsͲnot shown on plans 05/25/22Proposal Request Date: EXPLANATION: Fire Marshal required added PIV.Not on previously approved plans. TO: Meredith Everist TO:Russ Woodruff of Nine Thousand Four Hundred and Sixty Eight Dollars WE AGREE CONTRAC TO:Mered DATE PROP (14 days from You are direct SOURCE OF CONSTRU TO:Come Add PIV pe EXPLANATI NO CHANGE INCREASE DECREASE NO CHANGE INCREASE DECREASE Design Contractor Owner Code/AHJUnknown Conditions HealthPoint Other 7/18/22COMER GC, Inc. 7/19/2022                                                                1 Russ Woodruff From:Meredith Everist <everistm@baylisarchitects.com> Sent:Tuesday, July 12, 2022 8:55 AM To:Russ Woodruff Cc:16-0996 Family First Community Center Subject:FW: FFCC - CI-009 - CCD-002 - UG Fire Review - PIV required Attachments:FFCC - CI-009 - CCD-002 - UG Fire Review - PIV required_.pdf HiRuss,wetakenoexceptionstothisCO.  Thanks,Meredith  Meredith Everist | AIA | NOMA | LEED AP BD+C Principal Pronouns: she | her 10801 Main Street, # 110 | Bellevue, WA 98004 O: 425.454.0566 D: 425.679.5205 F: 425.453.8013 everistm@baylisarchitects.com | BaylisArchitects.com Facebook | LinkedIn | Houzz  From:LukeComer<luke@comergc.com> Sent:Wednesday,July6,20223:03PM To:'RussWoodruff'<RWoodruff@Rentonwa.gov>;MeredithEverist<everistm@baylisarchitects.com> Cc:'TimComer'<tim@comergc.com>;'JonScofield'<jon@comergc.com> Subject:FFCCͲCIͲ009ͲCCDͲ002ͲUGFireReviewͲPIVrequired  Team– Attachedispricingfor:FFCCͲCIͲ009ͲCCDͲ002ͲUGFireReviewͲPIVrequired,whichrelatestotheFire MarshalrequirementsforaddingaPIVtothefiressystem,whichincludestyingintothefirealarmsystem.   Thank you,  Luke Comer C:425Ͳ765Ͳ4118IP:425Ͳ636Ͳ8934IF:425Ͳ285Ͳ9785   CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.                                                                                                                                                                                                                 PUBLIC WORKS Facilities Division Project No:CCD # 20 CONSTRUCTION CHANGE DIRECTIVE Project Name: (CCD) (CONTRACTOR) You are directed to prepare a cost proposal for the work described below and/or detailed on the attachment referred to: SOURCE OF CHANGE: DATE PROPOSAL REQUIRED:7/7/22 CHANGE ORIGINATED BY: Contractor (14 days from Request Date, unless other date agreed to) PROPOSAL REQUESTED BY: Contractor ARCHITECTCOR PM WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR: CONTRACT SUM: (WASHINGTON STATE SALES TAX EXCLUDED) In accordance with the general condition, Cost Estimate Detail Sheet(s) are attached hereto. CONTRACT TIME: OF 0 CALENDAR DAYS BY: CONTRACTOR SIGNATURE DATE We have carefully examined this proposal and find the cost to be reasonable.Therefore, we recommend acceptance. ARCHITECT DATE HEALTHPOINT DATE City of Renton Authorized Signature To be utilized for changes requested by HealthPoint CITY OF RENTON DATE Family First Community Center TO: Comer GC, Inc. The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full force and effect. We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until incorporation of this COP into a Change Order by the City of Renton. City Inspector required change in storm drain connections from previously approved plans. 05/18/22Proposal Request Date: EXPLANATION: City insector (AHJ) required changes for SD connections TO: Meredith Everist TO:Russ Woodruff of Three Thousand Two Hundred and Thirty Four Dollars 3,234.00$ CAG 21Ͳ180 WE AGREE CONTRAC TO:Mered DATE PROP (14 days from You are direct SOURCE OF CONSTRU TO:Come City Inspec EXPLANATI NO CHANGE INCREASE DECREASE NO CHANGE INCREASE DECREASE Design Contractor Owner Code/AHJUnknown Conditions HealthPoint Other COMER GC, Inc.7/18/2022 7/14/2022                                              1 Russ Woodruff From:Meredith Everist <everistm@baylisarchitects.com> Sent:Tuesday, July 12, 2022 8:56 AM To:Russ Woodruff Cc:16-0996 Family First Community Center Subject:FW: FFCC - CI-020 - RFI-013 - Storm Connections Per City of Renton @ SD#62 Attachments:FFCC - CI-020 - RFI-013 - Storm Connections Per City of Renton @ SD#62.pdf HIRuss,noexceptionstothisCO#020.  Thanks,Meredith  Meredith Everist | AIA | NOMA | LEED AP BD+C Principal Pronouns: she | her 10801 Main Street, # 110 | Bellevue, WA 98004 O: 425.454.0566 D: 425.679.5205 F: 425.453.8013 everistm@baylisarchitects.com | BaylisArchitects.com Facebook | LinkedIn | Houzz  From:LukeComer<luke@comergc.com> Sent:Thursday,July7,20229:59AM To:'RussWoodruff'<RWoodruff@Rentonwa.gov>;MeredithEverist<everistm@baylisarchitects.com> Cc:'TimComer'<tim@comergc.com>;'JonScofield'<jon@comergc.com> Subject:FFCCͲCIͲ020ͲRFIͲ013ͲStormConnectionsPerCityofRenton@SD#62  Team– Attachedispricingfor:FFCCͲCIͲ020ͲRFIͲ013ͲStormConnectionsPerCityofRenton@SD#62,whichrelates tothescopedescribedinRFIͲ013,essentiallyrunningthefirevaultdraintotheclosesmanholepertheCityofRenton.   Thank you,  Luke Comer C:425Ͳ765Ͳ4118IP:425Ͳ636Ͳ8934IF:425Ͳ285Ͳ9785   CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.           PUBLIC WORKS Facilities Division Project No:CCD # 28 CONSTRUCTION CHANGE DIRECTIVE Project Name: (CCD) (CONTRACTOR) You are directed to prepare a cost proposal for the work described below and/or detailed on the attachment referred to: SOURCE OF CHANGE: DATE PROPOSAL REQUIRED:7/7/22 CHANGE ORIGINATED BY: Contractor (14 days from Request Date, unless other date agreed to) PROPOSAL REQUESTED BY: Contractor ARCHITECTCOR PM WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR: CONTRACT SUM: (WASHINGTON STATE SALES TAX EXCLUDED) In accordance with the general condition, Cost Estimate Detail Sheet(s) are attached hereto. CONTRACT TIME: OF 0 CALENDAR DAYS BY: CONTRACTOR SIGNATURE DATE We have carefully examined this proposal and find the cost to be reasonable.Therefore, we recommend acceptance. ARCHITECT DATE HEALTHPOINT DATE City of Renton Authorized Signature To be utilized for changes requested by HealthPoint CITY OF RENTON DATE CAG 21Ͳ180 Family First Community Center TO: Comer GC, Inc. The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full force and effect. We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until incorporation of this COP into a Change Order by the City of Renton. Roof edge details per roofing contractor recommendation.Not shown on plans. 06/15/22Proposal Request Date: EXPLANATION: Blocking required in defined areas for upturned edge requirements TO: Meredith Everist TO:Russ Woodruff of Two Thousand Six Hundred and Thirty Nine Dollars 2,639.00$ WE AGREE CONTRAC TO:Mered DATE PROP (14 days from You are direct SOURCE OF CONSTRU TO:Come Roof edge EXPLANATI NO CHANGE INCREASE DECREASE NO CHANGE INCREASE DECREASE Design Contractor Owner Code/AHJUnknown Conditions HealthPoint Other As required for installation of roof flashing. 7/18/22COMER GC, Inc. 7/19/2022                                                                1 Russ Woodruff From:Meredith Everist <everistm@baylisarchitects.com> Sent:Tuesday, July 12, 2022 11:26 AM To:Russ Woodruff Cc:16-0996 Family First Community Center Subject:FW: FFCC - CI-028 - Roof Edge Details - Added blocking required Per 6.15.22 Email Attachments:FFCC - CI-028 - Roof Edge Details - Added blocking required Per 6.15.22 Email.pdf HiRuss,IthinkthisCOisacceptablefortherecommendedframing.  Thanks,Meredith  Meredith Everist | AIA | NOMA | LEED AP BD+C Principal Pronouns: she | her 10801 Main Street, # 110 | Bellevue, WA 98004 O: 425.454.0566 D: 425.679.5205 F: 425.453.8013 everistm@baylisarchitects.com | BaylisArchitects.com Facebook | LinkedIn | Houzz  From:LukeComer<luke@comergc.com> Sent:Thursday,July7,20221:14PM To:'RussWoodruffͲCityofRenton'<rwoodruff@rentonwa.gov>;MeredithEverist<everistm@baylisarchitects.com> Cc:'TimComer'<tim@comergc.com>;JonScofield<jon@comergc.com> Subject:FFCCͲCIͲ028ͲRoofEdgeDetailsͲAddedblockingrequiredPer6.15.22Email  Team– Attachedispricingfor:FFCCͲCIͲ028ͲRoofEdgeDetailsͲAddedblockingrequiredPer6.15.22Email,which relatestotheadded2x8atroofedgeswithoutaguttertoallowfortheroofflashingtoattachtoblocking.  Thank you,  Luke Comer C:425Ͳ765Ͳ4118IP:425Ͳ636Ͳ8934IF:425Ͳ285Ͳ9785  CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.