Facilities Division CONTRACT NO:CAGͲ21Ͳ180 CO NO. 2
CONTRACT CHANGE ORDER (CO)PROJECT TITLE:FAMILY FIRST COMMUNITY CENTER
TO: COMER GC, Inc. (CONTRACTOR)
Description Amount
CCD 05ͲRevise Fire HydrantͲAHJ Fire Marshal Rqmts 5,914.00$
CCD 09ͲAdd PIV Per Fire Marshal 9,468.00$
CCD 13ͲUG Service Revisions HealthPoint Request 7,042.00$
CCD 20ͲStorm Drain Revisons Required By AHJ 3,234.00$
CCD 28ͲRoof Edge DetailsͲAdd Blocking 2,639.00$
Ͳ$
Ͳ$
Ͳ$
Subtotal 28,297.00$
WSST 2,858.00$
TOTAL THIS CHANGE ORDER 31,155.00$
CONTRACT SUM:
31,155.00$
(WASHINGTON STATE SALES TAX INCLUDED)
CONTRACT TIME:
0
CALENDAR DAYS
CONTRACT SUMMARY (Internal Use Only)
ORIGINAL CONTRACT SUM w/ WSST 12,474,330.00$
PREVIOUS ADDITIONS/DELETIONS 17,924.28$
PREVIOUS TOTAL 12,492,254.28$
CHANGE AMOUNT THIS CHANGE ORDER 31,155.00$
REVISED CONTRACT TOTAL 12,523,409.28$
PERCENT TOTAL CHANGE FROM ORIGINAL 0.39%
NOTICE TO PROCEED DATE February 25, 2022
PREVIOUS CONTRACT CALENDAR DAYS 0
PREVIOUS SUBSTANTIAL COMPLETION DATE February 25, 2023
REVISED CONTRACT CALENDAR DAYS THIS CHANGE ORDER 0
CURRENT SUBSTANTIAL COMPLETION DATE February 25, 2023
Architect AcknowledgementDate Contractor AcknowledgementDate
AUTHORIZING SIGNATURE DATE
The following mutually agreed to and Owner approved Contract Change Directive(s) are hereby incorporated by reference into the contract.
The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full force and
effect.
The City of Renton hereby accepts the foregoing changes. This formal acceptance constitutes a Change to the contract only when authorizing
signature is affixed. Invoices incorporating this Change Order constitute acceptance by the Contractor as total reimbursement due in
connection with this Change Order.
Thirty Two Thousand and Thirty Eight Dollars
OF:
CONTRACT
Description
CCD 05 ͲRevi
CCD 09 ͲAdd
CCD 13 ͲUG S
CCD 20 ͲStor
CCD 28 ͲRoof
The following
CONTRAC
TO:
m
NO CHANGE
INCREASE
DECREASE
NO CHANGE
INCREASE
DECREASE
7/19/2022 7/19/22
CAG-21-180, CO #2-22
PUBLIC WORKS
Facilities Division Project No:CCD # 5
CONSTRUCTION CHANGE DIRECTIVE Project Name:
(CCD)
(CONTRACTOR)
You are directed to prepare a cost proposal for the work described below and/or detailed on the attachment referred to:
SOURCE OF CHANGE:
DATE PROPOSAL REQUIRED:3/30/22 CHANGE ORIGINATED BY: AHJ
(14 days from Request Date, unless other date agreed to)
PROPOSAL REQUESTED BY: Contractor
ARCHITECTCOR PM
WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR:
CONTRACT SUM:
(WASHINGTON STATE SALES TAX EXCLUDED)
In accordance with the general condition, Cost Estimate Detail Sheet(s) are attached hereto.
CONTRACT TIME:
OF 0 CALENDAR DAYS
BY:
CONTRACTOR SIGNATURE DATE
We have carefully examined this proposal and find the cost to be reasonable.Therefore, we recommend acceptance.
ARCHITECT DATE HEALTHPOINT DATE
City of Renton Authorized Signature To be utilized for changes requested
by HealthPoint
CITY OF RENTON DATE
CAG 21Ͳ180
Family First Community Center
TO: Comer GC, Inc.
The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full
force and effect.
We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until
incorporation of this COP into a Change Order by the City of Renton.
Fire Marshal required hydrant install prior to the start of comustible construction.Hydrant required hot
tap and excavation not previously planned.
03/30/22Proposal Request Date:
EXPLANATION: Existing survey elevation discrepancy
TO: Meredith Everist TO:Russ Woodruff
Of Five Thousand Nine Hundred and Fourteen Dollars 5,914.00$
WE AGREE
CONTRAC
TO:Mered
DATE PROP
(14 days from
You are direct
SOURCE OF
Fire Marsh
tap and ex
EXPLANATI
CONSTRU
TO:Come
NO CHANGE
INCREASE
DECREASE
NO CHANGE
INCREASE
DECREASE
Design Contractor Owner Code/AHJUnknown Conditions HealthPoint Other
7/19/2022
7/19/2022COMER GC, Inc.
50441REGISTEREDP RP ORR FOO ESSIONOOANNLAAENGNNINENNEEEREEAARORNJ.JJFJELSTS A D
RPRPPPRPPRPPRPRPRPPRPPRP
AAAPP
AAAPP
APPPPPPPPP RPPRPRPR
AAAP
APPP
APP
AAAPPPPPP RPPRPRRPPPP
AFFFFFFFFFFFFFFFFFFFFFFFFFOOFOOFOOFOOFOOFFOOOFOOFOOFOOOFOOOOOOOFOOOOOOOOOOOFOOFOOOORRORORRRRORRRORRRRRRRRRRRRRRRRRRRRRRRRRRRRRRPRRPRPPPPRPPPPPPPPPPPPPPPPPPPPPPPPRRRRRRRPPPPPPPPRPPPPPPPPRPPRPPP
AAAAAAAAAAAAAFFFFFFFFFFFFFFOOFOOFOOFOOFOOFOOFOOFOOFOOOFOOFOFOOFOOOOOOOOOOOOOOOOFOFOOOORORORRRRRORRRRORRRRRRRRRRRPPPPPPPPPPPPRPPRRRRRPPPPPPPPPPPP
AAAAAAAAAAFFFFFFFFFFFFFFFFOOOOORRRRRORRRRRRRRRRRRRRRRRRRRRRRPRPRRPPRPPPPPPPPPPPPPPPPPPRPPPPPPPP
AAAAAATTTTTTTTTTTTTTTTTTTTTTT AATATATATTATTATTTATATATAATAATTTATTTTTTTTTTATATATATATATTATTATATAT
AAAAAANANAANAANANANANANASSSSSSSSSSSSSSSSSSSSSSSSSS0000000000000AAAAANANANANANANANANANANANANAAAAASSANSNSSSNSSSSSANSSSSSSSSSSSSSSSSSSSSSSSSS0000S0000000000AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAASSAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAASS4SSSSSSSS444S4SS44044044404ASS0AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAASSSAAAAAAAAAAAAAAAAASSS4SSSSS4444S4SSS404AAAAAAAAAAAASS0AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAASSSS4044404S4S00AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAOUOUNRGDTHEELERINNCLP801 SECOND AVENUE, SUITE 900 (206) 343-0460 SEATTLE, WA 98104 www.cplinc.com 0102040SCALE 1"=20'NW-28-23-5OUOUNRGDTHEELERINNCLP801 SECOND AVENUE, SUITE 900(206) 343-0460SEATTLE, WA 98104www.cplinc.comCall Before You Dig. 8-1-1 or 1-800-424-5555 Underground Service (USA)PROJECT NUMBER:PROJECT MANAGER:DRAWN BY:NO.DESCRIPTION DATETED-40-4110PROPOSALREQUEST #0101/27/20221 ADDENDUM 1 11/10/2139871REGISTEREDP RPP ORR FOO ESSIOINANNLAAENGNIGGNENNEEEREEREGURK
.NHTIEKPPPPPPPPPPP RPRRRRRRPRPRPPRRPRPPRRPRPRPRPPRPRPRPPRPRPRRPPRRRPPRPRRPRRRRRRRRRRPRPPRRPPPRPRPRPRPRPRPPRRPRRRRPPRPPRPRUUUUUUUUUUUUUUUUUUUUUUUUUUGGGGGGGEGEGEEGEEEGEEGEGEGEGEGGEGGEEEEGEEEGEEEEGEEEGEEEEEEEEEEEEEEEEEEEEEEEEGEEEEEEGEEGEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEREEEREEEEEEEEEEEEEEEEEEEEEEEEEEREEEEEEEEEEE
CONFORMED SET03/09/2022Existing Hydrantallowed to be utilizedtowards verticalconstruction need perFire MarshalExisting Hydrantallowed to be utilizedtowards verticalconstruction need perFire MarshalHotTap fire hydrantfor immediate installand operation perFire Marshal
1
Russ Woodruff
Subject:FW: FFCC - CI-005 - Fire Marshal Requirements - Vertical Construction
Attachments:CCD 28 - Roof Edge Details - Add Blocking.pdf
Russ Woodruff | Capital Project Coordinator
City of Renton – Public Works
1055 S. Grady Way – 5th Floor - Renton WA. 98057
Working remotely and can be reached via:
206-556-5026
rwoodruff@rentonwa.gov
From:MeredithEverist<everistm@baylisarchitects.com>
Sent:Friday,July15,20223:19PM
To:RussWoodruff<RWoodruff@Rentonwa.gov>;luke@comergc.com
Cc:16Ͳ0996FamilyFirstCommunityCenter<16Ͳ0996@baylisarchitects.com>
Subject:RE:FFCCͲCIͲ005ͲFireMarshalRequirementsͲVerticalConstruction
HIRuss,IthinkCCD#5looksgood.
Thanks,Meredith
Meredith Everist | AIA | NOMA | LEED AP BD+C
Principal
Pronouns: she | her
10801 Main Street, # 110 | Bellevue, WA 98004
O: 425.454.0566 D: 425.679.5205 F: 425.453.8013
everistm@baylisarchitects.com | BaylisArchitects.com
Facebook | LinkedIn | Houzz
From:RussWoodruff<RWoodruff@Rentonwa.gov>
Sent:Friday,July15,20229:44AM
To:MeredithEverist<everistm@baylisarchitects.com>;luke@comergc.com
Subject:FW:FFCCͲCIͲ005ͲFireMarshalRequirementsͲVerticalConstruction
HiMeredith,
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless
you know the content is safe.
PUBLIC WORKS
Facilities Division Project No:CCD # 9
CONSTRUCTION CHANGE DIRECTIVE Project Name:
(CCD)
(CONTRACTOR)
You are directed to prepare a cost proposal for the work described below and/or detailed on the attachment referred to:
SOURCE OF CHANGE:
DATE PROPOSAL REQUIRED:7/6/22 CHANGE ORIGINATED BY: AHJ
(14 days from Request Date, unless other date agreed to)
PROPOSAL REQUESTED BY: Contractor
ARCHITECTCOR PM
WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR:
CONTRACT SUM:
(WASHINGTON STATE SALES TAX EXCLUDED)
In accordance with the general condition, Cost Estimate Detail Sheet(s) are attached hereto.
CONTRACT TIME:
OF 0 CALENDAR DAYS
BY:
CONTRACTOR SIGNATURE DATE
We have carefully examined this proposal and find the cost to be reasonable.Therefore, we recommend acceptance.
ARCHITECT DATE HEALTHPOINT DATE
City of Renton Authorized Signature To be utilized for changes requested
by HealthPoint
CITY OF RENTON DATE
9,468.00$
CAG 21Ͳ180
Family First Community Center
TO: Comer GC, Inc.
The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full
force and effect.
We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until
incorporation of this COP into a Change Order by the City of Renton.
Add PIV per Fire Marshal requirementsͲnot shown on plans
05/25/22Proposal Request Date:
EXPLANATION: Fire Marshal required added PIV.Not on previously approved plans.
TO: Meredith Everist TO:Russ Woodruff
of Nine Thousand Four Hundred and Sixty Eight Dollars
WE AGREE
CONTRAC
TO:Mered
DATE PROP
(14 days from
You are direct
SOURCE OF
CONSTRU
TO:Come
Add PIV pe
EXPLANATI
NO CHANGE
INCREASE
DECREASE
NO CHANGE
INCREASE
DECREASE
Design Contractor Owner Code/AHJUnknown Conditions HealthPoint Other
7/18/22COMER GC, Inc.
7/19/2022
1
Russ Woodruff
From:Meredith Everist <everistm@baylisarchitects.com>
Sent:Tuesday, July 12, 2022 8:55 AM
To:Russ Woodruff
Cc:16-0996 Family First Community Center
Subject:FW: FFCC - CI-009 - CCD-002 - UG Fire Review - PIV required
Attachments:FFCC - CI-009 - CCD-002 - UG Fire Review - PIV required_.pdf
HiRuss,wetakenoexceptionstothisCO.
Thanks,Meredith
Meredith Everist | AIA | NOMA | LEED AP BD+C
Principal
Pronouns: she | her
10801 Main Street, # 110 | Bellevue, WA 98004
O: 425.454.0566 D: 425.679.5205 F: 425.453.8013
everistm@baylisarchitects.com | BaylisArchitects.com
Facebook | LinkedIn | Houzz
From:LukeComer<luke@comergc.com>
Sent:Wednesday,July6,20223:03PM
To:'RussWoodruff'<RWoodruff@Rentonwa.gov>;MeredithEverist<everistm@baylisarchitects.com>
Cc:'TimComer'<tim@comergc.com>;'JonScofield'<jon@comergc.com>
Subject:FFCCͲCIͲ009ͲCCDͲ002ͲUGFireReviewͲPIVrequired
Team–
Attachedispricingfor:FFCCͲCIͲ009ͲCCDͲ002ͲUGFireReviewͲPIVrequired,whichrelatestotheFire
MarshalrequirementsforaddingaPIVtothefiressystem,whichincludestyingintothefirealarmsystem.
Thank you,
Luke Comer
C:425Ͳ765Ͳ4118IP:425Ͳ636Ͳ8934IF:425Ͳ285Ͳ9785
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless
you know the content is safe.
PUBLIC WORKS
Facilities Division Project No:CCD # 20
CONSTRUCTION CHANGE DIRECTIVE Project Name:
(CCD)
(CONTRACTOR)
You are directed to prepare a cost proposal for the work described below and/or detailed on the attachment referred to:
SOURCE OF CHANGE:
DATE PROPOSAL REQUIRED:7/7/22 CHANGE ORIGINATED BY: Contractor
(14 days from Request Date, unless other date agreed to)
PROPOSAL REQUESTED BY: Contractor
ARCHITECTCOR PM
WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR:
CONTRACT SUM:
(WASHINGTON STATE SALES TAX EXCLUDED)
In accordance with the general condition, Cost Estimate Detail Sheet(s) are attached hereto.
CONTRACT TIME:
OF 0 CALENDAR DAYS
BY:
CONTRACTOR SIGNATURE DATE
We have carefully examined this proposal and find the cost to be reasonable.Therefore, we recommend acceptance.
ARCHITECT DATE HEALTHPOINT DATE
City of Renton Authorized Signature To be utilized for changes requested
by HealthPoint
CITY OF RENTON DATE
Family First Community Center
TO: Comer GC, Inc.
The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full
force and effect.
We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until
incorporation of this COP into a Change Order by the City of Renton.
City Inspector required change in storm drain connections from previously approved plans.
05/18/22Proposal Request Date:
EXPLANATION: City insector (AHJ) required changes for SD connections
TO: Meredith Everist TO:Russ Woodruff
of Three Thousand Two Hundred and Thirty Four Dollars 3,234.00$
CAG 21Ͳ180
WE AGREE
CONTRAC
TO:Mered
DATE PROP
(14 days from
You are direct
SOURCE OF
CONSTRU
TO:Come
City Inspec
EXPLANATI
NO CHANGE
INCREASE
DECREASE
NO CHANGE
INCREASE
DECREASE
Design Contractor Owner Code/AHJUnknown Conditions HealthPoint Other
COMER GC, Inc.7/18/2022
7/14/2022
1
Russ Woodruff
From:Meredith Everist <everistm@baylisarchitects.com>
Sent:Tuesday, July 12, 2022 8:56 AM
To:Russ Woodruff
Cc:16-0996 Family First Community Center
Subject:FW: FFCC - CI-020 - RFI-013 - Storm Connections Per City of Renton @ SD#62
Attachments:FFCC - CI-020 - RFI-013 - Storm Connections Per City of Renton @ SD#62.pdf
HIRuss,noexceptionstothisCO#020.
Thanks,Meredith
Meredith Everist | AIA | NOMA | LEED AP BD+C
Principal
Pronouns: she | her
10801 Main Street, # 110 | Bellevue, WA 98004
O: 425.454.0566 D: 425.679.5205 F: 425.453.8013
everistm@baylisarchitects.com | BaylisArchitects.com
Facebook | LinkedIn | Houzz
From:LukeComer<luke@comergc.com>
Sent:Thursday,July7,20229:59AM
To:'RussWoodruff'<RWoodruff@Rentonwa.gov>;MeredithEverist<everistm@baylisarchitects.com>
Cc:'TimComer'<tim@comergc.com>;'JonScofield'<jon@comergc.com>
Subject:FFCCͲCIͲ020ͲRFIͲ013ͲStormConnectionsPerCityofRenton@SD#62
Team–
Attachedispricingfor:FFCCͲCIͲ020ͲRFIͲ013ͲStormConnectionsPerCityofRenton@SD#62,whichrelates
tothescopedescribedinRFIͲ013,essentiallyrunningthefirevaultdraintotheclosesmanholepertheCityofRenton.
Thank you,
Luke Comer
C:425Ͳ765Ͳ4118IP:425Ͳ636Ͳ8934IF:425Ͳ285Ͳ9785
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless
you know the content is safe.
PUBLIC WORKS
Facilities Division Project No:CCD # 28
CONSTRUCTION CHANGE DIRECTIVE Project Name:
(CCD)
(CONTRACTOR)
You are directed to prepare a cost proposal for the work described below and/or detailed on the attachment referred to:
SOURCE OF CHANGE:
DATE PROPOSAL REQUIRED:7/7/22 CHANGE ORIGINATED BY: Contractor
(14 days from Request Date, unless other date agreed to)
PROPOSAL REQUESTED BY: Contractor
ARCHITECTCOR PM
WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR:
CONTRACT SUM:
(WASHINGTON STATE SALES TAX EXCLUDED)
In accordance with the general condition, Cost Estimate Detail Sheet(s) are attached hereto.
CONTRACT TIME:
OF 0 CALENDAR DAYS
BY:
CONTRACTOR SIGNATURE DATE
We have carefully examined this proposal and find the cost to be reasonable.Therefore, we recommend acceptance.
ARCHITECT DATE HEALTHPOINT DATE
City of Renton Authorized Signature To be utilized for changes requested
by HealthPoint
CITY OF RENTON DATE
CAG 21Ͳ180
Family First Community Center
TO: Comer GC, Inc.
The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full
force and effect.
We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until
incorporation of this COP into a Change Order by the City of Renton.
Roof edge details per roofing contractor recommendation.Not shown on plans.
06/15/22Proposal Request Date:
EXPLANATION: Blocking required in defined areas for upturned edge requirements
TO: Meredith Everist TO:Russ Woodruff
of Two Thousand Six Hundred and Thirty Nine Dollars 2,639.00$
WE AGREE
CONTRAC
TO:Mered
DATE PROP
(14 days from
You are direct
SOURCE OF
CONSTRU
TO:Come
Roof edge
EXPLANATI
NO CHANGE
INCREASE
DECREASE
NO CHANGE
INCREASE
DECREASE
Design Contractor Owner Code/AHJUnknown Conditions HealthPoint Other
As required for
installation of
roof flashing.
7/18/22COMER GC, Inc.
7/19/2022
1
Russ Woodruff
From:Meredith Everist <everistm@baylisarchitects.com>
Sent:Tuesday, July 12, 2022 11:26 AM
To:Russ Woodruff
Cc:16-0996 Family First Community Center
Subject:FW: FFCC - CI-028 - Roof Edge Details - Added blocking required Per 6.15.22 Email
Attachments:FFCC - CI-028 - Roof Edge Details - Added blocking required Per 6.15.22 Email.pdf
HiRuss,IthinkthisCOisacceptablefortherecommendedframing.
Thanks,Meredith
Meredith Everist | AIA | NOMA | LEED AP BD+C
Principal
Pronouns: she | her
10801 Main Street, # 110 | Bellevue, WA 98004
O: 425.454.0566 D: 425.679.5205 F: 425.453.8013
everistm@baylisarchitects.com | BaylisArchitects.com
Facebook | LinkedIn | Houzz
From:LukeComer<luke@comergc.com>
Sent:Thursday,July7,20221:14PM
To:'RussWoodruffͲCityofRenton'<rwoodruff@rentonwa.gov>;MeredithEverist<everistm@baylisarchitects.com>
Cc:'TimComer'<tim@comergc.com>;JonScofield<jon@comergc.com>
Subject:FFCCͲCIͲ028ͲRoofEdgeDetailsͲAddedblockingrequiredPer6.15.22Email
Team–
Attachedispricingfor:FFCCͲCIͲ028ͲRoofEdgeDetailsͲAddedblockingrequiredPer6.15.22Email,which
relatestotheadded2x8atroofedgeswithoutaguttertoallowfortheroofflashingtoattachtoblocking.
Thank you,
Luke Comer
C:425Ͳ765Ͳ4118IP:425Ͳ636Ͳ8934IF:425Ͳ285Ͳ9785
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless
you know the content is safe.